CN209163610U - Engineering construction enclosing - Google Patents
Engineering construction enclosing Download PDFInfo
- Publication number
- CN209163610U CN209163610U CN201821692009.3U CN201821692009U CN209163610U CN 209163610 U CN209163610 U CN 209163610U CN 201821692009 U CN201821692009 U CN 201821692009U CN 209163610 U CN209163610 U CN 209163610U
- Authority
- CN
- China
- Prior art keywords
- column
- enclosing
- door body
- engineering construction
- clump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model discloses engineering construction enclosings, including clump, door lock, headlamp and atomizer, fixation hole is formed above the clump, the first column and the second column are provided on the fixation hole, support beam is provided between first column and second column, first column side is provided with the first enclosing door body, and second column side is provided with the second enclosing door body.Beneficial effect is: the utility model passes through setting clump, the Fast Installation and fixation of building engineering construction enclosing may be implemented, punching installation trouble is saved, installation effectiveness is improved, by the way that atomizer is arranged, atomized dust settling operation can be carried out to construction site air, air quality is promoted, while by the first enclosing door body of setting and the second enclosing door body, can be convenient construction material and transporting nearby, transportation cost is reduced, working efficiency is promoted.
Description
Technical field
The utility model relates to construction guard fender technical fields, and in particular to engineering construction enclosing.
Background technique
Construction guard fender is safety construction measure, is that boundary of works area is isolated to separate with external environment, makes construction site
It is the management means for guaranteeing construction and going on smoothly, packet not by the temporary facility of external interference as the space of a relative closure
It includes using the various building materials enclosure wall built, the maintenance body constituted using various sheet formings etc., traditional construction project is applied
Work needs to be installed by beating mounting hole with enclosing, installs and fixes highly inconvenient, installation process time and effort consuming, while by
In being not provided with air cleaning device for reducing dust, cause construction site ambient air quality that cannot improve, there are also be exactly to construct
Material has to cause construction material that cannot transport nearby, transport inconvenient problem around construction guard fender during transporting.
Utility model content
(1) technical problems to be solved
In order to overcome the shortage of prior art, it is proposed that engineering construction enclosing solves traditional engineering construction
With enclosing install fixed inconvenience, time and effort consuming, construction site ambient air quality cannot improve and construct material cannot
It transports nearby, transport inconvenient problem.
(2) technical solution
The utility model is achieved through the following technical solutions: the utility model proposes engineering construction enclosing, packets
Clump, door lock, headlamp and atomizer are included, fixation hole is formed above the clump, is provided on the fixation hole
First column and the second column are provided with support beam, first column between first column and second column
Side is provided with the first enclosing door body, and second column side is provided with the second enclosing door body, the first enclosing door body and
Door body knob is provided on the second enclosing door body side wall, door body knob lower section is provided with the door lock, the door
Body knob side is provided with propaganda board, and reflection plaster is provided with above and below the propaganda board, is set above first column
It is equipped with the headlamp, first column lower end is provided with time control switch, and the time control switch side is provided with
Connecting line, is provided with the atomizer above second column, and second column lower end is provided with water inlet pipe, it is described into
Water inlet control valve is provided on water pipe.
Further, first column and second column are connect with the clump by the fixation hole, institute
Support beam is stated to be bolted with first column and second column.
Further, first column is connected by hinge with the first enclosing door body, second column and institute
The second enclosing door body is stated to be connected by hinge.
Further, the door body knob is connected by screw with the first enclosing door body and the second enclosing door body
It connects, the door lock is connected by screw to the first enclosing door body and the second enclosing door body.
Further, the propaganda board is Nian Jie with the first enclosing door body and the second enclosing door body, described reflective
It pastes Nian Jie with the first enclosing door body and the second enclosing door body.
Further, the headlamp is connected by screw to first column, the time control switch with it is described
First column is connected by screw to, the model KG316T of the time control switch.
Further, the atomizer is connected by screw to second column, the water inlet control valve with it is described
Atomizer is connected by the water inlet pipe.
(3) beneficial effect
The utility model compared with the existing technology, has the advantages that
1, it is installed with enclosing by beating mounting hole to solve traditional engineering construction, installation is fixed extremely not
Building engineering construction may be implemented with enclosing by setting clump in the problem of convenient, installation process time and effort consuming, the utility model
The Fast Installation and fixation of gear save punching installation trouble, improve installation effectiveness;
2, to solve traditional engineering construction enclosing due to being not provided with air cleaning device for reducing dust, cause to construct
Building site ambient air quality cannot improve problem, and the utility model, can be to construction site air by setting atomizer
Atomized dust settling operation is carried out, air quality is promoted;
3, to solve traditional engineering construction with enclosing when carrying out construction material and transporting, it is necessary to be enclosed around construction
Gear causes construction material that cannot transport nearby, transports inconvenient problem, and the utility model is by being arranged the first enclosing door body and the
Two enclosing door body can be convenient construction material and transport nearby, reduce transportation cost, promote working efficiency.
Detailed description of the invention
Fig. 1 is the main view of engineering construction enclosing described in the utility model;
Fig. 2 is the top view of engineering construction enclosing described in the utility model;
Fig. 3 is the circuit block diagram of engineering construction enclosing described in the utility model.
The reference numerals are as follows:
1, clump;2, fixation hole;3, the first column;4, the second column;5, the first enclosing door body;6, the second enclosing door
Body;7, support beam;8, reflection plaster;9, door body is shaken hands;10, door lock;11, propaganda board;12, headlamp;13, atomizer;14,
Water inlet pipe;15, water inlet control valve;16, time control switch;17, connecting line.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain
The utility model is not used to limit the utility model.
As shown in Figure 1-Figure 3, engineering construction enclosing, including clump 1, door lock 10, headlamp 12 and atomization spray
First 13, fixation hole 2 is formed above clump 1, the first column 3 and the second column 4 is provided on fixation hole 2, fixation hole 2 is used to
The first column 3 and the second column 4 are fixed, support beam 7 is provided between the first column 3 and the second column 4, support beam 7 rises
To the effect of firm first column 3 and the second column 4,3 side of the first column is provided with the first enclosing door body 5, the second column 4 one
Side is provided with the second enclosing door body 6, and the first enclosing door body 5 and the second enclosing door body 6 can be on and off at any time, can choose
Construction material is transported in nearest position, can effectively reduce the distance of construction material transportation, reduces construction cost, the first enclosing
Door body knob 9 is provided on 6 side wall of door body 5 and the second enclosing door body, 9 lower section of door body knob is provided with door lock 10, and door body is drawn
9 side of hand is provided with propaganda board 11, and propaganda board 11 is used to put up safe drumbeating language etc., be provided with above and below propaganda board 11
Reflection plaster 8, reflection plaster 8 can serve as a warning at night, and headlamp 12, headlamp 12 are provided with above the first column 3
For illuminating at night to construction site, 3 lower end of the first column is provided with time control switch 16, time control switch 16
The opening and closing time of headlamp 12 can be set, energy saving, 16 side of time control switch is provided with connecting line 17, the
Atomizer 13 is provided with above two columns 4, atomizer 13 carries out atomizing de-dusting to construction site periphery, improves construction site
Air quality, 4 lower end of the second column are provided with water inlet pipe 14, water inlet control valve 15 are provided on water inlet pipe 14.
Wherein, the first column 3 and the second column 4 are connect with clump 1 by fixation hole 2, support beam 7 and the first column
3 and second column 4 be bolted, the first column 3 is connected by hinge with the first enclosing door body 5, the second column 4 and second
Enclosing door body 6 is connected by hinge, and door body knob 9 is connected by screw to the first enclosing door body 5 and the second enclosing door body 6,
Door lock 10 is connected by screw to the first enclosing door body 5 and the second enclosing door body 6, propaganda board 11 and the first enclosing door body 5 and
Second enclosing door body 6 bonding, reflection plaster 8 is Nian Jie with the first enclosing door body 5 and the second enclosing door body 6, and headlamp 12 and first is stood
Column 3 is connected by screw to, and time control switch 16 is connected by screw to the first column 3, the model of time control switch 16
KG316T, atomizer 13 are connected by screw to the second column 4, and water inlet control valve 15 and atomizer 13 pass through water inlet pipe 14
Connection.
The working principle for the engineering construction enclosing that the utility model is mentioned: first by clump 1 by fixed spacing
It is well placed, then the first column 3 of this construction enclosing and the second column 4 is fixed in the fixation hole 2 of clump 1
Portion is sequentially completed the installation to construction project periphery enclosing, then connect external water source with water inlet pipe 14, can pass through water inlet
Control valve 15 controls atomizer 13 and works, and carries out atomizing de-dusting to construction site periphery, improves construction site air quality, outside
Portion's circuit is connect with connecting line 17, can automatically control the opening and closing of headlamp 12 by the way that time control switch 16 is arranged
It is time, easy to use while energy saving, safe drumbeating language is posted on propaganda board 11, when needing to transport construction material,
The first enclosing of opening door body 5 and the second enclosing door body 6 that can be nearest be capable of the distance of effective less construction material transportation,
Improve working efficiency.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this
Novel conception and scope is defined.Without departing from the design concept of the present utility model, ordinary people in the field couple
The all variations and modifications that the technical solution of the utility model is made, should fall within the protection scope of the present utility model, this reality
With novel claimed technology contents, it is all described in the claims.
Claims (7)
1. engineering construction enclosing, it is characterised in that: including clump (1), door lock (10), headlamp (12) and atomization spray
Head (13) forms fixation hole (2) above the clump (1), and the first column (3) and the are provided on the fixation hole (2)
Two columns (4) are provided with support beam (7), first column between first column (3) and second column (4)
(3) side is provided with the first enclosing door body (5), and the second column (4) side is provided with the second enclosing door body (6), and described
Door body knob (9) is provided in one enclosing door body (5) and the second enclosing door body (6) side wall, the door body is shaken hands under (9)
Side is provided with the door lock (10), and door body knob (9) side is provided with propaganda board (11), above the propaganda board (11) and
Lower section is provided with reflection plaster (8), is provided with the headlamp (12) above first column (3), first column (3)
Lower end is provided with time control switch (16), and time control switch (16) side is provided with connecting line (17), and described second
Be provided with the atomizer (13) above column (4), the second column (4) lower end is provided with water inlet pipe (14), it is described into
Water inlet control valve (15) are provided on water pipe (14).
2. engineering construction enclosing according to claim 1, it is characterised in that: first column (3) and described
Second column (4) is connect with the clump (1) by the fixation hole (2), the support beam (7) and first column
(3) it is bolted with second column (4).
3. engineering construction enclosing according to claim 1, it is characterised in that: first column (3) with it is described
First enclosing door body (5) is connected by hinge, and second column (4) is connected by hinge with the second enclosing door body (6).
4. engineering construction enclosing according to claim 1, it is characterised in that: door body knob (9) with it is described
First enclosing door body (5) and the second enclosing door body (6) are connected by screw to, the door lock (10) and first enclosing
Door body (5) and the second enclosing door body (6) are connected by screw to.
5. engineering construction enclosing according to claim 1, it is characterised in that: the propaganda board (11) and described the
One enclosing door body (5) and the second enclosing door body (6) bonding, the reflection plaster (8) and the first enclosing door body (5) and institute
State the second enclosing door body (6) bonding.
6. engineering construction enclosing according to claim 1, it is characterised in that: the headlamp (12) and described the
One column (3) is connected by screw to, and the time control switch (16) is connected by screw to first column (3), described
The model KG316T of time control switch (16).
7. engineering construction enclosing according to claim 1, it is characterised in that: the atomizer (13) with it is described
Second column (4) is connected by screw to, and the water inlet control valve (15) and the atomizer (13) pass through the water inlet pipe
(14) it connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821692009.3U CN209163610U (en) | 2018-10-18 | 2018-10-18 | Engineering construction enclosing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821692009.3U CN209163610U (en) | 2018-10-18 | 2018-10-18 | Engineering construction enclosing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209163610U true CN209163610U (en) | 2019-07-26 |
Family
ID=67334291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821692009.3U Expired - Fee Related CN209163610U (en) | 2018-10-18 | 2018-10-18 | Engineering construction enclosing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209163610U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924746A (en) * | 2019-12-10 | 2020-03-27 | 中铁十四局集团隧道工程有限公司 | Enclose fender structure and construction site |
CN112459610A (en) * | 2020-12-21 | 2021-03-09 | 安徽太基建设工程股份有限公司 | Protection fence for pile foundation construction |
CN115874864A (en) * | 2022-12-30 | 2023-03-31 | 中国建筑第四工程局有限公司 | Green and energy-saving dust-settling building construction method |
-
2018
- 2018-10-18 CN CN201821692009.3U patent/CN209163610U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924746A (en) * | 2019-12-10 | 2020-03-27 | 中铁十四局集团隧道工程有限公司 | Enclose fender structure and construction site |
CN112459610A (en) * | 2020-12-21 | 2021-03-09 | 安徽太基建设工程股份有限公司 | Protection fence for pile foundation construction |
CN115874864A (en) * | 2022-12-30 | 2023-03-31 | 中国建筑第四工程局有限公司 | Green and energy-saving dust-settling building construction method |
CN115874864B (en) * | 2022-12-30 | 2023-11-10 | 中国建筑第四工程局有限公司 | Green energy-saving dust-settling building construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209163610U (en) | Engineering construction enclosing | |
CN107349688A (en) | A kind of dry paint-fog separator | |
CN202215091U (en) | Secondary protection mechanism for top cover of air conditioning unit of railway vehicle | |
CN210993497U (en) | Gardens construction dust keeper | |
CN207981478U (en) | A kind of environmental project spraying device | |
CN202644967U (en) | Scaffold tool type wall connecting piece | |
CN207253982U (en) | A kind of water curtain dust-remover | |
CN211922472U (en) | Large-scale subway station foundation ditch construction sprays dust device | |
CN207668278U (en) | A kind of automatic punching dust-blowing device | |
CN203452882U (en) | Exhaust emission device for mobile power station | |
CN208542412U (en) | A kind of construction site acoustic control spray dust-reducing system | |
CN206661476U (en) | A kind of anti-blocking sprayer for flue gas desulfurization and dedusting purifier | |
CN207643435U (en) | A kind of rope saw cutting device | |
CN205593345U (en) | Work piece drying process platform | |
CN206027327U (en) | Coating cloud entrapment device | |
CN221115261U (en) | Energy-saving practical dry fog box device | |
CN219836276U (en) | Device for reducing dust emission on construction site | |
CN220771924U (en) | Roasting kiln tail flue gas recovery device | |
CN212790437U (en) | Novel oxynitride purifying tower | |
CN203714456U (en) | Novel ejection cover mechanism with sliding lock | |
CN207582766U (en) | A kind of circular pipe type angle brace structure for inner panel | |
CN203899444U (en) | Nebulizer and desulfurization tower | |
CN209005398U (en) | A kind of pipe connecting structure for restraining demister | |
CN220990306U (en) | Desulfurization and denitrification absorption tower | |
CN203508968U (en) | Air and water mixing device for plate blank continuous casting secondary cooling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190726 Termination date: 20211018 |