CN209177306U - A kind of raw coal bucket coal-blocking-proof device of coal - Google Patents

A kind of raw coal bucket coal-blocking-proof device of coal Download PDF

Info

Publication number
CN209177306U
CN209177306U CN201821942961.4U CN201821942961U CN209177306U CN 209177306 U CN209177306 U CN 209177306U CN 201821942961 U CN201821942961 U CN 201821942961U CN 209177306 U CN209177306 U CN 209177306U
Authority
CN
China
Prior art keywords
coal
heating
bucket
raw coal
primary air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821942961.4U
Other languages
Chinese (zh)
Inventor
张玉强
陈华安
叶福兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Tianjiaan Power Station of Anhui Electric Power Co Ltd
Original Assignee
Huainan Tianjiaan Power Station of Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Tianjiaan Power Station of Anhui Electric Power Co Ltd filed Critical Huainan Tianjiaan Power Station of Anhui Electric Power Co Ltd
Priority to CN201821942961.4U priority Critical patent/CN209177306U/en
Application granted granted Critical
Publication of CN209177306U publication Critical patent/CN209177306U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

The utility model provides primary air piping, rapping apparatus, cold and hot mixing windshield plate, cold and hot mixing air hose, tertiary-air pipe, pulverized coal preparation system hot wind main pipe and adjacent mill exhauster after a kind of raw coal bucket coal-blocking-proof device of coal, including raw coal bucket, heating cabinet, heating primary air piping, windshield plate of heating, cooling.Pulverized coal preparation system hot blast temperature is up to 320 DEG C, and mill exhauster outlet temperature highest is heated by the utility model to the raw coal bucket no more than 140 DEG C, evaporate the moisture of coal in raw coal bucket, caking ability is reduced, chute blockage is solved the problems, such as, guarantees the flameholding of boiler furnace.Meanwhile mill exhauster outlet temperature has obtained effective control, makes full use of the energy of system, has achieved the purpose that energy-saving and emission-reduction, improves production efficiency.

Description

A kind of raw coal bucket coal-blocking-proof device of coal
Technical field
The utility model belongs to power industry field, particularly relates to a kind of raw coal bucket coal-blocking-proof device of coal.
Background technique
It is increasingly saturated in modern power network, under the higher and higher harsh conditions of cost of electricity-generating, energy-saving is inevitable, guarantee The normal reception load of unit, quick response load variations ability will also directly influence the economy of unit.Ensure that unit is each Equipment it is normal handy just more important, and pulverized coal preparation system it is normal whether directly influence the reception load and load of unit The ability of response, only guaranteed pulverized coal preparation system fault-free or few failure just can ensure that unit safety economical operation.Existing powder processed System raw coal bucket, especially sleet season, raw coal moisture is bigger, and chute blockage, the defects of lower coal is unsmooth frequently occurs, seriously affects The economy of stability, safety and pulverized coal preparation system that boiler furnace burns.Main manual cleaning and the vibration of practical bulkhead at present Device is made, it is time-consuming and laborious, and there are certain security risks, coal biggish for moisture, bonding is serious, the effect pole of vibrator It is low.
Pulverized coal preparation system hot blast temperature up to 320 DEG C or so, mill exhauster outlet temperature highest no more than 140 DEG C, need it is cold, Hot wind rational proportion reaches running optimizatin, this results in 320 DEG C of hot wind temperature drop big, causes unnecessary energy loss.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of raw coal bucket coal-blocking-proof device of coal, coal in raw coal bucket is evaporated Moisture reduces caking ability, solves the problems, such as chute blockage, guarantee the flameholding of boiler furnace.Meanwhile mill exhauster outlet temperature obtains Effective control, makes full use of the energy of system, has achieved the purpose that energy-saving and emission-reduction, improve production efficiency.
In order to solve the above technical problems, the embodiments of the present invention provide a kind of raw coal bucket coal-blocking-proof device of coal, comprising: former Primary air piping, rapping apparatus, cold and hot mixing windscreen after coal scuttle, heating cabinet, heating primary air piping, windshield plate of heating, cooling Plate, cold and hot mixing air hose, tertiary-air pipe, pulverized coal preparation system hot wind main pipe and adjacent mill exhauster.
The heating cabinet is mounted on outside the raw coal bucket;The heating primary air piping and the pulverized coal preparation system hot wind main pipe Connection;The heating primary air piping is connected to the heating cabinet;Primary air piping is connected to the heating cabinet after cooling down;The storehouse Wall vibrator is mounted on the raw coal bucket;Windshield plate of the heating is mounted on the heating primary air piping;It is described cold Hot mixing windshield plate is mounted on the cold and hot mixing air hose;It is primary air piping and the tertiary-air pipe after cooling, described cold and hot mixed Air hose connection is closed, and is connect with the adjacent mill exhauster.
Preferably, the heating bulkhead is parallel with the raw coal headwall.
Preferably, the heating cabinet is mounted on the lower middle position of the raw coal bucket.
Preferably, the heating primary air piping is connected to the heating cabinet bottom.
Preferably, it is connected at the top of primary air piping and the heating cabinet after the cooling.
Preferably, the bunker wall vibration device is mounted on outer wall at the lower part outlet of the raw coal bucket.
The above-mentioned technical proposal of the utility model has the beneficial effect that:
In above scheme, by conveying hot gas to the heating cabinet, the moisture of coal, reduces caking ability in evaporation raw coal bucket, It solves the problems, such as chute blockage, guarantees the flameholding of boiler furnace, reduce the workload of staff, reduce accident and failure Incidence.Meanwhile mill exhauster outlet temperature has obtained effective control, makes full use of the energy of system, has reached energy-saving and emission-reduction Purpose, improve production efficiency.
Detailed description of the invention
Fig. 1 is longitudinal section schematic diagram of the embodiments of the present invention.
[main element symbol description]
1, raw coal bucket;
2, heating cabinet;
3, primary air piping is heated;
4, a windshield plate is heated;
5, primary air piping after cooling;
6, rapping apparatus;
7, cold and hot mixing windshield plate;
8, cold and hot mixing air hose;
9, tertiary-air pipe;
10, adjacent mill exhauster;
11, pulverized coal preparation system hot wind main pipe.
Specific embodiment
In order to make the technical problems, technical solutions and advantages to be solved by the utility model clearer, below in conjunction with attached drawing And specific embodiment is described in detail.
The utility model is directed to existing pulverized coal preparation system raw coal bucket, especially sleet season, and raw coal moisture is bigger, frequently Chute blockage, the defects of lower coal is unsmooth occurs, seriously affects the economy of the stability of boiler furnace burning, safety and pulverized coal preparation system The problem of property.Up to 320 DEG C or so, mill exhauster outlet temperature highest needs pulverized coal preparation system hot blast temperature no more than 140 DEG C Hot and cold wind rational proportion reaches running optimizatin, this results in 320 DEG C of hot wind temperature drop big, causes unnecessary energy loss.
In view of this, the utility model embodiment provides a kind of raw coal bucket coal-blocking-proof device of coal, and specific technical solution is as follows:
As shown in Figure 1, a kind of raw coal bucket coal-blocking-proof device of coal of the utility model embodiment, comprising: raw coal bucket 1, heating cabinet 2, Heat primary air piping 3, windshield plate 4 of heating, it is cooling after primary air piping 5, rapping apparatus 6, cold and hot mixing windshield plate 7, cold and hot Mix air hose 8, tertiary-air pipe 9, pulverized coal preparation system hot wind main pipe 11 and adjacent mill exhauster 10.
The heating cabinet 2 is installed outside the raw coal bucket 1, the heating cabinet 2 tends to have the middle and lower part of the raw coal bucket 1 The position outer wall of bonding raw coal wires up, it is preferable that 2 wall of heating cabinet is parallel with 1 wall of raw coal bucket, and it is logical that there are hot winds The space crossed is heated to the raw coal bucket 1 using hot wind, evaporates the moisture of raw coal in the raw coal bucket 1, keep drying, avoid Bonding.
The heating primary air piping 3 one are connected to the pulverized coal preparation system hot wind main pipe 11, other end and the heating cabinet 2 Connection;The heating primary air piping 3 takes hot wind from the pulverized coal preparation system hot wind main pipe 11, and hot wind is sent to the heating cabinet 2.
Windshield plate 4 of the heating is mounted on the heating primary air piping 3, when windshield plate 4 of the heating is opened Qi Shi, the pulverized coal preparation system hot wind main pipe 11 are started by the heating primary air piping 3 to 2 heat air delivery of heating cabinet, when When the heating First air flapper closure 4, the pulverized coal preparation system hot wind main pipe 11 is out-of-blast.
Primary air piping 5 is connected to the heating cabinet 2 after the cooling, and the hot wind of the heating cabinet 2 is giving the raw coal bucket 1 After heating, hot blast temperature is reduced, and is discharged via primary air piping 5 after the cooling.
The cold and hot mixing windshield plate 7 is mounted on the cold and hot mixing air hose 8, when the cold and hot mixing windshield plate 7 is opened Qi Shi, the cold and hot mixing air hose 8 start to convey cold and hot mixing wind to the adjacent mill exhauster 10;When the cold and hot mixing windscreen When plate 7 is closed, the cold and hot mixing air hose 8 is out-of-blast.
Primary air piping 5 is connected to the tertiary-air pipe 9, the cold and hot mixing air hose 8 after cooling, and with the adjacent row powder Machine 10 connects;Above three air hose mixes air distribution, is sent to the adjacent mill exhauster 10 according to wind-warm syndrome.
Preferably, the heating primary air piping 3 is connected to 2 bottom of heating cabinet, primary air piping 5 and institute after the cooling It states and is connected at the top of heating cabinet 2, the energy of hot wind can be made full use of in this way, heated to the raw coal bucket.
Above scheme evaporates the moisture of raw coal by the heating to the raw coal bucket 1, caking ability is reduced, with the rapping The cooperation of device 6 efficiently solves chute blockage problem, guarantees the flameholding of boiler furnace, reduces the workload of staff, subtract The incidence of accident and failure is lacked.Meanwhile mill exhauster outlet temperature has obtained effective control, makes full use of the energy of system Source has achieved the purpose that energy-saving and emission-reduction, improves production efficiency.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art For personnel, under the premise of not departing from principle described in the utility model, several improvements and modifications can also be made, these improvement It also should be regarded as the protection scope of the utility model with retouching.

Claims (6)

1. a kind of raw coal bucket coal-blocking-proof device of coal characterized by comprising raw coal bucket, heating cabinet, heating primary air piping, heating one Primary air piping, rapping apparatus, cold and hot mixing windshield plate, cold and hot mixing air hose, tertiary-air pipe, powder system processed after secondary windshield plate, cooling Hot wind main pipe of uniting and adjacent mill exhauster;
The heating cabinet is mounted on outside the raw coal bucket;The heating primary air piping and the pulverized coal preparation system hot wind main pipe connect It connects;The heating primary air piping is connected to the heating cabinet;Primary air piping is connected to the heating cabinet after cooling down;The rapping Device is mounted on the raw coal bucket;Windshield plate of the heating is mounted on the heating primary air piping;It is described cold and hot mixed Windshield plate is closed to be mounted on the cold and hot mixing air hose;Primary air piping and the tertiary-air pipe, the cold and hot mixing wind after cooling Pipe connection, and connect with the adjacent mill exhauster.
2. raw coal bucket coal-blocking-proof device of coal according to claim 1, which is characterized in that the heating bulkhead and the raw coal bucket Wall is parallel.
3. raw coal bucket coal-blocking-proof device of coal according to claim 1, which is characterized in that the heating cabinet is mounted on the raw coal The lower middle position of bucket.
4. raw coal bucket coal-blocking-proof device of coal according to claim 1, which is characterized in that the heating primary air piping adds with described Hot orlop portion connection.
5. raw coal bucket coal-blocking-proof device of coal according to claim 1, which is characterized in that after the cooling primary air piping with it is described Connection at the top of heating cabinet.
6. raw coal bucket coal-blocking-proof device of coal according to claim 1, which is characterized in that the rapping apparatus is mounted on the original Outer wall at the lower part outlet of coal scuttle.
CN201821942961.4U 2018-11-23 2018-11-23 A kind of raw coal bucket coal-blocking-proof device of coal Active CN209177306U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821942961.4U CN209177306U (en) 2018-11-23 2018-11-23 A kind of raw coal bucket coal-blocking-proof device of coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821942961.4U CN209177306U (en) 2018-11-23 2018-11-23 A kind of raw coal bucket coal-blocking-proof device of coal

Publications (1)

Publication Number Publication Date
CN209177306U true CN209177306U (en) 2019-07-30

Family

ID=67374054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821942961.4U Active CN209177306U (en) 2018-11-23 2018-11-23 A kind of raw coal bucket coal-blocking-proof device of coal

Country Status (1)

Country Link
CN (1) CN209177306U (en)

Similar Documents

Publication Publication Date Title
CN203194173U (en) Automatic cooling device of grain storage bin
CN103234214B (en) The fine coal coal gasification powder process of high-moisture coal and Water Sproading integrated system and method thereof
CN209177306U (en) A kind of raw coal bucket coal-blocking-proof device of coal
CN202476421U (en) Double heat source drying device applied to tobacco flue-curing
CN207563059U (en) A kind of coal dust preparation system
CN203731460U (en) System for drying fuel by waste smoke gas in biomass power plant
CN102557506A (en) Complete processing equipment of coal gas expanded perlite
CN209084796U (en) A kind of turbulent burner central air hose deashing device
CN204881146U (en) Cooling of rotary kiln kiln hood ejection of compact grate and heat utilize structure
CN109373342A (en) The hybrid flue gas eliminating white smoke system of hot wind and its removing method
CN103301921B (en) Energy-saving and emission-reducing device and method for industrial vertical mill
CN205037704U (en) Novel energy -conserving coal slime is dried device
CN204694011U (en) A kind of high-effective dust-removing foodstuff drying device
CN102607286A (en) Molten salt furnace afterheat power-generation and combustion comprehensive utilizing system
CN203704558U (en) Hot waste gas reverse-flow type brown coal drying furnace
CN209386337U (en) The hybrid flue gas eliminating white smoke system of hot wind
CN207699520U (en) It is a kind of to keep the temperature the system for making batcher firm by ramming using coke oven coke oven uprising tube waste heat anemophily formula
CN206959568U (en) A kind of rotary kiln coal mill system
CN206626596U (en) Meet the afterheat utilizing system of the flue gas cool-down of low temperature electric dust removal requirement
CN202415383U (en) Complete-set processing equipment for coal gas expanded perlite
CN206222352U (en) Flue gas waste heat recovery apparatus with empty mixing system
CN205300207U (en) Energy -efficient drying system of pure waste heat
CN203342903U (en) Energy-saving and emission-reduction device used for industrial vertical mill
CN108048116A (en) A kind of system for making batcher firm by ramming using the heat preservation of coke oven coke oven uprising tube waste heat anemophily formula
CN103664013B (en) A kind of feeding device of flyash

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant