CN209083296U - A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench - Google Patents

A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench Download PDF

Info

Publication number
CN209083296U
CN209083296U CN201821980726.6U CN201821980726U CN209083296U CN 209083296 U CN209083296 U CN 209083296U CN 201821980726 U CN201821980726 U CN 201821980726U CN 209083296 U CN209083296 U CN 209083296U
Authority
CN
China
Prior art keywords
fixedly installed
speed rail
protective device
rail tunnel
big cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821980726.6U
Other languages
Chinese (zh)
Inventor
高军
陈拥军
林晓
李秀君
申百屯
汤宇
王仁明
杨文龙
田佳
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821980726.6U priority Critical patent/CN209083296U/en
Application granted granted Critical
Publication of CN209083296U publication Critical patent/CN209083296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbenchs, including protective device, top plate, the first electric expansion column, bottom plate and lighting device, protective device is fixedly installed at the top of the top plate, the protective device is fixedly installed with safety rope by fender rod, and the both ends of the protective device two sides are fixedly installed with lighting device.The utility model is provided with protective device, it is blocked by some rock ballasts that protective device can fall high-speed rail tunnel top, it prevents from rock ballast from falling to worker with it to damage worker, the high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench is provided with safety rope, by the way that safety rope is bundled in worker, it prevents from worker from slipping during construction to fall, the high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench is provided with lighting device, it can be illuminated by lighting device with high-speed rail tunnel internal, be constructed convenient for worker.

Description

A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench
Technical field
The utility model relates to high-speed rail Tunnel Engineering technical field, the intelligent automatic row of specially a kind of high-speed rail tunnel big cross section Walk arch Mobile workbench.
Background technique
High-speed rail constructing tunnel is the abbreviation of new Austrian method for tunnel construction, it is Austrian scholar in long campaigns height In the practice of iron constructing tunnel, a kind of reasonable construction method proposed from the viewpoint of rock mechanics is using spray anchor skill Art, monitoring measurement etc. and the new engineering construction method of one kind formed with a system that rock mechanics theory is constituted, in height A kind of high-speed rail tunnel big cross section arch Mobile workbench is often needed to use during iron constructing tunnel.
Existing high-speed rail tunnel big cross section arch Mobile workbench lacks protective device during construction, and worker is at station in height When working on iron tunnel big cross section arch Mobile workbench, often because high-speed rail tunnel top falls some rock ballasts and causes to worker Injury is easy to fall, causes safety accident, existing high-speed rail tunnel big cross section in the case that worker is careless during construction Arch Mobile workbench is provided with lighting device, is constructed convenient for worker to high-speed rail tunnel by lighting device.
Utility model content
The purpose of this utility model is to provide a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench, with Solve the problems mentioned above in the background art.
To achieve the above object, the utility model provides the following technical solutions: a kind of high-speed rail tunnel big cross section is intelligently automatic Walking arch Mobile workbench, including protective device, top plate, the first electric expansion column, bottom plate and lighting device, the top plate top It is fixedly installed with protective device, the protective device is fixedly installed with safety rope by fender rod, the protective device two sides Both ends are fixedly installed with lighting device, and four angles of the bottom base plate are fixedly installed with driving device, at the top of the bottom plate Four angles are fixedly installed with the first electric expansion column, and the middle position of the bottom plate side is fixedly installed with the second electric expansion Bar, one end of second electric telescopic rod are fixedly installed with fixed support plate, the centre between the first electric expansion column It is fixedly installed with stabiliser bar at position, top plate, the top plate and first are fixedly installed at the top of the first electric expansion column It is fixedly installed with fixed link between electric expansion column, non-slip mat, the protective device leading flank are adhesive at the top of the top plate Control panel is fixedly installed with by fender rod.
Preferably, the protective device includes support rod, baffle and fender rod, and four angles of baffle bottom are fixedly installed with Support rod is fixedly installed with two groups of fender rods between support rod.
Preferably, the bottom of the lighting device is fixedly installed with headlamp, the fixed peace in the outside of headlamp by lamp holder Equipped with shield.
Preferably, one end of the safety rope is fixedly installed with sliding shoe, and the one end of the safety rope far from sliding shoe is solid Dingan County is equipped with lock.
Preferably, the inside of the driving device is fixedly installed with traveling wheel by shaft, the driving device side Bottom is fixedly installed with GV horizontal machine, and the output end of GV horizontal machine is fixedly connected by rotation axis with shaft.
Preferably, four angles of the control panel are fixedly installed with fixing bolt, and the control panel leading flank is inlayed First control switch, the second control switch, third control switch and the 4th control switch are installed.
Compared with prior art, the utility model has the beneficial effects that the high-speed rail tunnel big cross section intelligence automatically walk is encircleed Frame Mobile workbench is provided with protective device, is hidden by some rock ballasts that protective device can fall high-speed rail tunnel top Gear prevents rock ballast from falling to worker and damages with it to worker, the high-speed rail tunnel big cross section intelligence automatically walk arch operation Trolley is provided with safety rope, by the way that safety rope is bundled in worker, prevents worker from slipping during construction and falls, be somebody's turn to do High-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench is provided with lighting device, can be with high-speed rail tunnel by lighting device Inside is illuminated, and is constructed convenient for worker.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the protective device structure figure of the utility model;
Fig. 3 is the illuminator structure figure of the utility model;
Fig. 4 is the safety rope structure chart of the utility model;
Fig. 5 is the driving device structure figure of the utility model;
Fig. 6 is the circuit connection diagram of the utility model.
In figure: 1, protective device;101, support rod;102, baffle;103, fender rod;2, safety rope;201, sliding shoe; 202, it latches;3, non-slip mat;4, top plate;5, fixed support plate;6, the first electric expansion column;7, driving device;701, shaft; 702, GV horizontal machine;703, traveling wheel;8, bottom plate;9, stabiliser bar;10, the second electric telescopic rod;11, fixed link;12, it controls Plate;13, lighting device;1301, shield;1302, headlamp;1303, lamp holder.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-6 is please referred to, a kind of embodiment provided by the utility model: a kind of high-speed rail tunnel big cross section intelligence automatically walk Arch Mobile workbench, including protective device 1, top plate 4, the first electric expansion column 6, bottom plate 8 and lighting device 13,8 bottom of bottom plate Four angles be bolted driving device 7 be installed, defaecation driving device 7 can drive the trolley to be automatically moved, Four fillet welding at 8 top of bottom plate are connected to the first electric expansion column 6, and the first electric expansion column 6 is that machine is driven by a drive motor to rotate Structure, rotating mechanism carry out up and down motion operation by guiding axis band piston, adjust the trolley by the first electric expansion column 6 Highly, the middle position of 8 side of bottom plate, which is bolted, is equipped with the second electric telescopic rod 10, the second electric telescopic rod 10 One end be bolted fixed support plate 5 be installed, withstand on fixed support plate 5 by adjusting the second electric telescopic rod 10 The trolley is fixed on the wall of two sides, the middle position between the first electric expansion column 6 is bolted installation There is stabiliser bar 9, stabiliser bar 9 is fixed support connection to the first electric expansion column 6, reinforces the stabilization of the first electric expansion column 6 Property, the top of the first electric expansion column 6, which is bolted, is equipped with top plate 4, and top plate 4 stops over convenient for worker and constructs, and pushes up It is bolted between plate 4 and the first electric expansion column 6 and fixed link 11 is installed, pass through 11 Strengthening Roof 4 of fixed link and The connection of one electric expansion column 6, the top of top plate 4 are adhesive with non-slip mat 3, and non-slip mat 3 plays anti-skidding effect, prevents worker from going out The case where now slipping, 1 leading flank of protective device are fixedly installed with control panel 12 by fender rod 103, and control panel 12 passes through fixation Spiral shell is fixedly connected with fender rod 103, and control panel 12 controls the working condition of the trolley, is fixedly installed at the top of top plate 4 Protective device 1, the rock ballast that protective device 1 falls high-speed rail tunnel inner top block, and prevent rock ballast from damaging to worker, Protective device 1 is fixedly installed with safety rope 2 by fender rod 103, and safety rope 2 connects by the way that sliding shoe 201 and fender rod 103 are fixed It connects, the both ends of 1 two sides of protective device, which are bolted, is equipped with lighting device 13, is convenient for by lighting device 13 to construction ring Border is illuminated.
Further, protective device 1 includes support rod 101, baffle 102 and fender rod 103, four angles of 102 bottom of baffle It is welded with support rod 101, four angles of 102 bottom of baffle are fixedly installed in the top of top plate 4, support rod by support rod 101 Two groups of fender rods 103 are welded between 101, fender rod 103 can protect the surrounding at 4 top of top plate, prevent worker from losing Foot is fallen.
Further, the bottom of lighting device 13 is fixedly installed with headlamp 1302 by lamp holder 1303, and headlamp 1302 is right Construction environment is illuminated, and the outside of headlamp 1302, which is bolted, is equipped with shield 1301, and shield 1301 compares Bright lamp 1302 is protected.
Further, one end of safety rope 2 is fixedly connected with sliding shoe 201, and safety rope 2 passes through sliding shoe 201 and fender rod 103 are fixedly connected, and safety rope 2 is fixedly connected with lock 202 far from one end of sliding shoe 201, by lock 202 convenient for safety Rope 2 is bundled in worker.
Further, the inside of driving device 7 is fixedly installed with traveling wheel 703 by shaft 701,7 side of driving device Bottom, which is bolted, is equipped with GV horizontal machine 702, and the output end of GV horizontal machine 702 passes through rotation axis and shaft 701 It is fixedly connected, GV horizontal machine 702 drives traveling wheel 703 to be rotated by shaft 701, to realize that the trolley is moved It is dynamic.
Further, four angles of control panel 12 are fixedly installed with fixing bolt by helicitic texture, and control panel 12 is logical Fixing bolt is crossed to be fixedly connected with fender rod 103,12 leading flank of control panel inlay be equipped with the first control switch, second control open It closes, third control switch and the 4th control switch, the first control switch, the second control switch, third control switch and the 4th are controlled The work to GV horizontal machine 702, headlamp 1302, the first electric expansion column 6 and the second electric telescopic rod 10 respectively of system switch State is controlled.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench, including protective device, top plate, first electronic stretch Contracting column, bottom plate and lighting device, it is characterised in that: protective device is fixedly installed at the top of the top plate, the protective device is logical It crosses fender rod and is fixedly installed with safety rope, the both ends of the protective device two sides are fixedly installed with lighting device, the bottom plate bottom Four angles in portion are fixedly installed with driving device, and four angles at the top of the bottom plate are fixedly installed with the first electric expansion column, institute The middle position for stating bottom plate side is fixedly installed with the second electric telescopic rod, the fixed peace in one end of second electric telescopic rod Equipped with fixed support plate, the middle position between the first electric expansion column is fixedly installed with stabiliser bar, first electricity It is fixedly installed with top plate at the top of dynamic telescopic mast, is fixedly installed with fixed link between the top plate and the first electric expansion column, institute It states and is adhesive with non-slip mat at the top of top plate, the protective device leading flank is fixedly installed with control panel by fender rod.
2. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench according to claim 1, feature exist In: the protective device includes support rod, baffle and fender rod, and four angles of baffle bottom are fixedly installed with support rod, support Two groups of fender rods are fixedly installed between bar.
3. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench according to claim 1, feature exist In: the bottom of the lighting device is fixedly installed with headlamp by lamp holder, is fixedly installed with shield on the outside of headlamp.
4. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench according to claim 1, feature exist In: one end of the safety rope is fixedly installed with sliding shoe, and the safety rope is fixedly installed with lock far from one end of sliding shoe.
5. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench according to claim 1, feature exist In: the inside of the driving device is fixedly installed with traveling wheel by shaft, and the bottom of the driving device side is fixedly mounted There is GV horizontal machine, the output end of GV horizontal machine is fixedly connected by rotation axis with shaft.
6. a kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench according to claim 1, feature exist In: four angles of the control panel are fixedly installed with fixing bolt, and the control panel leading flank, which is inlayed, is equipped with the first control Make switch, the second control switch, third control switch and the 4th control switch.
CN201821980726.6U 2018-11-29 2018-11-29 A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench Active CN209083296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821980726.6U CN209083296U (en) 2018-11-29 2018-11-29 A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821980726.6U CN209083296U (en) 2018-11-29 2018-11-29 A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench

Publications (1)

Publication Number Publication Date
CN209083296U true CN209083296U (en) 2019-07-09

Family

ID=67125823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821980726.6U Active CN209083296U (en) 2018-11-29 2018-11-29 A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench

Country Status (1)

Country Link
CN (1) CN209083296U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295920A (en) * 2019-07-24 2019-10-01 中国葛洲坝集团第三工程有限公司 A kind of automatic lifting assembling rack and its application method for tunnel excavation construction
CN110849325A (en) * 2019-11-12 2020-02-28 栗新然 Movable tunnel section deformation detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295920A (en) * 2019-07-24 2019-10-01 中国葛洲坝集团第三工程有限公司 A kind of automatic lifting assembling rack and its application method for tunnel excavation construction
CN110849325A (en) * 2019-11-12 2020-02-28 栗新然 Movable tunnel section deformation detection device

Similar Documents

Publication Publication Date Title
CN209083296U (en) A kind of high-speed rail tunnel big cross section intelligence automatically walk arch Mobile workbench
CN208235351U (en) A kind of bridge combination guardrail Fast Installation plate device
CN205855853U (en) A kind of underground mine use track hoisting machine
CN110655015B (en) Trackless self-propelled platform car for subway tunnel maintenance
CN111993987A (en) Tarpaulin telescopic structure for carriage and vehicle comprising tarpaulin telescopic structure
CN207247005U (en) A kind of constructing tunnel rock-fall proof headlamp
CN105752854A (en) Special rope shake preventing gantry crane for port
CN108560510A (en) Surface low road movable overhaul platform in a kind of power station
CN205845222U (en) High efficiency alarming device is used in a kind of mining
CN209369701U (en) A kind of ladder and repair apparatus
CN202176135U (en) Parking space lifter driven by motor
CN207296594U (en) Golf range purse seine
CN205415556U (en) Rotatable intelligent control power maintenance platform
CN208472681U (en) Surface low road movable overhaul platform in a kind of power station
CN209083294U (en) A kind of tunnel construction trolley of automatic intelligent cross shifting
CN204125120U (en) Distribution insulated elevating platform
CN211422709U (en) Supporting device for tunnel accessory installation
KR920003799Y1 (en) Under ground vehicle lift
CN209196688U (en) A kind of High-Pole Lamp of high efficiency and heat radiation
CN208595504U (en) A kind of building engineering construction scene lighting device
CN208168897U (en) Automatic moving type net, anchor, shield integral support
CN212837094U (en) Warning guardrail is used in public road bridge roof beam engineering construction
CN211496856U (en) Tunnel inspection tool car
CN208812070U (en) A kind of packaged type coal mine hydraulic supporting maintenance platform
CN206707248U (en) A kind of hanging basket for overflow weir

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant