CN209176919U - Sealed part with encapsulating chamber - Google Patents
Sealed part with encapsulating chamber Download PDFInfo
- Publication number
- CN209176919U CN209176919U CN201821204873.4U CN201821204873U CN209176919U CN 209176919 U CN209176919 U CN 209176919U CN 201821204873 U CN201821204873 U CN 201821204873U CN 209176919 U CN209176919 U CN 209176919U
- Authority
- CN
- China
- Prior art keywords
- walls
- encapsulating
- sealed
- fuel tank
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Cooling, Air Intake And Gas Exhaust, And Fuel Tank Arrangements In Propulsion Units (AREA)
Abstract
A kind of sealed part with encapsulating chamber, the sealed part (100) is used in fuel tank, bunch of cables (11) especially are installed in fuel tanker, bunch of cables (11) can be sealingly fixed on the fuel tank floor of aircraft by it, the sealed part (100) includes being combined to form by two semicircular part case halfs (9) through walls, columnar part ontology (2) through walls, wherein, there is cavity in part case half (9) internal structure through walls, the cavity forms encapsulating chamber (7) inside the part ontology (2) through walls in two part case half pairings through walls, and flange (10) and annular fixing groove (8) are configured on the excircle of the part ontology (2) through walls, being respectively provided at the axial ends portion of the part ontology (2) through walls prevents sealant from flowing out Encapsulating baffle (1), and encapsulating baffle (1) is being installed and can remove from the part ontology (2) through walls after sealing glue solidifying.
Description
Technical field
The utility model relates to a kind of for installing the sealed part of bunch of cables in fuel tank, especially fuel tanker,
Bunch of cables can be sealingly fixed on the fuel tank floor of aircraft by it.
Background technique
The bunch of cables of more tanlc-aircrafts is when passing through fuel tank sealing floor, due to the gap between the cable in bunch of cables,
There can be the problem of cannot being fully sealed, leading to leakage in fuel tank.Currently, mainly using four kinds of modes in order to avoid above-mentioned interior leakage:
First, casing is arranged in bunch of cables overall length, it is sealed by casing.The program installs and uses inconvenience, and deposits
Complicated problem is replaced after casing damage.
Second, realizing sealing by using electric connector at floor in bunch of cables by electric connector itself, needing passing through
Bunch of cables is disconnected when sealing floor, and the electric connector cooperation on the installation of the both ends of disconnection electric connector, with floor.The party
The major defect of case is, is easy to produce spark, and there are security risks;Electric connector poor reliability;And it is expensive.
Third, bunch of cables is made to pass through prefabricated rubber hole, this is to realize to seal by the cooperation in electric wire and rubber hole, is needed
By every cable all separately through a rubber hole.The program installs and uses inconvenience, and leakproofness is poor.
Fourth, the program passes through glue filling opening to bunch of cables and part through walls in bunch of cables by using part through walls at floor
Encapsulating between inner wall, encapsulating process is complex, and sealant easily flows out cavity, is not easy firm holding, influences leakproofness.?
At present in aircraft in this way, there is leakage in serious in multi rack, leads to that fuel tanker can not be added to full oil condition, aircraft adds
Volume read-out limitation need to be carried out when oily to each fuel tank, the alarm of left and right fuel tank un-balance oil amount, the sliding race of each aircraft may be triggered
A series of problems, such as with being needed before flight to each fuel tank progress Fuel Check.
In view of the above problems, aircraft electrical can be made according to sealed part a kind of known to 10241811 A of document CN
Harness passes through airtight bulkhead and bonding, but larger according to the inner cavity of the sealed part of the prior art, is equipped with and fills
Glue hole, plastic hole and it is not set so that glue is maintained at intracavitary structure, and can not easily judge whether encapsulating is completed, only exist
Sealant could stop pouring into sealant when flowing out from plastic hole, and this time difference easily causes glue to be lost in encapsulating, together
When will affect leakproofness.
Utility model content
Be directed to the problems of in the prior art, the purpose of this utility model is that, propose it is a kind of for fuel tank,
Bunch of cables, can be sealingly fixed to the fuel tank rib of aircraft by the sealed part of installation bunch of cables especially in fuel tanker
On plate.The sealed part can make the bunch of cables convenience of aircraft, sealingly extend through the fuel tank floor of aircraft, corresponding in application
Installation method in the case where, can conveniently, effectively realize bunch of cables inside and the encapsulating between bunch of cables and part through walls.
For this purpose, sealed part according to the present utility model includes by two semicircular part case half pairing shapes through walls
At, columnar part ontology through walls, wherein have cavity in the part case half internal structure through walls, the cavity is at two
In the part body interior formation encapsulating chamber through walls and in the outer circle of the part ontology through walls when part case half pairing through walls
Flange and annular fixing groove are configured on week, wherein being respectively provided at the axial ends portion of the part ontology through walls prevents
The encapsulating baffle of sealant outflow, and the encapsulating baffle is being installed and can be from the part through walls after sealing glue solidifying
It is removed on ontology.It is capable of forming closed encapsulating chamber by the pairing and the encapsulating baffle of part case half through walls, thus
Glue filling opening and plastic hole are eliminated, structure is simplified and can prevent the sealant in encapsulating from flowing out from part through walls, simultaneously
Improve the leakproofness of encapsulating chamber after encapsulating.
Furthermore according to the utility model, each encapsulating baffle includes two semicircular encapsulating baffle half portions, the encapsulating
Baffle half portion is separately positioned at the axial ends portion of the part case half through walls, in two part case half pairings through walls
When, two encapsulating baffle half portions are correspondingly combined to form the encapsulating baffle.This split type construction of the encapsulating baffle
The first encapsulating that can be realized sealed part according to the present utility model, the mounting means installed again, so as to effectively keep away
Exempt from sealant to flow out and improve leakproofness.
Preferably, the encapsulating baffle can be made of the material of soft materials, and the encapsulating baffle is pasted onto institute
At the both ends for stating part ontology through walls.Therefore, the encapsulating baffle can closely surround bunch of cables by plastic deformation, thus
It realizes sealing effect, prevents sealant from flowing out.
According to the utility model, location hole and positioning are respectively equipped on the contact surface of described two part case halfs through walls
Pin, to make two part case half pairing positioning through walls.Preferably, on the contact surface of described two part case halfs through walls
It is respectively equipped with two location holes and two positioning pins.
According to the utility model, the annular fixing groove utilizes institute for installing circlip and retaining ring, the sealed part
It states flange to stick on the fuel tank floor of aircraft and be fixed on the fuel tank floor by the circlip and retaining ring, realize most
Whole installation positioning.Therefore the sealed part ensures that bunch of cables passes through the sealing installation of fuel tanker floor
The basic functional principle of the utility model is as follows: inside the harness for first passing through the position at fuel tank floor to bunch of cables
Encapsulating processing is carried out, after adhesive curing to be sealed, bunch of cables is made to pass through the fuel tank floor of aircraft, completes preliminary arrangement;Later, two
Sealant is filled in the cavity of a part case half through walls respectively and is utilized respectively encapsulating baffle half portion at both ends and blocks sealing
Glue;Next so that two part case halfs through walls is combined to form part ontology through walls and include bunch of cables, on part ontology through walls
Positioning pin and location hole by cooperation carry out pairing positioning, at the same time, encapsulating baffle half portion is correspondingly combined to form encapsulating
Baffle and closely surround bunch of cables;The sealed part formed after pairing is set to pass through the mounting hole on fuel tank floor, it is described
Sealed part is sticked on fuel tank floor and using retaining ring and circlip using its flange is fixed on the sealed part
On fuel tank floor;Finally, the sealant in part through walls to be sealed takes encapsulating baffle off again after being fully cured.
Compared with prior art, the sealed part of the utility model is other than having the advantages that the prior art, moreover it is possible to
It is enough it is more efficient, facilitate filling sealant, prevent sealant from flowing out and guarantee the leakproofness between part and cable through walls.
Detailed description of the invention
It is described in detail below according to specific embodiment of the attached drawing to sealed part according to the present utility model,
In:
Fig. 1 is the cross-sectional view of sealed part according to the present utility model;
Fig. 2 is the shaft side figure of the sealed part splitted along central axes;
Fig. 3 is the whole shaft side figure of the sealed part;And
Fig. 4 is that the sealed part is illustrated relative to the arrangement of bunch of cables and fuel tanker floor when installing bunch of cables
Figure.
Specific embodiment
The specific structure of sealed part 100 according to the present utility model is shown by Fig. 1 to 3.Wherein, the sealing is worn
Wall part 100 includes be combined to form by two semicircular part case halfs 9 through walls, columnar part ontology 2 through walls, wherein
Cavity is configured with inside the part case half 9 through walls respectively, the cavity is in two part case half pairings through walls in institute
Formation encapsulating chamber 7 inside part ontology 2 through walls is stated, and is configured with flange 10 and ring on the excircle of the part ontology 2 through walls
Shape fixing groove 8.
In addition, being respectively provided with the encapsulating for preventing sealant from flowing out at the axial ends portion of the part ontology 2 through walls
Baffle 1, the encapsulating baffle 1 are made of two semicircular encapsulating baffle half portions, and the encapsulating baffle half portion is separately positioned on
At the axial ends portion of the part case half 9 through walls, in two 9 pairings of part case half through walls, two encapsulating baffles half
Portion is correspondingly combined to form the encapsulating baffle 1.And the encapsulating baffle 1 is being installed and can be from after sealing glue solidifying
It is removed on the part ontology 2 through walls.
Two location holes 5 and two positioning pins 6 are respectively equipped on the contact surface of described two part case halfs 9 through walls,
To make two 9 pairing of part case half positioning through walls.In addition, the annular fixing groove 8 is for installing circlip 4 and retaining ring 3, institute
Stating sealed part 100 can be fixed on the fuel tank floor of aircraft by the flange 10 and the circlip 4 and retaining ring 3.
The sealed part 100 is shown in FIG. 4 when installing bunch of cables 11 relative to bunch of cables 11 and aircraft
Fuel tank floor 12 arrangement schematic diagram.Its specific installation process is as described below.
Before carrying out the bunch of cables 11 in fuel tanker and installing, first bunch of cables 11 is handled as follows:
The protective layer for passing through bunch of cables 11 at the position of fuel tank floor 12 removes about 100 mm length;
Bunch of cables 11 at this is scattered, and sealant is uniformly perfused thereto, it is ensured that every electric wire is by sealant bag
It wraps up in;
, will be fully wrapped around at encapsulating with band after to be sealed dose of solidification, and it is with cassette tape that band and protective layer is appropriate
Fastening.
The installation of bunch of cables 11 is carried out later:
Make treated bunch of cables 11 entirely through fuel tank floor 12, completes preliminary arrangement;
Sealant is filled respectively in the cavity of two part case halfs 9 through walls, at the both ends of part case half 9 through walls
Pasting encapsulating baffle half portion respectively prevents its outflow to block sealant;
Two part case halfs 9 through walls to be formed part ontology 2 through walls and include the upper of bunch of cables 11 to being combined
Treated part is stated, two location holes 5 and the progress pairing of positioning pin 6 in described two part case halfs 9 through walls are utilized
Positioning, at the same time, encapsulating baffle half portion is correspondingly combined to form encapsulating baffle 1 and closely surrounds bunch of cables;
The sealed part 100 formed after pairing is set to pass through the mounting hole 13 on fuel tank floor 12,2 benefit of part ontology through walls
12 side of fuel tank floor is sticked on flange 10, retaining ring 3 and circlip 4 are mounted on annular fixing groove in 12 other side of fuel tank floor
In 8, so far, the sealed part 100 has been firmly fixed;
Sealant in part through walls 100 to be sealed takes the encapsulating baffle 1 off and completes finally to pacify after being fully cured
Dress.
Preferred forms of the invention have been described in detail above by reference to attached drawing.It should be appreciated by those skilled in the art that attached
Figure and its corresponding description are just to explain the purpose of the present invention, and on this basis, those skilled in the art can make other
Modification, replacement or improvement.These modifications, replacement or improvement fall into protection scope of the present invention.
Reference signs list:
100 sealed parts
1 encapsulating baffle
2 part ontologies through walls
3 retaining rings
4 circlips
5 location holes
6 positioning pins
7 encapsulating chambers
8 annular fixing grooves
9 part case halfs through walls
10 flanges
11 bunchs of cables
12 fuel tank floors
13 mounting holes
Claims (8)
1. a kind of sealed part with encapsulating chamber, the sealed part (100) in fuel tank for installing bunch of cables
(11), bunch of cables (11) can be sealingly fixed on fuel tank floor, the sealed part (100) includes by two and half
Part ontology (2) through walls that circular part case half (9) through walls is combined to form, columnar, wherein in the part shell through walls half
Portion (9) internal structure has cavity, and the cavity is internal in the part ontology (2) through walls in two part case half pairings through walls
It is formed encapsulating chamber (7), and is configured with flange (10) and annular fixing groove (8) on the excircle of the part ontology (2) through walls,
It is characterized in that, being respectively provided with the encapsulating for preventing sealant from flowing out at the axial ends portion of the part ontology (2) through walls
Baffle (1), and the encapsulating baffle (1) is being installed and can be from the part ontology (2) through walls after sealing glue solidifying
It removes.
2. sealed part described in accordance with the claim 1, which is characterized in that each encapsulating baffle (1) includes two semicircles
Encapsulating baffle half portion, the encapsulating baffle half portion is separately positioned at the axial ends portion of the part case half (9) through walls,
In two part case half pairings through walls, two encapsulating baffle half portions are correspondingly combined to form the encapsulating baffle (1).
3. sealed part according to claim 1 or 2, which is characterized in that the encapsulating baffle (1) is by soft materials
Material is made.
4. sealed part according to claim 1 or 2, which is characterized in that the encapsulating baffle (1) is respectively adhered on institute
At the axial ends portion for stating part ontology (2) through walls.
5. sealed part according to claim 1 or 2, which is characterized in that in described two part case halfs (9) through walls
Contact surface on be respectively equipped with location hole (5) and positioning pin (6), to keep described two part case half (9) pairings through walls fixed
Position.
6. sealed part according to claim 5, which is characterized in that in described two part case halfs (9) through walls
Two location holes (5) and two positioning pins (6) are respectively equipped on contact surface.
7. sealed part according to claim 1 or 2, which is characterized in that the annular fixing groove (8) is used for installation card
Spring (4) and retaining ring (3), the sealed part (100) stick on fuel tank floor (12) and lead to using the flange (10)
It crosses the circlip (4) and retaining ring (3) is fixed on the fuel tank floor (12).
8. sealed part according to claim 1 or 2, which is characterized in that the sealed part (100) is used to fly
Bunch of cables (11) are installed in the fuel tank of machine, bunch of cables (11) can be sealingly fixed on the fuel tank floor of aircraft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821204873.4U CN209176919U (en) | 2018-07-27 | 2018-07-27 | Sealed part with encapsulating chamber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821204873.4U CN209176919U (en) | 2018-07-27 | 2018-07-27 | Sealed part with encapsulating chamber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209176919U true CN209176919U (en) | 2019-07-30 |
Family
ID=67357533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821204873.4U Active CN209176919U (en) | 2018-07-27 | 2018-07-27 | Sealed part with encapsulating chamber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209176919U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111268178A (en) * | 2020-03-16 | 2020-06-12 | 北京微动航科技术有限公司 | Satellite attitude control flying wheel pair, satellite attitude control system and satellite |
CN113026972A (en) * | 2021-04-07 | 2021-06-25 | 海南科技职业大学 | One-time embedded water stop joint for drainage of constructional engineering and construction method thereof |
CN113054603A (en) * | 2021-05-31 | 2021-06-29 | 成都雷通科技有限公司 | Protective wire penetrating clamp and mounting method thereof |
-
2018
- 2018-07-27 CN CN201821204873.4U patent/CN209176919U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111268178A (en) * | 2020-03-16 | 2020-06-12 | 北京微动航科技术有限公司 | Satellite attitude control flying wheel pair, satellite attitude control system and satellite |
CN113026972A (en) * | 2021-04-07 | 2021-06-25 | 海南科技职业大学 | One-time embedded water stop joint for drainage of constructional engineering and construction method thereof |
CN113054603A (en) * | 2021-05-31 | 2021-06-29 | 成都雷通科技有限公司 | Protective wire penetrating clamp and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209176919U (en) | Sealed part with encapsulating chamber | |
CN108666806A (en) | Interconnect sealing element | |
US9133698B2 (en) | Modular fracture plug and method of construction thereof | |
CN105074409A (en) | Method for producing a sensor housing and corresponding sensor housing | |
CN106532605B (en) | A kind of wall-through sealing device for odd-shaped cross section cable | |
CN202712567U (en) | Cable glue-pouring sealing structure and connector component | |
CN103225993A (en) | Vacuum filling and sealing device for warhead | |
CN103402828A (en) | Seal tape for gas generator | |
CN204477272U (en) | Air-breather and automotive power assembly | |
CN103879540A (en) | Center radiation net-pulling type high-altitude hyperpressure buoyancy bag body device | |
CN206259660U (en) | A kind of electric automobile converter wire harness water-proof structure | |
CN105390633A (en) | Sealing element for sealing battery cells, molded bodies for manufacturing the sealing eelement and method for manufacturing the sealing element | |
CN103586421A (en) | Shooting plate capable of being efficiently sealed together with oil passage core box | |
CN202685786U (en) | Wet-type braking integrated rear axle of coal mine car | |
CN105141073A (en) | Motor assembly | |
JP6031937B2 (en) | Lead acid battery | |
CN209634467U (en) | The device for storing liquid of motor vehicle brake fluid | |
FR3073030A1 (en) | SEAL AND METHOD OF MANUFACTURING SUCH A SEAL | |
CN208638167U (en) | A kind of submersible motor connecting box cable sealing device | |
CN104769301B (en) | Clutch disk | |
CN206727781U (en) | The cold bearing assembling structure of motor oil | |
CN206060436U (en) | Submersible pump leader cable sealing structure | |
CN205829118U (en) | For installing the cable seal plug of cable | |
CN206546367U (en) | Sensor lead sealing device | |
RU2789930C1 (en) | Circuit holder for drive shafts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |