CN209077414U - A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume - Google Patents

A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume Download PDF

Info

Publication number
CN209077414U
CN209077414U CN201821389260.2U CN201821389260U CN209077414U CN 209077414 U CN209077414 U CN 209077414U CN 201821389260 U CN201821389260 U CN 201821389260U CN 209077414 U CN209077414 U CN 209077414U
Authority
CN
China
Prior art keywords
temperature
chilling tower
pipe
pipeline
incineration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821389260.2U
Other languages
Chinese (zh)
Inventor
Yanling Yang
杨燕玲
Zhonghua Sun
孙钟华
Yaojian Li
李要建
Jun Li
李军
Zhu Chen
陈竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianying Environmental Protection Energy Equipment Co Ltd
Original Assignee
Jiangsu Tianying Environmental Protection Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianying Environmental Protection Energy Equipment Co Ltd filed Critical Jiangsu Tianying Environmental Protection Energy Equipment Co Ltd
Priority to CN201821389260.2U priority Critical patent/CN209077414U/en
Application granted granted Critical
Publication of CN209077414U publication Critical patent/CN209077414U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model discloses a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume, high-temperature pipe is extended in the conical pipeline of chilling tower, and the conical pipeline and straight pipeline intersection of chilling tower is arranged in the lower port of high-temperature pipe;The outside of high-temperature pipe is socketed with high-temperature service flange, and the upper surface of the conical pipeline of chilling tower is fixedly connected with quenching apparatus flange, chilling tower and high-temperature pipe and passes through high-temperature service flange and quenching apparatus flanged joint;The side wall of high-temperature pipe is provided with heating burner, and the top of high-temperature service flange is arranged in heating burner;The top of the lower port of high-temperature pipe is arranged in the uniform open cycle liquid eddy flow interface of four peripheral walls of conical pipe, circulation fluid eddy flow interface, and recirculated water is entered in conical pipe by circulation fluid eddy flow interface and forms uniform liquid film on the inner wall of chilling tower;Two-fluid spray nozzle is provided on the straight pipeline side wall of chilling tower.The utility model solves the problems, such as that high-temperature pipe and the junction salification of chilling tower block nozzle.

Description

A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume
Technical field
The utility model relates to incineration of refuse flyash Equipments for Heating Processing, and in particular to a kind of incineration of refuse flyash heat treatment work Skill rapid cooling device for fume.
Background technique
Since incineration of refuse flyash contains a large amount of chloride, according to " HJ2042-2014 hazardous waste disposal engineering skill Art directive/guide " incineration disposal system generate high-temperature flue gas chilling should be taken to dispose, flue-gas temperature should be down in 1s 200 DEG C with Under, flue gas is reduced in the residence time of 200 ~ 500 DEG C of humidity provinces, prevents the secondary generation of dioxin.Therefore flying dust heat treatment process needs Quenching apparatus is set.
Flying dust heat treatment process chilling tower such as Fig. 1, quenching apparatus pass through pipe with high-temperature flue gas section equipment at present Road connection, due to containing a large amount of villaumite and villaumite fusing point in flue gas at 800 DEG C or so, when high-temperature flue gas section and fast cooling device There are when low-temperature space, will appear salt condensation in high temperature conjunction pipeline so that equipment or line clogging, technique can not be normal for changeover portion Operation.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of incineration of refuse flyash heat treatment process cigarette Device for cooling out of breath.The device and high-temperature flue gas section direct connection, high-temperature flue gas section outlet setting burner avoid changeover portion cryogenic temperature condensation Salt blocks chilling tower entrance, while water-cooling wall is arranged in chilling tower, that is, can avoid high-temperature flue gas and corrode high-temperature pipe, while reducing gold Belong to the risk of villaumite condensation wall surface.
The technical solution of the utility model are as follows: a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume, packet Include chilling tower, high-temperature pipe, high-temperature service flange, quenching apparatus flange, heating burner, circulation fluid eddy flow interface, circulating water pipe, Liquid film, circulation water regulating valve, two-fluid spray nozzle, chilling tower are divided into the conical pipeline on top and the straight pipeline of lower part, chilling tower The internal diameter of conical pipeline lower port is slightly larger than the outer diameter of high-temperature pipe, and high-temperature pipe extends in the conical pipeline of chilling tower, high The conical pipeline and straight pipeline intersection of chilling tower is arranged in the lower port of warm pipeline;The outside of high-temperature pipe is socketed with high temperature and sets Standby flange, the upper surface of the conical pipeline of chilling tower are fixedly connected with quenching apparatus flange, and chilling tower and high-temperature pipe pass through height Warm vessel flange and quenching apparatus flanged joint;The side wall of high-temperature pipe is provided with heating burner, and heating burner is arranged in high temperature The top of vessel flange;The uniform open cycle liquid eddy flow interface of four peripheral walls of conical pipe, circulation fluid eddy flow interface are arranged in high temperature pipe The top of the lower port in road, recirculated water are entered in conical pipe by circulation fluid eddy flow interface and are formed on the inner wall of chilling tower Uniform liquid film;Two-fluid spray nozzle is provided on the straight pipeline side wall of chilling tower.
Further, the two-fluid spray nozzle be 1 ~ it is N number of.
Further, the lower section of the lower port of high-temperature pipe is arranged in the two-fluid spray nozzle,
Further, the two-fluid spray nozzle is arranged with air conservation casing, and the spray angle of two-fluid spray nozzle is 15 °.
Further, circulation water regulating valve is provided on the circulating water pipe, the thickness of liquid film passes through circulation water regulating valve It is controlled.
Further, the conical pipeline of the chilling tower selects high temperature anticorrosion alloy material to be made.
Further, the pipeline that the high-temperature pipe extends to chilling tower is coated with moisture-proof chlorine corrosion material.
Further, the high-temperature pipe inner wall is coated with high-temperature service refractory material.
Further, the straight pipeline of the chilling tower is made of non-metallic material.
The utility model has the following beneficial effects: the utility model eliminates the connecting pipe of high-temperature pipe Yu chilling tower, change For card edge type connection type, the Material Selection that high-temperature flue gas enters quenching apparatus linkage section is solved;High-temperature pipe exit Setting heating burner blocks asking for nozzle with the junction salification of chilling tower by periodically turning on heating burner solution high-temperature pipe Topic;The circulation fluid eddy flow interface of chilling tower setting, forms liquid film by recirculated water on the inner wall of chilling tower, that is, can avoid high temperature Flue gas corrosion high-temperature pipe, while reducing the risk of metal chloride condensation wall surface;Flue-gas temperature is down to using two-fluid spray nozzle 100 DEG C hereinafter, the optional non-metal anti-corrosion material of the straight pipeline of chilling tower, greatly reduces cost.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the prior art.
Fig. 2 is the structural schematic diagram of the utility model.
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing, the present embodiment is not constituted to this The limitation of utility model.
As shown in Fig. 2, a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume, including chilling tower 1, high temperature pipe Road 2, quenching apparatus flange 4, heating burner 5, circulation fluid eddy flow interface 6, circulating water pipe 7, liquid film 8, follows at high-temperature service flange 3 Ring water regulating valve 9, two-fluid spray nozzle 10.
Chilling tower 1 divides the conical pipeline 101 for top and the straight pipeline 102 of lower part, and the conical pipeline 101 of chilling tower 1 selects With high temperature anticorrosion alloy material.The internal diameter of 101 lower port of conical pipeline of chilling tower 1 is slightly larger than the outer diameter of high-temperature pipe 2, high temperature The lower part of pipeline 2 is arranged in the conical pipeline 101 of chilling tower 1, and the taper of chilling tower 1 is arranged in the lower port of high-temperature pipe 2 Pipeline 101 and 102 intersection of straight pipeline, high-temperature flue gas are directly entered in chilling tower 1, make the taper of high-temperature pipe 2 Yu chilling tower 1 Avoid flue gas cool-down that junction salification is caused to block between pipeline 101.
The outside of high-temperature pipe 2 is socketed with high-temperature service flange 3, and high-temperature service flange 3 is mounted on distance high-temperature pipeline 2 Above lower port at the position 500mm, i.e., it is 500mm that high-temperature pipe 2, which extends to the length in the conical pipeline 101 of chilling tower 1,.It is anxious The upper surface of the conical pipeline 101 of cold tower 1 is fixedly connected with quenching apparatus flange 4, high-temperature service flange 3 and quenching apparatus flange 4 are bolted, and chilling tower 1 is connect by high-temperature service flange 3 with quenching apparatus flange 4 with high-temperature pipe 2, using flanged joint Mode seals.
The side wall of high-temperature pipe 2 is provided with heating burner 5, and the top of high-temperature service flange 3 is arranged in heating burner 5, high The changeover portion of warm pipeline 2 and chilling tower 1 is easy to appear low temperature salification phenomenon, needs periodically to carry out the fused salt in high-temperature pipe 2 Heat treatment, when avoiding transitional region of the flue gas through over-quenching tower 1 and high-temperature pipe 2, cryogenic temperature condensation salt blocking chilling tower 1 enters Mouthful.The pipeline that high-temperature pipe 2 extends to chilling tower 1 is covered using moisture-proof chlorine corrosion material.2 inner wall of high-temperature pipe is coated with high temperature and sets Standby refractory material 201.
The uniform open cycle liquid eddy flow interface 6 of four peripheral walls of conical pipe 101, circulation fluid eddy flow interface 6 are arranged in high-temperature pipe 2 Lower port top, the nozzle of circulating water pipe 7 is arranged at circulation fluid eddy flow interface 6, and recirculated water is by circulating water pipe 7 by following Ring liquid eddy flow interface 6 enters in conical pipe 101, seam of the recirculated water between the inner wall of conical pipe 101 and the outer wall of high-temperature pipe 2 Inner wall between gap along chilling tower 1 flows downward, and uniform liquid film 8 is formed on the inner wall of chilling tower 1.Liquid film 8 can be prevented High temperature corrosion and high temperature salification phenomenon only occur on the inner wall of cold tower 1.When quantity of circulating water is about 4.2Nm3When/h, the thickness of liquid film 8 Spend about 3 ~ 5mm.Circulation water regulating valve 9 is provided on circulating water pipe 7, the thickness of liquid film 8 is controlled by recycling water regulating valve 9 System.
According to the air inflow of flue gas, reasonable disposition has 1 ~ N number of two-fluid spray nozzle on 102 side wall of straight pipeline of chilling tower 1 10, the temperature of flue gas is reduced using two-fluid spray nozzle 10, reaches insulation heat exchange saturation temperature.In the utility model, two-fluid spray Mouth 10 is arranged at the lower section 200mm of the lower port of high-temperature pipe 2.Two-fluid spray nozzle 5 is used for spray cooling, is down to flue gas full With temperature hereinafter, to reduce requirement of the subsequent technique to cleaning equipment.Two-fluid spray nozzle 10 uses high temperature resistant nickel base alloy material Material, has effective moisture-proof chlorine, the resistance to mixed acid containing chloride ion, anti-spot corrosion and crevice corrosion ability.
Two-fluid spray nozzle 10 is protected using air conservation casing, and the spray angle of two-fluid spray nozzle 10 is 15 °, double fluid The atomizing particle size of body nozzle 10 is less than 100 μm.Flue gas enters after the straight pipeline 102 of chilling tower 1 to be generated with two-fluid spray nozzle 10 Atomization grain contact heat-exchanging is cooled to 88 DEG C of saturation temperature or so, and the setting of two-fluid spray nozzle 10 can avoid high-temperature flue gas and corrode chilling The straight pipeline 102 of tower 1, while reducing the risk of 102 inner wall of straight pipeline of metal chloride condensation chilling tower 1.Chilling tower 1 it is straight Pipeline 102 is made of nonmetallic materials, can effectively reduce cost while effectively reducing acid and chlorine salt corrosion.
The diameter of the straight pipeline 102 of chilling tower 1 is 1000mm.
The above descriptions are merely preferred embodiments of the present invention, is not used in limitation the utility model, this field skill Art personnel can make various modifications or equivalent replacements to the utility model in the essence and protection scope of the utility model, This modification or equivalent replacement also should be regarded as falling in the protection scope of technical solutions of the utility model.

Claims (9)

1. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume, it is characterised in that: including chilling tower, high temperature pipe Road, high-temperature service flange, quenching apparatus flange, heating burner, circulation fluid eddy flow interface, circulating water pipe, liquid film, recirculated water are adjusted Valve, two-fluid spray nozzle, chilling tower are divided into the conical pipeline on top and the straight pipeline of lower part, the conical pipeline lower port of chilling tower Internal diameter is slightly larger than the outer diameter of high-temperature pipe, and high-temperature pipe extends in the conical pipeline of chilling tower, and the lower port of high-temperature pipe is set Set the conical pipeline and straight pipeline intersection in chilling tower;The outside of high-temperature pipe is socketed with high-temperature service flange, chilling tower The upper surface of conical pipeline is fixedly connected with quenching apparatus flange, and chilling tower and high-temperature pipe pass through high-temperature service flange and chilling Device flanged joint;The side wall of high-temperature pipe is provided with heating burner, and the top of high-temperature service flange is arranged in heating burner;Cone The top of the lower port of high-temperature pipe is arranged in the uniform open cycle liquid eddy flow interface of four peripheral walls of shape pipe, circulation fluid eddy flow interface, Recirculated water is entered in conical pipe by circulation fluid eddy flow interface and forms uniform liquid film on the inner wall of chilling tower;Chilling tower Straight pipeline side wall on be provided with two-fluid spray nozzle.
2. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: The two-fluid spray nozzle be 1 ~ it is N number of.
3. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 2, it is characterised in that: The lower section of the lower port of high-temperature pipe is arranged in the two-fluid spray nozzle.
4. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 3, it is characterised in that: The two-fluid spray nozzle is arranged with air conservation casing, and the spray angle of two-fluid spray nozzle is 15 °.
5. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: Circulation water regulating valve is provided on the circulating water pipe, the thickness of liquid film is controlled by recycling water regulating valve.
6. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: The conical pipeline of the chilling tower selects high temperature anticorrosion alloy material to be made.
7. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: The pipeline that the high-temperature pipe extends to chilling tower is coated with moisture-proof chlorine corrosion material.
8. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: The high-temperature pipe inner wall is coated with high-temperature service refractory material.
9. a kind of incineration of refuse flyash heat treatment process rapid cooling device for fume according to claim 1, it is characterised in that: The straight pipeline of the chilling tower is made of non-metallic material.
CN201821389260.2U 2018-08-28 2018-08-28 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume Active CN209077414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821389260.2U CN209077414U (en) 2018-08-28 2018-08-28 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821389260.2U CN209077414U (en) 2018-08-28 2018-08-28 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume

Publications (1)

Publication Number Publication Date
CN209077414U true CN209077414U (en) 2019-07-09

Family

ID=67115233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821389260.2U Active CN209077414U (en) 2018-08-28 2018-08-28 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume

Country Status (1)

Country Link
CN (1) CN209077414U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109078961A (en) * 2018-08-28 2018-12-25 江苏天楹环保能源成套设备有限公司 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109078961A (en) * 2018-08-28 2018-12-25 江苏天楹环保能源成套设备有限公司 A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume
CN109078961B (en) * 2018-08-28 2021-02-19 江苏天楹环保能源成套设备有限公司 Flue gas quenching device for waste incineration fly ash heat treatment process

Similar Documents

Publication Publication Date Title
CN109457070A (en) A kind of blast furnace granulated slag process steam disappears bletilla heat reclaiming system
CN105928382A (en) Quenching heat exchanger provided with multiple secondary heat exchange devices
CN209077414U (en) A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume
CN109078961A (en) A kind of incineration of refuse flyash heat treatment process rapid cooling device for fume
CN106011412B (en) The online water hardening device of aluminium section bar and aluminium section bar production line
CN208378801U (en) Gas cleaning device
CN201322313Y (en) Flue gas chilling device
CN103215445A (en) High-temperature powder cooling device and cooling method
CN209431446U (en) A kind of high-temperature flue gas pipeline with spray-chilling device
CN209322919U (en) A kind of blast furnace cinder environmental protection disappears white processing and afterheat utilizing system
CN209180956U (en) A kind of device of brine waste waste gas of incineration recycling
CN208019128U (en) Castoff fusing processing unit
CN208887387U (en) A kind of gas-liquid two-phase cooling device
CN207999810U (en) A kind of bushing type blast orifice oxygen burner
CN102688657A (en) Venturi quenching system
CN208449637U (en) A kind of high salty organic waste liquid rectangular coil spring nozzle
CN204737977U (en) Evaporative cooler and converter coal gas dry process dust pelletizing system
CN207962692U (en) It is a kind of for industrial coal powder boiler dry bottom hopper from deashing device
CN211192017U (en) Development module holding furnace atomization device
CN202605988U (en) Venturi chilling system
CN207094643U (en) A kind of boiler slag cooling conveying device
CN206094136U (en) High temperature flue gas rapid cooling and alkali cleaning integrated device
CN109402311A (en) A kind of blast furnace cinder environmental protection disappears white processing and afterheat utilizing system
CN206454834U (en) A kind of spray gun for desulphurization denitration
CN215675216U (en) Incineration flue gas quenching and cooling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant