CN209067007U - A kind of road construction enclosure device - Google Patents

A kind of road construction enclosure device Download PDF

Info

Publication number
CN209067007U
CN209067007U CN201821417284.4U CN201821417284U CN209067007U CN 209067007 U CN209067007 U CN 209067007U CN 201821417284 U CN201821417284 U CN 201821417284U CN 209067007 U CN209067007 U CN 209067007U
Authority
CN
China
Prior art keywords
column
stone pier
road construction
fixedly connected
enclosure device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821417284.4U
Other languages
Chinese (zh)
Inventor
李志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Compass Transportation Facilities Engineering Co Ltd
Original Assignee
Anhui Compass Transportation Facilities Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Compass Transportation Facilities Engineering Co Ltd filed Critical Anhui Compass Transportation Facilities Engineering Co Ltd
Priority to CN201821417284.4U priority Critical patent/CN209067007U/en
Application granted granted Critical
Publication of CN209067007U publication Critical patent/CN209067007U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is to be related to the technical field of maintenance device, is specifically related to a kind of road construction enclosure device, including the stone pier, and the one end side of the stone pier is fixedly connected with column one, and other end side is fixedly connected with column two;The column one side opens up two horizontal limiting slots, the column one offers through-hole that is vertical and running through limiting slot, stop collar there are two being fixedly connected on the periphery of the column two, and two stop collars are corresponding with the position of two limiting slots respectively, the utility model has many advantages, such as that easy to use, the stone pier is not easily shifted, flexibility ratio is high.

Description

A kind of road construction enclosure device
Technical field
The utility model is to be related to the technical field of maintenance device, is specifically related to a kind of road construction enclosure device.
Background technique
With the development of society, the infrastructure construction in China is also developing rapidly, the Musculature stab in two, three line cities makes It obtains infrastructure construction and is in the stage of rapid development, therefore often see construction site in city, due to field of constructing Existing various security risks, therefore construction site is safeguarded by guardrail, prevents non-construction personnel from entering building site, The situation for preventing construction equipment stolen can be played, existing building site guardrail is all to be fixed on fence on the stone pier to safeguard, But the stone pier is directly placed on ground, it is easy to is removed, the safeguard function played is weaker.
Utility model content
In view of the foregoing deficiencies of prior art, the purpose of this utility model is to provide a kind of road constructions with going along with sb. to guard him Device, for solving the problems, such as that existing building site guardrail is easy to be moved with the stone pier.
In order to achieve the above objects and other related objects, the utility model discloses a kind of road construction enclosure device, Including the stone pier, the one end side of the stone pier is fixedly connected with column one, and other end side is fixedly connected with column two;It is described vertical Column one side opens up two horizontal limiting slots, and the column one offers through-hole that is vertical and running through limiting slot, described vertical Stop collar there are two being fixedly connected on the periphery of column two, and two stop collars are corresponding with the position of two limiting slots respectively.
Preferred: the stone pier upper end offers mounting groove, and the mounting groove is fixedly connected with guardrail, before and after the stone pier The lower end in face offers chamfering respectively, opens up the leakage hole there are three " people " font on the stone pier, the leakage hole respectively with Mounting groove, two chamfering inclined-plane connections.
Preferred: the column one, column two are built respectively in two sides of the stone pier, and the column two is integrated with stop collar Change is cast.
Preferred: the leakage hole is " tee tube " shape.
Preferred: the stone pier is T-shaped.
As described above, a kind of road construction enclosure device of the utility model, has the advantages that in the stone pier Column one and column two is arranged in both ends, and the column one on two stones pier is linked together with column two by screw rod, so that It is completely embedded, will not be moved between the stone pier and the stone pier easily;The ponding in limiting slot can be discharged by leakage hole.
Detailed description of the invention
Fig. 1 is a kind of main view of road construction enclosure device of the utility model.
Fig. 2 is a kind of side view of road construction enclosure device of the utility model.
Fig. 3 is the assembly structure diagram of the utility model stone pier and the stone pier.
Wherein: the stone pier 1, chamfering 2, mounting groove 3, guardrail 4, leakage hole 5, column 1, limiting slot 61, through-hole 62, column two 7, stop collar 71, screw rod 8.
Specific embodiment
The embodiments of the present invention is illustrated by particular specific embodiment below, those skilled in the art can be by this Content disclosed by specification understands other advantages and effect of the utility model easily.
Embodiment 1
As shown in Figure 1-3, the utility model discloses a kind of road construction enclosure device, including the stone pier 1, the stone pier 1 one end side is fixedly connected with column 1, and other end side is fixedly connected with column 27;One 6 side of column opens up Two horizontal limiting slots 61, the column 1 offer through-hole 62 that is vertical and running through limiting slot 61, the column 27 Periphery on be fixedly connected there are two stop collar 71, and two stop collars 71 are corresponding with the position of two limiting slots 61 respectively.
Preferred: 1 upper end of the stone pier offers mounting groove 3, and the mounting groove 3 is fixedly connected with guardrail 4, the stone pier The lower end of 1 front-back offers chamfering 2 respectively, and the leakage hole 5 there are three " people " font, the leak are opened up on the stone pier 1 Hole 5 is connected to 3, two 2 inclined-planes of chamfering of mounting groove respectively.
Preferred: the column 1, column 27 are built respectively in 1 two sides of the stone pier, the column 27 and stop collar 71 It is cast for integration.
Preferred: the leakage hole 5 is " tee tube " shape.
Preferred: the stone pier 1 is T-shaped.
The utility model is implemented:
According to [Fig. 1], [Fig. 3], since two stop collars 71 are corresponding with the position of two limiting slots 61 respectively, first will Stop collar 71 on one stone pier 1 is inserted into the limiting slot 61 on another stone pier 1, and screw rod 4 is then run through through-hole 62 again, And stop collar 71 is passed through, then in 8 lower end screw on nut of screw rod, two stones pier 1 just link together at this time;
According to [Fig. 2], mounting groove 3 is first inserted into from 1 side of the stone pier in the bottom of guardrail 4, it is then with bolt that guardrail 4 is fixed On the stone pier;Due to opening up the leakage hole 5 there are three " people " font on the stone pier 1, leakage hole 5 respectively with 3, two chamferings of mounting groove The connection of 2 inclined-planes, therefore to the rainy day, the ponding in mounting groove 3 will flow to from chamfering from leakage hole 5, and flow out the stone pier 1.
The utility model has the beneficial effects that
At the both ends of the stone pier 1, column 1 and column 27 be set, and by screw rod 8 by two stones pier 1 column 1 with Column 27 links together, so that being completely embedded between the stone pier 1 and the stone pier 1, will not be moved easily;It can by leakage hole 5 By the ponding discharge in limiting slot 61.
Finally, it should be noted that above embodiments are only to illustrate the utility model and not limit the utility model and retouched The technical solution stated;Therefore, although this specification the utility model is had been carried out referring to above-mentioned each embodiment it is detailed Illustrate, still, those skilled in the art should understand that, it still can modify to the utility model or equally replace It changes;And the technical solution and its improvement of all spirit and scope for not departing from the utility model, it should all cover practical new at this In the scope of the claims of type.

Claims (5)

1. a kind of road construction enclosure device, including the stone pier, it is characterised in that: the one end side of the stone pier is fixedly connected with Column one, other end side are fixedly connected with column two;The column one side opens up two horizontal limiting slots, the column One offers through-hole that is vertical and running through limiting slot, is fixedly connected with that there are two stop collars on the periphery of the column two, and Two stop collars are corresponding with the position of two limiting slots respectively.
2. a kind of road construction enclosure device according to claim 1, it is characterised in that: the stone pier upper end offers Mounting groove, the mounting groove are fixedly connected with guardrail, and the lower end of the stone pier front-back offers chamfering respectively, on the stone pier The leakage hole there are three " people " font is opened up, the leakage hole is connected to mounting groove, two chamfering inclined-planes respectively.
3. a kind of road construction enclosure device according to claim 1, it is characterised in that: the column one, column two It is built respectively in two sides of the stone pier, the column two is integrated cast with stop collar.
4. a kind of road construction enclosure device according to claim 1, it is characterised in that: the leakage hole is " threeway Pipe " shape.
5. a kind of road construction enclosure device according to claim 1, it is characterised in that: the stone pier is T-shaped.
CN201821417284.4U 2018-08-31 2018-08-31 A kind of road construction enclosure device Expired - Fee Related CN209067007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821417284.4U CN209067007U (en) 2018-08-31 2018-08-31 A kind of road construction enclosure device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821417284.4U CN209067007U (en) 2018-08-31 2018-08-31 A kind of road construction enclosure device

Publications (1)

Publication Number Publication Date
CN209067007U true CN209067007U (en) 2019-07-05

Family

ID=67091540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821417284.4U Expired - Fee Related CN209067007U (en) 2018-08-31 2018-08-31 A kind of road construction enclosure device

Country Status (1)

Country Link
CN (1) CN209067007U (en)

Similar Documents

Publication Publication Date Title
CN207348483U (en) The working portable rain-proof shelter of underground pipe gallery
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN205206282U (en) Concertina type work platform
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN206438984U (en) A kind of anti-climbing hidden foldable ladder
CN209067007U (en) A kind of road construction enclosure device
CN207298064U (en) A kind of attachment device for municipal pipeline installation
CN206015531U (en) Quick assembled type ladder cage
CN206616594U (en) A kind of service shaft well
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN204435529U (en) United villa subsurface stormwater concentrates discharge structure
CN204982672U (en) Bridge bent cap die block anti -leakage device
CN206957349U (en) Encorbelment protection advertisement enclosure wall
CN210766897U (en) Municipal administration public works are with theftproof anti-blocking well lid
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN209227356U (en) A kind of piping lane foundation pit employment row suspension bridge
CN209368738U (en) Assembled sidewalk guardrail
CN205954802U (en) Pit shaft protection network installation device
CN205742489U (en) The drainage system device of integral type
CN220468932U (en) Road side staggering abnormal-shaped well lid
CN204570899U (en) A kind of protection sink hole
CN205276288U (en) Prestressing force shaped steel integrated configuration
CN209194329U (en) High stability ferroalloy water-falling structure
CN212714510U (en) Flood discharge isolation guardrail with retractable structure base
CN204457074U (en) Combined enclosing wall component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705

Termination date: 20210831

CF01 Termination of patent right due to non-payment of annual fee