CN209163057U - Prefabricated assembled integrated pipe frame bean column node - Google Patents

Prefabricated assembled integrated pipe frame bean column node Download PDF

Info

Publication number
CN209163057U
CN209163057U CN201821277761.1U CN201821277761U CN209163057U CN 209163057 U CN209163057 U CN 209163057U CN 201821277761 U CN201821277761 U CN 201821277761U CN 209163057 U CN209163057 U CN 209163057U
Authority
CN
China
Prior art keywords
precast beam
prefabricated
prefabricated post
mounting plate
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821277761.1U
Other languages
Chinese (zh)
Inventor
王建群
李大浪
黄恒平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ruim Engineering Technology Ltd By Share Ltd
China Nerin Engineering Co Ltd
Original Assignee
China Ruim Engineering Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ruim Engineering Technology Ltd By Share Ltd filed Critical China Ruim Engineering Technology Ltd By Share Ltd
Priority to CN201821277761.1U priority Critical patent/CN209163057U/en
Application granted granted Critical
Publication of CN209163057U publication Critical patent/CN209163057U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled integrated pipe frame bean column nodes, comprising: prefabricated post, the prefabricated post are reinforced concrete prefabricated column;Precast beam, the precast beam are armored concrete precast beam, and the precast beam has installation end, and the installation end is equipped with mounting plate, and the precast beam is fixed on the side of the prefabricated post by the mounting plate.According to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment, prefabricated post and precast beam are after factory realizes standardized production, construction site passes through the fixed progress modularization assembling of the mounting plate of precast beam installation end and the side of prefabricated post, it avoids traditional precast beam and is connected with prefabricated post by bracket, following advantage is brought for construction and installation: saving transport space, completely without scene processing and production, in-site installation is simple, installation workload and duration significantly shorten, improve the efficiency of construction assembly, improve installation accuracy and build guality, installation cost has been greatly reduced.

Description

Prefabricated assembled integrated pipe frame bean column node
Technical field
The utility model relates to the integrated pipe frame technical fields in Process of Engineering Construction, more particularly, to a kind of prefabrication and assembly construction Formula integrated pipe frame bean column node.
Background technique
In the Process of Engineering Construction such as smelting, chemical industry, mine, pipe gallery (namely pipe support) is always the important set of factory At part.Traditional integrated pipe frame structure generally uses steel construction and cast-in-place concrete frame structure.Due to steel construction integrated pipe Frame is especially in the environment of corrosive medium in wet environment and is easy corrosion, and durability is poor, needs periodic maintenance, Considerably increase late maintenance cost.
In recent years, proprietor increasingly tends to using concrete integrated pipe frame, and uses cast-in-place concrete integrated pipe frame, Construction condition is poor, and long construction period, construction quality is difficult to ensure.Traditional precast concrete integrated pipe frame generally uses column Bracket is connect with beam, and stress performance is not good enough, is unfavorable for the factorial production and road transport, and it is exposed to there is bracket in appearance, not beautiful It sees.
Utility model content
The utility model aims to solve at least one of the technical problems existing in the prior art.For this purpose, the utility model One purpose is to propose a kind of prefabricated assembled integrated pipe frame bean column node, integrated pipe frame production standardization, module assembled Change, construction efficiency is high and construction quality is high.
According to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment, comprising:
Prefabricated post, the prefabricated post are reinforced concrete prefabricated column;
Precast beam, the precast beam are armored concrete precast beam, and the precast beam has installation end, and the installation end is set There is mounting plate, the precast beam is fixed on the side of the prefabricated post by the mounting plate.
According to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment, prefabricated post and precast beam are in work After factory realizes standardized production, construction site passes through the fixed progress module of the mounting plate of precast beam installation end and the side of prefabricated post Change assembling, avoid traditional precast beam and connected with prefabricated post by bracket, brings following advantage for construction and installation: saving fortune Defeated space, completely without scene processing and production, in-site installation is simple, and installation workload and duration significantly shorten, and improves The efficiency of construction assembly, improves installation accuracy and build guality, and installation cost, and the integrated pipe after assembly has been greatly reduced Frame appearance looks elegant.
In addition, can also be had as follows according to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment Additional technical feature:
One embodiment according to the present utility model, the mounting plate are bolted on the side of the prefabricated post On.
Further, the mounting plate is equipped with bolt hole, and the precast beam is equipped with perforation, and the perforation extends transversely through described The mounting plate is fixed on described by opposite two side of prefabricated post, the bolt across the perforation and the bolt hole In prefabricated post.
Further, there are two the precast beams, two precast beams are separately fixed at the opposite of the prefabricated post On two sides.
One embodiment according to the present utility model, the precast beam are equipped with built-in fitting, the built-in fitting and the installation Plate is fixed.
Further, the built-in fitting is H profile steel.
Further, the H profile steel has the edge of a wing, and the edge of a wing is equipped with multiple pegs.
Further, there are two the edges of a wing, multiple pegs are divided into multiple row arrangement, wherein on each edge of a wing At least one column peg is being equipped with along the edge of a wing length direction.
Further, multiple pegs are divided into the arrangement of four column, wherein along the edge of a wing length on each edge of a wing Direction is equipped with the two column pegs.
Further, the built-in fitting is welded and fixed with the mounting plate.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
The above-mentioned and/or additional aspect and advantage of the utility model from the description of the embodiment in conjunction with the following figures will Become obvious and be readily appreciated that, in which:
Fig. 1 is the assembling schematic diagram of the prefabricated assembled integrated pipe frame bean column node of the utility model one embodiment.
Fig. 2 is the decomposition diagram of the prefabricated assembled integrated pipe frame bean column node of the utility model one embodiment.
Fig. 3 is the signal of the H profile steel of the prefabricated assembled integrated pipe frame bean column node of the utility model one embodiment.
Fig. 4 be the prefabricated assembled integrated pipe frame bean column node of the utility model one embodiment H profile steel on bolt is set The schematic diagram of nail.
Appended drawing reference:
The perforation of prefabricated post 1 11
22 edge of a wing of precast beam 2 mounting plate, 21 bolt hole, 211 H profile steel, 221 peg 222
Bolt 3
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and should not be understood as to the utility model Limitation.
The prefabricated assembled integrated pipe frame bean column node of the utility model can be realized what structural elements was designed, and produced, installing Standardization, load module play positive effect to raising site operation efficiency and construction quality, meet construction project The national policy direction of assembling, meanwhile, meet engineering be applicable in, safe and environment-friendly requirement.It is comprehensive with traditional cast-in-place concrete Pipe support is different, and the structure design of the utility model may be implemented to transport safely, reduce cost, guarantee precision, convenient for factory's metaplasia The purpose of production, and finally offer convenience for the installation of concrete integrated pipe frame.
Prefabricated assembled integrated pipe frame beam column section according to the utility model embodiment is described below with reference to Fig. 1 to Fig. 4 Point.
According to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment, including prefabricated post 1 and precast beam 2, prefabricated post 1 is reinforced concrete prefabricated column 1;Precast beam 2 is armored concrete precast beam 2, and precast beam 2 has installation end, peace It fills end and is equipped with mounting plate 21, precast beam 2 is fixed on the side of prefabricated post 1 by mounting plate 21.
According to the prefabricated assembled integrated pipe frame bean column node of the utility model embodiment, prefabricated post 1 and precast beam 2 exist After factory realizes standardized production, construction site by the side of the mounting plate 21 of 2 installation end of precast beam and prefabricated post 1 it is fixed into Row modularization assembling avoids traditional precast beam and is connected with prefabricated post by bracket, brings following advantage for construction and installation: section Transport space has been saved, completely without scene processing and production, in-site installation is simple, and installation workload and duration significantly shorten, The efficiency for improving construction assembly, improves installation accuracy and build guality, installation cost has been greatly reduced, and after assembly Integrated pipe frame appearance looks elegant.
One embodiment according to the present utility model, mounting plate 21 are fixed on the side of prefabricated post 1 by bolt 3.Tool Body, mounting plate 21 is equipped with bolt hole 211, and precast beam 2 is equipped with perforation 11, and perforation 11 extends transversely through opposite two of prefabricated post 1 A side, bolt 3 passes through perforation 11 and mounting plate 21 is fixed in prefabricated post 1 by bolt hole 211.It is prefabricated to wearing using bolt 3 The bolt hole 211 in perforation 11 and mounting plate 21 on column 1 will connect precast beam 2 and be fixed in prefabricated post 1, and installation is simple, It firmly installs, installation cost and insecurity factor can be greatly decreased.
According to the further example of the utility model, there are two precast beams 2, and two precast beams 2 are separately fixed at prefabricated post 1 Opposite sides side on.Specifically, two precast beams 2 are located on the side of 1 opposite sides of prefabricated post, and holding two pre- Bolt hole 211 on beam 2 processed with 11 pairs of perforation in prefabricated post 1 just, bolt 3 passes through two 2 upper bolt hole of precast beam, 211 Hes Perforation 11 in prefabricated post 1, so that two precast beams 2 are separately fixed on the opposite two sides of prefabricated post 1.
Here, it needs illustratively, in various embodiments, according to actual needs, the bolt hole 211 on mounting plate 21 Can be to be multiple with 11 quantity of perforation in prefabricated post 1,11 direction of perforation in prefabricated post 1 can be arranged in parallel, and can also hand over Fork setting, so that precast beam 2 is fixed on the demand face of prefabricated post 1 securely.
One embodiment according to the present utility model, precast beam 2 are equipped with built-in fitting, and built-in fitting and mounting plate 21 are fixed.Tool Body, built-in fitting is welded and fixed with mounting plate 21.It is fixed by mounting plate 21 with built-in fitting, in particular by the mode of welding It is fixed, enhance the fixed reliability of mounting plate 21.
According to the further example of the utility model, built-in fitting is H profile steel 22.H profile steel 22 improves pre- as built-in fitting The intensity of beam 2 processed.
According to the further example of the utility model, H profile steel 22 has the edge of a wing 221, and the edge of a wing 221 is equipped with multiple pegs 222.Specifically, multiple pegs 222 are divided into multiple row arrangement, wherein along the edge of a wing on each edge of a wing 221 there are two the edges of a wing 221 221 length directions are equipped with an at least column peg 222.In the present embodiment, it is preferred that multiple pegs 222 are divided into the arrangement of four column, Wherein, two column pegs 222 are being equipped with along 221 length direction of the edge of a wing on each edge of a wing 221.It is more by being arranged on the edge of a wing 221 A peg 222, so that built-in fitting H profile steel 22 has the function of shearing resistance and is embedded in concrete securely.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, knot Structure, material or feature are contained at least one embodiment or example of the utility model.In the present specification, to above-mentioned art The schematic representation of language may not refer to the same embodiment or example.Moreover, description specific features, structure, material or Person's feature can be combined in any suitable manner in any one or more of the embodiments or examples.
While there has been shown and described that the embodiments of the present invention, it will be understood by those skilled in the art that: These embodiments can be carried out with a variety of variations, modification, replacement in the case where not departing from the principles of the present invention and objective And modification, the scope of the utility model are defined by the claims and their equivalents.

Claims (3)

1. a kind of prefabricated assembled integrated pipe frame bean column node characterized by comprising
Prefabricated post, the prefabricated post are reinforced concrete prefabricated column;
Precast beam, the precast beam are armored concrete precast beam, and the precast beam has installation end, and the installation end is equipped with peace Loading board, the precast beam are fixed on the side of the prefabricated post by the mounting plate;
The precast beam is equipped with built-in fitting, and the built-in fitting is fixed with the mounting plate;
The built-in fitting is H profile steel;
The H profile steel has the edge of a wing, and the edge of a wing is equipped with multiple pegs;
There are two the edges of a wing, and multiple pegs are divided into the arrangement of four column, wherein long along the edge of a wing on each edge of a wing It spends direction and is equipped with the two column pegs;
The mounting plate is bolted on the side of the prefabricated post;
The mounting plate is equipped with bolt hole, and the prefabricated post is equipped with perforation, and the perforation extends transversely through the opposite of the prefabricated post Two sides, the bolt pass through it is described perforation and the bolt hole mounting plate is fixed in the prefabricated post;
The bolt hole on the mounting plate includes two middle part bolts hole, and two middle part spiro keyhole positions are in the H Outside the two sides of the web of shape steel plate, be respectively provided on the two sides of the precast beam facilitate installation bolt pothole, two The pothole is connected to two middle part bolts hole respectively, and the perforation in the prefabricated post includes and two middle parts The middle part of bolt hole face is perforated, and two bolts are each passed through two groups of corresponding middle part perforation and the middle part bolt Hole simultaneously fastens.
2. prefabricated assembled integrated pipe frame bean column node according to claim 1, which is characterized in that the precast beam has two A, two precast beams are separately fixed on the opposite two sides of the prefabricated post.
3. prefabricated assembled integrated pipe frame bean column node according to claim 1, which is characterized in that the built-in fitting and institute Mounting plate is stated to be welded and fixed.
CN201821277761.1U 2018-08-08 2018-08-08 Prefabricated assembled integrated pipe frame bean column node Active CN209163057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821277761.1U CN209163057U (en) 2018-08-08 2018-08-08 Prefabricated assembled integrated pipe frame bean column node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821277761.1U CN209163057U (en) 2018-08-08 2018-08-08 Prefabricated assembled integrated pipe frame bean column node

Publications (1)

Publication Number Publication Date
CN209163057U true CN209163057U (en) 2019-07-26

Family

ID=67329464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821277761.1U Active CN209163057U (en) 2018-08-08 2018-08-08 Prefabricated assembled integrated pipe frame bean column node

Country Status (1)

Country Link
CN (1) CN209163057U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854479A (en) * 2021-03-04 2021-05-28 羿射旭减隔震张家口有限公司 Assembled building beam column node

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854479A (en) * 2021-03-04 2021-05-28 羿射旭减隔震张家口有限公司 Assembled building beam column node

Similar Documents

Publication Publication Date Title
CN101761154A (en) Shear wall with inbuilt continuous-row steel tube concrete core column and soft steel energy consumption bond and manufacturing method thereof
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN102852244A (en) Detachable self-resetting type energy-dissipation coupling beam and construction process thereof
CN209163057U (en) Prefabricated assembled integrated pipe frame bean column node
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN113718950A (en) Novel rapid Assembly formula beam column nodal connection structure
CN110056086A (en) New type FRP profile quick assembled type beam-column node structure
CN208023723U (en) A kind of semi-rigid double web timber structure nodes of assembled
CN109235663A (en) A kind of high-strength screw bolt assembled connecting node
CN107060132B (en) Prefabricated assembled shear wall
CN212001633U (en) Temporary fixing structure for steel beam and profile steel concrete column
CN201003223Y (en) Triangle skeleton unit suitable for large space double curved surface suspended ceiling
CN103104034A (en) Connected node of end plate type H-shaped steel beam and rectangular pipe column split bolt
CN203701386U (en) Steel-structure floor slab group
CN202831237U (en) Shaft flange joint structure for assembly-type cold rolled section steel structure connection
CN107201784A (en) The method for being embedded into the structure of Cast-in-place concrete beneficial to inner thread piece and forming built-in fitting
CN209704139U (en) A kind of vertical storehouse of the prefabricated assembling type reinforced concrete with tenon structure
CN211948924U (en) Connecting assembly of steel structure building
CN210562653U (en) Assembled structure connecting piece
CN101550735A (en) Concrete link plate wall body and installation method thereof
CN208056461U (en) A kind of precast concrete composite beam
CN113026967A (en) Side wall and bottom plate connecting node of assembled structure
CN209443589U (en) A kind of high-strength screw bolt assembled connecting node
CN209353328U (en) A kind of steel reinforcement cage
CN113062449B (en) Connecting joint of flat steel tube concrete column and steel beam and construction method