CN209082664U - A kind of multi-functional ponding draining structure - Google Patents

A kind of multi-functional ponding draining structure Download PDF

Info

Publication number
CN209082664U
CN209082664U CN201821873296.8U CN201821873296U CN209082664U CN 209082664 U CN209082664 U CN 209082664U CN 201821873296 U CN201821873296 U CN 201821873296U CN 209082664 U CN209082664 U CN 209082664U
Authority
CN
China
Prior art keywords
draining
chock plug
cup body
spigot
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821873296.8U
Other languages
Chinese (zh)
Inventor
何守光
史燕
何在为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821873296.8U priority Critical patent/CN209082664U/en
Application granted granted Critical
Publication of CN209082664U publication Critical patent/CN209082664U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of multi-functional ponding draining structures, including pre-buried cup body, draining chock plug A, draining chock plug B, pre-buried cup body is embedded in floor in advance, and draining chock plug A, draining chock plug B are two eccentric hoops, draining chock plug A outer annular diameter and draining chock plug B annular diameters matching.The inlet of the utility model upper angled setting, may extend into waterproof layer in cup body;Bell and spigot depth is less than normal in the prior art, and the structure pre-buried cup body inlet bottom is equipped with upward flange, to meet socket joint depth;Only filtrate is arranged in pyramidal cavity room in the structure, and filtration pack is avoided excessively to cause to waste;Annular connecting plate and fixation hole, it is convenient to bury pre-buried cup body in advance, it is ensured that the position of pre-buried cup body;The structure setting has multiple bulge loops, has the function of antiseepage while enhancing intensity, makes to combine between floor and pre-buried cup body closer;The structure can complete in factory, and without field fabrication, reliable in quality is transformed finished project very convenient.

Description

A kind of multi-functional ponding draining structure
Technical field
The utility model relates to ponding excretion technical field more particularly to a kind of multi-functional ponding draining structures.
Background technique
With the improvement of people's living conditions, the requirement for house is no longer to be only capable of keeping out wind and rain, and people are not only It is required that house is firm, comfortable, more requires house beauty, there is characteristic.Drain function it is advanced whether, directly determine entire house It is whether practical and beautiful, there is ponding for a long time between the waterproof layer and finishing layer of present toilet or balcony, easily causes leakage, And the foot of a wall gets damp, or even since long-term ponding, moisture enter between the decorative layer in room and structure sheaf, keeps room air damp Wet, furniture is impaired, influences human health.
Prior art waterproof construction and water-storing test are all more difficult, prior art filtration pack excessively cause waste, Upper bell and spigot depth is less than normal and needs processing and fabricating hole at the scene, and the prior art finished project is transformed it is non- Normal difficulty.
Utility model content
The purpose of this utility model is that:, filled by filtration difficult for above-mentioned prior art waterproof construction and water-storing test Object excessively causes that waste, upper bell and spigot depth are less than normal, need processing and fabricating hole and to change finished project at the scene It makes the problems such as extremely difficult, the utility model provides a kind of multi-functional ponding draining structure.
The technical solution adopted in the utility model is as follows:
A kind of multi-functional ponding draining structure, including pre-buried cup body, draining chock plug A, draining chock plug B, the pre-buried cup body It is embedded in floor in advance, the draining chock plug A, draining chock plug B are respectively eccentric hoop, and the water-drainage tube part above floor accesses the row Water chock plug A inner ring, the draining chock plug A are placed in the draining chock plug B inner ring, and the draining chock plug B is placed in the pre-buried cup body Upper bell and spigot in.
When floor slab construction, pre-buried cup body is embedded in floor, water-drainage tube part access when pipe-line system is installed, above floor Chock plug A inner ring is drained, draining chock plug A is socketed in draining chock plug B inner ring, and sub-assembly is socketed in the upper bell and spigot of pre-buried cup body, Water-drainage tube part below floor accesses pre-buried cup body from lower bell and spigot, and infiltration water imports in inlet through waterproof layer, then flows into cone Shape chamber flows into pre-buried cup body from drainage hole after filtering, the drainpipe below floor is finally entered, to exclude ponding, in advance Antiseep.
Further, the pre-buried cup body head be inlet, the inlet be inclined outwardly with waterproof layer drop-over, prevent It seeps water between floor and pre-buried cup body, facilitates draining for ponding;It is upper bell and spigot below the inlet, the draining chock plug B The diameter of outer ring is matched with upper bell and spigot and is mounted in upper bell and spigot, sliding for water flow obliquely below the upper bell and spigot Road is lower bell and spigot below the water flow slideway, and the water flow slideway and lower bell and spigot junction are provided with internal projecting ring one, convex The intensity of tube body, the fixation of convenient lower drainpipe can be enhanced in ring one, it is ensured that the length of drainpipe insertion, while preventing pre-buried cup Leakage at body and lower drain interface;Drainpipe below floor accesses in pre-buried cup body from lower bell and spigot and is pushed against convex The downside of ring one.
Further, the larger space side of the draining chock plug A, draining chock plug B are equipped with cone cell chamber, cone cell chamber bottom Portion is strip trap drainage hole, is filled with filtering core in cone cell chamber lower half;The inner ring bottom of the draining chock plug A is set It is equipped with internal projecting ring two, the inner ring bottom of the draining chock plug B is provided with internal projecting ring three, and water-drainage tube part accesses draining chock plug from top A is interior and is pushed against the upside of internal projecting ring two, and the draining chock plug A access draining chock plug B is interior and is pushed against the upside of internal projecting ring three.
In use, infiltration water merges into inlet through waterproof layer, then the pyramidal cavity for flowing into draining chock plug A, draining chock plug B Room enters drainage pipeline from the drainage hole of bottom after core filters, and filtering core stops waste to enter drainpipe, drains Pipe fitting accesses in draining chock plug A from top and is pushed against the upside of internal projecting ring two, and draining chock plug A access is drained in chock plug B and supported Tightly in the upside of internal projecting ring three, by the setting of internal projecting ring, facilitate consolidating for draining chock plug A and drainpipe while enhancing intensity It is fixed, it is ensured that the length of draining chock plug A and drainpipe insertion.
Further, the bottom periphery of the pre-buried cup body is provided with annular connecting plate, and the annular connecting plate is equipped with Several fixation holes.It is convenient to bury pre-buried cup body in advance by setting annular connecting plate and fixation hole, to ensure the position of pre-buried cup body It sets.
It further, further include cone rubber plug, the cone rubber plug is corresponding with the cone cell chamber size, is installing When, cone rubber plug clogs cone cell chamber, to carry out water-storing test, extracts in backfill thick in cone rubber plug and laying Sand.
Further, the periphery of the lower bell and spigot is provided with outer bulge loop, enhances the intensity of pre-buried cup body, and have The effect of antiseepage makes to combine between floor and pre-buried cup body closer.
Further, socket joint is provided with upward flange on the pre-buried cup body.
In conclusion the beneficial effects of the utility model are:
1, the inlet of the utility model upper angled setting, may extend into waterproof layer in cup body, cone cell rubber stopper side Just water-storing test is carried out;Bell and spigot depth is less than normal in the prior art, and the utility model pre-buried cup body inlet bottom increases upward Flange;This structure can complete in factory, reliable in quality;Only filtrate is arranged in pyramidal cavity room in the utility model, keeps away Exempt from filtration pack excessively to cause to waste;Using the draining chock plug of the utility model, finished project is very convenient for transformation, and It is at low cost, reliable in quality.
2, the utility model is provided with multiple bulge loops, has the function of antiseepage while enhancing intensity, make floor with it is pre-buried Closer, and setting annular connecting plate and fixation hole is combined between cup body, it is convenient to bury pre-buried cup body in advance, to ensure pre-buried cup The position of body.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is cross-sectional view of the pre-buried cup body along vertical tangent plane;
Fig. 3 is the top view for draining chock plug A;
Fig. 4 is to drain chock plug A along the cross-sectional view of vertical tangent plane;
Fig. 5 is the top view for draining chock plug B;
Fig. 6 is to drain chock plug B along the cross-sectional view of vertical tangent plane.
Marked in the figure: the pre-buried cup body of 1-, 11- inlet, the upper bell and spigot of 12-, 13- water flow slideway, bell and spigot under 14-, The outer bulge loop of 141-, 15- internal projecting ring one, 16- annular connecting plate, 161- fixation hole, 2- drain chock plug A, 21- internal projecting ring two, 3- row Water chock plug B, 31- internal projecting ring three, 4- cone cell chamber, 41- trap drainage hole, 42- filtering core, 43- cone rubber plug, 17- are convex Edge, 18- water-drainage tube part.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
Embodiment 1
A kind of multi-functional ponding draining structure, including pre-buried cup body 1, draining chock plug A2, draining chock plug B3, the pre-buried cup Body 1 is embedded in floor in advance, and the draining chock plug A2, draining chock plug B3 are respectively eccentric hoop, the water-drainage tube part access above floor The draining chock plug A2 inner ring, the draining chock plug A2 are placed in the draining chock plug B3 inner ring, and the draining chock plug B3 is placed in institute In the upper bell and spigot 12 for stating pre-buried cup body 1.
When floor slab construction, first pre-buried cup body 1 is embedded in floor, water-drainage tube part when pipe laying system, above floor 18 access draining chock plug A2 inner ring, draining chock plug A2 are socketed in draining chock plug B3 inner ring, and sub-assembly is socketed on the upper of pre-buried cup body 1 In bell and spigot 12, the water-drainage tube part below floor accesses pre-buried cup body 1 from lower bell and spigot 14, and infiltration water catchments through waterproof layer importing In mouth 11, then cone cell chamber is flowed into, is flowed into pre-buried cup body 1 after filtering from drainage hole, finally enter the drainpipe below floor, So that ponding is excluded, pre- antiseep, and can be directly pre-buried, it does not need to do hole second coagulation soil pouring construction again.
Embodiment 2
On the basis of embodiment 1,1 head of pre-buried cup body be inlet 11, the inlet 11 be inclined outwardly with Floor waterproof layer drop-over, the inlet 11 is upper bell and spigot 12, the draining chock plug B3 overall diameter and upper bell and spigot 12 below Interior diameter is matched and is mounted in bell and spigot 12, and the upper bell and spigot 12 is below water flow slideway 13 obliquely, the water Fluent road 13 is lower bell and spigot 14 below, and the water flow slideway 13 is provided with internal projecting ring 1 with lower 14 junction of bell and spigot, from The pipeline that lower bell and spigot 14 is inserted into pre-buried cup body 1 is pushed against the downside of internal projecting ring 1.
In use, infiltration water merges into inlet 11 through floor waterproof layer, is drained chock plug and flowed downwards, hence into floor Following drainpipe flows away, the upper end outer of inlet 11 be inclined outwardly and with floor waterproof layer drop-over, prevent floor with it is pre-buried It seeps water between cup body 1, facilitates draining for ponding, drainpipe is inserted into pre-buried cup body 1 and pushes against from lower bell and spigot 14 below floor In the downside of internal projecting ring 1, the intensity of tube body is can be enhanced in internal projecting ring 1, facilitates below floor the fixation of drainpipe and true Protect the length of insertion.
Embodiment 3
On the basis of embodiment 1, the draining chock plug A2, draining chock plug B3 larger space side are equipped with cone cell chamber 4, 4 bottom of cone cell chamber is strip trap drainage hole 41, is filled with filtering core 42 in 4 lower half of cone cell chamber;The draining The inner ring bottom of chock plug A2 is provided with internal projecting ring 2 21, and the inner ring bottom of the draining chock plug B3 is provided with internal projecting ring 3 31, arranges Pipe fitting 18 accesses in draining chock plug A2 from top and is pushed against the upside of internal projecting ring 2 21, the draining chock plug A2 access draining Chock plug B3 is interior and is pushed against the upside of internal projecting ring 3 31.
In use, ponding merges into inlet 11 through waterproof layer, then flow into the cone cell on draining chock plug A2, draining chock plug B3 Chamber 4, by filtering core 42 filtering after from the drainage hole 41 of bottom enter drainage pipeline, filtering core 42 prevent waste into Enter drainpipe, water-drainage tube part 18 accesses in draining chock plug A2 and is pushed against from top the upside of internal projecting ring 2 21, drains chock plug A2 Access draining chock plug B3 is interior and is pushed against the upside of internal projecting ring 3 31, and by the setting of internal projecting ring, it is convenient while intensity to enhance Drain the fixation of chock plug A2 and drainpipe 18, it is ensured that the length that draining chock plug A2 and drainpipe 18 are inserted into.
Embodiment 4
On the basis of embodiment 1, the bottom periphery of the pre-buried cup body 1 is provided with annular connecting plate 16, the annular Connecting plate 16 is equipped with several fixation holes 161.It is convenient to bury pre-buried cup in advance by setting annular connecting plate 16 and fixation hole 161 Body 1, to ensure the position of pre-buried cup body 1.It further include cone rubber plug 43, the cone rubber plug 43 and the cone cell chamber 4 Size is corresponding, and during installation, cone rubber plug 43 clogs cone cell chamber 4, to carry out water-storing test, extracts taper in backfill Rubber stopper 43 is simultaneously laid with medium coarse sand.The periphery of the lower bell and spigot 14 is provided with outer bulge loop 141, enhances the strong of pre-buried cup body 1 Degree, and have the function of antiseepage, make to combine between floor and pre-buried cup body 1 closer.1 inlet of pre-buried cup body, 11 bottom Portion is provided with upward flange 17.
The utility model is not limited to above-mentioned specific embodiment, and those skilled in the art are not departing from the utility model Under the premise of spirit and scope, several change and modification can be done.The protection scope of the utility model should be with the utility model Subject to claim.

Claims (7)

1. a kind of multi-functional ponding draining structure, it is characterised in that: including pre-buried cup body (1), draining chock plug A (2), draining chock plug B (3), the pre-buried cup body (1) are embedded in floor in advance, and the draining chock plug A (2), draining chock plug B (3) are respectively eccentric hoop, building Water-drainage tube part (18) above plate accesses draining chock plug A (2) inner ring, and the draining chock plug A (2) is placed in the draining chock plug In B (3) ring, draining chock plug B (3) is placed in the upper bell and spigot (12) of the pre-buried cup body (1).
2. a kind of multi-functional ponding draining structure according to claim 1, it is characterised in that: pre-buried cup body (1) head Portion is inlet (11), the inlet (11) be inclined outwardly with floor waterproof layer drop-over, the inlet (11) is below to be upper Bell and spigot (12), draining chock plug B (3) outer annular diameter match with upper bell and spigot (12) interior diameter and are mounted on upper bell and spigot (12) in, the upper bell and spigot (12) is below water flow slideway (13) obliquely, and the water flow slideway (13) is held under being below Socket (14), the water flow slideway (13) and lower bell and spigot (14) junction are provided with internal projecting ring one (15), the row below floor Water pipe is inserted into the pre-buried cup body (1) from lower bell and spigot (14) and is pushed against the downside of internal projecting ring one (15).
3. a kind of multi-functional ponding draining structure according to claim 1, it is characterised in that: the draining chock plug A (2), The larger space side for draining chock plug B (3) is equipped with cone cell chamber (4), and cone cell chamber (4) bottom is the trap drainage hole of strip (41), filtering core (42) are filled in cone cell chamber (4) lower half;In the inner ring bottom of draining chock plug A (2) is provided with The inner ring bottom of bulge loop two (21), draining chock plug B (3) is provided with internal projecting ring three (31), and water-drainage tube part (18) connects from top Enter to drain in chock plug A (2) and be pushed against the upside of internal projecting ring two (21), draining chock plug A (2) access draining chock plug B (3) is interior And it is pushed against the upside of internal projecting ring three (31).
4. a kind of multi-functional ponding draining structure according to claim 1, it is characterised in that: the pre-buried cup body (1) Bottom periphery is provided with annular connecting plate (16), and the annular connecting plate (16) is equipped with several fixation holes (161).
5. a kind of multi-functional ponding draining structure according to claim 3, it is characterised in that: further include cone rubber plug (43), the cone rubber plug (43) matches with the cone cell chamber (4).
6. a kind of multi-functional ponding draining structure according to claim 2, it is characterised in that: the lower bell and spigot (14) Periphery is provided with outer bulge loop (141).
7. a kind of multi-functional ponding draining structure according to claim 1, it is characterised in that: the pre-buried cup body (1) Inlet (11) bottom is provided with upward flange (17).
CN201821873296.8U 2018-11-14 2018-11-14 A kind of multi-functional ponding draining structure Expired - Fee Related CN209082664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821873296.8U CN209082664U (en) 2018-11-14 2018-11-14 A kind of multi-functional ponding draining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821873296.8U CN209082664U (en) 2018-11-14 2018-11-14 A kind of multi-functional ponding draining structure

Publications (1)

Publication Number Publication Date
CN209082664U true CN209082664U (en) 2019-07-09

Family

ID=67124057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821873296.8U Expired - Fee Related CN209082664U (en) 2018-11-14 2018-11-14 A kind of multi-functional ponding draining structure

Country Status (1)

Country Link
CN (1) CN209082664U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502182A (en) * 2020-04-24 2020-08-07 深圳市维业装饰集团股份有限公司 Anti-seepage construction method for drainage pipe of balcony floor penetrating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502182A (en) * 2020-04-24 2020-08-07 深圳市维业装饰集团股份有限公司 Anti-seepage construction method for drainage pipe of balcony floor penetrating

Similar Documents

Publication Publication Date Title
CN206034572U (en) Pre -buried ponding treater of intelligence leak protection
CN104358305B (en) A kind of cyclone, water drainage riser connecting piece of caisson type washroom
CN105064649B (en) A kind of integrated toilet bottom plate
CN209082664U (en) A kind of multi-functional ponding draining structure
CN207905261U (en) Anti-clogging noise-proofing roof drainage system
CN103938679A (en) Drainage riser connector of caisson-type toilet
CN207988044U (en) A kind of co-layer draining special single standpipe three-way fitting of cast-in-place pre-buried type
CN207376723U (en) A kind of subsided rest room
CN201195867Y (en) Water seepage prevention floor drain
CN202509615U (en) Returning and overflowing-proof floor drain for balcony
CN208651834U (en) A kind of pre-buried water accumulator drainage arrangement with expansion junction block
CN207499071U (en) toilet
CN215253214U (en) Drainage pipe aversion antiseep connects
CN207749588U (en) A kind of floor built-in type soil stack connector
CN207092237U (en) Pre-buried deodorization washing machine floor drain
CN203821521U (en) Soil stack connection piece for caisson type toilet
CN204940490U (en) A kind of Multipurpose deodorization ponding processor and treatment system
CN208950004U (en) A kind of same-floor drainage riser Water-logged draining device
CN206545242U (en) Water-bound component under a kind of integrated toilet bottom plate made by hand
CN207176877U (en) A kind of toilet drainage pipe leakproof joint
CN207017403U (en) A kind of floor drain of floor drain embedded box and correlation
CN205171650U (en) Heavy pond of pre -buried formula floor floor drain
KR200417635Y1 (en) Apartment veranda drainage ditch trillion
CN203891153U (en) Floor drain
CN2934441Y (en) Block-proof cover for roofing rain pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709

Termination date: 20211114

CF01 Termination of patent right due to non-payment of annual fee