CN209129401U - Side containment system is faced in floor regularization - Google Patents

Side containment system is faced in floor regularization Download PDF

Info

Publication number
CN209129401U
CN209129401U CN201821848175.8U CN201821848175U CN209129401U CN 209129401 U CN209129401 U CN 209129401U CN 201821848175 U CN201821848175 U CN 201821848175U CN 209129401 U CN209129401 U CN 209129401U
Authority
CN
China
Prior art keywords
column
sleeve part
floor
cross bar
containment system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821848175.8U
Other languages
Chinese (zh)
Inventor
李孟强
刘柳星
梁永斌
龚剑影
王勇
王明
郭军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201821848175.8U priority Critical patent/CN209129401U/en
Application granted granted Critical
Publication of CN209129401U publication Critical patent/CN209129401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of floor regularization and faces side containment system, for going along with sb. to guard him between adjacent structure column or going along with sb. to guard him between concrete wall and structural column, the containment system includes: clip, including the first sleeve part and the second sleeve part being set side by side, first sleeve part and the second sleeve part integrally connected, first sleeve part, which is nested with, to be anchored on outside the structural column;First column matches with second sleeve part and is nested with fastening;Cross bar, it is laterally connected on first column, the cross bar has more along the first column extending direction arranged for interval, the second column is fixed on the cross bar, cross-fixing forms the containment system in length and breadth with the cross bar respectively for second column, first column.The utility model can avoid steel pipe in the prior art and directly contact influence finished product protection with structural column, reduce later period rehabilitation cost, while can effectively improve the turnover rate for facing side and going along with sb. to guard him, reduce material consumption, reduce artificial pay.

Description

Side containment system is faced in floor regularization
Technical field
The utility model relates to technical field of building construction, relates in particular to a kind of floor regularization and face side go along with sb. to guard him and be System.
Background technique
As urban land resource is increasingly in short supply, for building gradually to aerial development, skyscraper has become urban architecture Mainstream development trend.High-rise, super-high building structure form is mainly frame, shear wall structure and tube structure, with green The arrival in construction epoch, stimulates the development of steel tube-concrete column and the development of high level, super high-rise building, and high-rise, Super High The edge protection of building is particularly important in secure context.
For the structure of steel tube-concrete column, floor side is closed on, the prior art generallys use steel tube fastener assembling or combination Formula faces side enclosure device, the former not only to high material consumptions such as steel pipes, turnover rate is low, steel pipe is directly contacted with structural column can shadow Finished product protection is rung, and manpower consumption is big, work day is more, effect is undesirable;The latter need to install vertical columns by expansion bolt, break Bad floor topping, and construction cost is higher, and it is high to be damaged rehabilitation cost.
Utility model content
In view of the foregoing, the utility model provides a kind of floor regularization and faces side containment system, solves existing floor Edge protection influences the protection of finished product structure column, destroys floor topping and big, at high cost, turnover rate the is low technology of manpower consumption Problem.
To achieve the above object, the technical scheme adopted by the utility model is that: a kind of floor regularization be provided face side and go along with sb. to guard him System, the containment system include:
Clip, including the first sleeve part and the second sleeve part being set side by side, first sleeve part with described second set Portion's integrally connected is set, first sleeve part is nested with outside the structural column being anchored on the floor;
First column matches with second sleeve part and is nested with fastening;
Cross bar is laterally connected on first column, and the cross bar is along the first column extending direction arranged for interval There are more, the second column is fixed on the cross bar, second column, first column are handed over the cross bar in length and breadth respectively Fork fixation forms the containment system.
In the utility model embodiment, the clip includes the two clip pieces to spelling, each clip piece include with it is described First wall of the outer cooperation of structural column and the second wall cooperated with the outer of first column, first wall with By connecting plate integrally connected between the adjacent end portion of second wall, the first wall of the two clips piece is to spell shape at institute The first sleeve part is stated, the second wall of the two clips piece is to spell shape at second sleeve part, the connection of the two clips piece It has been formed separately perforation on plate, has enabled bolt place the perforation and is spirally connected with nut to fasten first sleeve part and the structure Column, second sleeve part and first column.
In the utility model embodiment, each second wall has opposite a first end and the second end, and described the One end is fixed with first wall by connecting plate, and the second end is formed with fastening plates, is shaped in the fastening plates There is perforation, the fastening plates of the two clips piece are placed by bolt to be spirally connected to fasten first column and described second with nut Sleeve part.
In the utility model embodiment, first wall has two opposite end sides, and two end side is respectively fixed with The connecting plate is to connect 2 second sleeve parts.
In the utility model embodiment, the bottom end of first column is removably fixed in the floor by built-in fitting On, the built-in fitting includes the first fixed part and the second fixed part, and the bottom end of first fixed part is embedded in the floor, The top of first fixed part is fixed with second fixed part, and second fixed part is band internal thread sleeve, institute It states the second fixed part and first fixed part is spirally connected fixation, second fixed part is anchored in first column, described First column is hollow steel pipe.
In the utility model embodiment, the end of the cross bar at concrete wall is connected with end coupling, described Telescopically support the concrete wall in one end of end coupling.
In the utility model embodiment, the cross bar is hollow steel pipe, and the end coupling includes screw rod, nut and U Shape supporting plate, one end of the screw rod are inserted in the cross bar, and the nut is bolted on the screw rod, and the nut is positioned at The end of the cross bar and limit one end of the screw rod in the cross bar, the other end of the screw rod stretch out the cross bar, The other end of the screw rod is fixed with the U-shaped pallets, and the U-shaped supporting plate supports the concrete wall.
In the utility model embodiment, protective block is equipped between the end coupling and the concrete wall, it is described Protective block is arranged in the U-lag of the U-shaped supporting plate.
In the utility model embodiment, the protective block is flitch.The utility model due to use above technical scheme, Make it have it is following the utility model has the advantages that
(1) the utility model floor regularization faces side containment system by the way that clamp connection is arranged between adjacent structure column, Avoid in the prior art steel pipe with structural column directly contact influence finished product protection, the utility model by setting end coupling keep away Concrete wall surface is destroyed in the end for exempting from containment system;The first column and floor are connected by setting built-in fitting, is reduced to floor face The destruction of layer reduces later period rehabilitation cost.
(2) regularization of the utility model floor faces the turnover rate gone along with sb. to guard him when containment system can effectively improve and face, reduces material Material consumption reduces artificial expenditure, save the cost, and is continuously increased as the number of turnover increases cost savings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of containment system between the utility model adjacent structure column.
Fig. 2 is the partial enlargement diagram that the utility model clip is connect with structural column, the first column.
Fig. 3 is the structural schematic diagram of the first embodiment of the utility model clip.
Fig. 4 is the structural schematic diagram of the second embodiment of the utility model clip.
Fig. 5 is the structural schematic diagram of the 3rd embodiment of the utility model clip.
Fig. 6 is the structural schematic diagram of the utility model the first column and built-in fitting.
Fig. 7 is the partial structural diagram of containment system between the utility model concrete wall and structural column.
The corresponding relationship of appended drawing reference and component is as follows:
Clip 1;First sleeve part 11;First wall 111;Second sleeve part 12;Second wall 121;Connecting plate 13;Bolt 14;Fastening plates 15;First column 2;First fixed part 21;Second fixed part 22;Second column 23;Cross bar 3;End coupling 4; Screw rod 41;Nut 42;U-shaped supporting plate 43;Protective block 5;Structural column 6;Concrete wall 7.
Specific embodiment
For the benefit of to the understanding of the utility model, it is illustrated with reference to the accompanying drawings and embodiments.
Shown in please referring to Fig.1 to Fig.4, the utility model provides a kind of floor regularization and faces side containment system, described to go along with sb. to guard him System includes clip 1, the first column 2 and cross bar 3, and the clip 1 includes that the first sleeve part 11 being set side by side and second are nested with Portion 12, first sleeve part 11 and 12 integrally connected of the second sleeve part, first sleeve part 11, which is nested with, is anchored on institute It states outside the structural column 6 on floor, first column 2 matches with second sleeve part 12 and is nested with fastening, and the cross bar 3 is horizontal To being connected on first column, the cross bar 3 has more along the 2 extending direction arranged for interval of the first column, the cross Be fixed with the second column 23 on bar 3, second column 23, first column 2 respectively with the cross-fixing in length and breadth of cross bar 3 Form the containment system.
In the utility model embodiment, the clip 1 includes the two clip pieces to spelling, each clip piece include with it is described First wall 111 of the outer cooperation of structural column 6 and the second wall 121 cooperated with the outer of first column 2, described the By 13 integrally connected of connecting plate between one wall 111 and the adjacent end portion of second wall 121, the of the two clips piece One wall 111 is to spell shape at first sleeve part 11, and the second wall 121 of the two clips piece is to spell shape at described second set Portion 12 is set, has been formed separately perforation on the connecting plate 13 of the two clips piece, enables bolt 14 place the perforation and is spirally connected with nut To fasten first sleeve part 11 and the structural column 6, second sleeve part 12 and first column 2.Preferably, edge The multiple perforation of the 13 length direction interval of connecting plate setting with fasten first sleeve part 11 and the structural column 6, Second sleeve part 12 and first column 2.
In the utility model embodiment, first column 2 and the structural column 6 are cylindrical, and described first is nested with Portion 11 and the cross section of second sleeve part 12 are circle, and corresponding first wall 111 is with the second wall 121 The arc panel of cross section semicircular in shape, as shown in figure 4, the structural column 6 also can be shaped as the shape different from cylinder, it is described In a rectangular parallelepiped shape, the cross section of first sleeve part 11 is rectangle to structural column 6;First column 2 also can be shaped as not It is same as the shape of cylinder.
In the utility model embodiment, each second wall 121 has opposite first end and the second end, described First end and first wall 111 are fixed by connecting plate 13, and the second end is formed with fastening plates 15, the fastening Perforation is formed on plate 15, the fastening plates 15 of the two clips piece are placed by bolt 14 to be spirally connected to fasten described first with nut Column 2 and second sleeve part 12.
Preferably, as shown in Figures 2 to 4, first wall 111 has two opposite end sides, when the structural column two When side requires that the containment system is arranged, two end side is respectively fixed with the connecting plate 13 with described second set of connection two Set the end of second wall 121 in portion 12.
Preferably, as shown in Figure 1, shown in Figure 5, when the structural column 6 only needs side that the containment system is arranged, the card Hoop 1 includes first sleeve part 11 and second sleeve part 12, forms 2 first walls 111 of first sleeve part 11 One group of corresponding end be integrally formed.
Preferably, as shown in Figure 1 and Figure 2, arranged for interval has multiple clips 1 on the length direction of the structural column 6, Corresponding first column 2, which places, to be anchored in multiple clips 1.
As shown in fig. 6, the bottom end of first column 2 is detachably fixed by built-in fitting in the utility model embodiment In on the floor, the built-in fitting includes the first fixed part 21 and the second fixed part 22, the bottom end of first fixed part 21 It is embedded in the floor, the top of first fixed part 21 is fixed with second fixed part 22, second fixed part 22 be band internal thread sleeve, and second fixed part 22 and first fixed part 21 are spirally connected fixation, and described second is fixed Portion 22 is anchored in first column 2, and first column 2 is hollow steel pipe.Preferably, first fixed part 21 is useless Steel bar end, the top mantle fiber of the useless steel bar end and the sleeve are spirally connected fastening.
Preferably, as shown in fig. 7, (knot is not shown in Fig. 7 with structural column 6 when the containment system is set to concrete wall 7 Structure column 6, can refer to Fig. 1) between when, the end of the cross bar 3 at concrete wall is connected with end described in end coupling 4 Telescopically support the concrete wall 7 in one end of connector 4.In the utility model embodiment, the end coupling 4 is wrapped Screw rod 41, nut 42 and U-shaped supporting plate 43 are included, one end of the screw rod 41 is inserted in the cross bar 3, is spirally connected on the screw rod 41 There is the nut 42, the nut 42 is positioned at the end of the cross bar 3 and limits one end of the screw rod 41 in the cross bar 3 The other end of interior, the described screw rod 42 stretches out the cross bar 3, and the other end of the screw rod 41 is fixed with the U-shaped pallets 43, described U-shaped supporting plate 43 supports the concrete wall 7;Preferably, it is equipped between the end coupling 4 and the concrete wall 7 Protective block 5, the protective block 5 are arranged in the U-lag of the U-shaped supporting plate 43, and the protective block 5 is flitch.
Combine accompanying drawings and embodiments that the utility model is described in detail above, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, certain details in embodiment should not be constituted to this reality With novel restriction, the utility model will be using the range that the appended claims define as the protection scope of the utility model.

Claims (9)

1. side containment system is faced in a kind of floor regularization, which is characterized in that the containment system includes:
Clip, including the first sleeve part and the second sleeve part being set side by side, first sleeve part and second sleeve part Integrally connected, first sleeve part are nested with outside the structural column being anchored on the floor;
First column matches with second sleeve part and is nested with fastening;
Cross bar is laterally connected on first column, and the cross bar has more along the first column extending direction arranged for interval Root, the second column is fixed on the cross bar, and second column, first column intersect with the cross bar solid in length and breadth respectively It is shaped as the containment system.
2. side containment system is faced in floor regularization according to claim 1, which is characterized in that the clip includes to spelling Two clip pieces, each clip piece include and the first wall of the outer of structural column cooperation and outer with first column Along the second wall of cooperation, pass through connecting plate integrally connected between first wall and the adjacent end portion of second wall, First wall of the two clips piece is to spell shape at first sleeve part, and the second wall of the two clips piece is to spell shape at institute The second sleeve part is stated, has been formed separately perforation on the connecting plate of the two clips piece, bolt is enabled to place the perforation and nut spiral shell It connects to fasten first sleeve part and the structural column, second sleeve part and first column.
3. side containment system is faced in floor regularization according to claim 2, which is characterized in that each second wall has Opposite first end and the second end, the first end are fixed with first wall by connecting plate, the second end Portion is formed with fastening plates, perforation is formed in the fastening plates, the fastening plates of the two clips piece are placed by bolt and nut It is spirally connected to fasten first column and second sleeve part.
4. side containment system is faced in floor regularization according to claim 2, which is characterized in that first wall has phase Pair two end sides, two end side is respectively fixed with the connecting plate to connect 2 second sleeve parts.
5. facing side containment system to floor regularization described in any claim in 4 according to claim 1, which is characterized in that The bottom end of first column is removably fixed on the floor by built-in fitting, the built-in fitting include the first fixed part and The bottom end of second fixed part, first fixed part is embedded in the floor, and the top of first fixed part is fixed The second fixed part is stated, second fixed part is band internal thread sleeve, second fixed part and first fixed part Be spirally connected fixation, and second fixed part is anchored in first column, and first column is hollow steel pipe.
6. side containment system is faced in floor regularization according to claim 5, which is characterized in that at concrete wall The end of cross bar is connected with end coupling, and the concrete wall is telescopically supported in one end of the end coupling.
7. side containment system is faced in floor regularization according to claim 6, which is characterized in that the cross bar is hollow steel Pipe, the end coupling includes screw rod, nut and U-shaped supporting plate, and one end of the screw rod is inserted in the cross bar, the spiral shell The nut is bolted on bar, the nut is positioned at the end of the cross bar and limits one end of the screw rod in the cross bar The other end of interior, the described screw rod stretches out the cross bar, and the other end of the screw rod is fixed with the U-shaped pallets, the U-shaped supporting plate Support the concrete wall.
8. side containment system is faced in floor regularization according to claim 7, which is characterized in that the end coupling and institute It states and is equipped with protective block between concrete wall, the protective block is arranged in the U-lag of the U-shaped supporting plate.
9. side containment system is faced in floor regularization according to claim 8, which is characterized in that the protective block is flitch.
CN201821848175.8U 2018-11-11 2018-11-11 Side containment system is faced in floor regularization Active CN209129401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821848175.8U CN209129401U (en) 2018-11-11 2018-11-11 Side containment system is faced in floor regularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821848175.8U CN209129401U (en) 2018-11-11 2018-11-11 Side containment system is faced in floor regularization

Publications (1)

Publication Number Publication Date
CN209129401U true CN209129401U (en) 2019-07-19

Family

ID=67244577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821848175.8U Active CN209129401U (en) 2018-11-11 2018-11-11 Side containment system is faced in floor regularization

Country Status (1)

Country Link
CN (1) CN209129401U (en)

Similar Documents

Publication Publication Date Title
CN205978823U (en) Pump line fixing device
CN207079735U (en) A kind of beam-column node structure
CN209129401U (en) Side containment system is faced in floor regularization
CN109138494A (en) A kind of non-console mode large span mould plate supporting device and its construction method
CN104061005A (en) Rubber waterstop fixing supporting rod and use method thereof
CN110206271A (en) A kind of concrete ultra-flat terrace cutting-free construction method
CN206530078U (en) A kind of support meanss
CN207110242U (en) A kind of I-shaped reinforcing bar steel core concrete column structure
CN211735773U (en) Overlength primary and secondary truss and clitellum truss dome steel construction
CN209146691U (en) A kind of antidetonation connecting elements and antidetonation suspension and support
CN206204992U (en) Detachable waterproof node structure between prefabricated comprehensive pipe gallery joints
CN105714685A (en) Stretch-draw auxiliary device for suspender of arch bridge
CN209725487U (en) A kind of installing mechanism of architectural engineering spray head
CN206530077U (en) A kind of support frame
CN207032680U (en) A kind of bar connecting fixing device
CN207775737U (en) Bridge post-cast strip ruggedized construction
CN209555866U (en) A kind of unrestrained device of gear
CN210266210U (en) Can absorb exempting from to tear open mould pipe joint of deformation
CN207314348U (en) A kind of fixed structure of flare template
CN209397711U (en) A kind of steel-structure factory building mounting rack
CN207177332U (en) A kind of new sliceable building reinforced column
CN205777882U (en) A kind of construction site protect enclosure wall temporarily
CN206477596U (en) Reusable concrete pump pipe support system
CN208251780U (en) A kind of annular concrete electric pole
CN208586897U (en) A kind of composite floor construction overhanging portion template supporting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant