CN209166162U - A kind of cement cooling device of blanking section - Google Patents

A kind of cement cooling device of blanking section Download PDF

Info

Publication number
CN209166162U
CN209166162U CN201821779101.3U CN201821779101U CN209166162U CN 209166162 U CN209166162 U CN 209166162U CN 201821779101 U CN201821779101 U CN 201821779101U CN 209166162 U CN209166162 U CN 209166162U
Authority
CN
China
Prior art keywords
cooling
pipe
jet pipe
cement
jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821779101.3U
Other languages
Chinese (zh)
Inventor
滕槟
姚国镜
杨日巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jinglan Cement Group Co Ltd
Original Assignee
Hubei Jinglan Cement Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jinglan Cement Group Co Ltd filed Critical Hubei Jinglan Cement Group Co Ltd
Priority to CN201821779101.3U priority Critical patent/CN209166162U/en
Application granted granted Critical
Publication of CN209166162U publication Critical patent/CN209166162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

A kind of cement cooling device of blanking section, belongs to cooling apparatus field comprising: feeder pipe, cooling duct, jet pipe, collection flitch, blower, cooling device, dehumidification device, blast pipe;Feeder pipe is vertically arranged, and the tube wall that cooling duct one end passes through feeder pipe is extend into feeder pipe, and jet pipe lower end is connect with cooling duct one end, and jet pipe top is stitched equipped with multiple nozzles, and around setting jet pipe periphery, the diameter for collecting flitch is greater than jet size;Blast pipe is connected by the air intake of the drying of dehumidification device and the cooling of cooling device and blower, and the outlet air end of blower connect the wind that dry cooling is passed through into cooling duct with the cooling duct other end;Collect flitch center and jet pipe top middle portion is rotatably installed in by rotating mechanism.Heat exchange efficiency greatly improved using the principle of suspended preheater, cement powders is made to obtain the cooling that more adequately exchanges heat in shorter vertical blanking pipe, at low cost, device production is simple, and cooling effect is ideal, and does not influence cement performance.

Description

A kind of cement cooling device of blanking section
Technical field
The utility model relates to cooling apparatus fields, more particularly, to a kind of cement cooling device of blanking section.
Background technique
Bulk cement temperature is high, brings many problems, such as bad adaptability, early coagulation phenomena, cement water to concrete construction side Change reaction to accelerate, accelerates slump loss, the rate of complaints improves.
Currently, cement cool-down method has: 1, water drenching in grinding absorbs heat in grinding by water drenching, but will cause cement appearance Early coagulation phenomena, influences strength of cement.2, a part of heat, but mill inner ventilation system can be taken away by reinforcing ventilation, ventilation in ball mill System resistance, lock wind, the restrict such as leak out.3, cylinder watering cooling, influences cement performance, and long-time water drenching also will cause cylinder Corrosion.4, sink is done on the outside of conveyer, cement temperatures reduction is unobvious, and be easy to cause water inlet in equipment, influences hydraulicity Can, there is false set in cement.There are more problems for existing cement cool-down method, are insufficient for client to cement temperatures It is required that.
Therefore, it is really necessary to design a kind of cement cooling device of blanking section, to overcome the above problem.
Utility model content
For disadvantage more than solution, a kind of cement cooling device of blanking section is provided, the principle of suspended preheater is utilized Heat exchange efficiency greatly improved, cement powders is made to obtain the cooling that more adequately exchanges heat in shorter vertical blanking pipe, at This is low, and device production is simple, and cooling effect is ideal, and does not influence cement performance.
A kind of cement cooling device of blanking section provided by the utility model, is mounted on that enter bulk vehicle in bulk cement vertical Blanking section, comprising: feeder pipe, cooling duct, jet pipe, collection flitch, blower, cooling device, dehumidification device, blast pipe;
Feeder pipe is vertically arranged, cooling duct one end pass through feeder pipe tube wall extend into feeder pipe, jet pipe lower end with The connection of cooling duct one end, jet pipe top are stitched equipped with multiple nozzles, and multiple nozzle seams collect the diameter of flitch around setting jet pipe periphery Greater than jet size;Blast pipe is connected by the air intake of the drying of dehumidification device and the cooling of cooling device and blower, blower Outlet air end the wind that dry cooling is passed through into cooling duct is connect with the cooling duct other end;
Collect flitch center and jet pipe top middle portion is rotatably installed in by rotating mechanism;Rotating mechanism includes rotating seat, rotation Column, fan, rotating seat are fixed on jet pipe top middle portion, are rotatably installed on rotating seat in the middle part of column spinner, and collection flitch center is fixed In rotation top end, fan is fixed on column spinner bottom end and is located inside jet pipe;When the wind in jet pipe is to fan, fan turns Dynamic, fan drives collection flitch to rotate by column spinner.
Preferably, it is equipped with annular recess in the middle part of column spinner, is equipped with boss in the middle part of rotating seat, boss is movably arranged on groove It is interior.
Preferably, a multiple nozzles seam point multilayers are wound around on jet pipe, and every layer equally distributed to be equipped with multiple nozzles seams, and Multilayer nozzle seam is staggered.
Preferably, nozzle stitches slit width 15-20mm.
Preferably, jet size is the 1/4-1/3 of blanking pipe diameter.
Preferably, cooling duct is located at feeder pipe that one end upper end of inside equipped with flute profile buildup device.
Heat exchange efficiency greatly improved using the principle of suspended preheater in the device, make cement powders it is shorter it is vertical under The cooling that more adequately exchanges heat is obtained in pipe material.Cooling air is stitched from multilayer nozzle to be sprayed with the speed of 50-70m/s, is being sprayed Pipe nozzle segment forms cooling air curtain, and the cement powders dispersion of whereabouts is suspended in short-term, and a part of cooling air is predicted stream and risen, from Vertical feeder pipe top is discharged into dust-precipitator, and remaining cooling air enters vehicle tank in bulk with stream and collects discharge by dust-precipitator.Under In expects pipe the cement powders of downlink pass through air curtain when dispersed, be in half suspended dispersion, cooling air dispersion, uplink, The powder to suspend during downlink with half comes into full contact with, and exchanges heat.
Wherein;
Jet size is the 1/4-1/3 of blanking pipe diameter, guarantees the whereabouts (not resulting in blockage) for not blocking material, can be used Seamless steel pipe.
Nozzle seam is calculated as interruption profile bar seam, slit width 15-20mm, circumferential direction seam unconnected area be staggered in interlayer, cooling air from Circumferential weld blowout forms complete annular air curtain in jet nozzle section, and the cooled air of the powder to fall by this section is adequately made With, all cooled air dispersion of the powder for reaching all, cooling effect.
The powder fallen from above is accumulated on collection flitch, prevents powder to the erosive wear of lower nozzle after generating buildup; It prevents powder from entering nozzle generation from nozzle ring seam under specific circumstances and escapes or block air hose, collection flitch radius ratio nozzle half The big 10mm of diameter, upper surface are the low curved surface in intermediate high periphery, greatly reduce powder in accumulation above;When collection flitch can be rotated When, powder above can be swapped out and normal blanking, and it is simple and convenient, it is practical and efficient.
Cooling duct sectional area can be equal to nozzle seam sectional area, and jet nozzle section is in the middle part of blanking pipe, material Using seamless steel pipe.
Flute profile buildup device is welded in cooling duct top, accumulates the powder fallen from above, prevents powder pair after generating buildup The erosive wear of lower pipeline, slot edge height 15mm;Flute profile buildup device 20mm wide compared with air hose.
Heat exchange efficiency greatly improved using the principle of suspended preheater in device, makes cement powders in shorter vertical blanking The cooling that more adequately exchanges heat is obtained in pipe, can reduce 10-20 DEG C of cement temperatures, partially meets cement user to cement temperature The requirement of degree.
Compared with prior art, the utility model has the following beneficial effects:
There are more problems, such as grinding machine or belt water drenching to easily corrode cylinder, amount of water sprayed control for existing cement cool-down method Not at that time, moisture is unable to evaporating completely to system, and the moisture content of synthesis can make strength of cement performance depreciation, and cement will appear false set The problem of.Although temperature of charge can be reduced by reinforcing mill inner ventilation, ventilation in mill by system resistance, lock wind, leak out Etc. restrict so that grinding effect economy is deteriorated if air quantity crosses conference also by the restriction of product fineness.Therefore, by mentioning High ball mill mill inner ventilation has certain limit to reduce out the temperature of grind materials.
Heat exchange efficiency greatly improved using the principle of suspended preheater in the cooling device, and cement powders is made to hang down in shorter The cooling that more adequately exchanges heat is obtained in straight blanking pipe, at low cost, device production is simple, and cooling effect is ideal, and does not influence Cement performance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the cement cooling device of the blanking section of one preferred embodiment of the utility model;
Fig. 2 is the enlarged structure schematic diagram of the jet pipe sum aggregate flitch of one preferred embodiment of the utility model;
Fig. 3 is the enlarged structure schematic diagram of A in Fig. 2;
The drawing reference numeral of specific embodiment illustrates:
1, feeder pipe,
2, cooling duct,
3, jet pipe, 31, nozzle seam,
4, collect flitch,
5, blower,
6, cooling device,
7, dehumidification device,
8, rotating mechanism, 81, rotating seat, 82, column spinner, 83, fan, 84, groove, 85, boss,
9, flute profile buildup device.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing.In the utility model Description in, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside" The orientation or positional relationship of equal instructions is to be based on the orientation or positional relationship shown in the drawings, and being merely for convenience of description, this is practical new Type and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation Construction and operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second ", " third " are only used In description purpose, it is not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
As shown in Figure 1 to Figure 3, the cement cooling device 6 of a kind of blanking section provided in this embodiment, comprising: feeder pipe 1, Cooling duct 2, jet pipe 3, collection flitch 4, blower 5, cooling device 6, dehumidification device 7, blast pipe.
As shown in Figure 1 to Figure 3, feeder pipe 1 is vertically arranged, and the tube wall that 2 one end of cooling duct passes through feeder pipe 1 is extend into down In expects pipe 1,3 lower end of jet pipe is connect with 2 one end of cooling duct, and 3 top of jet pipe is equipped with multiple nozzles seam 31, multiple nozzles seam 31 around 3 periphery of jet pipe is set, and the diameter of collection flitch 4 is greater than 3 diameter of jet pipe;Drying and cooling device 6 of the blast pipe by dehumidification device 7 Cooling connect with the air intake of blower 5, the outlet air end of blower 5 is connect with 2 other end of cooling duct to be passed through into cooling duct 2 Dry cooling wind;Meanwhile collecting 4 center of flitch and 3 top middle portion of jet pipe is rotatably installed in by rotating mechanism 8;Rotating mechanism 8 wraps Rotating seat 81, column spinner 82, fan 83 are included, rotating seat 81 is fixed on 3 top middle portion of jet pipe, is rotatably installed in the middle part of column spinner 82 On rotating seat 81, collection 4 center of flitch is fixed on 82 top of column spinner, and fan 83 is fixed on 82 bottom end of column spinner and is located at jet pipe 3 It is internal;When the wind in jet pipe 3 is to fan 83, fan 83 is rotated, and fan 83 drives collection flitch 4 to rotate by column spinner 82;From And turn the powder collected on flitch 4, reduction is gathered materials.
As shown in Figure 1 to Figure 3, it is equipped with annular recess 84 in the middle part of column spinner 82, is equipped with boss 85, boss in the middle part of rotating seat 81 85 are movably arranged in groove 84;So that the cooperation of column spinner 82 and rotating seat 81 is more flexible efficiently.
And in the present embodiment, multiple nozzles stitch 31 points of multilayers and are wound around on jet pipe 3, every layer equally distributed be equipped with it is multiple Nozzle seam 31, and multilayer nozzle seam 31 is staggered;Nozzle stitches 31 slit width 15-20mm.Cooling air is stitched from multilayer nozzle 31 are sprayed with the speed of 50-70m/s, form cooling air curtain in 3 nozzle segment of jet pipe, and the cement powders dispersion of whereabouts is hanged in short-term Floating, a part of cooling air is predicted stream and is risen, and is discharged into dust-precipitator from vertical 1 top of feeder pipe, remaining cooling air enters with stream Vehicle tank in bulk is collected by dust-precipitator and is discharged.Dispersed when the cement powders of downlink pass through air curtain in feeder pipe 1, it is outstanding in half Floating dispersity, the powder that cooling air suspends during dispersion, uplink, downlink with half come into full contact with, exchange heat.It is circumferential Seam unconnected area is staggered in interlayer, and cooling air is blown out from circumferential weld, complete annular air curtain is formed in 3 nozzle segment of jet pipe, by this The cooled air of the powder that section falls adequately acts on, all cooled air dispersion of the powder for reaching all, cooling effect.
3 diameter of jet pipe is the 1/4-1/3 of 1 diameter of feeder pipe, and jet pipe 3 is located at 1 center of feeder pipe, and guarantee does not block material Whereabouts (not resulting in blockage), meanwhile, good cooling heat transferring effect can be reached;Seamless steel pipe can be used.
Cooling duct 2 is located at 1 that one end upper end of inside of feeder pipe and is equipped with flute profile buildup device 9, accumulates the powder fallen from above, Prevent powder to the erosive wear of lower pipeline, slot edge height 15mm after generating buildup;Flute profile buildup device 9 is wide compared with air hose 20mm。
Heat exchange efficiency greatly improved using the principle of suspended preheater in the cooling device 6, makes cement powders shorter The cooling that more adequately exchanges heat is obtained in vertical feeder pipe 1, at low cost, device production is simple, and cooling effect is ideal, and not shadow Ring cement performance.
Novel technical solution, rather than its limitations;Although having been carried out in detail referring to foregoing embodiments to the utility model Thin explanation, those skilled in the art should understand that: it still can be to technical side documented by foregoing embodiments Case is modified, or equivalent substitution of some or all of the technical features;And these are modified or replaceed, not Shi Xiangyingjishufanganbenzhituolibenshiyongxinxinggeshishilijishufanganfanwei.

Claims (6)

1. a kind of cement cooling device of blanking section characterized by comprising feeder pipe, cooling duct, jet pipe, collection flitch, wind Machine, cooling device, dehumidification device, blast pipe;
Feeder pipe is vertically arranged, and the tube wall that cooling duct one end passes through feeder pipe is extend into feeder pipe, jet pipe lower end and cooling The connection of air hose one end, jet pipe top are stitched equipped with multiple nozzles, and around setting jet pipe periphery, the diameter for collecting flitch is greater than multiple nozzle seams Jet size;Blast pipe is connected by the air intake of the drying of dehumidification device and the cooling of cooling device and blower, and blower goes out Wind end connect the wind that dry cooling is passed through into cooling duct with the cooling duct other end;
Collect flitch center and jet pipe top middle portion is rotatably installed in by rotating mechanism;Rotating mechanism includes rotating seat, column spinner, wind Fan, rotating seat are fixed on jet pipe top middle portion, are rotatably installed on rotating seat in the middle part of column spinner, and collection flitch center is fixed on rotation Top end, fan are fixed on column spinner bottom end and are located inside jet pipe;When the wind in jet pipe is to fan, fan is rotated, fan Collection flitch rotation is driven by column spinner.
2. the cement cooling device of blanking section as described in the appended claim 1, it is characterised in that: be equipped in the middle part of column spinner cyclic annular recessed Slot, rotating seat middle part are equipped with boss, and boss is movably arranged in groove.
3. the cement cooling device of blanking section as described in the appended claim 1, it is characterised in that: a multiple nozzle seam point multilayers are wound around On jet pipe, every layer equally distributed to be equipped with multiple nozzles seams, and multilayer nozzle seam is staggered.
4. the cement cooling device of blanking section as described in the appended claim 1, it is characterised in that: nozzle stitches slit width 15-20mm.
5. the cement cooling device of blanking section as described in the appended claim 1, it is characterised in that: jet size is blanking pipe diameter 1/4-1/3。
6. the cement cooling device of blanking section as described in the appended claim 1, it is characterised in that: cooling duct is located inside feeder pipe That one end upper end is equipped with flute profile buildup device.
CN201821779101.3U 2018-10-31 2018-10-31 A kind of cement cooling device of blanking section Active CN209166162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821779101.3U CN209166162U (en) 2018-10-31 2018-10-31 A kind of cement cooling device of blanking section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821779101.3U CN209166162U (en) 2018-10-31 2018-10-31 A kind of cement cooling device of blanking section

Publications (1)

Publication Number Publication Date
CN209166162U true CN209166162U (en) 2019-07-26

Family

ID=67335945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821779101.3U Active CN209166162U (en) 2018-10-31 2018-10-31 A kind of cement cooling device of blanking section

Country Status (1)

Country Link
CN (1) CN209166162U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112573844A (en) * 2020-12-31 2021-03-30 邹邦彦 Preparation process of sulphoaluminate cement
CN117102740A (en) * 2023-09-01 2023-11-24 宝瑞精密机械(广州)有限公司 Butt welding equipment for locking plate and base

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112573844A (en) * 2020-12-31 2021-03-30 邹邦彦 Preparation process of sulphoaluminate cement
CN112573844B (en) * 2020-12-31 2023-01-20 新疆圣雄水泥有限公司 Preparation process of sulphoaluminate cement
CN117102740A (en) * 2023-09-01 2023-11-24 宝瑞精密机械(广州)有限公司 Butt welding equipment for locking plate and base
CN117102740B (en) * 2023-09-01 2024-03-08 宝瑞精密机械(广州)有限公司 Butt welding equipment for locking plate and base

Similar Documents

Publication Publication Date Title
CN209166162U (en) A kind of cement cooling device of blanking section
CN102534073A (en) Steam condensation tower for a granulation installation
CN108592611A (en) A method of it being used for the steam rotary drying system of ammonium salt and prepares ammonium salt
CN110118483A (en) The drying means and device of material
CN108679995A (en) Steam rotary drying system for purified salt and the method for preparing purified salt
CN208419545U (en) A kind of steam rotary drying system for ammonium salt
CN208635520U (en) Steam rotary drying system for purified salt
CN216073091U (en) Cylinder drying device is used in poly aluminium chloride production
CN207562532U (en) A kind of bag filter in multimedium high concentration sub-micron exhaust treatment system
CN208075524U (en) A kind of weaving drying unit
CN206488584U (en) A kind of forming net drying device
CN208454771U (en) A kind of sludge reduction low-temperature drier
CN209310433U (en) A kind of industrial drier
CN209042923U (en) A kind of drying device for fertiliser granulates
CN107514894B (en) No sieve stream washes formula battery material drier
CN110360667A (en) A kind of cooling air conditioner compressor
CN207487445U (en) A kind of organic fertilizer cooling device
CN204987768U (en) Dry microwave equipment of multilayer rotation medicine
CN108371218A (en) A kind of tealeaves pretreatment unit
CN209696481U (en) A kind of goat milk production high efficiente callback device
CN211601419U (en) Centrifugal drying device
CN209555522U (en) A kind of preshrinking machine
CN209406007U (en) A kind of circulation-adsorption type drying machine
CN209214036U (en) A kind of double air outlet efficient air coolers
CN207805549U (en) Granulation tower captation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant