CN209165735U - A kind of cold-prevention bridge frame structure of air handling unit - Google Patents
A kind of cold-prevention bridge frame structure of air handling unit Download PDFInfo
- Publication number
- CN209165735U CN209165735U CN201821777540.0U CN201821777540U CN209165735U CN 209165735 U CN209165735 U CN 209165735U CN 201821777540 U CN201821777540 U CN 201821777540U CN 209165735 U CN209165735 U CN 209165735U
- Authority
- CN
- China
- Prior art keywords
- outer rim
- interior
- threeway
- cold
- prevention bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 12
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000001125 extrusion Methods 0.000 claims description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract description 12
- 229910052742 iron Inorganic materials 0.000 abstract description 6
- DOSMHBDKKKMIEF-UHFFFAOYSA-N 2-[3-(diethylamino)-6-diethylazaniumylidenexanthen-9-yl]-5-[3-[3-[4-(1-methylindol-3-yl)-2,5-dioxopyrrol-3-yl]indol-1-yl]propylsulfamoyl]benzenesulfonate Chemical compound C1=CC(=[N+](CC)CC)C=C2OC3=CC(N(CC)CC)=CC=C3C(C=3C(=CC(=CC=3)S(=O)(=O)NCCCN3C4=CC=CC=C4C(C=4C(NC(=O)C=4C=4C5=CC=CC=C5N(C)C=4)=O)=C3)S([O-])(=O)=O)=C21 DOSMHBDKKKMIEF-UHFFFAOYSA-N 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000010079 rubber tapping Methods 0.000 description 2
- 229920005830 Polyurethane Foam Polymers 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000036760 body temperature Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920002635 polyurethane Polymers 0.000 description 1
- 239000004814 polyurethane Substances 0.000 description 1
- 239000011496 polyurethane foam Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
Landscapes
- Refrigerator Housings (AREA)
Abstract
This application involves a kind of cold-prevention bridge frame structure of air handling unit, it is characterized in that: including outer rim, cold-prevention bridge heat insulating strip, interior frame, outer threeway, sealing strip, interior threeway, panel, cooperated between adjacent outer rim by outer threeway and is clamped, the outer threeway two fixing end protrusions at 90 degree of angles are inserted respectively into two corresponding outer rim hollow-out parts and are fixed, there are two steps for outer rim tool, panel is provided between outer rim first step and interior frame, outer rim second step is equipped with cold-prevention bridge heat insulating strip, interior frame, outer rim is bolted in first step, interior frame, outer rim first step, sealing strip is installed between panel;Interior threeway is fixed on the inside of outer threeway, and two fixing ends of interior threeway are connected and fixed with corresponding two interior frames respectively.The application prevents to condense substantially, and structure is simple, cheap.It is easy for installation, without iron filings generate, substantially prolong the service life of product.
Description
Technical field
This application involves a kind of cold-prevention bridge frame structure of air handling unit, it is mainly applicable in dehumidifier, the installation of air-conditioning is fixed.
Background technique
The steel frame of traditional dehumidifier, using polyurethane in steelframe polyurethane foam, frame connecting flange and steel framework
The direct bolt of frame is fixed.Since case body temperature is lower, cooling capacity can quickly be conducted by flange, steel frame, lead to outer container body surface
Face hangs dew, while influencing equipment work, also results in the intracorporal loss of refrigeration capacity of case.Self tapping spiral shell is leaned on additionally, due to traditional steel frame
Silk connection, is also easy to produce iron filings, to accelerate the corrosion of frame, influences life of product.
Summary of the invention
The technical issues of the application solves is to overcome the above deficiencies in the existing technologies, and provide a kind of structure letter
It is clean, cold-prevention bridge frame structure of air handling unit easy to use.In such a way that cold-prevention bridge heat insulating strip and interior outline border compress sealing strip, base
Originally the extension dew phenomenon of equipment surface has been prevented.Bolt hole is directly opened additionally, due to profile, eliminates the connection type of self-tapping screw,
Iron filings will not be generated.
The application solves technical solution used by above-mentioned technical problem: a kind of cold-prevention bridge frame structure of air handling unit,
Be characterized in including outer rim, cold-prevention bridge heat insulating strip, interior frame, outer threeway, sealing strip, interior threeway, panel, adjacent outer rim it
Between by outer threeway cooperate be clamped, the outer threeway two fixing end protrusions at 90 degree of angles are inserted respectively into corresponding
It is fixed in two outer rim hollow-out parts, there are two steps for outer rim tool, set between outer rim first step and interior frame
It is equipped with panel, outer rim second step is equipped with cold-prevention bridge heat insulating strip, and interior frame, outer rim are connected in first step by bolt
It connects, interior frame, outer rim first step install sealing strip between panel;Interior threeway is fixed on the inside of outer threeway, interior threeway two
Fixing end is connected and fixed to form an entirety with corresponding two interior frames respectively.
There is cavity inside herein described outer rim.
The application interior frame is provided with the through-hole of bolt installation, and bolt installation corresponding with through-hole is provided on the inside of outer rim and is used
Bolt hole prevented iron filings generation due to aperture prior on mounting structure.
Preferably, the sealing strip hardness is preferably in 40HA-50HA, shape, can be effective in hollow mushroom-shaped
Extrusion deformation is generated, short transverse amount of compression is 2mm, in order to easily squeeze, quickly carries out the installation of bolt.
The beneficial effects of the utility model are: 1. prevent to condense substantially.2. structure is simple, cheap.3. easy for installation,
4. generating without iron filings, the service life of product is substantially prolonged.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present application.
Fig. 2 is the sectional perspective schematic diagram of the embodiment of the present application.
Specific embodiment
It is described in further detail with reference to the accompanying drawing and by embodiment to the application, following embodiment is to this Shen
Explanation please and the application is not limited to following embodiment.
Referring to Fig. 1, Fig. 2, the present embodiment includes outer rim 1, cold-prevention bridge heat insulating strip 2, interior frame 3, outer threeway 4, countersunk head spiral shell
Bolt 5, sealing strip 6, interior threeway 7, panel 8.It is connected between outer rim 1 by outer threeway 4, outer threeway 4 two at 90 degree of angle phases
Same fixing end protrusion 41 is inserted respectively into corresponding two outer rims, 1 hollow-out part 11, forms effectively fitting.
There are two steps for the tool of outer rim 1, and panel 8, interior frame 3, outer rim 1 are provided between outer rim first step 12 and interior frame 3
Between be bolted, wherein interior frame 3 opens the through-hole more slightly larger than bolt, and 1 inside of outer rim position corresponding with through-hole is opened
Bolt hole has prevented iron filings generation due to the prior aperture of material itself.Interior frame 3,1 first step 12 of outer rim, panel 8 it
Between install sealing strip 6 to reach sealing effect.Finally use dormant bolt 5 by 7 two fixing ends 71 of interior threeway and corresponding two
Interior frame 3 connects to form an entirety.Outer rim second step 13 is equipped with cold-prevention bridge heat insulating strip 2, has prevented substantially outer
The generation of 1 dew condensation phenomenon of frame.
The simple deformation or combination of all present techniques features and technical solution, it is considered that fall into the protection of the application
Range.
Claims (4)
1. a kind of cold-prevention bridge frame structure of air handling unit, it is characterized in that: including outer rim, cold-prevention bridge heat insulating strip, interior frame, outer three
Lead to, sealing strip, interior threeway, panel, is cooperated between adjacent outer rim by outer threeway and be clamped, outer threeway two at 90 degree of angles
Fixing end protrusion be inserted respectively into two corresponding outer rim hollow-out parts and be fixed, outer rim has two
A step is provided with panel between outer rim first step and interior frame, outer rim second step is equipped with cold-prevention bridge heat insulating strip,
Interior frame, outer rim are bolted in first step, and interior frame, outer rim first step install sealing strip between panel;
Interior threeway is fixed on the inside of outer threeway, and two fixing ends of interior threeway are connected and fixed with corresponding two interior frames respectively.
2. cold-prevention bridge frame structure of air handling unit according to claim 1, it is characterized in that: having cavity inside the outer rim.
3. cold-prevention bridge frame structure of air handling unit according to claim 1 is used it is characterized in that: the interior frame is provided with bolt installation
Through-hole, the bolt hole of bolt installation corresponding with through-hole is provided on the inside of outer rim.
4. according to claim 1 to cold-prevention bridge frame structure of air handling unit described in 3 any claims, it is characterized in that: described is close
Strip of paper used for sealing hardness is in 40HA-50HA, and for shape in hollow mushroom-shaped, short transverse extrusion deformation degree is 2mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821777540.0U CN209165735U (en) | 2018-10-31 | 2018-10-31 | A kind of cold-prevention bridge frame structure of air handling unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821777540.0U CN209165735U (en) | 2018-10-31 | 2018-10-31 | A kind of cold-prevention bridge frame structure of air handling unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209165735U true CN209165735U (en) | 2019-07-26 |
Family
ID=67335963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821777540.0U Active CN209165735U (en) | 2018-10-31 | 2018-10-31 | A kind of cold-prevention bridge frame structure of air handling unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209165735U (en) |
-
2018
- 2018-10-31 CN CN201821777540.0U patent/CN209165735U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209165735U (en) | A kind of cold-prevention bridge frame structure of air handling unit | |
CN206091784U (en) | Section bar frame door and window's firm fast -assembling angle sign indicating number | |
CN204513723U (en) | Frame-type cold-prevention bridge air conditioning box body | |
CN205348494U (en) | Exposed frame glass curtain wall | |
CN204775982U (en) | Aircraft load flap fixing device | |
CN206942543U (en) | The aluminum alloy double-layer glass cleaning window of corner fittings connection | |
CN211598247U (en) | Mounting structure using window auxiliary frame | |
CN209409886U (en) | A kind of refrigerator car | |
CN207212724U (en) | A kind of blower fan used electric control box | |
CN206918407U (en) | Pipeline support component and air conditioner | |
CN102839895B (en) | Connection structure and connection part for adapter frame of doors and windows | |
WO2020052532A1 (en) | Curtain wall glass fastening clamping member | |
CN205400506U (en) | Upvc door and window structure | |
CN105201334B (en) | A kind of doorframe | |
CN203925168U (en) | A kind of glass press frame mounting structure of metal door and window | |
CN219158643U (en) | Embedded handle mounting structure | |
CN216114804U (en) | Air-cooled industrial water chiller | |
CN107975168A (en) | A kind of cell cube curtain wall external corner hanger structure | |
CN207749983U (en) | A kind of aluminum heat insulation maintenance door | |
CN206755729U (en) | Refrigerator power panel box mounting structure | |
CN206117397U (en) | Installation of fan motor structure for utensil damping is done | |
CN220191229U (en) | Aluminum profile shell | |
CN203719080U (en) | Frame-free condensation-free embedded air conditioning cabinet | |
CN210105487U (en) | Adjustable locking block | |
CN210241155U (en) | Cold-proof formula aluminium alloy frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 2088 Science and Technology Avenue, Qingshan Industrial Park, Lin'an District, Hangzhou City, Zhejiang Province, 311300 Patentee after: Hangzhou Jierui Intelligent Equipment Co.,Ltd. Address before: No. 2088 Science and Technology Avenue, Qingshan Industrial Park, Lin'an District, Hangzhou City, Zhejiang Province, 311300 Patentee before: HANGZHOU DRY AIR TREATMENT EQUIPMENT Co.,Ltd. |