Prior art keywords
main body
grouting
grouting pipe
steel pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820896501.6U
Other languages
Chinese (zh)
Inventor
陈锡宝
陈凌峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Minqing County Revitalization Of Agricultural Cooperatives
Original Assignee
Minqing County Revitalization Of Agricultural Cooperatives
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Minqing County Revitalization Of Agricultural Cooperatives filed Critical Minqing County Revitalization Of Agricultural Cooperatives
Priority to CN201820896501.6U priority Critical patent/CN209070838U/en
Application granted granted Critical
Publication of CN209070838U publication Critical patent/CN209070838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

It can grouting spray head freely rotated the utility model discloses a kind of teaching assembled, including steel pipe, steel tube connection head, steel pipe main body, steel pipe aperture, the steel pipe includes steel tube connection head, steel pipe main body, steel pipe aperture, steel tube connection head is provided with above the steel pipe main body, and steel pipe main body circumferential surface position on the lower side is provided with several steel pipe apertures, inside center of the penstock installation in Grouting Pipe, the beneficial effects of the utility model are: by the way that Grouting Pipe is designed to two parts --- Grouting Pipe main body and Grouting Pipe are in charge of, Grouting Pipe is in charge of symmetrical with Grouting Pipe main body, structure is simple, when teaching, Grouting Pipe main body and Grouting Pipe are in charge of and separated, the structure inside Grouting Pipe is shown to student, student is facilitated to learn to understand, improve teaching efficiency;By design the first locating piece and the second locating piece, the first locating piece and the fixed Grouting Pipe main body of the second locating piece cooperation tip and Grouting Pipe be in charge of between connection, facilitate lecturer to dismount, reduce labor intensity, it is highly-safe.

Description

A kind of teaching assembled can grouting spray head freely rotated
Technical field
The utility model belongs to teaching aid technical field, and in particular to a kind of teaching assembled freely rotated can fill Spray nozzle for slurry.
Background technique
Grouting --- it is that a certain proportion of slurries are poured into ground hole, crack or building itself with pressure appropriate It fills, cementing antiseepage or consolidation process, i.e., is sat equipment bottom and base with stone concrete fine crushing or cement slurry in seam, crack The gap of plinth space surface is filled up and parallels or anchoring bolt etc. is embedded in concrete, to fix parallels and bear the negative of equipment Lotus.Back-grouting method is the preformed hole for reserving foundation bolt when pouring basis in basis in advance.In equipment installation again ground Foot bolt, which is mounted on placing concrete or cement mortar in preformed hole, keeps foundation bolt secured.Its advantages are that foundation bolt is convenient for It adjusts and is installed convenient for equipment.The disadvantage is that not poured once securely on cast-in-place coagulation with the combination of original basis.Grouting spray head be The important equipment of cementing operations, skills training of being in the milk, the spray head that is in the milk are important a ring using training.
The teaching of the prior art is had the following problems with grouting spray head: can be any without the assembled for being exclusively used in teaching, training The grouting spray head of rotation brings great inconvenience to training and teaching.
Utility model content
To solve the problems mentioned above in the background art.The utility model provides a kind of teaching assembled can be any The grouting spray head of rotation, has the characteristics that facilitate teaching.
To achieve the above object, the utility model provides the following technical solutions: a kind of teaching can be rotated arbitrarily with assembled Grouting spray head, including steel pipe, steel tube connection head, steel pipe main body, steel pipe aperture, the steel pipe include steel tube connection head, steel pipe Main body, steel pipe aperture are provided with steel tube connection head above the steel pipe main body, and steel pipe main body circumferential surface position on the lower side is set Be equipped with several steel pipe apertures, the penstock installation Grouting Pipe inside center, the Grouting Pipe include slip casting pipe connector, Grouting Pipe aperture, Grouting Pipe main body, the first locating piece, location hole, the second locating piece, Grouting Pipe are in charge of, the Grouting Pipe main body Top be provided with slip casting pipe connector, and the side of Grouting Pipe main body is provided with Grouting Pipe and is in charge of, the Grouting Pipe main body Circumferential surface is provided with several groups locating ring, and the two sides of the Grouting Pipe main body are provided with the first locating piece of several groups, and infuse The two sides different from the first locating piece of slurry pipe main body are also equipped with several groups check valve, and the Grouting Pipe main body is in charge of with Grouting Pipe Abutted surface be provided with several Grouting Pipe apertures, the surface that the Grouting Pipe is in charge of is provided with several the second locating pieces, Tip is provided with below the Grouting Pipe main body;The circumferential surface position on the upper side of the steel pipe main body is provided with Joining clasp, And the lower circumferential surface of steel pipe main body is also equipped with Joining clasp, the circumferential surface of the Joining clasp is provided with slurry check ring.
Preferably, first locating piece is corresponded to each other with the position of the second locating piece.
Preferably, the surface of corresponding second locating piece of the location hole is provided with positioning pin, and it is fixed that positioning slightly insertion is mounted on The inside in position hole.
Preferably, it is engaged and is fixedly connected by tip connector screw thread between the tip and Grouting Pipe.
Preferably, the locating ring is corresponded to each other with the position of check valve.
Preferably, the steel pipe and Grouting Pipe are fixed by bearing piece.
Compared with prior art, the utility model has the beneficial effects that the utility model is by being designed to two for Grouting Pipe A part --- Grouting Pipe main body and Grouting Pipe are in charge of, and Grouting Pipe is in charge of symmetrical with Grouting Pipe main body, and structure is simple, teaching When, Grouting Pipe main body and Grouting Pipe are in charge of and separated, shows the structure inside Grouting Pipe to student, student is facilitated to learn to understand, Improve teaching efficiency;By the first locating piece of design and the second locating piece, the first locating piece and the second locating piece cooperation tip are solid Determine Grouting Pipe main body and Grouting Pipe be in charge of between connection, facilitate lecturer to dismount, reduce labor intensity, it is highly-safe.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the main view of the utility model.
In figure: 1, steel pipe;11, steel tube connection head;12, steel pipe main body;13, steel pipe aperture;2, Grouting Pipe;21, Grouting Pipe Connector;22, Grouting Pipe aperture;23, Grouting Pipe main body;24, the first locating piece;25, location hole;26, the second locating piece;27, Grouting Pipe is in charge of;3, locating ring;4, check valve;5, slurry check ring;6, Joining clasp;7, tip;71, tip connector.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model is the following technical schemes are provided: a kind of teaching assembled freely rotated can fill referring to FIG. 1-2, Spray nozzle for slurry, including steel pipe 1, steel tube connection head 11, steel pipe main body 12, steel pipe aperture 13, steel pipe 1 include steel tube connection head 11, steel Pipe main body 12, steel pipe aperture 13, the top of steel pipe main body 12 is provided with steel tube connection head 11, and 12 circumferential surface of steel pipe main body is inclined Bottom, which installs, is equipped with several steel pipe apertures 13, and steel pipe 1 is mounted on the inside center of Grouting Pipe 2, and Grouting Pipe 2 connects including Grouting Pipe Connector 21, Grouting Pipe aperture 22, Grouting Pipe main body 23, the first locating piece 24, location hole 25, the second locating piece 26, Grouting Pipe point Pipe 27, the top of Grouting Pipe main body 23 is provided with slip casting pipe connector 21, and the side of Grouting Pipe main body 23 is provided with Grouting Pipe It is in charge of 27, the circumferential surface of Grouting Pipe main body 23 is provided with several groups locating ring 3, if the two sides of Grouting Pipe main body 23 are provided with The first locating piece 24 of dry group, and the two sides different from the first locating piece 24 of Grouting Pipe main body 23 are also equipped with several groups check valve 4, The abutted surface that Grouting Pipe main body 23 and Grouting Pipe are in charge of 27 is provided with several Grouting Pipe apertures 22, and Grouting Pipe is in charge of 27 table Face is provided with several the second locating pieces 26, and the lower section of Grouting Pipe main body 23 is provided with tip 7;The circumferential surface of steel pipe main body 12 Position on the upper side is provided with Joining clasp 6, and the lower circumferential surface of steel pipe main body 12 is also equipped with Joining clasp 6, Joining clasp 6 Circumferential surface be provided with slurry check ring 5.
Be located by connecting the first locating piece 24 and the second locating piece 26 for convenience, in the present embodiment, it is preferred that the first positioning Block 24 is corresponded to each other with the position of the second locating piece 26.
It is in charge of 27 connections in order to fixed Grouting Pipe main body 23 and Grouting Pipe, in the present embodiment, it is preferred that location hole 25 The surface of corresponding second locating piece 26 is provided with positioning pin, and positioning slightly insertion is mounted on the inside of location hole 25.
In order to facilitate dismounting Grouting Pipe 2, in the present embodiment, it is preferred that pass through tip connection between tip 7 and Grouting Pipe 2 Mouth 71 screw threads engagement is fixedly connected.
In the present embodiment, it is preferred that locating ring 3 is corresponded to each other with the position of check valve 4.
In order to the position of fixed steel pipe 1, in the present embodiment, it is preferred that steel pipe 1 is fixed with Grouting Pipe 2 by bearing piece.
The working principle and process for using of the utility model: in teaching in use, fixed after the utility model installs Grouting Pipe 2 reverses tip 7 counterclockwise, removes tip 7, opens the connection between the first locating piece 24 and the second locating piece 26, point It opens Grouting Pipe main body 23 and Grouting Pipe is in charge of 27, expose the structure in Grouting Pipe main body 23, then show and explain to student.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of teaching assembled can grouting spray head freely rotated, including steel pipe (1), steel tube connection head (11), steel pipe master Body (12), steel pipe aperture (13), the steel pipe (1) include steel tube connection head (11), steel pipe main body (12), steel pipe aperture (13), It is provided with steel tube connection head (11) above the steel pipe main body (12), and the position setting on the lower side of steel pipe main body (12) circumferential surface There are several steel pipe apertures (13), it is characterised in that: the steel pipe (1) is mounted on the inside center of Grouting Pipe (2), the slip casting Managing (2) includes slip casting pipe connector (21), Grouting Pipe aperture (22), Grouting Pipe main body (23), the first locating piece (24), location hole (25), the second locating piece (26), Grouting Pipe are in charge of (27), are provided with slip casting pipe connector above the Grouting Pipe main body (23) (21), and the side of Grouting Pipe main body (23) is provided with Grouting Pipe and is in charge of (27), the circumferential surface of the Grouting Pipe main body (23) It being provided with several groups locating ring (3), the two sides of the Grouting Pipe main body (23) are provided with the first locating piece of several groups (24), and The two sides different from the first locating piece (24) of Grouting Pipe main body (23) are also equipped with several groups check valve (4), the Grouting Pipe master The abutted surface that body (23) and Grouting Pipe are in charge of (27) is provided with several Grouting Pipe apertures (22), and the Grouting Pipe is in charge of (27) Surface be provided with several the second locating pieces (26), be provided with tip (7) below the Grouting Pipe main body (23);
The circumferential surface position on the upper side of the steel pipe main body (12) is provided with Joining clasp (6), and the lower end of steel pipe main body (12) Circumferential surface is also equipped with Joining clasp (6), and the circumferential surface of the Joining clasp (6) is provided with slurry check ring (5).
2. teaching assembled according to claim 1 can grouting spray head freely rotated, it is characterised in that: described first Locating piece (24) is corresponded to each other with the position of the second locating piece (26).
3. teaching assembled according to claim 1 can grouting spray head freely rotated, it is characterised in that: the positioning The surface in hole (25) corresponding second locating piece (26) is provided with positioning pin, and positioning slightly insertion is mounted on the inside of location hole (25).
4. teaching assembled according to claim 1 can grouting spray head freely rotated, it is characterised in that: the tip (7) it is engaged and is fixedly connected by tip connector (71) screw thread between Grouting Pipe (2).
5. teaching assembled according to claim 1 can grouting spray head freely rotated, it is characterised in that: the positioning Circle (3) is corresponded to each other with the position of check valve (4).
6. teaching assembled according to claim 1 can grouting spray head freely rotated, it is characterised in that: the steel pipe (1) it is fixed with Grouting Pipe (2) by bearing piece.
CN201820896501.6U 2018-06-11 2018-06-11 A kind of teaching assembled can grouting spray head freely rotated Expired - Fee Related CN209070838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820896501.6U CN209070838U (en) 2018-06-11 2018-06-11 A kind of teaching assembled can grouting spray head freely rotated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820896501.6U CN209070838U (en) 2018-06-11 2018-06-11 A kind of teaching assembled can grouting spray head freely rotated

Publications (1)

Publication Number Publication Date
CN209070838U true CN209070838U (en) 2019-07-05

Family

ID=67088892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820896501.6U Expired - Fee Related CN209070838U (en) 2018-06-11 2018-06-11 A kind of teaching assembled can grouting spray head freely rotated

Country Status (1)

Country Link
CN (1) CN209070838U (en)

Similar Documents

Publication Publication Date Title
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN206409246U (en) A kind of Water slop injector
CN111764931A (en) High-ground-stress weak surrounding rock tunnel supporting structure and construction method thereof
CN209070838U (en) A kind of teaching assembled can grouting spray head freely rotated
CN208966022U (en) A kind of template poured for large-scale beam column
CN205617578U (en) Fossil fragments embedding slot for building
CN205188954U (en) Novel reinforced concrete prefabrication side stake pile extension structure
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN204282382U (en) A kind of equipment by decompression drainage quick blocking precipitation pipe well
CN202202561U (en) Floor preformed hole construction sleeve
CN111719861A (en) Construction device and construction method for grouting plugging of fabricated building
CN208364136U (en) A kind of combination fastener of embedded sleeve barrel and rear-mounted conduit
CN212983913U (en) Pressure-bearing downcomer well back cover is from waterproof one-way water outlet layer board piece of burying
CN213682064U (en) Foundation reinforcing and repairing device
CN212478572U (en) Construction equipment of assembled building slip casting shutoff
CN205917547U (en) Rail foundation subsides back direction of height adjustment system
CN201062393Y (en) Hollow concrete block for round or arc buildings
CN211689825U (en) Road and bridge pavement crack repairing device
CN209339334U (en) A kind of Architectural Structure Design wall column foot Quick Connect Kit
CN208072393U (en) A kind of pile pile of the built-in slip casting pipe with piecing devices
CN208310215U (en) A kind of construction through-flooring sleeve fixing device
CN208686105U (en) A kind of device controlling framework lower end filling concrete height
CN206308907U (en) A kind of anchor reserved for reinforcing bar
CN208501675U (en) A kind of detachable civil engineering foundation pile
CN207813039U (en) A kind of preforming combination tool of mattess partitioning slot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant