The tele-control system of sewage disposal device
Technical field
The utility model relates to technical field of sewage treatment equipment, particularly, are related to a kind of the long-range of sewage disposal device
Control system.
Background technique
As what plant chimney stalk and sanitary sewage arbitrarily discharged gets worse, water pollution problems has been concerned.It is existing
The control system of sewage disposal device needs technical staff to manipulate at the scene mostly, and cannot achieve long-range monitoring, manpower
Cost is larger.
Although some sewage disposal device control systems monitor sewage using monitoring computer is arranged in duty room at present
The working condition of processing equipment, but it can only be for several of a scene sewage disposal device even sewage disposal device
It is monitored, network type monitoring can not be carried out, monitoring range is limited, and monitoring capacity is poor.
Utility model content
The utility model provides a kind of tele-control system of sewage disposal device, is set with solving existing sewage treatment
The standby limited technical problem of control system monitoring range.
One aspect according to the present utility model provides a kind of tele-control system of sewage disposal device comprising uses
In the Cloud Server being connect with long-range monitoring computer, the monitoring modular for monitoring sewage disposal process parameters, for pair
The sewage treatment execution module that sewage is handled, the on-off model for acquiring monitoring modular and analog signals and basis
Collected signal controls the working condition of sewage treatment execution module and PLC module and use for generating failure alarm signal
In the collected on-off model of PLC module and analog signals and the failure alarm signal of generation are transmitted to Cloud Server
Communication module;
PLC module is connect with monitoring modular and sewage treatment execution module respectively, communication module respectively with PLC module and cloud
Server connection.
Further, communication module and mobile terminal are using wireless communication connection, and PLC module includes short message control mould
Block.
Further, monitoring modular includes Level meter, flow detector, dissolved oxygen meter, total phosphorus detector, ammonia nitrogen detection
One of instrument and COD detector are a variety of.
Further, sewage treatment execution module includes ultraviolet light disinfector, pump, solenoid valve, blower, physics dephosphorization apparatus
One of or it is a variety of.
Further, tele-control system further includes the alarm module for connecting and be used to issue alarm signal with PLC module.
Further, tele-control system further includes the video camera for connecting and be used to play supervisory function bit with communication module.
Further, tele-control system further include for extend communication module to Cloud Server communication distance conversion
Device, converter are connect with Cloud Server and communication module respectively.
Further, tele-control system further include connect and be used for PLC module to PLC module carry out parameter setting and
The touch screen of control.
Further, tele-control system further includes the neural network module connecting with PLC module, and neural network module is used
Sewage treatment, which is transferred to, in the on-off model and analog signals and PLC module to come based on PLC module transfer executes mould
The control signal of block carries out deep learning to realize intelligentized control method.
Further, communication module includes one in radio communication module, fiber optic telecommunications module and GPRS communication module
Kind is a variety of.
The utility model has the following beneficial effects:
The tele-control system of the sewage disposal device of the utility model, can by Cloud Server simultaneously with more sewage
Processing equipment is communicated, and long-range monitoring computer can obtain the fortune of more sewage disposal devices by logging in Cloud Server simultaneously
Row state, but also more sewage disposal devices can remotely be controlled by Cloud Server, monitoring range is wider, more
Meet the demand of Internet of Things development.In addition, the tele-control system of the utility model sewage disposal device can also be according to acquisition
To monitoring modular on-off model and analog signals to automatically control sewage treatment execution module be performed in accordance with adjusting,
To ensure that sewage disposal device has optimal wastewater treatment efficiency, while improving sewage treating efficiency.
Other than objects, features and advantages described above, there are also other purposes, feature and excellent for the utility model
Point.Below with reference to figure, the utility model is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model
Illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.In attached drawing
In:
Fig. 1 is the modular structure signal of the tele-control system of the sewage disposal device of the preferred embodiment in the utility model
Figure.
Marginal data:
11, Cloud Server;12, communication module;13, PLC module;14, monitoring modular;15, sewage treatment execution module;
16, alarm module;17, video camera;18, converter;19, touch screen;111, neural network module.
Specific embodiment
The embodiments of the present invention are described in detail below in conjunction with attached drawing, but the utility model can be by following
The multitude of different ways for limiting and covering is implemented.
As shown in Figure 1, the preferred embodiment of the utility model provides a kind of tele-control system of sewage disposal device,
Including the Cloud Server 11 for being connect with long-range monitoring computer 20, the on-off model for acquiring monitoring modular 14 and simulation
Amount signal simultaneously controls the working condition of sewage treatment execution module 15 according to collected signal and believes for generating fault alarm
Number PLC module 13, for by the collected on-off model of PLC module and analog signals and the fault alarm of generation letter
It number is transmitted to the communication module 12 of Cloud Server 11, the monitoring modular 14 for monitoring sewage disposal process parameters and is used for
To the sewage treatment execution module 15 that sewage is handled, PLC module 13 executes mould with monitoring modular 14 and sewage treatment respectively
Block 15 connects, and communication module 12 is connect with PLC module 13 and Cloud Server 11 respectively.The monitoring modular 14 can monitor dirt
Parameters in water treatment procedure, such as: liquid level, flow, water outlet COD value, oxygen dissolved in aeration tank etc..The monitoring mould
Block 14 includes one of Level meter, flow detector, dissolved oxygen meter, total phosphorus detector, ammonia nitrogen detector and COD detector
Or it is a variety of.The sewage treatment execution module 15 is including in ultraviolet light disinfector, pump, solenoid valve, blower, physics dephosphorization apparatus
It is one or more, every ginseng in sewage disposal process is adjusted by controlling the control parameter of sewage treatment execution module 15
Number.It include CPU element in the PLC module 13, CPU element can acquire the on-off model and analog quantity letter of monitoring modular 14
Number, i.e., CPU element obtain monitoring modular 14 every monitoring result and working condition, and according to monitoring result determine sewage treatment
As a result whether comply with standard, determine it whether normal operation according to its working condition.If CPU element determines sewage treatment knot
Fruit is not inconsistent standardization, then CPU element carries out operation according to the program that it is carried in advance, and corresponding according to operation result generation
Control the working condition of signal control sewage treatment execution module 15.For example, being monitored when CPU element collects COD detector
Sewage treatment after water outlet COD value it is exceeded when, CPU element reduces inflow by operation control elevator pump to realizing reduction
It is discharged COD value, so that sewage disposal device reaches optimal wastewater treatment efficiency, and improves sewage treating efficiency.In addition, working as
CPU element collects when determining that certain monitoring modular 14 breaks down after the on-off model of monitoring modular 14, CPU element generate therefore
Barrier alarm signal is simultaneously transmitted to Cloud Server 11 by communication module 12, and failure alarm signal is transmitted to far by Cloud Server 11 again
Range monitoring computer 20, so that staff can obtain warning reminding on long-range monitoring computer 20.It is appreciated that PLC module
13, which will also collect on-off model and analog signals, is also transmitted to Cloud Server 11, is connected to the long-range of Cloud Server 11
Monitoring computer 20 can carry out configuration remote read-write, so as to also can know that sewage treatment in the case where unattended at the scene
The operating status of equipment.Also, long-range monitoring computer 20 remotely can also control PLC module 13 by Cloud Server 11
System can control equipment start-stop, setting parameter and failure reset etc..It is appreciated that Cloud Server 11 can simultaneously with more dirts
Water treatment facilities are communicated, and long-range monitoring computer 20 may be implemented and remotely controlled to more sewage disposal devices simultaneously
System.
The tele-control system of the sewage disposal device of the utility model, can by Cloud Server 11 simultaneously with more dirts
Water treatment facilities are communicated, and long-range monitoring computer 20 can obtain more sewage treatments by login Cloud Server 11 simultaneously and set
Standby operating status, but also more sewage disposal devices can remotely be controlled by Cloud Server 11, monitoring range
It is wider, it is more in line with the demand of Internet of Things development.In addition, the tele-control system of the sewage disposal device of the utility model may be used also
To automatically control sewage treatment execution module 15 according to the on-off model of collected monitoring modular 14 and analog signals
It is performed in accordance with adjusting, to ensure that sewage disposal device has optimal wastewater treatment efficiency, while improving sewage treatment effect
Rate.
It is appreciated that the mode that the communication module 12 is communicated with Cloud Server 11 can be radio communication, light
One of fiber communication, GPRS communication are a variety of.The communication module 12 includes radio communication module, fiber optic telecommunications module
With one of GPRS communication module or a variety of.
It is appreciated that preferably, the communication module 12 and mobile terminal 30 wirelessly communicate connection, and PLC mould
Block 13 includes short message control module, i.e. PLC module 13 can support short message read-write capability, and wherein short message control module can be selected
Select GRM200 type PLC short message control module.After PLC module 13 generates failure alarm signal, it can be sent out by communication module 12
Send warning message to mobile terminal 30, even if staff not at the scene, can also understand the operation shape of sewage disposal device in time
Condition.It, can be by sending information to communication module 12, then after staff obtains warning message by mobile terminal 30
Information content read-write is entered and is converted to control signal to control the working condition of sewage disposal device by PLC module 13.For example,
The start and stop of short message Read-write Catrol sewage disposal device, setting relevant parameter or failure reset etc. can be passed through.It is appreciated that described
Mobile terminal 30 is mobile phone, tablet computer or wearable electronic etc..
It is appreciated that preferably, the tele-control system of the sewage disposal device further includes connecting with PLC module 13
Connect and be used to issue the alarm module 16 of alarm signal.When PLC module 13 detects equipment fault, alarm module can control
16 issue alarm signal, so that staff on site can have found in time, with rapidly removing faults.The alarm signal can
To be that voice signal, optical signal or both combine.As it is further preferred that the long-range control of the sewage disposal device is
System further includes the video camera 17 that communication module 12 connects and is used to play supervisory function bit, and video camera 17 can be to the production at scene
Environment and equipment running status are monitored, and monitoring content is passed through communication module 12 in real time and is transmitted to Cloud Server 11.
For example, staff can be sent out in monitoring computer 20 by video camera 17 in time when alarm module 16 issues alarm signal
Existing alarm signal, with rapidly removing faults, video camera 17 plays the role of auxiliary monitoring.
It is appreciated that preferably, the tele-control system further includes for extending communication module 12 to cloud service
The converter 18 of the communication distance of device 11, converter 18 are connect with Cloud Server 11 and communication module 12 respectively.For example, described turn
Parallel operation 18 is RS232/RS485 converter, can be by RS232 level conversion RS485 level, and transmission range is farther, extends
Communication module 12 arrives the communication distance of Cloud Server 11.
It is appreciated that preferably, the tele-control system further includes connecting with PLC module 13 and for PLC
The touch screen 19 of module 13 progress parameter setting and control.Staff can control sewage disposal device by touch screen 19
Start and stop carry out parameter setting and failure reset etc. to it.
It is appreciated that preferably, the tele-control system further includes the neural network mould connecting with PLC module 13
Block 111, the on-off model and analog signals and PLC that neural network module 111 is used to transmit based on PLC module 13
The control signal that module 13 is transferred to sewage treatment execution module 15 carries out deep learning to realize intelligentized control method.The PLC
Module 13 be transferred to sewage treatment execution module 15 control signal be sewage treatment execution module 15 setting parameter.May be used also
To understand, the neural network module 111 is neuron chip.It, can be by depth by the way that neural network module 111 is arranged
Acquistion is transmitted to sewage treatment execution module 15 by PLC module 13 to optimal parameter setting, and by optimal parameter, thus
Intelligentized control method is realized, without manually being debugged or being debugged to sewage disposal device.And as sewage treatment is set
Standby operation, the basic data obtained of neural network module 111 can be more and more, and the result of deep learning can be more and more smart
Really, control accuracy can be higher and higher.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.