CN209179411U - Variety classes floor flushes structure - Google Patents

Variety classes floor flushes structure Download PDF

Info

Publication number
CN209179411U
CN209179411U CN201821940376.0U CN201821940376U CN209179411U CN 209179411 U CN209179411 U CN 209179411U CN 201821940376 U CN201821940376 U CN 201821940376U CN 209179411 U CN209179411 U CN 209179411U
Authority
CN
China
Prior art keywords
transverse slat
slabstone
floor
timber floor
screed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821940376.0U
Other languages
Chinese (zh)
Inventor
李静
谢锦川
檀东健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Boshen Engineering Technology Co Ltd
Original Assignee
Shenzhen Boshen Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Boshen Engineering Technology Co Ltd filed Critical Shenzhen Boshen Engineering Technology Co Ltd
Priority to CN201821940376.0U priority Critical patent/CN209179411U/en
Application granted granted Critical
Publication of CN209179411U publication Critical patent/CN209179411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

Structure, including base are flushed the utility model relates to a kind of variety classes floor, slabstone, timber floor are equipped in the base, flat profile is provided between the slabstone and the timber floor;The flat profile includes transverse slat, filler rod, and the filler rod is set to the transverse slat bottom, and perpendicular to the transverse slat center arrangement, the transverse slat is overlapped in the slabstone and the timber floor filler rod.Slabstone can be connected to together with timber floor without indisposed Horizon by the utility model, when pedestrian gap of the trip between slabstone and timber floor, not feel as difference in height, and flat Snap-bar structure is simple, have versatile, and installation is convenient and solid and reliable effect.

Description

Variety classes floor flushes structure
Technical field
The utility model relates to the technical fields of floor splicing, flush structure more particularly, to variety classes floor.
Background technique
Currently, ground can be divided into different parts from the combined and spliced of timber floor by slabstone, the splicing construction of the two is wide It is general to be applied to family, office, in advanced place.
Existing slabstone is different from timber floor thickness, may cause the two edge after splicing not on sustained height, deposits In difference in height, pedestrian's walking is influenced, while the two uses for a long time, may generate in slabstone and timber floor edge quick-fried Side, notch influence the service life of slabstone and timber floor.
Prior art among the above have the following deficiencies: 1. slabstones and timber floor splicing after not on sustained height; 2. slabstone with it is easily damaged at edge of carpet, to generate defect, influence service life.
Utility model content
Structure is flushed the purpose of the utility model is to provide variety classes floor, has and alleviates slabstone and timber floor height Spend difference, the effect that both protections edge is not damaged.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of variety classes floor flushes structure, including base, and slabstone, timber floor are equipped in the base, described Flat profile is provided between slabstone and the timber floor;
The flat profile includes transverse slat, filler rod, and the filler rod is set to the transverse slat bottom, and the filler rod is perpendicular to described Transverse slat center arrangement, the transverse slat are overlapped in the slabstone and the timber floor.
By using above-mentioned technical proposal, right angle is covered on the side of slabstone and timber floor at transverse slat and the two of filler rod composition On at edge, so as to protect the two edge not damaged by the external world, slabstone and timber floor are indirectly connected by flat profile, the two side It is connected at edge by transverse slat, and then transverse slat can cover difference in height existing for the two edge, and slabstone and timber floor is enable to put down Arrangement is connect, slabstone without indisposed is connected to together with timber floor, when pedestrian gap of the trip between slabstone and timber floor, no It may feel that difference in height.
Further, arrange that the transverse slat maximum width is set as 24mm in the arcwall face of convex at the top of the transverse slat, Maximum gauge is set as 1.5mm.
By using above-mentioned technical proposal, transverse slat setting width just covers slabstone timber floor edge, if too wide, shadow The aesthetics of phonolite plate and timber floor splicing construction, if too narrow, transverse slat cannot effectively cover the edge of slabstone and timber floor, horizontal Plate setting thickness, which is subject to, does not influence pedestrian's walking, and 1.5mm arrangement can effectively protect the edge of slabstone and timber floor, and not Pedestrian's walking is influenced, pedestrian walks when on transverse slat, will not be too big because of its thickness, generate strong sole sense of touch.
Further, the transverse slat surface is provided with anti-slip layer.
By using above-mentioned technical proposal, anti-slip layer can effectively increase the frictional force between pedestrian's sole and transverse slat surface, In order to avoid because transverse slat surface is excessively smooth cause pedestrian to walk when the security risk skidded.
Further, be provided with wire-drawing surface at the transverse slat bottom at least one, the wire-drawing surface be set to the transverse slat with The slabstone and the timber floor lap-joint, the lines of the wire-drawing surface are parallel to the transverse slat length direction arrangement.
By using above-mentioned technical proposal, wire-drawing surface cross section is arranged in trough shape, surface area be greater than transverse slat top surface Surface, and transverse slat can be made in the vertical direction become more flexible, if slabstone or timber floor edge are uneven, wire-drawing surface can be with its table Face adhered shape on it, and then can enhance transverse slat in the laminating degree of slabstone and timber floor edge, the versatility of flat profile It is stronger.
Further, be provided with silica gel face at the transverse slat bottom at least one, the silica gel face be set to the transverse slat with The slabstone and the timber floor lap-joint, the silica gel face are parallel to the transverse slat length direction arrangement.
By using above-mentioned technical proposal, silica gel face has the viscosity of strength, and transverse slat can be bonded in slabstone and wood ground Plate edge, transverse slat can be secured firmly on the two edge, be not easy to produce the defect of structure loosely even if using for a long time.
Further, the filler rod bottom end is provided with barb, and the filler rod maximum height is set as 6.5mm.
By using above-mentioned technical proposal, after filler rod is inserted into the gap of slabstone and timber floor, work that filler rod passes through barb It is not easy to transfer to out of slabstone and timber floor gap under, and then strengthens the fastness of flat profile in the vertical direction, filler rod is long Degree is no more than slabstone or timber floor minimum thickness and arranges, so as not to filler rod it is too long and caused by install it is inconvenient.
Further, the base includes floor layer, the first screed-coat, the second screed-coat, first screed-coat and institute It states the second screed-coat to be all set on the floor layer, adhesive layer is provided on first screed-coat, the slabstone passes through institute It states adhesive layer to be fixed on the screed-coat, second screed-coat edge is provided with partition, the partition other end and institute It states the first screed-coat edge to be connected, timber floor bottom is provided on second screed-coat, the timber floor is set to the wood On the bottom of floor.
By using above-mentioned technical proposal, the first screed-coat and the second screed-coat are that slabstone and timber floor horizontal can be laid with and mention For condition, screed-coat is divided into the part of two different heights, makes slabstone and the timber floor energy after laying that thickness is different by partition It keeps in the same horizontal line, adhesive layer uses the side of edge mortise-tenon joint for fixing slabstone, the paving mode of timber floor Formula, timber floor bottom can make timber floor absorption on it, and then timber floor is enable to be laid on the second screed-coat indirectly.
In conclusion the utility model has the following beneficial effects: 1. slabstones without indisposed are connected to together with timber floor, pedestrian Go on a journey gap between slabstone and timber floor when, do not feel as difference in height;2. flat Snap-bar structure is simple, versatile, Installation is convenient and solid and reliable.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that slabstone and timber floor flush in the utility model embodiment one;
Fig. 2 is the structural schematic diagram of the utility model embodiment one;
Fig. 3 is the structural schematic diagram of the utility model embodiment two;
Fig. 4 is the structural schematic diagram of the utility model embodiment three.
In figure, 1, base;11, floor layer;12, the first screed-coat;121, adhesive layer;13, the second screed-coat;131, every It is disconnected;132, timber floor bottom;2, slabstone;3, timber floor;4, flat profile;41, transverse slat;411, wire-drawing surface;412, silica gel face;42, Filler rod;421, barb.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment one:
Referring to Figures 1 and 2, structure, including base 1 are flushed for a kind of variety classes floor disclosed by the utility model (base is made of floor layer 11, the first screed-coat 12, the second screed-coat 13, does not identify in figure), be equipped in base 1 slabstone 2, Timber floor 3 is provided with flat profile 4 between slabstone 2 and timber floor 3, flat profile 4 includes transverse slat 41, filler rod 42, and filler rod 42 is set to 41 bottom of transverse slat, perpendicular to 41 center arrangement of transverse slat, transverse slat 41 is overlapped in slabstone 2 and timber floor 3 filler rod 42.
Right angle is covered on the edge of slabstone 2 and timber floor 3 at transverse slat 41 and the two of the composition of filler rod 42, so as to protect Both shields edge is not damaged by the external world, and slabstone 2 is indirectly connected with timber floor 3 by flat profile 4, and the two passes through cross on edge Plate 41 connects, and then transverse slat 41 can cover difference in height existing for the two edge, and slabstone 2 and timber floor 3 is enable to flush arrangement, Slabstone 2 without indisposed is connected to together with timber floor 3, it, will not when pedestrian gap of the trip between slabstone 2 and timber floor 3 Feel difference in height.
It is arranged at the top of transverse slat 41 in the arcwall face of convex, 41 maximum width of transverse slat is set as 24mm, maximum gauge setting For 1.5mm, the setting width of transverse slat 41, which just covers 2 timber floor of slabstone, 3 edge, influences slabstone 2 and timber floor 3 if too wide The aesthetics of splicing construction, if too narrow, transverse slat 41 cannot effectively cover the edge of slabstone 2 Yu timber floor 3, and thickness is arranged in transverse slat 41 Degree, which is subject to, does not influence pedestrian's walking, and 1.5mm arrangement can effectively protect the edge of slabstone 2 Yu timber floor 3, and does not influence to go People's walking, pedestrian walk when on transverse slat 41, will not be too big because of its thickness, generate strong sole sense of touch, the setting of 41 surface of transverse slat There is anti-slip layer, anti-slip layer can effectively increase the frictional force between 41 surface of pedestrian's sole and transverse slat, in order to avoid because of 41 surface mistake of transverse slat In the security risk that smooth and while causing pedestrian to walk skids.
42 bottom end of filler rod is provided with barb 421, and 42 maximum height of filler rod is set as 6.5mm, and filler rod 42 is inserted into slabstone 2 and wood After in the gap on floor 3, filler rod 42 is not easy to transfer to out of slabstone 2 and timber floor 3 gap under the action of passing through barb 421, in turn The fastness of flat profile 4 in the vertical direction, the of length no more than slabstone 2 of filler rod 42 or 3 minimum thickness of timber floor arrangement are strengthened, In order to avoid filler rod 42 it is too long and caused by install it is inconvenient.
Base 1 includes floor layer 11, the first screed-coat 12, the second screed-coat 13, the first screed-coat 12 and the second screed-coat 13 are all set on floor layer 11, and adhesive layer 121 is provided on the first screed-coat 12, and slabstone 2 is fixed on by adhesive layer 121 to be looked for On leveling, 13 edge of the second screed-coat is provided with partition 131, and 131 other ends of partition are connected with 12 edge of the first screed-coat, the Timber floor bottom 132 is provided on two screed-coats 13, timber floor 3 is set on timber floor bottom 132.
First screed-coat 12 and the second screed-coat 13 horizontal can be laid with the condition that provides, partition 131 for slabstone 2 and timber floor 3 Screed-coat is divided into the part of two different heights, is able to maintain slabstone 2 that thickness is different and timber floor 3 same after laying On horizontal line, adhesive layer 121 is for fixing slabstone 2, and the paving mode of timber floor 3 is by the way of the mortise-tenon joint of edge, wood Floor bottom 132 can make the absorption of timber floor 3 on it, and then timber floor 3 is enable to be laid on the second screed-coat 13 indirectly.
The implementation principle of the present embodiment are as follows: slabstone 2 and timber floor 3 are indirectly coupled to the first screed-coat 12 and the second screed-coat After 13, under the adjusting by 13 different height of the first screed-coat 12 and the second screed-coat, 2 surface of slabstone and 3 surface of timber floor can It is arranged in same horizontal line, flat profile 4 is inserted at the gap of slabstone 2 and timber floor 3,2 surface of slabstone and timber floor 3 can be made Surface links together, to alleviate existing difference in height therebetween, so that slabstone 2 and timber floor 3 is flushed arrangement, together When flat profile 4 can protect the edge of slabstone 2 and timber floor 3, avoid it from being damaged by the external world, be provided with barb on filler rod 42 421, firmness of the flat profile 4 between slabstone 2 and timber floor 3 can be reinforced, so as to make slabstone 2 and timber floor 3 splice knot Structure is stablized.
Embodiment two:
Referring to Fig. 3, a kind of variety classes floor flushes structure, and is in place of the difference of embodiment one: 41 bottom of transverse slat Portion is provided with wire-drawing surface 411 at two, is respectively arranged at transverse slat 41 and 3 Liang Chu lap-joint of slabstone 2 and timber floor, wire-drawing surface 411 Lines is parallel to 41 length direction of transverse slat arrangement.
411 cross section of wire-drawing surface arranges in trough shape, surface area be greater than 41 top surface surface of transverse slat, and transverse slat 41 can be made Become more flexible in the vertical direction, if slabstone 2 or 3 edge of timber floor are uneven, wire-drawing surface 411 can be bonded with its surface shape On it, and then transverse slat 41 can be enhanced in the laminating degree of 3 edge of slabstone 2 and timber floor, the versatility of flat profile 4 is stronger.
Embodiment three:
Referring to Fig. 4, a kind of variety classes floor flushes structure, with embodiment one the difference is that: 41 bottom of transverse slat Portion is provided with silica gel face 412 at two, is respectively arranged at transverse slat 41 and 3 two sides lap-joint of slabstone 2 and timber floor, and silica gel face 412 is flat Row arranges that silica gel face 412 has the viscosity of strength in 41 length direction of transverse slat, and transverse slat 41 can be bonded in slabstone 2 and wood ground 3 edge of plate, transverse slat 41 both can be secured firmly on edge, even if for a long time using being not easy to produce structure lacking loosely It falls into.
The embodiment of present embodiment is the preferred embodiment of the utility model, and non-sequential limitation is originally practical new The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all cover practical with this Within novel protection scope.

Claims (7)

1. a kind of variety classes floor flushes structure, including base (1), it is characterised in that: be equipped with stone on the base (1) Plate (2), timber floor (3), are provided with flat profile (4) between the slabstone (2) and the timber floor (3);
The flat profile (4) includes transverse slat (41), filler rod (42), and the filler rod (42) is set to the transverse slat (41) bottom, institute Filler rod (42) is stated perpendicular to the transverse slat (41) center arrangement, the transverse slat (41) is overlapped in the slabstone (2) and the wood ground On plate (3).
2. variety classes floor according to claim 1 flushes structure, it is characterised in that: be at the top of the transverse slat (41) The arcwall face of convex arranges that transverse slat (41) maximum width is set as 24mm, and maximum gauge is set as 1.5mm.
3. variety classes floor according to claim 1 flushes structure, it is characterised in that: transverse slat (41) surface is set It is equipped with anti-slip layer.
4. variety classes floor according to claim 1 flushes structure, it is characterised in that: transverse slat (41) bottom is extremely It is provided with wire-drawing surface (411) at few one, the wire-drawing surface (411) is set to the transverse slat (41) and the slabstone (2) and described Timber floor (3) lap-joint, the lines of the wire-drawing surface (411) are parallel to the transverse slat (41) length direction arrangement.
5. variety classes floor according to claim 1 flushes structure, it is characterised in that: transverse slat (41) bottom is extremely It is provided with silica gel face (412) at few one, the silica gel face (412) is set to the transverse slat (41) and the slabstone (2) and described Timber floor (3) lap-joint, the silica gel face (412) are parallel to the transverse slat (41) length direction arrangement.
6. variety classes floor according to claim 1 flushes structure, it is characterised in that: filler rod (42) bottom end is set It is equipped with barb (421), filler rod (42) maximum height is set as 6.5mm.
7. variety classes floor according to claim 1 flushes structure, it is characterised in that: the base (1) includes building Plate layer (11), the first screed-coat (12), the second screed-coat (13), first screed-coat (12) and second screed-coat (13) It is all set on the floor layer (11), is provided with adhesive layer (121) on first screed-coat (12), the slabstone (2) is logical The adhesive layer (121) to be crossed to be fixed on the screed-coat, the second screed-coat (13) edge is provided with partition (131), Partition (131) other end is connected with the first screed-coat (12) edge, is provided with wood on second screed-coat (13) Floor bottom (132), the timber floor (3) are set on the timber floor bottom (132).
CN201821940376.0U 2018-11-22 2018-11-22 Variety classes floor flushes structure Active CN209179411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821940376.0U CN209179411U (en) 2018-11-22 2018-11-22 Variety classes floor flushes structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821940376.0U CN209179411U (en) 2018-11-22 2018-11-22 Variety classes floor flushes structure

Publications (1)

Publication Number Publication Date
CN209179411U true CN209179411U (en) 2019-07-30

Family

ID=67374026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821940376.0U Active CN209179411U (en) 2018-11-22 2018-11-22 Variety classes floor flushes structure

Country Status (1)

Country Link
CN (1) CN209179411U (en)

Similar Documents

Publication Publication Date Title
CN104863285A (en) Heat-preservation decorative wall body and construction method of same
CN209179411U (en) Variety classes floor flushes structure
CN209670222U (en) Precast stair
CN2883549Y (en) Hollow slide block type floor keel
CN204738495U (en) Built -in rubber and plastic sponge fossil fragments of mating formation
CN207959817U (en) A kind of removable dismounting wood floors of insertion slot type
CN214498232U (en) Self-adhesion floor with anti-rupture structure
CN203412160U (en) Multifunctional novel structural composite roof
CN103334528B (en) Multifunction structure combination roof
CN211666161U (en) Composite floor paving structure
CN205742864U (en) A kind of environment-friendly type Wood-plastic floor
KR20180087603A (en) Environment-Friendly and High-Strength Composite Decking Assembly with Enhanced Durability
CN112814318A (en) Tunnel portal wall stone facing structure and construction method
CN211850483U (en) Novel stair carpet
CN206667677U (en) A kind of dismountable spring stage floor
CN206737344U (en) A kind of wooden inorganic compounding stone plate of water-proof fire-retardant
CN205295833U (en) Brick permeates water in gap convenient to drainage
CN211523953U (en) Be used for carpet ground and threshold stone connected node structure
CN204753858U (en) Whole rock wool board insulation construction of high -rise outer wall
CN209760689U (en) Wood floor and passing stone joint structure
CN214941975U (en) Expansion joint anti-deformation device for paving floor panel
CN219793495U (en) Wear-resistant and anti-slip ecological paving stone
JP7426354B2 (en) Floor material support and floating floor structure using it
CN211817643U (en) Connecting structure of PVC (polyvinyl chloride) ground and ceramic tile ground
CN204298708U (en) Arrangement of reinforcement compound outdoor ground brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant