CN209083726U - A kind of novel three-stage tube bank - Google Patents

A kind of novel three-stage tube bank Download PDF

Info

Publication number
CN209083726U
CN209083726U CN201821882242.8U CN201821882242U CN209083726U CN 209083726 U CN209083726 U CN 209083726U CN 201821882242 U CN201821882242 U CN 201821882242U CN 209083726 U CN209083726 U CN 209083726U
Authority
CN
China
Prior art keywords
arm
hoop
caulking groove
arc
hoop arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821882242.8U
Other languages
Chinese (zh)
Inventor
廖小波
覃宝
张映华
黄诗彬
黄种欣
黄王杰
张汇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANZHOU TENGDA FINE CASTING CO Ltd
Original Assignee
QUANZHOU TENGDA FINE CASTING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANZHOU TENGDA FINE CASTING CO Ltd filed Critical QUANZHOU TENGDA FINE CASTING CO Ltd
Priority to CN201821882242.8U priority Critical patent/CN209083726U/en
Application granted granted Critical
Publication of CN209083726U publication Critical patent/CN209083726U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

A kind of novel three-stage tube bank, caulking groove two can be mutually chimeric with the caulking groove one at middle section double end hoop arm right arm end, the pin hole one at one middle part of caulking groove at middle section double end hoop arm right arm end can be aligned with pin hole two and be concatenated by a first pin rod realization activity, first arc hoop arm can realize flexible rotating using the first pin rod as axis of rotation, caulking groove three can be mutually chimeric with the caulking groove one at middle section double end hoop arm left arm end, the pin hole one at one middle part of caulking groove at middle section double end hoop arm left arm end can be aligned with pin hole three and be concatenated by a second pin rod realization activity, second arc hoop arm can realize flexible rotating using the second pin rod as axis of rotation.The utility model has the characteristics that structure novel, flexible operation, beam tube intensity are high.

Description

A kind of novel three-stage tube bank
Technical field
The utility model relates to a kind of tube banks of novel three-stage.
Background technique
At present, it is common to use tube bank can have the defects that beam tube intensity is weak, malfunction in actual use.
Summary of the invention
In order to make up drawbacks described above, the utility model provides a kind of novel three-stage tube bank, it has structure novel, operation Flexibly, the high feature of beam tube intensity.
In order to achieve the above object, the utility model provides following particular technique measure: a kind of novel three-stage tube bank, it It is made of middle section double end hoop arm, arc hoop arm, which is characterized in that
The intrados one of middle section double end hoop arm is used as front end face, and the bottom of the front end face is integrally formed with one section of arc flesh item One, integrally formed with a caulking groove one to lower recess, the middle part of each caulking groove one is bored at the two-arm end of middle section double end hoop arm There is a pin hole one;
The intrados two of first arc hoop arm is used as front end face, and the bottom of the front end face is integrally formed with one section of arc flesh item Two, integrally formed with a caulking groove being recessed upwards two, the middle part of caulking groove two is drilled with a pin at the left arm end of the first arc hoop arm Hole two, the right arm end of the first arc hoop arm are folded to that hoop is first integrally formed with one, this, which is folded to, binds round first middle part and be drilled with one Circular hole;
Caulking groove two can be with the caulking groove one at middle section double end hoop arm right arm end mutually chimeric, the caulking groove at middle section double end hoop arm right arm end The pin hole one at one middle part can be aligned with pin hole two and be concatenated by a first pin rod realization activity;
First arc hoop arm can realize flexible rotating using the first pin rod as axis of rotation;
The intrados three of second arc hoop arm is used as front end face, and the bottom of the front end face is integrally formed with one section of arc flesh item Three, integrally formed with a caulking groove being recessed upwards three, the middle part of caulking groove three is drilled with a pin at the left arm end of the second arc hoop arm The right arm end in hole three, the second arc hoop arm is folded to hoop head two integrally formed with one, this is folded to the middle top surface one of hoop head two Form one of groove;
Caulking groove three can be with the caulking groove one at middle section double end hoop arm left arm end mutually chimeric, the caulking groove at middle section double end hoop arm left arm end The pin hole one at one middle part can be aligned with pin hole three and be concatenated by a second pin rod realization activity;
Second arc hoop arm can realize flexible rotating using the second pin rod as axis of rotation;
The intrados one of middle section double end hoop arm, the intrados two of the first arc hoop arm, the second arc hoop arm intrados three A circular beam tube space can be enclosed.
The groove for being folded to the circular hole bound round on first and being folded on hoop head two is used to walking for wound and bound rope.
The beneficial effects of the utility model are that it has the characteristics that structure novel, flexible operation, beam tube intensity are high.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 is the utility model entire combination connection structure perspective view.
In figure: the middle section A- double end hoop arm, A1- intrados one, B- the first arc hoop arm, B1- intrados two, B2- are folded to hoop First, B21- circular hole, C- the second arc hoop arm, C1- intrados three, C2- be folded to hoop head two, C21- groove, the first pin rod of D1-, The second pin rod of D2-.
Specific embodiment
As shown in Figure 1, a kind of novel three-stage tube bank, it is made of middle section double end hoop arm A, arc hoop arm, feature It is,
One A1 of intrados of middle section double end hoop arm A is as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item one, the two-arm end of middle section double end hoop arm A is integrally formed with a caulking groove one to lower recess, the middle part of each caulking groove one It is drilled with a pin hole one;
Two B1 of intrados of first arc hoop arm B is as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item two, integrally formed with a caulking groove being recessed upwards two, the middle part of caulking groove two is drilled with one at the left arm end of the first arc hoop arm B The right arm end of a pin hole two, the first arc hoop arm B is folded to the first B2 of hoop integrally formed with one, this is folded to the middle part for binding round first B2 It is drilled with a circular hole B21;
Caulking groove two can with the caulking groove one at middle section double end hoop arm A right arm end mutually it is chimeric, middle section double end hoop arm A right arm end it is embedding The pin hole one at one middle part of slot can be aligned with pin hole two and be concatenated by a first pin rod D1 realization activity;
First arc hoop arm B can realize flexible rotating using the first pin rod D1 as axis of rotation;
Three C1 of intrados of second arc hoop arm C is as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item three, integrally formed with a caulking groove being recessed upwards three, the middle part of caulking groove three is drilled with one at the left arm end of the second arc hoop arm C The right arm end of a pin hole three, the second arc hoop arm C is folded to hoop two C2 of head integrally formed with one, this is folded to the middle part of hoop two C2 of head Top surface is integrally formed with one of groove C21;
Caulking groove three can with the caulking groove one at middle section double end hoop arm A left arm end mutually it is chimeric, middle section double end hoop arm A left arm end it is embedding The pin hole one at one middle part of slot can be aligned with pin hole three and be concatenated by a second pin rod D2 realization activity;
Second arc hoop arm C can realize flexible rotating using the second pin rod D2 as axis of rotation;
One A1 of intrados of middle section double end hoop arm A, two B1 of intrados of the first arc hoop arm B, the second arc hoop arm C it is interior Three C1 of cambered surface can be enclosed a circular beam tube space.

Claims (1)

1. a kind of novel three-stage tube bank, it is made of middle section double end hoop arm (A), arc hoop arm, which is characterized in that
The intrados one (A1) of middle section double end hoop arm (A) is used as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item one, the two-arm end of middle section double end hoop arm (A) is integrally formed with a caulking groove one to lower recess, in each caulking groove one Portion is drilled with a pin hole one;
The intrados two (B1) of first arc hoop arm (B) is used as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item two, integrally formed with a caulking groove being recessed upwards two, the middle part of caulking groove two is drilled at the left arm end of the first arc hoop arm (B) One pin hole two, the right arm end of the first arc hoop arm (B) is folded to integrally formed with one binds round first (B2), and it is first that this is folded to hoop (B2) circular hole (B21) is drilled in the middle part of;
Caulking groove two can with the caulking groove one at middle section double end hoop arm (A) right arm end mutually it is chimeric, middle section double end hoop arm (A) right arm end it is embedding The pin hole one at one middle part of slot can be aligned with pin hole two and be concatenated by the first pin rod (D1) realization activity;
First arc hoop arm (B) can realize flexible rotating using the first pin rod (D1) as axis of rotation;
The intrados three (C1) of second arc hoop arm (C) is used as front end face, and the bottom of the front end face is integrally formed with one section of arc Flesh item three, integrally formed with a caulking groove being recessed upwards three, the middle part of caulking groove three is drilled at the left arm end of the second arc hoop arm (C) The right arm end of one pin hole three, the second arc hoop arm (C) is folded to hoop head two (C2) integrally formed with one, this is folded to hoop head two (C2) middle top surface is integrally formed with one of groove (C21);
Caulking groove three can with the caulking groove one at middle section double end hoop arm (A) left arm end mutually it is chimeric, middle section double end hoop arm (A) left arm end it is embedding The pin hole one at one middle part of slot can be aligned with pin hole three and be concatenated by the second pin rod (D2) realization activity;
Second arc hoop arm (C) can realize flexible rotating using the second pin rod (D2) as axis of rotation;
The intrados one (A1) of middle section double end hoop arm (A), the intrados two (B1) of the first arc hoop arm (B), the second arc hoop arm (C) intrados three (C1) can be enclosed a circular beam tube space.
CN201821882242.8U 2018-11-15 2018-11-15 A kind of novel three-stage tube bank Active CN209083726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821882242.8U CN209083726U (en) 2018-11-15 2018-11-15 A kind of novel three-stage tube bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821882242.8U CN209083726U (en) 2018-11-15 2018-11-15 A kind of novel three-stage tube bank

Publications (1)

Publication Number Publication Date
CN209083726U true CN209083726U (en) 2019-07-09

Family

ID=67124281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821882242.8U Active CN209083726U (en) 2018-11-15 2018-11-15 A kind of novel three-stage tube bank

Country Status (1)

Country Link
CN (1) CN209083726U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112234537A (en) * 2020-09-25 2021-01-15 中国直升机设计研究所 Cable guide mechanism for preventing and removing ice on rotor wing
CN113883135A (en) * 2021-10-15 2022-01-04 宁波迪亚工业设备有限公司 Firmly-connected lean pipe connector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112234537A (en) * 2020-09-25 2021-01-15 中国直升机设计研究所 Cable guide mechanism for preventing and removing ice on rotor wing
CN113883135A (en) * 2021-10-15 2022-01-04 宁波迪亚工业设备有限公司 Firmly-connected lean pipe connector

Similar Documents

Publication Publication Date Title
CN209083726U (en) A kind of novel three-stage tube bank
CN209494119U (en) Bamboo and woods fiber wallboard
RU2013143840A (en) TOY CONSTRUCTOR
WO2010008785A3 (en) Wrist pin, connecting rod, piston and piston assembly therewith and methods of constructing and assembling the same
CN207436822U (en) A kind of folding door with linkage fold mechanism
US20180193761A1 (en) Set of castle building blocks
CN207033916U (en) Parachute kit support bar and its Location resilient piece
CN107489349A (en) A kind of folding door with linkage fold mechanism
CN208492228U (en) A kind of connectionless double acting abdominal cavity pincers binding clip portion
CN206798969U (en) A kind of road and bridge construction load-bearing gantry suspension bracket
CN202302058U (en) Limit structure of ball valve
CN202596299U (en) Double-fin reinforced linkage lock
ITMI20082001A1 (en) DEVICE FOR VERTICAL HANDLING OF FURNITURE DOORS.
CN205007563U (en) Top action bars
CN205571255U (en) Angle bending machine of crooked round pin rack is decided to ring
CN208685846U (en) A kind of shock-absorbing type lightgage steel joist
CN208941139U (en) A kind of dinner set box
CN206913076U (en) A kind of automatic nailing machine nail hole path dual-cavity connector
CN209595008U (en) A kind of luggage case pull rod
CN209800474U (en) Mortise and tenon structure
CN205577751U (en) A steel member for door and window
CN207285469U (en) Polygonal umbrella and its umbrella cover structure
CN214620857U (en) Multifunctional combined pin roller
CN209325023U (en) A kind of double flute piston rod
CN101913449B (en) Paper tube

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant