CN209129688U - A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW - Google Patents

A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW Download PDF

Info

Publication number
CN209129688U
CN209129688U CN201821365772.5U CN201821365772U CN209129688U CN 209129688 U CN209129688 U CN 209129688U CN 201821365772 U CN201821365772 U CN 201821365772U CN 209129688 U CN209129688 U CN 209129688U
Authority
CN
China
Prior art keywords
pressure
high pressure
cylinder
rotor
revolving speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821365772.5U
Other languages
Chinese (zh)
Inventor
刘扬
张立志
陆伟
李佳佳
王龙洋
高敏
丁莹
刘栋辉
曲文波
杨晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Turbine Co Ltd
Original Assignee
Harbin Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Turbine Co Ltd filed Critical Harbin Turbine Co Ltd
Priority to CN201821365772.5U priority Critical patent/CN209129688U/en
Application granted granted Critical
Publication of CN209129688U publication Critical patent/CN209129688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Turbines (AREA)

Abstract

A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW, is related to steam turbine field.The utility model is the low problem of cycle efficieny in order to solve the level steam turbines such as existing 45MW and take up a large area.Two support members are respectively used to support high pressure cylinder and low pressure exhaust hood, rotor tail end connects reduction gearbox by diaphragm coupling, the revolving speed that rotor rotation generates drives the shaft of generator to rotate after reduction gearbox slows down, the main vapour of high pressure adjusts union valve and is arranged on the outer wall of high pressure cylinder, middle pressure reheating adjusts union valve intake valve and is arranged on the outer wall of intermediate pressure cylinder, main steam adjusts union valve by the main vapour of high pressure and enters high pressure cylinder, it is flowed out after flowing through high pressure flow by the blow-off line of high pressure cylinder lower part, the steam of outflow adjusts union valve intake valve by middle pressure reheating after boiler reheating and enters cylinder middle section, flow through mesolow it is through-flow after condenser entered by low pressure exhaust hood lower part steam drain, to complete the through-flow of steam.It is the high revolving speed steam turbine of a resuperheat.

Description

A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW
Technical field
The utility model relates to a kind of high revolving speed steam turbines of resuperheat of super-pressure 45MW, belong to steam turbine field.
Background technique
The level steam turbines molded design such as 45MW of China's active service, generally existing main vapour parameter is low, and system design and structure are set It counts the problems such as unreasonable, at high cost, unit cycle efficieny is low, net coal consumption rate is high, and not only energy utilization rate is low but also pollution row It is high-volume big.
Utility model content
The utility model is the low problem of cycle efficieny in order to solve the level steam turbines such as existing 45MW and take up a large area. Now provide a kind of resuperheat of super-pressure 45MW high revolving speed steam turbine.
A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW, it include rotor, two support members, cylinder body, The main vapour of diaphragm coupling 8, reduction gearbox 9, generator 10, high pressure adjusts union valve and middle pressure reheating adjusts union valve intake valve,
Cylinder body includes high pressure cylinder 4, cylinder middle section 5 and low pressure exhaust hood 6,
High pressure cylinder 4, cylinder middle section 5 and low pressure exhaust hood 6 are successively cased on rotor, two support members are respectively used to support High pressure cylinder 4 and low pressure exhaust hood 6,
Rotor tail end connects reduction gearbox 9 by diaphragm coupling 8, and the revolving speed that rotor rotation generates slows down by reduction gearbox 9 The shaft rotation of generator 10 is driven afterwards,
The main vapour of high pressure adjusts union valve and is arranged on the outer wall of high pressure cylinder 4, and middle pressure reheating adjusts the setting of union valve intake valve On the outer wall of intermediate pressure cylinder 5,
Main steam adjusts union valve by the main vapour of high pressure and enters high pressure cylinder 4, flows through after high pressure flow by 4 lower part of high pressure cylinder Blow-off line outflow, the steam of outflow adjust union valve intake valve by middle pressure reheating after boiler reheating and enter cylinder middle section 5, Flow through mesolow it is through-flow after condenser entered by 6 lower part steam drain of low pressure exhaust hood, to complete the through-flow process of steam.
The utility model has the following beneficial effects:
The steam-turbine unit of the application is designed using high revolving speed, high, medium and low pressing cylinder, front bearing box landing arrangement, rear axle It holds case and exhaust casing is welded as entirety to save shafting length.In addition, the unilateral downward steam discharge of low pressure exhaust hood, it is long to shorten shafting Degree shortens unit length under the premise of guaranteeing that unit has high circulation efficiency, high security to greatest extent, reduces unit Occupied area saves space, reduces power plant construction cost.Meanwhile high pressure entirety inner casing, steam admission mode use 360 ° of tangential snails Shell guarantees into the horizontal stator blade of vapour collocation into vapour efficiency.
Unit uses full admission, and the main vapour of high pressure adjusts union valve and high pressure cylinder is direct-connected, middle pressure reheating adjusting union valve into Air valve is direct-connected with intermediate pressure cylinder, has minimized and has lost into vapour, and has avoided more enthalpy drop and fall in inefficient impulsion Formula governing stage, these enthalpy drops are distributed on small enthalpy drop reactionary style pressure stage, can obtain higher stage efficiency;
The whole stator blades of high, middle pressure, movable vane use pretwist fabricated construction, compared with traditional welding partition, fabricated construction There is no weld seam, avoid welding deformation, better assures that through-flow precision;
Compared with existing 45MW grade cylinder of steam turbine, improve unit steam inlet condition to 13.24MPa/566 DEG C/566 DEG C, Fundamentally improve cycle efficieny.
The absolute dead point of the application is designed after low pressure exhaust hood at pedestal, is the absolute dead point of expansion of entire unit.Subtract On the basis of fast case is fixed on by pedestal, setting thrust radial journal bearing is as the absolute dead point of reduction gearbox rotor in reduction gearbox.Steamer It designs at front bearing box thrust bearing at the relative expansion dead point of machine rotor.High pressure cylinder, intermediate pressure cylinder, low pressure exhaust hood during operation End expansion is adjusted, cylinder pushes front bearing box to slide by the beam that centers, and turbine rotor is expanded to electric end.Turbine rotor with subtract Diaphragm coupling is set between fast case rotor for swollen difference between two rotor clutches during absorbing hot operation.Speed reduction gear box uses Double-helical-tooth makes thrust self-balancing.To make entire set structure stablize.
Detailed description of the invention
Fig. 1 is a kind of vertical section structure schematic diagram of the high revolving speed steam turbine of resuperheat of super-pressure 45MW,
Fig. 2 is entire steam-turbine unit arrangement schematic diagram,
Fig. 3 is the top view of Fig. 2,
Fig. 4 is high pressure inner casing entity side view,
Fig. 5 is high pressure inner casing entity top view,
Fig. 6 is to calculate motion pattern into vapour spiral case CFD (fluid dynamics),
Fig. 7 is to calculate middle section Mach Number Distribution figure into vapour spiral case CFD,
Fig. 8 is to calculate middle section pressure-plotting into vapour spiral case CFD.
Specific embodiment
Specific embodiment 1: illustrating present embodiment referring to figs. 1 to Fig. 5, one kind described in present embodiment is super The high revolving speed steam turbine of resuperheat of high pressure 45MW, it includes rotor, two support members, cylinder body, diaphragm coupling 8, subtracts The main vapour of fast case 9, generator 10, high pressure adjusts union valve and middle pressure reheating adjusts union valve intake valve,
Cylinder body includes high pressure cylinder 4, cylinder middle section 5 and low pressure exhaust hood 6,
High pressure cylinder 4, cylinder middle section 5 and low pressure exhaust hood 6 are successively cased on rotor, two support members are respectively used to support High pressure cylinder 4 and low pressure exhaust hood 6,
Rotor tail end connects reduction gearbox 9 by diaphragm coupling 8, and the revolving speed that rotor rotation generates slows down by reduction gearbox 9 The shaft rotation of generator 10 is driven afterwards,
The main vapour of high pressure adjusts union valve and is arranged on the outer wall of high pressure cylinder 4, and middle pressure reheating adjusts the setting of union valve intake valve On the outer wall of intermediate pressure cylinder 5,
Main steam adjusts union valve by the main vapour of high pressure and enters high pressure cylinder 4, flows through after high pressure flow by 4 lower part of high pressure cylinder Blow-off line outflow, the steam of outflow adjust union valve intake valve by middle pressure reheating after boiler reheating and enter cylinder middle section 5, Flow through mesolow it is through-flow after condenser entered by 6 lower part steam drain of low pressure exhaust hood, to complete the through-flow process of steam.
In present embodiment, front bearing box landing arrangement, rear bearing case is welded as whole long to save shafting with exhaust casing Degree.Rotor is divided into high-temperature region and two sections of low-temperature space, two-stage rotor, tightly, makes full use of material property using bolt.Steam turbine It exports using high Design of Rotation, and after being slowed down using reduction gearbox to generator.Rotor supports are in preceding radial journal bearing and rear supporting axis It holds, and absorbs the swollen difference of shafting using diaphragm coupling.Unit is designed using no steam guiding tube.
Low pressure exhaust hood 6 uses steel plate butt welding structure.
The main vapour of high pressure adjusts union valve and high pressure cylinder 4 uses flanged joint, and middle pressure reheating adjusts union valve intake valve in Cylinder pressure 5 uses flanged joint.
Specific embodiment 2: present embodiment is in primary to a kind of super-pressure 45MW described in specific embodiment one Between the high revolving speed steam turbine of reheating be described further, in present embodiment, two support members include two bearings and two axis Case is held,
Bearing includes fore bearing 11 and rear bearing 12, and bearing housing includes front bearing box 3 and rear bearing case 7,
The head end side wall and tail end side wall of rotor are respectively supported on fore bearing 11 and rear bearing 12, fore bearing 11 and high pressure Cylinder 4 adjusts end to be each attached on front bearing box 3, and rear bearing 12 and low pressure exhaust hood 6 adjust end to be each attached on rear bearing case 7.
Specific embodiment 3: present embodiment is in primary to a kind of super-pressure 45MW described in specific embodiment two Between the high revolving speed steam turbine of reheating be described further, in present embodiment, it further includes pedestal,
Two bearing housings are supported on pedestal.
Specific embodiment 4: present embodiment is in primary to a kind of super-pressure 45MW described in specific embodiment two Between the high revolving speed steam turbine of reheating be described further, in present embodiment, rotor includes high pressure rotor 1 and mesolow rotor 2,
It is connected between high pressure rotor 1 and mesolow rotor 2 using flange bolt,
High pressure rotor 1 adjusts end to be supported on fore bearing 11, and the electric end of mesolow rotor 2 is supported in rear bearing 12.
In present embodiment, high pressure rotor 1 and turbine rotor 2 are integral rotor, high pressure rotor 1 and turbine rotor 2 have different mechanical performances, have not only met the elevated temperature strength requirement of high temperature section, but also meet the high-intensitive and low crisp of low-temperature zone The performance of sex reversal temperature value.
Steam turbine in the application is by 7 grades of backheat designs, wherein the 1st, 2,3,4 grade of backheat design is in high pressure cylinder, the 5th, 6,7 The design of grade backheat is oxygen-eliminating device in mesolow cylinder, the 4th grade of backheat.
Specific embodiment 5: present embodiment is in primary to a kind of super-pressure 45MW described in specific embodiment two Between the high revolving speed steam turbine of reheating be described further, in present embodiment, high pressure cylinder 4 adjusts end by lower ram's horn to be supported on fore bearing On case 3,4 bottom end of high pressure cylinder passes through beam 13 and 3 axial restraint of front bearing box of centering.
Specific embodiment 6: present embodiment is in primary to a kind of super-pressure 45MW described in specific embodiment one Between the high revolving speed steam turbine of reheating be described further, in present embodiment, high pressure cylinder 4 be double shell structure.
In present embodiment, high pressure uses double shell structure, adapts to the high-temperature work environment feature of unit, guarantees that cylinder body is strong Spend, good rigidity, thermal stress it is small, the inside and outside cylinder of high pressure is casting, using high narrow flange arrangement, to adapt to unit quick start Needs.High pressure entirety inner casing, steam admission mode are guaranteed into the horizontal stator blade of vapour collocation into vapour efficiency using 360 ° of tangential spiral cases.From Fig. 6 is into Fig. 8, it can be seen that the flow velocity of steam.

Claims (6)

1. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW, which is characterized in that it includes rotor, two support portions The main vapour of part, cylinder body, diaphragm coupling (8), reduction gearbox (9), generator (10), high pressure adjusts union valve and middle pressure reheating adjusts connection Valve intake valve is closed,
Cylinder body includes high pressure cylinder (4), cylinder middle section (5) and low pressure exhaust hood (6),
High pressure cylinder (4), cylinder middle section (5) and low pressure exhaust hood (6) are successively cased on rotor, two support members are respectively used to prop up High pressure cylinder (4) and low pressure exhaust hood (6) are supportted,
By diaphragm coupling (8) connection reduction gearbox (9), the revolving speed that rotor rotation generates subtracts rotor tail end by reduction gearbox (9) The shaft rotation of generator (10) is driven after speed,
The main vapour of high pressure adjusts union valve and is arranged on the outer wall of high pressure cylinder (4), and middle pressure reheating adjusts the setting of union valve intake valve and exists On the outer wall of intermediate pressure cylinder (5),
Main steam adjusts union valve by the main vapour of high pressure and enters high pressure cylinder (4), flows through after high pressure flow by high pressure cylinder (4) lower part Blow-off line outflow, the steam of outflow adjust union valve intake valve by middle pressure reheating after boiler reheating and enter cylinder middle section (5), flow through mesolow it is through-flow after condenser entered by low pressure exhaust hood (6) lower part steam drain, to complete the through-flow mistake of steam Journey.
2. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW according to claim 1, which is characterized in that two A support member includes two bearings and two bearing housings,
Bearing includes fore bearing (11) and rear bearing (12), and bearing housing includes front bearing box (3) and rear bearing case (7),
The head end side wall and tail end side wall of rotor are respectively supported on fore bearing (11) and rear bearing (12), fore bearing (11) and height Cylinder pressure (4) adjusts end to be each attached on front bearing box (3), and rear bearing (12) and low pressure exhaust hood (6) adjust end to be each attached to rear bearing On case (7).
3. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW according to claim 2, which is characterized in that it It further include pedestal,
Two bearing housings are supported on pedestal.
4. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW according to claim 2, which is characterized in that turn Attached bag includes high pressure rotor (1) and mesolow rotor (2),
It is connected between high pressure rotor (1) and mesolow rotor (2) using flange bolt,
High pressure rotor (1) adjusts end to be supported on fore bearing (11), and mesolow rotor (2) electricity end is supported on rear bearing (12).
5. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW according to claim 2, which is characterized in that high Cylinder pressure (4) adjusts end to be supported on front bearing box (3) by lower ram's horn, and high pressure cylinder (4) bottom end passes through the beam that centers (13) and front axle Hold case (3) axial restraint.
6. a kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW according to claim 1, which is characterized in that high Cylinder pressure (4) is double shell structure.
CN201821365772.5U 2018-08-23 2018-08-23 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW Active CN209129688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821365772.5U CN209129688U (en) 2018-08-23 2018-08-23 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821365772.5U CN209129688U (en) 2018-08-23 2018-08-23 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW

Publications (1)

Publication Number Publication Date
CN209129688U true CN209129688U (en) 2019-07-19

Family

ID=67229218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821365772.5U Active CN209129688U (en) 2018-08-23 2018-08-23 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW

Country Status (1)

Country Link
CN (1) CN209129688U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162765A (en) * 2018-08-23 2019-01-08 哈尔滨汽轮机厂有限责任公司 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW
CN112096457A (en) * 2020-10-10 2020-12-18 中国长江动力集团有限公司 Sub-high pressure high rotation speed condensing steam turbine
CN113669118A (en) * 2021-09-23 2021-11-19 哈尔滨汽轮机厂有限责任公司 100MW single-cylinder air-cooling photo-thermal steam turbine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162765A (en) * 2018-08-23 2019-01-08 哈尔滨汽轮机厂有限责任公司 A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW
CN109162765B (en) * 2018-08-23 2023-10-10 哈尔滨汽轮机厂有限责任公司 Ultrahigh-pressure 45MW once intermediate reheating high-rotation-speed steam turbine
CN112096457A (en) * 2020-10-10 2020-12-18 中国长江动力集团有限公司 Sub-high pressure high rotation speed condensing steam turbine
CN113669118A (en) * 2021-09-23 2021-11-19 哈尔滨汽轮机厂有限责任公司 100MW single-cylinder air-cooling photo-thermal steam turbine

Similar Documents

Publication Publication Date Title
CN109162765A (en) A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW
CN209129688U (en) A kind of high revolving speed steam turbine of resuperheat of super-pressure 45MW
CN106089307B (en) A kind of low parameter big flow double split flow back pressure turbine
CN101482083B (en) Ultra-low specific speed mixed-flow type turbine
CN106224015B (en) The overcritical clammy condensing turbines of the steam discharge of three cylinder two of 350MW
CN213711123U (en) High-temperature ultrahigh-pressure single-reheating 50 MW-grade condensing gas power generation turbine
CN109653817A (en) A kind of 160MW grade axial exhaust extraction condensing type combination circulation steam turbine
CN213478410U (en) 25 MW-grade high-rotating-speed steam extraction condensing steam turbine
AU2013302217B2 (en) Turbine assembly
CN114215606A (en) 10MW axial-flow sCO2Turbine and method of operating a turbine
CN112343675A (en) 25 MW-grade high-rotating-speed steam extraction condensing steam turbine
CN104533550B (en) The Double reheat steam turbine ultra-high pressure cylinder that all feedwater backheat is drawn gas can be provided
CN112343672A (en) High-temperature ultrahigh-pressure single-reheating 50 MW-grade condensing gas power generation turbine
CN104819018B (en) Single reheat turbine high pressure cylinder capable of providing all extraction steam for regenerative feedwater heating
CN108979761A (en) A kind of large capacity combination circulation steam turbine
WO2024108958A1 (en) 60mw reaction intermediate-intake single-reheat air turbine and operation method
CN210799056U (en) Ultra-high temperature and ultra-high pressure back pressure steam turbine
CN216429681U (en) 10MW axial-flow sCO2Turbine and method of operating a turbine
CN201339532Y (en) Small-sized francis turbine generator
CN109555571A (en) A kind of electricity-generating method of integral type waste heat integrated power generation system
CN109026216A (en) A kind of resuperheat reaction turbine of subcritical 80MW grade
CN215907927U (en) 40MW ultrahigh-pressure high-rotation-speed single-cylinder air cooling steam turbine
CN206860242U (en) Heat-insulated closure assembly and the super-pressure reheating turbine for including it
CN215979511U (en) 30MW steam turbine that possesses high back pressure heat supply function
CN202937317U (en) Fast starting turboset

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant