CN209156079U - A kind of comprehensive centralized broken integrated equipment of hopper - Google Patents
A kind of comprehensive centralized broken integrated equipment of hopper Download PDFInfo
- Publication number
- CN209156079U CN209156079U CN201821335851.1U CN201821335851U CN209156079U CN 209156079 U CN209156079 U CN 209156079U CN 201821335851 U CN201821335851 U CN 201821335851U CN 209156079 U CN209156079 U CN 209156079U
- Authority
- CN
- China
- Prior art keywords
- equipment
- hopper
- vertical
- crushing plant
- material crushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Disintegrating Or Milling (AREA)
Abstract
The utility model belongs to equipment for pulverizing material technical field, integrated equipment is crushed more particularly to a kind of comprehensive centralized hopper, material including a closed or semienclosed high building frame and a crushing production line is crushed integrated system, from left to right successively includes the lateral dispenser of 3 layers of vertical dispenser and 2 horizontal layouts of 1 vertical runs in high building frame;Vertical 3 layers of dispenser is arranged successively from top to bottom is placed with material feeding equipment, first material crushing plant and second material crushing plant, and the discharge port of first material crushing plant is connected with the feed inlet of second material crushing plant by hopper;Lateral dispenser, which is from left to right arranged successively, is placed with third equipment for pulverizing material, material screening equipment and material transfer equipment;Hopper includes oblique hopper and vertical hopper.A kind of comprehensive centralized hopper disclosed by the utility model is crushed integrated equipment and concentrates more material equipment of placement, and the vertical butt joint type structure of design reduces the use of conveying device.
Description
Technical field
The utility model relates to a kind of comprehensive centralized hoppers to be crushed integrated equipment, belong to equipment for pulverizing material technology neck
Domain.
Background technique
Crushing operation is not that single machine is disposably completed but is crushed by multimachine multistage to complete.In addition mating object is also wanted
Feeding equipment, conveyer and screening machine (also referred to as vibrating screen) etc. subsidiary engine are expected, by material feeding equipment by feedstock transportation to level-one
First bankruptcy product after carrying out first break, are delivered to second level material crusher by conveyer and carried out again by material crusher
Broken then broken to three-level, level Four is broken etc., is delivered to screening machine finally by conveyer and is sieved, qualified finished product
Sort out storage, underproof product is instead crushed to material crusher again by conveyer, in cycles, thus composition one
Crushing production line.Crushing production line is widely used in the field of building materials, and mine resources exploit field.
Crushing production line under traditional technology is the netted crushing production line mode of expansion, divides multistage broken, and two sections broken
Between be connected with 25-35 meters of straight line material transfer equipment, land occupation is big, and management is inconvenient;To " dust, sewage and noise " etc.
Environmental pollution is difficult to eradicate;Because after " direct labor is within crushing production line ", it is difficult to eradicate " safety " hidden danger.
In the prior art, crushing production line is divided into " fixed " and " movable type " two major classes:
The advantages of " fixed " is that the installation of 1 equipment is not limited by length and width high spatial, and crushing production line enlargement is unrestricted;
2 materials are fed from by being unfolded, very convenient;3 service clearances are sufficient;The disadvantage is that 1 once crushing production line construction complete once not
It can be mobile;2 land occupations are big;3 pairs of soils are invaded turbid;
And the advantages of " movable type " be 1 can with strange land move operation;2 pairs of soils are not invaded turbid;It is installed again after 3 resettlements,
Without putting into infrastructure cost again;The disadvantage is that 1 equipment is limited by the length and width high spatial of highway transportation condition, it is only suitable for micro-
Type, small-sized crushing production line;2 material conveying mechanism complexity costs are high;3 service clearances are narrow, make to repair extremely inconvenient.
And the crushing production line under the prior art is all mostly generally outdoor production line, in crushing operation, can be generated big
The dust and noise of amount, environmental pollution is very big, all very unfavorable to production and health;In addition the green of current National Mine enterprise
Environmental requirement is more and more tighter, and environmental protection orders to stop production not up to standard;Therefore, effective dust-proof, noise-reducing pollution control measure very must
It wants.Then, bargh takes effective dust suppression to crushing production line one after another, due to this to reduce environmental pollution
Expansion crushing production line takes up a large area, and takes the unified mode to build a house, and engineering is huge, and undesirable, so, some mines
Enterprise takes the mode to single device building, so, although effectively dust and noise have been administered, for equipment
Management for, generate inconvenience.Then, the development of mine industry is badly in need of in " fixed " and " movable type " both biographies
Other than the mode of system, preferably the third mode is found.
In conclusion it is of the existing technology in order to solve the problems, such as, it needs to invent a kind of more materials of concentration placement at present
Crushing plant, convenient working are crushed integrated equipment with the comprehensive centralized hopper of management is facilitated.It is applicable in the object high to volume requirement
Broken place is expected, it can be achieved that standardization, the production of automatic assembly line formula.
Utility model content
The utility model proposes a kind of process flows for greatly simplifying crushing production line, and there is concentration to be arranged vertically, and collect
The effect of middle improvement, can also significantly save land occupation, convenient working and facilitate management, can save energy and save between equipment
The comprehensive centralized hopper of material transferring is crushed integrated equipment, solves the problems, such as of the existing technology.
In order to solve the above-mentioned technical problem, the technical solution of the utility model are as follows: in high building the superior and the subordinate's crushing plant into
Material mouth is connected by hopper, innovative design vertical butt joint type structure, is connected by hopper, and material conveying in the prior art is reduced
The use of equipment solves the transmitting that equipment concentrates material under plumbness, the settable diversification of hopper, in realization by gravity
Lower material crusher mistake formula connects, and realizes equipment concentrated setting and integration.
A kind of comprehensive centralized broken integrated equipment of hopper, including a closed or semienclosed building blocks high building and one
The material of crushing production line is crushed integrated system, and building blocks high building includes that high building frame is enclosed with the high building that the high building frame is arranged in
Protection structure from left to right successively includes the 3 layers of vertical dispenser and 2 horizontal layouts of 1 vertical runs in the high building frame
Lateral dispenser;3 layers of the vertical dispenser is arranged successively is placed with material feeding equipment from top to bottom, first material is crushed
Equipment and second material crushing plant, the discharge port of the first material crushing plant and the feed inlet of second material crushing plant
It is connected by hopper;There is high and low fall between first material crushing plant and second material crushing plant, by material to be broken
Material conveying is realized under the effect of gravity;The transverse direction dispenser, which is from left to right arranged successively, is placed with that third material is broken to be set
Standby, material screening equipment and material transfer equipment;The hopper includes oblique hopper and vertical hopper.
Further, the oblique hopper cross section is in half Y type, including the first bevel edge, the first vertical edge and the second vertical edge, institute
It states the first bevel edge and the second vertical edge forms the feed inlet of the oblique hopper, first vertical edge and the second vertical edge form described oblique
To the discharge port of hopper.
Further, the vertical hopper cross section is in Y type, and the second bevel edge and third including being laid in two sides respectively are perpendicular
Side, adjacent two second bevel edge form the feed inlet of the vertical hopper, and the adjacent two third vertical edge forms described vertical
The discharge port of hopper.
Further, the first material crushing plant and second material crushing plant are jaw crusher or cone crusher
Machine or one of oppositely rolling roller crusher or impact crusher, the discharge port and second material of the first material crushing plant
The feed inlet of crushing plant is connected by vertical hopper.
Further, the first material crushing plant and second material crushing plant are that impact breaker or hammer are broken
One of broken machine, the discharge port of the first material crushing plant and the feed inlet of second material crushing plant pass through oblique material
Bucket is connected.
Further, the first material crushing plant be jaw crusher or gyratory crusher or oppositely rolling roller crusher or
One of impact crusher, the second material crushing plant be one of impact breaker or hammer mill,
The discharge port of the first material crushing plant is connected with the feed inlet of second material crushing plant by oblique hopper.
Further, the first material crushing plant be one of impact breaker or hammer mill, it is described
Second material crushing plant is jaw crusher or gyratory crusher or one of oppositely rolling roller crusher or impact crusher,
The discharge port of the first material crushing plant is connected with the feed inlet of second material crushing plant by vertical hopper.
Further, the feed inlet of the material feeding equipment and the first material crushing plant passes through vertical conveying pipeline
It is connected.
Further, the lateral dispenser and vertical dispenser include for placing equipment for pulverizing material or material feeding
The cross-brace frame of equipment or material screening equipment and the vertical supporting frame for being used to support the cross-brace frame;The vertical branch
Support and cross-brace frame are Fast Installation detaching structure, and the high building building enclosure is the active assembled knot of combined modularization
Structure, including top plate and bottom plate and side plate, the top plate and bottom plate and side plate pass through bolt and the vertical supporting frame and cross-brace
Frame is mutually fixed.
Between the second material crushing plant and third equipment for pulverizing material, the third equipment for pulverizing material and material
It is connected between screening plant by leveling conveyer belt, the leveling conveyer belt includes combination in the first conveyer belt of " V " type and the
Two conveyer belts.
Opening one's minds for the utility model is: having analysed in depth in the prior art in practice in applicant, has been crushed production
The advantages of " fixed " and " movable type " dpd mode of line, both discoveries and the disadvantage is that complementary, then imagines and take both
The advantages of in one, a kind of new vertical+horizontal layout mode of innovative design.This new model Bu Shou highway length and width high spatial limit
System;It is large-scale, super-huge to be suitable for, the especially suitable operating condition required with some pairs of occupied areas, device heights.
The significant structure feature of the utility model is: equipment for pulverizing material in high building is perpendicular+planar set in arrange shape,
The discharge port of higher level's crushing plant is connected with the feed inlet of junior crushing plant by hopper in vertical high building, will be concentrated by equipment
Brought logistics problem is acted on by material gravity in such a way that crushing plant is connected by hopper and being solved.
The core technology of the utility model is: realizing material in such a way that crushing plant feed inlet and outlet is connected by hopper
Quick crashing has overturned the netted crushing production line of traditional expansion and has fallen behind mode, miniature, it is small, in, it is large-scale and super-huge etc.
Etc. all crushing production lines, innovative design is at arranging shape in vertical+planar set.
The utility model have the characteristics that it is following and the utility model has the advantages that
The utility model relates to a kind of comprehensive centralized hopper be crushed integrated equipment and vertically set all equipment concentrations
It sets, establishes basis for environmental protection measure;Then by the spout of feeding equipment to the feed inlet of pseudo-first-order crushing plant, level-one is broken
The discharge port of equipment is directed at the feed inlet of two-stage crushing equipment by different types of customization hopper, afterbody crushing plant
Discharge port is connect by conveying device with screening plant, final sizing storage;The equipment globality integration that will be put together, pole
The earth simplifies the process flow of crushing production line, protects and saved valuable land resource, significantly saves land occupation, side
Just operation and facilitate management, can save energy.Entirely broken integrated equipment innovative design vertical butt joint type structure, reduces conveying
The use of device.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed embodiment 1 in integrated equipment;
Fig. 2 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed embodiment 2 in integrated equipment;
Fig. 3 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed embodiment 3 in integrated equipment;
Fig. 4 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed embodiment 4 in integrated equipment;
Fig. 5 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed oblique hopper in integrated equipment;
Fig. 6 is the structural schematic diagram that a kind of comprehensive centralized hopper of the utility model is crushed vertical hopper in integrated equipment;
Fig. 7 is the structural representation that a kind of comprehensive centralized hopper of the utility model is crushed leveling conveyer belt in integrated equipment
Figure.
In figure: 1- material feeding equipment;2- first material crushing plant;3- second material crushing plant;The first bevel edge of 4-;
5- hopper;6- material screening equipment;7- material transfer equipment;The first vertical edge of 8-;The second vertical edge of 9-;10- vertical supporting frame;11-
Cross-brace frame;12- high building building enclosure;The second bevel edge of 13-;14- third vertical edge;15- third equipment for pulverizing material;16- is flat
Layer conveyer belt;17- first conveyer belt;The second conveyer belt of 18-.
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing.It should be noted that
The explanation of these embodiments is used to help to understand the utility model, but does not constitute the restriction to the utility model.This
Outside, technical characteristic involved in the various embodiments of the present invention described below is as long as they do not conflict with each other
It can be combined with each other.
Embodiment 1:
A kind of comprehensive centralized hopper shown in referring to Fig.1 is crushed the structural schematic diagram of embodiment 1 in integrated equipment.It is a kind of
Comprehensive centralization hopper is crushed integrated equipment, including a closed or semienclosed building blocks high building and crushing production line
Material is crushed integrated system, and building blocks high building includes high building frame and the high building building enclosure 12 that the high building frame is arranged in, institute
State the from left to right successively lateral placement of 3 layers of vertical dispenser including 1 vertical runs and 2 horizontal layouts in high building frame
Frame;3 layers of the vertical dispenser is arranged successively from top to bottom is placed with material feeding equipment 1, first material crushing plant 2 and
The feed inlet of two equipment for pulverizing material 3, the discharge port and second material crushing plant 3 of the first material crushing plant 2 passes through
Hopper is connected;There is high and low fall between first material crushing plant 2 and second material crushing plant 3, existed by material to be broken
Material conveying is realized under gravity;The transverse direction dispenser, which is from left to right arranged successively, is placed with third equipment for pulverizing material
15, material screening equipment 6 and material transfer equipment 7.The upper of the first material crushing plant 2 is arranged in material feeding equipment 1
Layer, is connected with the feed inlet of the first material crushing plant 2 by vertical conveying pipeline.
The structural schematic diagram of leveling conveyer belt in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 7.
Between the second material crushing plant 2 and third equipment for pulverizing material 15, the third equipment for pulverizing material 15 and material sieve
It is connected between subset 6 by leveling conveyer belt 16, the leveling conveyer belt 16 includes the first conveyer belt that combination is in " V " type
17 and second conveyer belt 18.
The structural schematic diagram of vertical hopper in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 4.Institute
Vertical hopper cross section is stated in Y type, the second bevel edge 13 and third vertical edge 14 including being laid in two sides respectively, adjacent two described the
Two bevel edges 13 form the feed inlet of the vertical hopper, and the adjacent two third vertical edge 14 forms the discharging of the vertical hopper
Mouthful.
The first material crushing plant 2 and second material crushing plant 3 are jaw crusher or gyratory crusher or right
One of kibbler roll or impact crusher, the discharge port and second material of the first material crushing plant 2 are broken
The feed inlet of equipment 3 is connected by vertical hopper.The first material crushing plant 2 is arranged in the material feeding equipment 1
Upper layer is connected with the feed inlet of the first material crushing plant 2 by vertical hopper.It is equal for upper layer and lower layer material crusher
For the input and output material mode of upper entering and lower leaving, vertical hopper docking setting is taken, material crushing efficiency is improved according to material fall trajectory.
It is described transverse direction dispenser and vertical dispenser include for place equipment for pulverizing material or material feeding equipment 1 or
The cross-brace frame 11 of material screening equipment 6 and the vertical supporting frame 10 for being used to support the cross-brace frame 11;It is described vertical
Support frame 10 and cross-brace frame 11 are Fast Installation detaching structure, and the high building building enclosure 12 is that combined modularization is active
Splicing structure, including top plate and bottom plate and side plate, the top plate and bottom plate and side plate by bolt and the vertical supporting frame 10 and
11 phase of cross-brace frame is fixed.
Embodiment 2:
The structural schematic diagram of embodiment 2 in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 2.It is a kind of
Comprehensive centralization hopper is crushed integrated equipment, including a closed or semienclosed building blocks high building and crushing production line
Material is crushed integrated system, and building blocks high building includes high building frame and the high building building enclosure 12 that the high building frame is arranged in, institute
State the from left to right successively lateral placement of 3 layers of vertical dispenser including 1 vertical runs and 2 horizontal layouts in high building frame
Frame;3 layers of the vertical dispenser is arranged successively from top to bottom is placed with material feeding equipment 1, first material crushing plant 2 and
The feed inlet of two equipment for pulverizing material 3, the discharge port and second material crushing plant 3 of the first material crushing plant 2 passes through
Hopper is connected;There is high and low fall between first material crushing plant 2 and second material crushing plant 3, existed by material to be broken
Material conveying is realized under gravity;The transverse direction dispenser, which is from left to right arranged successively, is placed with third equipment for pulverizing material
15, material screening equipment 6 and material transfer equipment 7.The upper of the first material crushing plant 2 is arranged in material feeding equipment 1
Layer, is connected with the feed inlet of the first material crushing plant 2 by vertical conveying pipeline.
The structural schematic diagram of leveling conveyer belt in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 7.
Between the second material crushing plant 2 and third equipment for pulverizing material 15, the third equipment for pulverizing material 15 and material sieve
It is connected between subset 6 by leveling conveyer belt 16, the leveling conveyer belt 16 includes the first conveyer belt that combination is in " V " type
17 and second conveyer belt 18.
A kind of comprehensive centralized hopper referring to Figure 5 is crushed the structural schematic diagram of oblique hopper in integrated equipment.Institute
Oblique hopper cross section is stated in half Y type, including the first bevel edge 4, the first vertical edge 8 and the second vertical edge 9, first bevel edge 4 and the
Two vertical edges 9 form the feed inlet of the oblique hopper, and first vertical edge 8 and the second vertical edge 9 form going out for the oblique hopper
Material mouth.
The first material crushing plant 2 is that jaw crusher or gyratory crusher or oppositely rolling roller crusher or impact type are broken
One of broken machine, the second material crushing plant 3 be one of impact breaker or hammer mill, described first
The discharge port of equipment for pulverizing material 2 is connected with the feed inlet of second material crushing plant 3 by oblique hopper.The material feeding
The upper layer of the first material crushing plant 2 is arranged in equipment 1, passes through with the feed inlet of the first material crushing plant 2 perpendicular
It is connected to hopper.First material crushing plant 2 charging discharging mode present into it is lower go out, the charging of second material crushing plant 3
Discharging mode in it is left into it is lower go out, be upper entering and lower leaving for upper layer and lower layer material crusher, left into lower input and output material mould out
Formula is taken through oblique hopper docking setting, improves material crushing efficiency according to material fall trajectory.
It is described transverse direction dispenser and vertical dispenser include for place equipment for pulverizing material or material feeding equipment 1 or
The cross-brace frame 11 of material screening equipment 6 and the vertical supporting frame 10 for being used to support the cross-brace frame 11;It is described vertical
Support frame 10 and cross-brace frame 11 are Fast Installation detaching structure, and the high building building enclosure 12 is that combined modularization is active
Splicing structure, including top plate and bottom plate and side plate, the top plate and bottom plate and side plate by bolt and the vertical supporting frame 10 and
11 phase of cross-brace frame is fixed.
Embodiment 3:
The structural schematic diagram of embodiment 3 in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 3.It is a kind of
Comprehensive centralization hopper is crushed integrated equipment, including a closed or semienclosed building blocks high building and crushing production line
Material is crushed integrated system, and building blocks high building includes high building frame and the high building building enclosure 12 that the high building frame is arranged in, institute
State the from left to right successively lateral placement of 3 layers of vertical dispenser including 1 vertical runs and 2 horizontal layouts in high building frame
Frame;3 layers of the vertical dispenser is arranged successively from top to bottom is placed with material feeding equipment 1, first material crushing plant 2 and
The feed inlet of two equipment for pulverizing material 3, the discharge port and second material crushing plant 3 of the first material crushing plant 2 passes through
Hopper is connected;There is high and low fall between first material crushing plant 2 and second material crushing plant 3, existed by material to be broken
Material conveying is realized under gravity;The transverse direction dispenser, which is from left to right arranged successively, is placed with third equipment for pulverizing material
15, material screening equipment 6 and material transfer equipment 7.The upper of the first material crushing plant 2 is arranged in material feeding equipment 1
Layer, is connected with the feed inlet of the first material crushing plant 2 by vertical conveying pipeline.
The structural schematic diagram of leveling conveyer belt in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 7.
Between the second material crushing plant 2 and third equipment for pulverizing material 15, the third equipment for pulverizing material 15 and material sieve
It is connected between subset 6 by leveling conveyer belt 16, the leveling conveyer belt 16 includes the first conveyer belt that combination is in " V " type
17 and second conveyer belt 18.
A kind of comprehensive centralized hopper referring to Figure 5 is crushed the structural schematic diagram of oblique hopper in integrated equipment.Institute
Oblique hopper cross section is stated in half Y type, including the first bevel edge 4, the first vertical edge 8 and the second vertical edge 9, first bevel edge 4 and the
Two vertical edges 9 form the feed inlet of the oblique hopper, and first vertical edge 8 and the second vertical edge 9 form going out for the oblique hopper
Material mouth.
The first material crushing plant 2 and second material crushing plant 3 are in impact breaker or hammer mill
One kind, the discharge port of the first material crushing plant 2 passes through oblique hopper phase with the feed inlet of second material crushing plant 3
Even.The upper layer of the first material crushing plant 2 is arranged in the material feeding equipment 1, with the first material crushing plant
2 feed inlet is connected by vertical hopper.The charging discharging mode of first material crushing plant 2 and second material crushing plant 3
In a left side into it is lower go out, for upper layer and lower layer material crusher be for a left side into it is lower go out input and output material mode, take oblique docking setting,
Material crushing efficiency is improved according to material fall trajectory.
It is described transverse direction dispenser and vertical dispenser include for place equipment for pulverizing material or material feeding equipment 1 or
The cross-brace frame 11 of material screening equipment 6 and the vertical supporting frame 10 for being used to support the cross-brace frame 11;It is described vertical
Support frame 10 and cross-brace frame 11 are Fast Installation detaching structure, and the high building building enclosure 12 is that combined modularization is active
Splicing structure, including top plate and bottom plate and side plate, the top plate and bottom plate and side plate by bolt and the vertical supporting frame 10 and
11 phase of cross-brace frame is fixed.
Embodiment 4:
The structural schematic diagram of embodiment 4 in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 4.It is a kind of
Comprehensive centralization hopper is crushed integrated equipment, including a closed or semienclosed building blocks high building and crushing production line
Material is crushed integrated system, and building blocks high building includes high building frame and the high building building enclosure 12 that the high building frame is arranged in, institute
State the from left to right successively lateral placement of 3 layers of vertical dispenser including 1 vertical runs and 2 horizontal layouts in high building frame
Frame;3 layers of the vertical dispenser is arranged successively from top to bottom is placed with material feeding equipment 1, first material crushing plant 2 and
The feed inlet of two equipment for pulverizing material 3, the discharge port and second material crushing plant 3 of the first material crushing plant 2 passes through
Hopper is connected;There is high and low fall between first material crushing plant 2 and second material crushing plant 3, existed by material to be broken
Material conveying is realized under gravity;The transverse direction dispenser, which is from left to right arranged successively, is placed with third equipment for pulverizing material
15, material screening equipment 6 and material transfer equipment 7.The upper of the first material crushing plant 2 is arranged in material feeding equipment 1
Layer, is connected with the feed inlet of the first material crushing plant 2 by vertical conveying pipeline.
The structural schematic diagram of leveling conveyer belt in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 7.
Between the second material crushing plant 2 and third equipment for pulverizing material 15, the third equipment for pulverizing material 15 and material sieve
It is connected between subset 6 by leveling conveyer belt 16, the leveling conveyer belt 16 includes the first conveyer belt that combination is in " V " type
17 and second conveyer belt 18.
The structural schematic diagram of vertical hopper in integrated equipment is crushed referring to a kind of comprehensive centralized hopper shown in Fig. 4.Institute
Vertical hopper cross section is stated in Y type, the second bevel edge 13 and third vertical edge 14 including being laid in two sides respectively, adjacent two described the
Two bevel edges 13 form the feed inlet of the vertical hopper, and the adjacent two third vertical edge 14 forms the discharging of the vertical hopper
Mouthful.
The first material crushing plant 2 is one of impact breaker or hammer mill, the second material
Crushing plant 3 is jaw crusher or gyratory crusher or one of oppositely rolling roller crusher or impact crusher, described the
The discharge port of one equipment for pulverizing material 2 is connected with the feed inlet of second material crushing plant 3 by vertical hopper.The material is fed
The upper layer of the first material crushing plant 2 is arranged in material equipment 1, passes through with the feed inlet of the first material crushing plant 2
Vertical hopper is connected.The charging discharging mode of first material crushing plant 2 be in it is left into it is lower go out, second material crushing plant 3
Charging discharging mode present into it is lower go out, for upper layer and lower layer material crusher be it is left into it is lower out, the disengaging of upper entering and lower leaving
Material mode takes vertical hopper docking setting, improves material crushing efficiency according to material fall trajectory.
It is described transverse direction dispenser and vertical dispenser include for place equipment for pulverizing material or material feeding equipment 1 or
The cross-brace frame 11 of material screening equipment 6 and the vertical supporting frame 10 for being used to support the cross-brace frame 11;It is described vertical
Support frame 10 and cross-brace frame 11 are Fast Installation detaching structure, and the high building building enclosure 12 is that combined modularization is active
Splicing structure, including top plate and bottom plate and side plate, the top plate and bottom plate and side plate by bolt and the vertical supporting frame 10 and
11 phase of cross-brace frame is fixed.
The embodiments of the present invention is explained in detail in conjunction with attached drawing above, but the utility model is not limited to be retouched
The embodiment stated.For a person skilled in the art, right in the case where not departing from the utility model principle and spirit
These embodiments carry out a variety of change, modification, replacement and modification, still fall in the protection scope of the utility model.
Claims (10)
1. a kind of comprehensive centralized hopper is crushed integrated equipment, it is characterised in that: including a closed or semienclosed building blocks
The material of high building and a crushing production line is crushed integrated system, and building blocks high building includes high building frame and is arranged in the high building frame
The high building building enclosure of frame from left to right successively includes 3 layers of vertical dispenser and 2 of 1 vertical runs in the high building frame
The lateral dispenser of a horizontal layout;
3 layers of the vertical dispenser is arranged successively from top to bottom is placed with material feeding equipment, first material crushing plant and
Two equipment for pulverizing material, the discharge port of the first material crushing plant and the feed inlet of second material crushing plant pass through hopper
It is connected;There is high and low fall between first material crushing plant and second material crushing plant, made by material to be broken in gravity
It is conveyed with lower realization material;
The transverse direction dispenser is from left to right arranged successively that be placed with third equipment for pulverizing material, material screening equipment and material defeated
Send equipment;
The hopper includes oblique hopper and vertical hopper.
2. a kind of comprehensive centralized hopper according to claim 1 is crushed integrated equipment, it is characterised in that: the oblique material
Bucket cross section is in half Y type, including the first bevel edge, the first vertical edge and the second vertical edge, and first bevel edge and the second vertical edge form institute
The feed inlet of oblique hopper is stated, first vertical edge and the second vertical edge form the discharge port of the oblique hopper.
3. a kind of comprehensive centralized hopper according to claim 1 is crushed integrated equipment, it is characterised in that: the vertical material
Cross section struggle against in Y type, the second bevel edge and third vertical edge including being laid in two sides respectively, adjacent two second bevel edge form institute
The feed inlet of vertical hopper is stated, the adjacent two third vertical edge forms the discharge port of the vertical hopper.
4. a kind of comprehensive centralized hopper according to claim 3 is crushed integrated equipment, it is characterised in that: first object
Expect crushing plant and second material crushing plant is that jaw crusher or gyratory crusher or oppositely rolling roller crusher or impact type are broken
One of broken machine, the discharge port of the first material crushing plant and the feed inlet of second material crushing plant are by vertically expecting
Bucket is connected.
5. a kind of comprehensive centralized hopper according to claim 2 is crushed integrated equipment, it is characterised in that: first object
Expect crushing plant and second material crushing plant is one of impact breaker or hammer mill, the first material is broken
The discharge port of broken equipment is connected with the feed inlet of second material crushing plant by oblique hopper.
6. a kind of comprehensive centralized hopper according to claim 2 is crushed integrated equipment, it is characterised in that: first object
Expect that crushing plant is jaw crusher or gyratory crusher or one of oppositely rolling roller crusher or impact crusher, described the
Two equipment for pulverizing material are one of impact breaker or hammer mill, the discharge port of the first material crushing plant
It is connected with the feed inlet of second material crushing plant by oblique hopper.
7. a kind of comprehensive centralized hopper according to claim 3 is crushed integrated equipment, it is characterised in that: first object
Expect that crushing plant is one of impact breaker or hammer mill, the second material crushing plant is jaw crusher
Or gyratory crusher or one of oppositely rolling roller crusher or impact crusher, the discharge port of the first material crushing plant
It is connected with the feed inlet of second material crushing plant by vertical hopper.
8. a kind of any comprehensive centralized hopper is crushed integrated equipment in -7 according to claim 1, it is characterised in that: institute
Material feeding equipment is stated to be connected with the feed inlet of the first material crushing plant by vertical conveying pipeline.
9. a kind of comprehensive centralized hopper according to claim 8 is crushed integrated equipment, it is characterised in that: the laterally peace
It puts frame and vertical dispenser includes the lateral branch for placing equipment for pulverizing material or material feeding equipment or material screening equipment
Support and the vertical supporting frame for being used to support the cross-brace frame;The vertical supporting frame and cross-brace frame are Fast Installation
Detaching structure, the high building building enclosure are the active splicing structure of combined modularization, including top plate and bottom plate and side plate are described
Top plate and bottom plate and side plate are mutually fixed by bolt with the vertical supporting frame and cross-brace frame.
10. a kind of comprehensive centralized hopper according to claim 1 is crushed integrated equipment, it is characterised in that: described second
Pass through between equipment for pulverizing material and third equipment for pulverizing material, between the third equipment for pulverizing material and material screening equipment
Leveling conveyer belt is connected, and the leveling conveyer belt includes the first conveyer belt and the second conveyer belt that combination is in " V " type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821335851.1U CN209156079U (en) | 2018-08-19 | 2018-08-19 | A kind of comprehensive centralized broken integrated equipment of hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821335851.1U CN209156079U (en) | 2018-08-19 | 2018-08-19 | A kind of comprehensive centralized broken integrated equipment of hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209156079U true CN209156079U (en) | 2019-07-26 |
Family
ID=67329838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821335851.1U Expired - Fee Related CN209156079U (en) | 2018-08-19 | 2018-08-19 | A kind of comprehensive centralized broken integrated equipment of hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209156079U (en) |
-
2018
- 2018-08-19 CN CN201821335851.1U patent/CN209156079U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208906117U (en) | A kind of rectilinear hopper crushing device in list building | |
CN207271392U (en) | A kind of novel energy-saving environment-friendly aggregate production line | |
CN209138823U (en) | A kind of rectilinear feed back crushing plant in list building | |
CN209156079U (en) | A kind of comprehensive centralized broken integrated equipment of hopper | |
CN208912287U (en) | A kind of single column places side by side formula and is crushed integrated system | |
CN205833339U (en) | Crushing and screening all-in-one | |
CN108820940B (en) | Building type intelligent environment-friendly crushing, screening and loading system | |
CN210304004U (en) | Open-circuit and closed-circuit convertible system of cement mill | |
CN208906120U (en) | A kind of comprehensive centralized crushing device | |
CN208912285U (en) | A kind of rectilinear broken integrated system in building blocks list building | |
CN206716421U (en) | Coal material screening breaker | |
CN208944322U (en) | A kind of broken integrated system of rectilinear environmental protection in list building | |
CN209156081U (en) | A kind of broken integrated system of comprehensive centralization of building blocks high building | |
CN110813484A (en) | Building block combined type crushing integrated system and building block combining method | |
CN209501892U (en) | A kind of rectilinear crushing device of single column vibrating screen | |
CN209076868U (en) | A kind of broken integrated system of multitower lappet formula feed back | |
CN209188971U (en) | A kind of comprehensive centralized broken concentrating equipment of vibrating screen | |
CN211538117U (en) | Device for separating machine to produce sand and river stone | |
CN209156082U (en) | A kind of broken integrated single column of floating type feed back | |
CN212215822U (en) | Novel 500 ton building rubbish production line | |
CN208960098U (en) | Feed back is crushed integrated system in a kind of floating type planar set | |
WO2020038339A1 (en) | Integrated material returning crushing system with multiple vertically arranged towers and crushing process thereof | |
CN208906121U (en) | A kind of plane centralization broken set is at system | |
CN209109341U (en) | Building blocks case is crushed integrated system in a kind of floating type planar set | |
CN208906119U (en) | A kind of comprehensive centralized broken integrated equipment of feed back |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190726 Termination date: 20200819 |
|