CN209099561U - A kind of pre-buried fixed structure of architectural lay wire pipeline box - Google Patents
A kind of pre-buried fixed structure of architectural lay wire pipeline box Download PDFInfo
- Publication number
- CN209099561U CN209099561U CN201821463718.4U CN201821463718U CN209099561U CN 209099561 U CN209099561 U CN 209099561U CN 201821463718 U CN201821463718 U CN 201821463718U CN 209099561 U CN209099561 U CN 209099561U
- Authority
- CN
- China
- Prior art keywords
- steel joist
- pipeline
- lightgage steel
- keel
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model relates to new construction material fields, are specifically related to a kind of pre-buried fixed structure of architectural lay wire pipeline box.Including lightgage steel joist, the lightgage steel joist two sides are fixed with metal stretching net, the metal stretching Netcom crosses screw and is fixed with wire box, described wire box one end is fixed with pipeline, the other end of the pipeline passes through the lightgage steel joist for cutting with notch, the lightgage steel joist incision is fixed with reinforcement keel, the lightgage steel joist that the reinforcement keel cut with notch by one section is made, the other end of the pipeline, which passes through, reinforces keel, has poured lightweight aggregate concrete in the cavity that the metal stretching net and the lightgage steel joist are formed.This structure is not only simple in structure, easy for construction, greatly improves construction speed, realize the layout installation synchronous with keel piece of pipeline, wire box, the bad process for avoiding secondary fluting, mending slot and secondary seam, ensure that the globality of wall is not damaged, and guarantee construction quality.
Description
Technical field
The utility model relates to new construction material fields, and it is pre-buried solid to be specifically related to a kind of architectural lay wire pipeline box
Determine structure.
Background technique
At the scene when casting concrete wall, traditional way is using the template being oppositely arranged face-to-face, in template institute
Casting concrete in the volume defined between template is connected by connecting rod, connecting rod by template wall outside locking piece cross lock
It is fixed, after concrete setting, template is recycled, takes out locking piece.Connecting rod in Transducers Embedded in Concrete is stayed within the walls or is taken out, but its
It no longer cuts any ice to the intensity of wall, but also the remitted its fury of wall can be made.
DIPY construction formwork mesh is a kind of new construction material introduced from foreign countries, which is in factory directly by wall
Body requirement for height produces lay wire in blocks, and on-site consolidation after-pouring concrete is widely used to multilayer and small sized multiple story building.The mould
Net does not have to remove after casting concrete, and abandoning is put in wall, reduces many workloads, while increasing strength of wall body.It builds at present
It builds in lay wire wall construction, when installing spool, wire box, water pipe, aperture, fluting, are destroyed usually on molded wall
The original globality of wall, while increasing the secondary reparation of wall and the process and cost of joint treatment.
Utility model content
For the technical problems in the prior art, the purpose of this utility model is to provide a kind of architectural lay wire pipelines
The pre-buried fixed structure of box.To achieve the goals above, the technology employed by the present utility model is
A kind of pre-buried fixed structure of architectural lay wire pipeline box, including lightgage steel joist, the lightgage steel joist two sides are fixed with gold
Belong to stretching nets, the metal stretching Netcom crosses screw and is fixed with wire box, and described wire box one end is fixed with pipeline, the pipeline it is another
One end passes through the lightgage steel joist for cutting with notch, and the lightgage steel joist incision is fixed with reinforcement keel, and the reinforcement keel are by one
Section cuts with the lightgage steel joist of notch and is made, and the other end of the pipeline, which passes through, reinforces keel, the metal stretching net and described light
Lightweight aggregate concrete has been poured in the cavity that steel joist is formed.
Preferably, the lightgage steel joist is to be processed by hot-galvanized steel band through keel forming equipment, and thickness of strips is
0.6mm, 0.7mm or 0.8mm, lightgage steel joist are made of two flangings and interarea, and shape is C-shaped, longitudinal equal on flanging and interarea
There are impression, the bending of hemmed edges band.
Preferably, V-shaped among the flanging.
Preferably, the metal stretching net is to be processed by hot-galvanized steel band through keel forming equipment, and thickness of strips is
0.5mm, 0.6mm or 0.7mm, mesh are in blossom type, go out contraction outward.
The utility model is not only simple in structure, easy for construction, greatly improves construction speed, realizes pipeline, wire box and keel
The synchronous layout installation of component, the bad process for avoiding secondary fluting, mending slot and secondary seam ensure that the globality of wall not
It is damaged, guarantees construction quality.
Detailed description of the invention
Fig. 1 is the pre-buried fixed structure schematic diagram of architectural lay wire pipeline box that the utility model is proposed.
Fig. 2 is the reinforcement keel installation signal for the pre-buried fixed structure of architectural lay wire pipeline box that the utility model is proposed
Figure.
In Fig. 1, Fig. 2:
1, lightgage steel joist 2, metal stretching net 3, wire box 4, pipeline 5, screw 6, reinforcement keel
Specific embodiment
It is right with reference to the accompanying drawing for a kind of pre-buried fixed structure of architectural lay wire pipeline box for further describing the utility model
It is described further.
In Fig. 1, Fig. 2, a kind of pre-buried fixed structure of architectural lay wire pipeline box, including lightgage steel joist 1, lightgage steel joist 1 be by
Hot-galvanized steel band is processed into through keel forming equipment, and thickness of strips 0.6mm, 0.7mm or 0.8mm, lightgage steel joist 1 is by two
A flanging and interarea form, longitudinal on flanging and interarea to have impression, the bending of hemmed edges band or intermediate V-shaped, the light steel
1 two sides of keel are fixed with metal stretching net 2, and metal stretching net 2 is to be processed by hot-galvanized steel band through keel forming equipment, steel
Tape thickness is 0.5mm, 0.6mm or 0.7mm, and mesh is in blossom type, goes out contraction outward, and the metal stretching net 2 passes through screw 5
It is fixed with wire box 3, described 3 one end of wire box is fixed with pipeline 4, and the other end of the pipeline 4 passes through the lightgage steel joist for cutting with notch
1,1 incision of lightgage steel joist, which is fixed with, reinforces keel 6, the lightgage steel joist system reinforced keel 6 and cut with notch by one section
At the other end of the pipeline 4, which passes through, reinforces keel 6, in the cavity that the metal stretching net 2 and the lightgage steel joist 1 are formed
Lightweight aggregate concrete is poured.
When construction, first line setting installs lightgage steel joist 1, and the needs of pipeline 4 are worn in 4 position of wire box of having good positioning 3 and pipeline
The lightgage steel joist 1 crossed cuts a notch, and the metal stretching net 2 that then will be close to 3 one end of wire box is first fixed on lightgage steel joist 1,
Then wire box is fixed on metal stretching net 2 by screw 5, and 4 one end of pipeline is fixed in wire box 3, and the other end passes through light steel dragon
The notch of bone 1, then 1 incision of lightgage steel joist, last other side metal stretching net 2 are fixed on by keel 6 are reinforced by keel pincers
It is fixed on lightgage steel joist 1, then pours lightweight aggregate concrete in the cavity that metal stretching net 2 and lightgage steel joist 1 are formed, support
The corresponding metal stretching net of wire box 3 is cut off after protecting the time.
Above content is only the design example and explanation to the utility model, the technologies of affiliated the art
Personnel make various modifications or additions to the described embodiments or are substituted in a similar manner, without departing from
The design of utility model or beyond the scope defined by this claim, all should belong to the protection range of the utility model.
Claims (4)
1. a kind of pre-buried fixed structure of architectural lay wire pipeline box, including lightgage steel joist, the lightgage steel joist two sides are fixed with metal
Stretching nets, the metal stretching Netcom cross screw and are fixed with wire box, and described wire box one end is fixed with pipeline, the pipeline it is another
End is across the lightgage steel joist for cutting with notch, and the lightgage steel joist incision is fixed with reinforcement keel, and the reinforcement keel are by one section
The lightgage steel joist for cutting with notch is made, and the other end of the pipeline, which passes through, reinforces keel, the metal stretching net and the light steel
Lightweight aggregate concrete has been poured in the cavity that keel are formed.
2. a kind of pre-buried fixed structure of architectural lay wire pipeline box according to claim 1, which is characterized in that the light steel dragon
Bone is to be processed by hot-galvanized steel band through keel forming equipment, thickness of strips 0.6mm, 0.7mm or 0.8mm, lightgage steel joist
It is made of two flangings and interarea, shape is C-shaped, longitudinal on flanging and interarea to have impression, the bending of hemmed edges band.
3. a kind of pre-buried fixed structure of architectural lay wire pipeline box according to claim 2, which is characterized in that in the flanging
Between it is V-shaped.
4. a kind of pre-buried fixed structure of architectural lay wire pipeline box according to claim 1, which is characterized in that the metal is drawn
Stretching net is to be processed by hot-galvanized steel band through keel forming equipment, thickness of strips 0.5mm, 0.6mm or 0.7mm, and mesh is in
Blossom type goes out contraction outward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463718.4U CN209099561U (en) | 2018-09-07 | 2018-09-07 | A kind of pre-buried fixed structure of architectural lay wire pipeline box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463718.4U CN209099561U (en) | 2018-09-07 | 2018-09-07 | A kind of pre-buried fixed structure of architectural lay wire pipeline box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209099561U true CN209099561U (en) | 2019-07-12 |
Family
ID=67152166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821463718.4U Active CN209099561U (en) | 2018-09-07 | 2018-09-07 | A kind of pre-buried fixed structure of architectural lay wire pipeline box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209099561U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924564A (en) * | 2019-11-20 | 2020-03-27 | 中国十七冶集团有限公司 | Electrical pipeline pre-embedding system in secondary structure and implementation method |
-
2018
- 2018-09-07 CN CN201821463718.4U patent/CN209099561U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924564A (en) * | 2019-11-20 | 2020-03-27 | 中国十七冶集团有限公司 | Electrical pipeline pre-embedding system in secondary structure and implementation method |
CN110924564B (en) * | 2019-11-20 | 2021-02-23 | 中国十七冶集团有限公司 | Electrical pipeline pre-embedding system in secondary structure and implementation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207633612U (en) | A kind of special full precast floor slab of assembling type steel structure | |
CN103410265A (en) | Jointing structure of composite floor | |
CN110295738A (en) | Shear wall formwork structure and construction method | |
CN209099561U (en) | A kind of pre-buried fixed structure of architectural lay wire pipeline box | |
CN107083804B (en) | A kind of wall structure column joint bar construction method | |
CN203947498U (en) | Poured band of outer wall of basement wall Side Template | |
CN208633535U (en) | A kind of concrete component split bolt hole plugging structure | |
CN107780577A (en) | A kind of special laminated floor slab of assembling type steel structure | |
CN108035241A (en) | A kind of assembled steel-mixed combined bridge and its construction technology | |
CN105839917B (en) | A kind of construction method of all-steel mold plate fair-faced concrete exposed joint strip and its outseam | |
CN205025078U (en) | Be applied to drawknot system that outside support body and major structure are connected | |
CN109403511A (en) | A kind of wall system and its installation method | |
CN109024904A (en) | A kind of fabricated shear wall vertical abutment joint curved bar bolt fastening structure and construction method | |
CN106337530B (en) | A kind of construction of frame beam seams stifled construction method | |
CN205915488U (en) | Reserve door and window pouring mold | |
CN207633613U (en) | A kind of special laminated floor slab of assembling type steel structure | |
CN107386556A (en) | Light composite heat insulation outer wall plate | |
CN204343442U (en) | A kind of prefabricated assembling type reinforced concrete air-condition plate | |
CN209163167U (en) | A kind of precast floor slab connecting node construction | |
CN209227820U (en) | A kind of architectural lay wire abnormity wall connecting structure | |
CN203412285U (en) | Simple arched component chamfering mold plate | |
CN203891470U (en) | Fastening bolt for shear wall formwork | |
CN105735487A (en) | Wall tied reinforcement component | |
CN206681262U (en) | A kind of prefabricated Concrete-Filled Square Steel Tube coupling beam of multilayer | |
CN205742259U (en) | One lower channel side wall assembled template over long distances |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |