CN209082309U - Walking strikes off vibration constructing device - Google Patents

Walking strikes off vibration constructing device Download PDF

Info

Publication number
CN209082309U
CN209082309U CN201821684322.2U CN201821684322U CN209082309U CN 209082309 U CN209082309 U CN 209082309U CN 201821684322 U CN201821684322 U CN 201821684322U CN 209082309 U CN209082309 U CN 209082309U
Authority
CN
China
Prior art keywords
track
bridge
strikes
vibration
turntable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821684322.2U
Other languages
Chinese (zh)
Inventor
孙建龙
张先锋
罗志威
王维
胡鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Ying Ying Engineering Equipment Technology Co Ltd
Original Assignee
Suzhou Ying Ying Engineering Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Ying Ying Engineering Equipment Technology Co Ltd filed Critical Suzhou Ying Ying Engineering Equipment Technology Co Ltd
Priority to CN201821684322.2U priority Critical patent/CN209082309U/en
Application granted granted Critical
Publication of CN209082309U publication Critical patent/CN209082309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

This application discloses a kind of walkings to strike off vibration constructing device, including the first track, the second track and bridge, bridge extends in a first direction, bridge is supported on the first track and the second track, bridge is removable along the extending direction of the first track and the second track, and the underhung of bridge strikes off vibration head, and it is removable along first direction to strike off vibration head, wherein, the first track can be rotated with respect to bridge in the horizontal plane;Second track can be rotated with respect to bridge in the horizontal plane.The utility model can be reduced its overall width, greatly reduce cost when transporting or entering tunnel in this way by the rotation of track so that the first track and the second track are housed in below bridge, and keep being arranged in parallel with bridge.

Description

Walking strikes off vibration constructing device
Technical field
This application involves a kind of construction equipments, strike off vibration constructing device more particularly to a kind of walking.
Background technique
It is existing to strike off vibration constructing device, in order to guarantee that bridge has enough travel distances, the first track and the second rail Road is usually arranged long, and in the operating condition, and the first track and the second track usually require to keep vertical with bridge, The area of plane for causing entire constructing device to occupy in this way is larger, and when transport needs to dismantle track, and construction area again Assembling, to increase cost.
Utility model content
The purpose of this utility model is to provide a kind of walkings to strike off vibration constructing device, in the prior art to overcome It is insufficient.
To achieve the above object, the utility model provides the following technical solutions:
The embodiment of the present application discloses a kind of walking and strikes off vibration constructing device, including the first track, the second track and across Beam, bridge extend in a first direction, and bridge is supported on the first track and the second track, and bridge is along the first track and the second track Extending direction it is removable, the underhung of bridge strikes off vibration head, and it is removable along first direction to strike off vibration head, wherein
First track can be rotated with respect to bridge in the horizontal plane;
Second track can be rotated with respect to bridge in the horizontal plane.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, the first track can turn to parallel with bridge Position;
Second track can turn to and bridge parallel position.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, the first track includes turntable, lower supporter and rail Road, lower supporter along track slidably, turntable be connected to the lower section of bridge and opposite bridge can rotation, turntable is installed on lower supporter Top and relatively fixed between lower supporter.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, the first track further includes driving device, the driving Device acts on turntable and turntable can be driven to rotate.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, driving device includes hydraulic cylinder and is connected to The rack gear of hydraulic cylinder, the surrounding of turntable 1 have the double wedge being engaged with rack.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, the side of turntable is provided with vertical baffle.
Preferably, it is struck off in vibration constructing device in above-mentioned walking, the both ends of bridge are also symmetrically fixed with first Support leg and the second supporting leg.
Preferably, struck off in vibration constructing device in above-mentioned walking, the first supporting leg and the second supporting leg it is opposite across Beam is displaced adjustable in the vertical direction.
Compared with the prior art, the advantages of the utility model are: rotation of the utility model by track, so that the first track It is housed in below bridge with the second track, and keeps being arranged in parallel with bridge, can reduced in this way when transporting or entering tunnel Its overall width, greatly reduces cost.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The some embodiments recorded in application, for those of ordinary skill in the art, without creative efforts, It is also possible to obtain other drawings based on these drawings.
Fig. 1 show the stereochemical structure signal that walking in the utility model specific embodiment strikes off vibration constructing device Figure;
Fig. 2 show the utility model specific embodiment middle orbit structural schematic diagram.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
As shown in connection with fig. 1, the embodiment of the application provides a kind of walking and strikes off vibration constructing device, including first Track 10, the second track 20 and bridge 30, bridge 30 extend in a first direction, and bridge 30 is supported in the first track 10 and the second rail On road 20, bridge 30 is removable along the extending direction of the first track 10 and the second track 20, and the underhung of bridge 30 strikes off It is removable along first direction to strike off vibration head 40 for vibration head 40.
As an innovative improvement of the present embodiment, the first track 10 can be rotated with respect to bridge 30 in the horizontal plane; Second track 20 can be rotated with respect to bridge 30 in the horizontal plane.
In one embodiment, the first track 10 and the second track 20 are set side by side.
In order to guarantee that bridge has enough travel distances, the first track and the second track be usually arranged it is long, and In the operating condition, the first track and the second track usually require to keep vertical with bridge, and entire constructing device is caused to account in this way The area of plane is larger, and when transport needs to dismantle track, and re-assemblies in construction area, to increase cost.In addition, Special construction environment, such as constructing tunnel, entrance is relatively narrow, also cannot be introduced into if track is long.
In this case, by the rotation of track so that the first track and the second track are housed in below bridge, and keep with across Beam is arranged in parallel, and can reduce its overall width when transporting or entering tunnel in this way, greatly reduce cost.
This case strikes off vibration constructing device, the pavement construction especially suitable for narrow pavement construction, such as in tunnel, It is stringenter to the width requirement of construction equipment since tunnel portal is narrow, it otherwise needs disassembled asset then again in tunnel It is assembled in road, transport and construction cost are relatively high.And the track of this case can lead in transport and when into tunnel portal Crossing rotation reduces in width direction size, to facilitate adaptation particular surroundings, while being also convenient for vehicle-mounted transport.
The length of bridge can select according to the actual situation, such as: when needing full width to mat formation, the length of bridge be should be greater than Equal to the width to making face;When needing half range to construct, the length of bridge should be greater than the half for being equal to the width to making face; Certainly, other condition of construction can specifically set the length of bridge as the case may be.
Bridge can there are many selections, such as: it is spliced to form the bridge of an entirety by multiple junior units, works as needs in this way When adjusting the length of bridge according to the actual situation, so that it may be realized by laying down several junior units;Certain bridge can also be with It is an entirety.
Under normal conditions, the length of bridge covers the width on road surface to obtain preferable operating efficiency.The length of track It is relatively short in order to transporting and store.
Bridge can be girder truss, box beam or Honeycomb Beam, etc.;Steel can be used in material, and industrial aluminium profiles can also be used Material, etc.;It can certainly be the combination between above-mentioned each beam, such as: combination, girder truss and the Honeycomb Beam of girder truss and box beam Combination or box beam and Honeycomb Beam combination or even girder truss, the combination between box beam and Honeycomb Beam;It needs to illustrate It is that the connection type between each beam can be to be detachably connected to be also possible to be fixedly connected, such as: it is bolted or welds Connect, etc..
In a preferred embodiment, the first track 10 can turn to and 30 parallel position of bridge;Second track 20 can be with It turns to and 30 parallel position of bridge.
It is less high to the width requirement of device it should be noted that under certain circumstances, then the first track and second As long as track turns to certain angle.
The structure and principle of first track 10 and the second track 20 are essentially identical, respectively to support the both ends of bridge, with It is described in detail for the structure of the first track 10 and principle down, the structure of the second track 20 repeats no more.
As shown in connection with fig. 2, the first track 10 includes turntable 101, lower supporter 102 and track 103, and lower supporter 102 is along track 103 slidably, turntable 101 be connected to the lower section of bridge 30 and opposite bridge 30 can rotation, turntable 101 is installed on lower supporter 102 Top and relatively fixed between lower supporter.
In the technical solution, turntable 101 can drive lower supporter 102 and track 103 whole in level during rotation It can be rotated in face.
Further, the first track 10 further includes driving device 104, which acts on turntable 101 and can drive Turn disk 101 rotates.
In one embodiment, driving device 104 includes hydraulic cylinder and is connected to the rack gear of hydraulic cylinder, and the four of turntable 101 Week has the double wedge (not shown) being engaged with rack.
In the technical solution, hydraulic cylinder extension with directly band carry-over bar be moved forward and backward, engage between rack gear and turntable thus Turntable rotation is driven, to realize the rotation of track.
In other embodiments, driving device can also be motor, be passed between motor and turntable by the belt with rack gear Dynamic connection.
In one embodiment, the side of turntable 101 is vertically arranged with baffle 106.
In the technical solution, covering protective effect can be played to the operating space of rack gear and turntable by baffle.
The both ends of bridge 30 are also symmetrically fixed with the first supporting leg 50 and the second supporting leg 60.
In one embodiment, the first supporting leg 50 and the opposite bridge of the second supporting leg 60 are adjustable in the vertical direction.
The principle of this case is: the first supporting leg and the second supporting leg can drive bridge to raise so that the first track and Then second orbit suspended adjusts the position of the first track and the second track with respect to bridge on direction of travel (vertical first direction) It sets, then the first supporting leg and the second supporting leg drive bridge decline, so that the first track and the second track and ground face contact are simultaneously It realizes the support to bridge, while the first supporting leg and the second supporting leg are hanging, strikes off vibration head and moved back and forth along first direction Realization strikes off work, and then bridge is moved along the first track and the second track in second direction, advances one to work and continues to realize Work is struck off, when reaching tail track, the first supporting leg and the second supporting leg decline and support, so that orbit suspended, repeats Above-mentioned movement realizes that can be walked strikes off vibration construction.
Continuing with chain 105 shown in Fig. 2, is provided on track 103 along its length, electricity is installed on lower supporter 102 Machine 107, the output end of motor 107 fix the first sprocket wheel 108, are sequentially connected between the first sprocket wheel 108 and chain 106.
In the technical solution, motor 107 can directly drive the rotation of the first sprocket wheel 108, the first sprocket wheel 108 and chain 106 it Between engage, and then it is mobile in length direction to drive chain 106, moves to drag track 103 with respect to lower supporter 102.
In one embodiment, the two sides of the first sprocket wheel 108 are also respectively provided with the second sprocket wheel 109 and third sprocket wheel 110, the Two sprocket wheels 109 and third sprocket wheel 110 are sequentially connected between chain 106 respectively.
Further, chain 106 is located at 110 top of the second sprocket wheel 109 and third sprocket wheel, and chain 106 is located at the first sprocket wheel 108 lower section.
In the technical solution, by being set to two sprocket wheels of the first sprocket wheel two sides, the balance branch to chain may be implemented Support, while being acted on above chain by the first sprocket wheel, avoid chain from teetertottering.
In one embodiment, the section of track 103 is in I-shaped, and idler wheel 111 is combined in the recessed space in two sides, is rolled Wheel 111 is rotatably dispose on lower supporter 102.
Further, in order to avoid track 103 teetertotters, every side is respectively arranged with multiple idler wheels, and at least one Idler wheel is matched with the upper edge of track, at least one idler wheel is matched with the lower edge of track.
In one embodiment, the supported underneath of track 103 has the first stabilizer blade 112 and the second stabilizer blade 113, the first stabilizer blade 112 The both ends of 103 length direction of track are respectively arranged at the second stabilizer blade 113.
First stabilizer blade 112 and the second stabilizer blade 113 respectively include a horizontal bottom plate 114.
In a preferred embodiment, bottom plate 114 is circle.
The principle of this case is: when needing track being moved to next construction location, can first pass through supporting leg will Bridge and track integrated support are hanging, then pass through the effect of motor and chain, and driving track advances with respect to bridge, then supports Leg drives track decline, realizes ground supports by track, after supporting leg is hanging, striking off vibration head can work.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (8)

1. a kind of walking strikes off vibration constructing device, which is characterized in that including the first track, the second track and bridge, bridge It extends in a first direction, bridge is supported on the first track and the second track, extension of the bridge along the first track and the second track Direction is removable, and the underhung of bridge strikes off vibration head, and it is removable along first direction to strike off vibration head, wherein
First track can be rotated with respect to bridge in the horizontal plane;
Second track can be rotated with respect to bridge in the horizontal plane.
2. walking according to claim 1 strikes off vibration constructing device, which is characterized in that the first track can turn to With bridge parallel position;
Second track can turn to and bridge parallel position.
3. walking according to claim 1 strikes off vibration constructing device, which is characterized in that the first track include turntable, Lower supporter and track, lower supporter along track slidably, turntable be connected to the lower section of bridge and opposite bridge can rotation, turntable installation In lower supporter top and between lower supporter it is relatively fixed.
4. walking according to claim 3 strikes off vibration constructing device, which is characterized in that the first track further includes driving Device, the driving device act on turntable and turntable can be driven to rotate.
5. walking according to claim 4 strikes off vibration constructing device, which is characterized in that driving device includes hydraulic Cylinder and the rack gear for being connected to hydraulic cylinder, the surrounding of turntable 1 have the double wedge being engaged with rack.
6. walking according to claim 3 strikes off vibration constructing device, which is characterized in that the side of turntable is provided with perpendicular Straight baffle.
7. walking according to claim 1 strikes off vibration constructing device, which is characterized in that the both ends of bridge are also symmetrically solid Surely there are the first supporting leg and the second supporting leg.
8. walking according to claim 7 strikes off vibration constructing device, which is characterized in that the first supporting leg and second Support leg is displaced adjustable in the vertical direction with respect to bridge.
CN201821684322.2U 2018-10-17 2018-10-17 Walking strikes off vibration constructing device Active CN209082309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821684322.2U CN209082309U (en) 2018-10-17 2018-10-17 Walking strikes off vibration constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821684322.2U CN209082309U (en) 2018-10-17 2018-10-17 Walking strikes off vibration constructing device

Publications (1)

Publication Number Publication Date
CN209082309U true CN209082309U (en) 2019-07-09

Family

ID=67119590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821684322.2U Active CN209082309U (en) 2018-10-17 2018-10-17 Walking strikes off vibration constructing device

Country Status (1)

Country Link
CN (1) CN209082309U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021051491A1 (en) * 2019-09-18 2021-03-25 广东博智林机器人有限公司 Integrated spreading and leveling robot, and building construction apparatus
CN115094719A (en) * 2022-04-19 2022-09-23 中铁工程装备集团有限公司 Transverse cushion paver, U-shaped shield tunneling machine and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021051491A1 (en) * 2019-09-18 2021-03-25 广东博智林机器人有限公司 Integrated spreading and leveling robot, and building construction apparatus
CN115094719A (en) * 2022-04-19 2022-09-23 中铁工程装备集团有限公司 Transverse cushion paver, U-shaped shield tunneling machine and construction method thereof

Similar Documents

Publication Publication Date Title
CN109944451B (en) Upper span existing line construction safety protection device and construction method thereof
CN209082309U (en) Walking strikes off vibration constructing device
US7069681B2 (en) Sliding sign
CN205046891U (en) Two -layer three -dimensional parking space
CN209082306U (en) Variable-width strikes off vibration constructing device
CN205394855U (en) Tunnel secondary lining cutting device
CN212835011U (en) Supporting structure for transporting beam to pass station
CN208486176U (en) It is a kind of for a point dedicated inspection vehicle for secondary formula bridge
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
CN116427283A (en) Construction method for erecting small-radius bridge precast beam in mountain area
CN216712769U (en) Rotary monorail bridge girder erection machine
CN206319214U (en) A kind of self-action point pillow assembly platform
CN206815110U (en) It may extend across the straddle-type shiftable track beam of road
KR101063773B1 (en) Tunnel side corresponding protector for expanding running tunnel
CN113322814B (en) Construction method of cable-stayed bridge steel box girder spanning multiple obstacles
RU157720U1 (en) BRIDGE ROPE FLOORING
CN210264763U (en) One-way four-lane highway tunnel can be assembled excavation and steel bow member installation platform truck
CN206051318U (en) A kind of new mucking machine dolly rotary apparatuss
CN104912365A (en) Three-dimensional parking rack for narrow place
CN105274913A (en) Multifunctional railway turnout integral transverse-and-longitudinal movement device and movement method thereof
JPH0436201B2 (en)
CN205935820U (en) Indulge and move formula car and stereo garage
CN216894456U (en) Inverted trapezoidal movable working trolley for construction of secondary structure of large shield tunnel
JP2005220665A (en) Construction method of structure straddling railway track
KR102348001B1 (en) Driving vehicle for carrying PC girders