CN209139390U - Concrete delivery pump pipe Quick dredging and cleaning plant - Google Patents

Concrete delivery pump pipe Quick dredging and cleaning plant Download PDF

Info

Publication number
CN209139390U
CN209139390U CN201821844563.9U CN201821844563U CN209139390U CN 209139390 U CN209139390 U CN 209139390U CN 201821844563 U CN201821844563 U CN 201821844563U CN 209139390 U CN209139390 U CN 209139390U
Authority
CN
China
Prior art keywords
fixed
pedestal
bull stick
bevel
pump line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821844563.9U
Other languages
Chinese (zh)
Inventor
张迎松
张海鸣
张凯华
曹峰
李娟�
张厚起
杲永亮
杨继波
张洪川
赵剑
张康
翟书青
樊兆鹏
王保同
王志鹏
刘丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG GOLD REAL ESTATE TOURISM GROUP Co Ltd
China Construction Eighth Engineering Division Co Ltd
Original Assignee
SHANDONG GOLD REAL ESTATE TOURISM GROUP Co Ltd
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GOLD REAL ESTATE TOURISM GROUP Co Ltd, China Construction Eighth Engineering Division Co Ltd filed Critical SHANDONG GOLD REAL ESTATE TOURISM GROUP Co Ltd
Priority to CN201821844563.9U priority Critical patent/CN209139390U/en
Application granted granted Critical
Publication of CN209139390U publication Critical patent/CN209139390U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, including base, pedestal, rotating electric machine, bull stick and feeding motor, are provided with front bevel and back bevel on base, front bevel is fixed with guide rail and rack gear;Be characterized in that: pedestal is set on two guide rails through sliding block, feeds the gear for being fixed on the output shaft of motor and being meshed with rack gear;Rotating electric machine is fixed on pedestal, and the front end of bull stick is rotatably dispose on pedestal through two bearings, and drill bit or coil of wire are fixed on bull stick, and rotating electric machine drives bull stick to rotate through meshed gears;To be unclogged or cleaning pump line is fixed on back bevel.The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, dredging or prune job quickly can be carried out to the pump line blocked, compared with previous manual cleaning, it not only reduces labor intensity, improve work efficiency, it also can avoid the destruction to pump line, beneficial effect is significant, is suitable for the application of popularization.

Description

Concrete delivery pump pipe Quick dredging and cleaning plant
Technical field
The utility model relates to a kind of Quick dredging and cleaning plants, more specifically, more particularly to a kind of concrete it is defeated Send pump line Quick dredging and cleaning plant.
Background technique
In building construction process, the concrete after stirring is delivered to corresponding positions under the action of pumping system, through pump line It sets for using.In the transmission process of concrete, feed-line is usually gradually formed by connecting by the steel pipe of 3 meter Yi Jie, defeated Send concrete is downward, upward or horizontal feed under the pressure of pump.In actual use, one can be adhered on pump line inner wall Layer concrete, as the long-time of pump line uses, the concrete layer bonded can be increasingly thicker, can make concrete pumping system Transfer efficiency reduces;It will lead to pump tube lumen under serious conditions to be blocked, lead to not normal pump concrete.
It, will be corresponding when concrete pumping tube coupling inner cavity is obstructed or the way after death, typically now used that is blocked completely is Tube coupling disassembles, and tube coupling slant setting, then takes the weights such as hammer to strike pump line outer wall by worker, utilizes the side of vibration Formula taps the concrete adhered on pump line inner wall, it is sometimes desirable to using in reinforcing rod insertion pump line, will be pumped using hammer Concrete in pipe is prized bit by bit, and large labor intensity, working efficiency are low, seriously affects the normal pumping of concrete.
Summary of the invention
The utility model in order to overcome the shortcomings of the above technical problems, provides a kind of concrete delivery pump pipe Quick dredging And cleaning plant.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, including base, pedestal, rotating electric machine, Bull stick and feeding motor, the front and rear of base are the consistent front bevel of tilt angle and back bevel, are grown on front bevel along it Degree direction is fixed with two guide rails being parallel to each other, and is provided between two guide rails and the consistent rack gear in its direction;It is characterized by: The both ends of base lower surface are set on two guide rails through sliding block, and feeding motor is fixed on the lower surface of pedestal, feed motor The gear being meshed with rack gear is fixed on output shaft;Rotating electric machine is fixed on pedestal, and the front end of bull stick is rotated through two bearings It is set on pedestal, the rear end of bull stick is fixed with the drill bit or coil of wire that the inner wall of pump line is dredged or cleared up, electric rotating It is fixed with driving gear on the output shaft of machine, the driven gear being meshed with driving gear is fixed on bull stick;It is to be unclogged or clear The pump line of reason is coaxially fixable on back bevel through locking device and bull stick.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, including by water tank, water pump, water pipe and spray The high-pressure sprayer of head composition, is fixed on the outer cage positioned at bull stick periphery on pedestal, water tank and water pump are both secured to pedestal On, the water inlet of water pump is communicated with water tank, and water outlet is communicated with water pipe, and spray head is fixed on one end on outer cage close to drill bit, Spray head is communicated with water pipe.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, being fixed on the base prevents pump line The concrete block of outflow enters the isolation board on front bevel, and isolation board is opened on isolation board between front bevel and back bevel Equipped with the through-hole passed through convenient for drill bit.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model are fixed with to pump line on the back bevel The limited block that is limited of front end, the two sides and rear end of back bevel are respectively and fixedly provided with the locking device positioned to pump line, institute It states locking device to be made of sleeve, screw rod, clamping plate and crank, sleeve is fixed on back bevel, and screw rod is located in sleeve and with spiral shell The form of line matches, and for Boards wall in the front end of screw rod, crank is fixed on the rear end of clamping plate.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model are fixed with to two axis on the pedestal It holds, the protective cover that the bull stick before driving gear, driven gear and two bearings is sealed.
The beneficial effects of the utility model are: the concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, Pedestal is placed on two guide rails on front bevel by sliding block, is fixed with the tooth being meshed with rack gear on the feeding motor on pedestal Wheel, so that pedestal can be driven to move forward and backward along guide rail under the driving effect of feeding motor.Bull stick is set to pedestal by bearing On, and the rotating electric machine on pedestal drives bull stick to be rotated through the engagement of gear, so that under the induced effect of rotating electric machine, The drill bit or coil of wire that bull stick front end can be driven carry out dredging or prune job to pump line.There is same tilt angle by setting Front bevel, back bevel, drive the mechanism of bit and feeding to move on front bevel, it is to be unclogged or cleaning pump line fix In on back bevel, so that the concrete clinker under being cleaned flows out automatically under self gravity, the dredging of pump line and clear is accelerated Manage speed.
Further, by the way that the high-pressure sprayer by water tank, water pump, water pipe and sprinkler composition is arranged, in the work of water pump Under, the high pressure water extracted out from water tank can be sprayed at drill bit position through spray head, so that the concrete block that will be bored sprays, It can also be achieved the cooling to drill bit simultaneously.
The concrete delivery pump pipe Quick dredging and cleaning plant of the utility model, can quickly to the pump line blocked into Row dredging or prune job only need manually to position pump line, and follow-up work can be automatically performed, with previous manual cleaning phase Than not only reducing labor intensity, improving work efficiency, also can avoid the destruction to pump line, beneficial effect is significant, suitable for answering With popularization.
Detailed description of the invention
Fig. 1 is the concrete delivery pump pipe Quick dredging of the utility model and the main view of cleaning plant;
Fig. 2 is the concrete delivery pump pipe Quick dredging of the utility model and the top view of cleaning plant;
Fig. 3 is the enlarged diagram of a-quadrant in Fig. 1;
Fig. 4 is the partial enlargement diagram at position where pedestal in Fig. 2;
Fig. 5 is the concrete delivery pump pipe Quick dredging of the utility model and the usage state diagram of cleaning plant.
In figure: 1 base, 2 front bevels, 3 back bevels, 4 pedestals, 5 rotating electric machines, 6 bull sticks, 7 guide rails, 8 rack gears, 9 feeding electricity Machine, 10 locking devices, 11 sliding blocks, 12 bearings, 13 driven gears, 14 driving gears, 15 drill bits, 16 protective covers, 17 water tanks, 18 water Pump, 19 water pipes, 20 spray heads, 21 outer cages, 22 isolation boards, 23 limited blocks, 24 sleeves, 25 screw rods, 26 clamping plates, 27 cranks, 28 is logical Hole, 29 pump lines.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
As shown in Figure 1 and Figure 2, the concrete delivery pump pipe Quick dredging and the master of cleaning plant of the utility model are given View and top view, Fig. 3 give the enlarged diagram of a-quadrant, and Fig. 4 gives the partial enlargement at position where pedestal in Fig. 2 Schematic diagram is made of base 1, pedestal 4, rotating electric machine 5, bull stick 6, guide rail 7, rack gear 8, feeding motor 9, locking device 10, Base 1, which serves, to be fixed and supported, and the front and rear of base 1 is respectively front bevel 2 and back bevel 3, back bevel 3 and front bevel 2 tilt angle is consistent, and the benefit that inclined surface is arranged is that pump line 29 is made to be dredged or be cleared up under inclined angle, can make clear The concrete clinker managed flows out automatically, accelerates cleaning speed.Two guide rails parallel to each other are fixed on shown front bevel 2 7, rack gear 8 is fixed between two guide rails 7, and rack gear 8 is consistent with the direction of guide rail 7.
The both ends of 4 lower surface of pedestal are respectively and fixedly provided with the sliding block 11 matched with guide rail 7, to pass through guide rail 7 and sliding block 11 The guiding role to pedestal 4 is realized in cooperation, so that pedestal 4 is moved forward and backward along the direction where guide rail 7.In order to realize 4 jail of pedestal Admittedly be fixed on guide rail 7, swallow-tail form wide at the top and narrow at the bottom can be used in shown guide rail 7, guiding while realize fixed function.Into It is fixed on to motor 9 on the lower surface of pedestal 4, feeds and be fixed with the gear being meshed with rack gear 8 on the output shaft of motor 9, this Sample can drive pedestal 4 to move forward and backward along 7 direction of guide rail during feeding the rotation of 9 both forward and reverse directions of motor.
Shown rotating electric machine 5 is fixed on the upper surface of pedestal 4, and pedestal 4 is fixed on through two bearings 12 in the front end of bull stick 6 On, also assure that it is freely rotated while realizing fixed to bull stick 6.Master is fixed on the output shaft of shown rotating electric machine 5 Moving gear 14 is fixed on the driven gear 13 being meshed with driving gear 14 on bull stick 6, in this way, the mistake rotated in rotating electric machine 5 Bull stick 6 can be driven to be rotated in journey.Shown bull stick 6 is fixedly arranged at the front end with dismountable drill bit 15, when pump line 29 is blocked After can be dredged with drill bit 15;Can also drill bit 15 be changed into coil of wire, it, can after adhering to concrete on pump line 29 only inner wall Only cleared up by coil of wire.
Shown to be unclogged or cleaning pump line 29 is fixed on back bevel 3 through locking device 10, and the front end of back bevel 3 is fixed There is limited block 23, for limited block 23 for limiting to the front end of pump line 29, the rear end and two sides of pump line 29 are provided with locking Device 10, so as to pump line 29 rear end and two sides limited and locked, after pump line 29 is locked, the axis of pump line 29 with turn The axis of bar 6 is on same straight line.In this way, while rotating electric machine 5 drives bull stick 6 and drill bit 15 while rotating, feeding Motor 9 drives drill bit 15 to move to the inner cavity depths of pump line 29, and the concrete cut in pump line 29 can get off, and realizes to pump The dredging or cleaning of pipe 29.
Shown locking device 10 is made of sleeve 24, screw rod 25, clamping plate 26, crank 27, and sleeve 24 is fixed on back bevel 3 On, screw rod 25 is located in sleeve 24, is provided with screw thread on the inner wall of sleeve 24, matches so that screw rod 25 carries out screw thread with sleeve 24 It closes.Clamping plate 26 is fixed on the front end of screw rod 25, and crank 27 is fixed on the rear end of screw rod 25, by rotating crank 27, can drive Screw rod 25 is moving forward and backward, and to realize the fixation to pump line 29, is aligned drill bit 15 with the position to be cut in pump line 29.
During pump line 29 is dredged and cleared up, in order to which the concrete clinker guaranteed in pump line 29 smoothly flows Out, it is additionally provided with high-pressure sprayer.High-pressure sprayer is made of water tank 17, water pump 18, water pipe 19 and spray head 20, bull stick 6 Periphery be provided with outer cage 21, the front end of outer cage 21 is fixed on pedestal 4, and outer cage 21 will not influence the freedom of bull stick 6 Rotation.The water inlet of water pump 18 is communicated with water tank 17, and water outlet is communicated with water pipe 19;Spray head 20 is fixed on close on outer cage 21 The position of drill bit 15, spray head 20 are communicated with water pipe 19, the injection direction of spray head 20 towards drill bit 15 boring sites in curing, in this way, Under the action of the high pressure water flow that spray head 20 ejects, the concrete bored can not only be gushed out, but also can also be achieved to brill First 15 cooling effect.
During clearing up pump line 29, in order to avoid entering 2 institute of front bevel from the concrete clinker in pump line 29 Position, vertical isolation board 22 is provided between front bevel 2 and back bevel 3, offers through-hole 28 on isolation board 22, with Just drill bit 7, bull stick 7 and outer cage 21 pass through through-hole 28;As shown in figure 5, giving the concrete delivery pump pipe of the utility model The usage state diagram of Quick dredging and cleaning plant, shown in drill bit 7, bull stick 7 and outer cage 21 stretch to the interior of pump line 29 In chamber.Be provided with protective cover 16 on shown pedestal 4, protective cover 16 realize to two bearings 12, driving gear 14, driven gear 13 with And the package of the bull stick 6 between two bearings 12, realization protect it.

Claims (4)

1. a kind of concrete delivery pump pipe Quick dredging and cleaning plant, including base (1), pedestal (4), rotating electric machine (5), turn Bar (6) and feeding motor (9), the front and rear of base are the consistent front bevel of tilt angle (2) and back bevel (3), preceding oblique Two guide rails (7) being parallel to each other are fixed on face along its length, are provided with and the consistent rack gear in its direction between two guide rails (8);It is characterized by: the both ends of pedestal (4) lower surface are set on two guide rails (7) through sliding block (11), feeding motor is fixed on On the lower surface of pedestal, the gear for being fixed on the output shaft of motor and being meshed with rack gear is fed;Rotating electric machine is fixed on pedestal On, the front end of bull stick is rotatably dispose on pedestal through two bearings (12), the rear end of bull stick be fixed with to the inner wall of pump line (29) into Row is dredged or the drill bit (15) or coil of wire of cleaning, is fixed with driving gear (14) on the output shaft of rotating electric machine, solid on bull stick Due to the driven gear (13) being meshed with driving gear;To be unclogged or cleaning pump line (29) is through locking device (10) and bull stick It is coaxially fixable on back bevel (3).
2. concrete delivery pump pipe Quick dredging according to claim 1 and cleaning plant, it is characterised in that: including by water The high-pressure sprayer that case (17), water pump (18), water pipe (19) and spray head (20) form, pedestal are fixed on (4) positioned at bull stick (6) peripheral outer cage (21), water tank and water pump are both secured on pedestal (4), and the water inlet of water pump is communicated with water tank, water outlet It is communicated with water pipe, spray head is fixed on one end on outer cage close to drill bit (15), and spray head is communicated with water pipe.
3. concrete delivery pump pipe Quick dredging according to claim 1 or 2 and cleaning plant, it is characterised in that: described The concrete block that being fixed on base (1) prevents pump line (29) from flowing out enters the isolation board (22) on front bevel (2), isolation board position Between front bevel (2) and back bevel (3), the through-hole (28) passed through convenient for drill bit (15) is offered on isolation board.
4. concrete delivery pump pipe Quick dredging according to claim 1 or 2 and cleaning plant, it is characterised in that: described The limited block (23) limited to the front end of pump line (29) is fixed on back bevel (3), the two sides and rear end of back bevel are solid Surely there is the locking device (10) positioned to pump line (29), the locking device is by sleeve (24), screw rod (25), clamping plate (26) It is formed with crank (27), sleeve is fixed on back bevel, and screw rod is located in sleeve and is matched in the form of screw thread, Boards wall In the front end of screw rod, crank is fixed on the rear end of clamping plate.
CN201821844563.9U 2018-11-09 2018-11-09 Concrete delivery pump pipe Quick dredging and cleaning plant Expired - Fee Related CN209139390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821844563.9U CN209139390U (en) 2018-11-09 2018-11-09 Concrete delivery pump pipe Quick dredging and cleaning plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821844563.9U CN209139390U (en) 2018-11-09 2018-11-09 Concrete delivery pump pipe Quick dredging and cleaning plant

Publications (1)

Publication Number Publication Date
CN209139390U true CN209139390U (en) 2019-07-23

Family

ID=67284991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821844563.9U Expired - Fee Related CN209139390U (en) 2018-11-09 2018-11-09 Concrete delivery pump pipe Quick dredging and cleaning plant

Country Status (1)

Country Link
CN (1) CN209139390U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109304336A (en) * 2018-11-09 2019-02-05 中国建筑第八工程局有限公司 Concrete delivery pump pipe Quick dredging and cleaning plant
CN110586582A (en) * 2019-09-18 2019-12-20 长沙矿山研究院有限责任公司 Method for quickly dredging filling pipeline
CN111618338A (en) * 2020-06-08 2020-09-04 温州益蓉机械有限公司 Drilling machine for mechanical manufacturing for cooling pipeline blockage
CN112845306A (en) * 2021-01-04 2021-05-28 中铁第五勘察设计院集团有限公司 Drilling rod belt cleaning device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109304336A (en) * 2018-11-09 2019-02-05 中国建筑第八工程局有限公司 Concrete delivery pump pipe Quick dredging and cleaning plant
CN110586582A (en) * 2019-09-18 2019-12-20 长沙矿山研究院有限责任公司 Method for quickly dredging filling pipeline
CN111618338A (en) * 2020-06-08 2020-09-04 温州益蓉机械有限公司 Drilling machine for mechanical manufacturing for cooling pipeline blockage
CN112845306A (en) * 2021-01-04 2021-05-28 中铁第五勘察设计院集团有限公司 Drilling rod belt cleaning device
CN112845306B (en) * 2021-01-04 2022-06-17 中铁第五勘察设计院集团有限公司 Drilling rod belt cleaning device

Similar Documents

Publication Publication Date Title
CN209139390U (en) Concrete delivery pump pipe Quick dredging and cleaning plant
CN103721876B (en) Shower nozzle and cleaning device
CN101713200B (en) Double-shaft groove forming machine
CN109304336A (en) Concrete delivery pump pipe Quick dredging and cleaning plant
CN211058244U (en) Wall plastering machine for municipal administration
CN108856187A (en) Pipeline drainer
CN209145485U (en) A kind of anchor cable rig with device for reducing dust
CN209385061U (en) A kind of sandblasting drilling machine
DE1171848B (en) Device and method for driving a borehole
ITTO20080335A1 (en) HEAD OF INJECTION FOR THE EXECUTION OF JET GROUTING TECHNIQUES
CN104259159A (en) Pipe cleaning machine
KR100705355B1 (en) Injection nozzle device of water jet system
CN108213895B (en) Underwater replacing device for nuclear power station coaming bolt
CN102784911A (en) Cleaning machine for cleaning efficient liner blank coating
CN203764436U (en) Spraying head and cleaning device
CN107971305A (en) A kind of petroleum pipeline outer wall cleaner
CN210996593U (en) Steel plate drilling machine head
CN209006323U (en) Pipeline drainer
CN209886820U (en) High-pressure water cutting device with recovery device
CN210614486U (en) Inclined plate sedimentation tank with cleaning device
JP3171606U (en) Nozzle head for water jet drilling and drilling device
CN219483694U (en) Inner and outer wall cleaning equipment for barreled purified water bucket
CN210341900U (en) Six-shaft cement mixing pile construction equipment
CN204959760U (en) Novel two high pressure jet shunts
CN219736118U (en) Inside scale deposit cleaning device of tubular heat exchanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190723

Termination date: 20201109