CN209178936U - A kind of gas shield dam fixed infrastructure - Google Patents

A kind of gas shield dam fixed infrastructure Download PDF

Info

Publication number
CN209178936U
CN209178936U CN201821684020.5U CN201821684020U CN209178936U CN 209178936 U CN209178936 U CN 209178936U CN 201821684020 U CN201821684020 U CN 201821684020U CN 209178936 U CN209178936 U CN 209178936U
Authority
CN
China
Prior art keywords
foundation
dam
installation
gas shield
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821684020.5U
Other languages
Chinese (zh)
Inventor
洪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Shoukong Environmental Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821684020.5U priority Critical patent/CN209178936U/en
Application granted granted Critical
Publication of CN209178936U publication Critical patent/CN209178936U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

Gas shield provided by the utility model dam fixed infrastructure, it realizes not only rely on bolt anchorage effect and realize by the structures such as path clearance between installation foundation, dam body foundation and the installation foundation on dam body foundation and installation bolt, limit salient point and the fixed of gas scuta, air bag and hermetic seal band is limited, structure is formed by installation foundation itself simultaneously and realizes that the limit to hermetic seal band and air bag is reinforced with the mating reaction of dam body foundation, effectively improves the integral installation stability on gas shield dam.

Description

A kind of gas shield dam fixed infrastructure
Technical field
The utility model belongs to gas shield dam technical field, and in particular to a kind of gas shield dam fixed infrastructure.
Background technique
Scuta and air bag in existing gas shield dam are to be fixed on coagulation by bolt or rivet by basic fixed plate On earth foundation, fixed plate and bolt or rivet etc. only rely on bolt all on mounting plane same as gas scuta and air bag Anchorage effect, stability is poor.
Utility model content
The purpose of the utility model is to overcome the anchorage effects that existing gas shield dam fixed structure only relies on bolt, consolidate The poor problem of property.
In order to achieve the above object, the utility model provides a kind of gas shield dam fixed infrastructure, including dam body foundation, it is described Include an installation foundation on dam body foundation, one is arranged between the installation foundation and the dam body foundation from the installation foundation front end side Extend downwards, behind the bottom surface of the installation foundation obliquely, the path clearance that extends back;
A lug boss is set on the front end top surface of the installation foundation, a cross-perforating is opened up on the lug boss;
The tail end lug boss of one extension tilted backwards is set on the rear end top surface of the installation foundation, the tail end lug boss The perforation on a vertical inclined-plane is opened up on inclined-plane;
The top center of the installation foundation opens up a vertical threaded bore;
The bolt of installation hermetic seal band is provided at the path clearance of the bottom surface front end face of the installation foundation With the upper lower platen of the upper and lower sides for the lower end for being separately positioned on the hermetic seal band;
The bottom surface of the tail end lug boss is provided at least two the first salient points along inclined-plane extending direction arrangement;
It is provided on the rear end inclined-plane of the path clearance corresponding with first salient point and first salient point cooperation Second salient point.
The advantages of the utility model is as follows: structure is simple, easily fabricated and installation, especially by the anchorage effect of bolt While, cooperation and self structure position-limiting action by installation foundation and dam body foundation effectively improve the entirety on gas shield dam Stability is installed.
It elaborates with reference to the accompanying drawings and examples to the utility model.
Detailed description of the invention
Fig. 1 is a kind of gas shield dam fixed infrastructure schematic diagram.
Fig. 2 is a kind of secondary gas shield dam structural schematic diagram.
Fig. 3 is double bolloon gas shield dam structural schematic diagram.
Specific embodiment
It is a kind of gas shield dam fixed infrastructure, including dam body foundation 1 (i.e. concrete foundation) shown in Fig. 1, in order to overcome Mounting plate existing for existing mounting structure and screw or rivet are easily damaged the problem of causing maintenance cost to increase, the present embodiment Include an installation foundation 2 on the dam body foundation 1 of offer, one is arranged between the installation foundation 2 and dam body foundation 1 from the installation foundation 2 front end sides extend downwards, behind the bottom surface of installation foundation 2 obliquely, the path clearance 3 that extends back, used for installation connection Hermetic seal band 9 and air bag 12 provide installation space.
It is high-visible by Fig. 1, a lug boss 4 is set on the front end top surface of installation foundation 2, a cross is opened up on the lug boss 4 To perforation 5, scuta 14 is mounted on installation foundation 2 by bolt or pin shaft;And it is arranged one on the rear end top surface of installation foundation 2 The tail end lug boss 6 of extension tilted backwards opens up the perforation 7 on a vertical inclined-plane on the inclined-plane of the tail end lug boss 6, by Caging bolt is installed in the perforation 7 and realizes that the extruding to 12 tail end of air bag limits;The top center of installation foundation 2 opens up one Installation foundation 2 is fixed on dam body foundation 1 after the vertical threaded bore 8 by vertical threaded bore 8 by fixing bolt 13.
The bolt and difference of installation hermetic seal band 9 are provided at the path clearance 3 of the bottom surface front end face of installation foundation 2 The upper lower platen of the upper and lower sides of the lower end of hermetic seal band 9 is set;Wherein, lower platen is fixed on dam body by pre-embedded bolt 20 On basis 1.The lower end of hermetic seal band 9 is fixed on dam body foundation 1 by upper lower platen and bolt, while will by bolt The upper end of hermetic seal band 9 is fixed on the top of lug boss 4, to realize the sealing waterproof to scuta 14.
And in order to preferably install fixation balloon 12, the present embodiment is provided on the rear end inclined-plane of path clearance 3 The upper lower gasbag pressing plate 16 for the two sides up and down for being placed in 12 lower end of air bag that bolt or rivet are fixed, lower gasbag pressing plate pass through pre-buried spiral shell Bolt 19 is fixed on dam body foundation 1, and bolt compresses are then limited on upper air bag pressing plate and are realized to the i.e. lower end of tail end of air bag 12 Limit, meanwhile, in order to ensure the mounting stability of air bag 12, the present embodiment is set in the bottom surface of the tail end lug boss 6 of installation foundation 2 At least two the first salient points 10 along inclined-plane extending direction arrangement are equipped with, after path clearance 3 corresponding with first salient point 10 It is provided with the second salient point 11 with the cooperation of the first salient point 10 on the inclined-plane of end, passes through opposite first salient point 10 and the second salient point 12 It realizes that the extruding to the tail end of air bag 12 limits, effectively prevent loosening for air bag 12, improve the fixed stability of its installation.
And Fig. 2 show another gas shield dam for being mounted on gas shield shown in FIG. 1 dam rear, i.e., secondary gas shield dam, to be formed Double bolloon gas shield dam shown in Fig. 3 has 17 He of secondary installation foundation in the secondary gas shield dam in Fig. 2 or gas shield shown in Fig. 3 dam Balloonet 18, wherein secondary installation foundation 17 is mounted on dam body foundation 1 by the bigger bolt of intensity, and balloonet 18 then leads to It crosses structure identical with air bag 12 and completes installation.
By Fig. 2 or 3 as it can be seen that increasing the position 20 of stability in one increase contact area of the lower end of bolt 13 setting, Its shape can be the sheet that strip, disk or bottom surface have arcuate projection.

Claims (5)

1. a kind of gas shield dam fixed infrastructure, including dam body foundation (1), it is characterised in that: include on the dam body foundation (1) One installation foundation (2) is arranged one from installation foundation (2) the front end side between the installation foundation (2) and the dam body foundation (1) Extend downwardly, behind the bottom surface of the installation foundation (2) obliquely, the path clearance (3) that extends back;
A lug boss (4) are set on the front end top surface of the installation foundation (2), open up a cross-perforating on the lug boss (4) (5);
The tail end lug boss (6) of one extension tilted backwards, the tail end lug boss are set on the rear end top surface of the installation foundation (2) (6) perforation (7) on a vertical inclined-plane is opened up on inclined-plane;
The top center of the installation foundation (2) opens up a vertical threaded bore (8);
Installation hermetic seal band (9) is provided at the path clearance (3) of the bottom surface front end face of the installation foundation (2) The upper lower platen of bolt and the upper and lower sides for the lower end for being separately positioned on the hermetic seal band (9);
The bottom surface of the tail end lug boss (6) is provided at least two the first salient points (10) along inclined-plane extending direction arrangement;
It is provided on the rear end inclined-plane of the path clearance (3) corresponding with the first salient point (10) and first salient point (10) The second salient point (11) of cooperation.
2. gas shield as described in claim 1 dam fixed infrastructure, it is characterised in that: the rear end of the path clearance (3) is oblique The upper lower gasbag pressing plate (16) for the two sides up and down for being placed in air bag (12) lower end that bolt or rivet are fixed is provided on face.
3. gas shield as claimed in claim 1 or 2 dam fixed infrastructure, it is characterised in that: the installation foundation (2) passes through solid Determine bolt (13) to be fixed on the dam body foundation (1) after the vertical threaded bore (8).
4. gas shield as claimed in claim 3 dam fixed infrastructure, it is characterised in that: the lower platen is solid by pre-embedded bolt It is scheduled on the dam body foundation (1).
5. gas shield as claimed in claim 2 dam fixed infrastructure, it is characterised in that: the lower gasbag pressing plate (16) passes through pre- Bolt is buried to be fixed on the dam body foundation (1).
CN201821684020.5U 2018-10-17 2018-10-17 A kind of gas shield dam fixed infrastructure Active CN209178936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821684020.5U CN209178936U (en) 2018-10-17 2018-10-17 A kind of gas shield dam fixed infrastructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821684020.5U CN209178936U (en) 2018-10-17 2018-10-17 A kind of gas shield dam fixed infrastructure

Publications (1)

Publication Number Publication Date
CN209178936U true CN209178936U (en) 2019-07-30

Family

ID=67361550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821684020.5U Active CN209178936U (en) 2018-10-17 2018-10-17 A kind of gas shield dam fixed infrastructure

Country Status (1)

Country Link
CN (1) CN209178936U (en)

Similar Documents

Publication Publication Date Title
CN209178936U (en) A kind of gas shield dam fixed infrastructure
CN209178934U (en) A kind of fixed infrastructure part on gas shield dam
CN209178933U (en) A kind of double bolloon gas shield dam
CN201395883Y (en) Hidden frame glass curtain wall connecting device
CN208268400U (en) A kind of gap sealing component and sealing strip
CN214117960U (en) Durable water retaining device
CN209397866U (en) A kind of embedded mounting device of balustrade exterior panelling for installing elevator hoistway with steel structure additional
CN209043415U (en) A kind of protective embankments in lakeside areas area multi-parameter damage caused by waterlogging early warning system
CN206914341U (en) A kind of transparent board fixer
CN202393800U (en) Outdoor rainproof single-phase electric meter box
CN201025247Y (en) An improved wind machine tower canister platform structure
CN205399256U (en) Traffic sign structure
CN206289886U (en) A kind of photovoltaic system drainage arrangement
CN206442365U (en) A kind of Kato main body and card cap fasten the metallic mobile phone Kato of assembling
CN208515577U (en) A kind of lock installation position of parking disassemble structure
CN212242930U (en) Buckle structure of sealing strip corner of automobile door
CN214450918U (en) Power lithium battery cabinet body mounting structure
CN204326595U (en) A kind of detachable outdoor skidding court board
CN108514397A (en) A kind of cap assembly of dish-washing machine
CN207394202U (en) Zigzag die casting connector
CN203752849U (en) Vehicle door inner plate assembly
CN209266706U (en) Socket rain cover
CN219801606U (en) High-pressure tank mounting structure
CN207157314U (en) A kind of bus hinge type access cover structure
CN201169870Y (en) Gable cornice rim covering structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230822

Address after: No. 2, Wuliling Industrial Park Functional Zone, Shanggao County, Yichun City, Jiangxi Province, 336400

Patentee after: Jiangxi Shoukong Environmental Technology Co.,Ltd.

Address before: 265300 No. 101, unit 2, building 9, No. 668, Yuejin Road, Qixia City, Yantai City, Shandong Province

Patentee before: Hong Liang