CN209054547U - The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe - Google Patents

The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe Download PDF

Info

Publication number
CN209054547U
CN209054547U CN201821545838.9U CN201821545838U CN209054547U CN 209054547 U CN209054547 U CN 209054547U CN 201821545838 U CN201821545838 U CN 201821545838U CN 209054547 U CN209054547 U CN 209054547U
Authority
CN
China
Prior art keywords
spirally
wound tubes
butt end
pipe
docking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821545838.9U
Other languages
Chinese (zh)
Inventor
姚金华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Luoyuan Power Generation Co Ltd
Original Assignee
Huaneng Luoyuan Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Luoyuan Power Generation Co Ltd filed Critical Huaneng Luoyuan Power Generation Co Ltd
Priority to CN201821545838.9U priority Critical patent/CN209054547U/en
Application granted granted Critical
Publication of CN209054547U publication Critical patent/CN209054547U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model proposes the transition structures of the spirally-wound tubes of boiler water wall and vertical wall pipe, for the connection transition between boiler water wall bottom spirally-wound tubes and water-cooling wall upper vertical tube panel, the transition structure includes spirally-wound tubes butt end, intermediate header and tube panel butt end;The intermediate header is equipped with and adjacent first docking section in spirally-wound tubes butt end;First docking section is equipped with multiple spirally-wound tubes docking pipe fitting and docks with spirally-wound tubes butt end;The intermediate header is equipped with and adjacent second docking section in tube panel butt end;Second docking section is equipped with multiple tube panels docking pipe fitting and docks with tube panel butt end;The utility model can provide transition structure resistant to high temperature for the connection transition between spirally-wound tubes and vertical wall pipe.

Description

The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe
Technical field
The utility model relates to the spirally-wound tubes of electrical equipment technical field, especially boiler water wall and vertical wall pipe Transition structure.
Background technique
There are enough cooling capacities in order to adapt to boiler under various loads, and can effectively compensate for along burner hearth circumference On thermal deviation, in existing supercritical boiler, lower part water-cooling wall generally use spirally-wound tubes, top water-cooling wall uses one Secondary rising vertical tube plates are connected with transition header therebetween.Spirally-wound tubes use various bend pipes and furnace wall in transition fragment position Outer intermediate header is connected, and intermediate header fairlead is connected to furnace wall by special bend pipe and is changed into vertical section, in this way Biggish plate sealing together is necessarily formed on furnace wall between changeover portion, sealing plate suqare is larger will inevitably be cooling less than good, So as to cause this long-term overheating operation of part sealing block.
Transition has certain want to the angle of elbow because of differential seat angle, while when bend pipe between spirally-wound tubes and vertical water-wall tube Ask, must not be plastically deformed, it is inevitable in this way to form larger gap at the position, it is necessary to biggish sealing plate to the position into Row sealing, sealing plate suqare is larger will inevitably be cooling less than good, leads to this long-term overheating operation of part sealing plate, for a long time Crackle easily occurs for the sealing plate at the position, and crack propagation to water screen tube causes water-cooling wall to leak when serious, causes unit Non- stoppage in transit of choosing the easy way out.This phenomenon has generation in many power plant, therefore how to solve the problems, such as that this is extremely urgent.
It solves the problems, such as this, can be improved in terms of following two:
1, changeover portion between spirally-wound tubes and vertical water-wall tube must will not be formed biggish gap, so that close in operation The medium that the heat that sealing plate absorbs can be water cooled in wall pipe is taken away, and overheating problem will not occur.
2, sealing plate uses heat-resisting material, i.e. for the material when being not required to cooling by medium, the interior tissue of material is not yet It can change, will not be burnt or generate stress cracking;But in this respect, at water-wall tubes for thermal power plant intermediate header In-furnace temperature it is quite high (be greater than 1300 DEG C), therefore the 2nd kind of scheme is very high to material requirements, is difficult to find this material, and Material (generally 12Cr1MoVG or 15CrMo) grade of this material and water screen tube differs greatly, and is not easy to weld, Yi Fasheng Welding defect.
Summary of the invention
The utility model proposes the transition structure of the spirally-wound tubes of boiler water wall and vertical wall pipe, can for spirally-wound tubes with Connection transition between vertical wall pipe provides transition structure resistant to high temperature.
The utility model uses following technical scheme.
The transition structure of the spirally-wound tubes of boiler water wall and vertical wall pipe, for boiler water wall bottom spirally-wound tubes with Connection transition between water-cooling wall upper vertical tube panel, the transition structure include spirally-wound tubes butt end, intermediate header and tube panel Butt end;The intermediate header is equipped with and adjacent first docking section in spirally-wound tubes butt end;First docking section is equipped with multiple spiral shells Coil circle docking pipe fitting is docked with spirally-wound tubes butt end;The intermediate header is equipped with and docks with tube panel butt end adjacent second Portion;Second docking section is equipped with multiple tube panels docking pipe fitting and docks with tube panel butt end.
The spirally-wound tubes docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
Multiple spirally-wound tubes nozzles are equipped at the spirally-wound tubes butt end;The first docking section inside spin pipeloop docking Pipe fitting corresponds interface position and spirally-wound tubes butt end spirally-wound tubes nozzle position.
The tube panel docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
Multiple wall pipe nozzles are equipped at the tube panel butt end;Tube panel butt tube part to interface in second docking section End wall pipe nozzle position one-to-one correspondence is docked with tube panel in position.
Each spirally-wound tubes in first docking section dock the uniform dense arrangement of pipe fitting;Each pipe of second docking section The screen docking uniform dense arrangement of pipe fitting.
In the present invention, due to largely using two-way, tee pipe fitting as connection transition, and pipe fitting inlet and outlet are vertical Furnace wall arrangement, without bending radius, therefore not will form biggish gap between can accomplishing changeover portion, so that pipe fitting position The fin size of the positions such as sealing plate and helix tube, vertical tube is essentially the same, therefore equally can preferably be cooled down, and will not occur Scaling loss cracks.
Detailed description of the invention
With reference to the accompanying drawings and detailed description to the further details of explanation of the utility model:
Attached drawing 1 is the schematic diagram of spirally-wound tubes butt end, intermediate header and tube panel butt end;
Attached drawing 2 is another schematic diagram of spirally-wound tubes butt end, intermediate header and tube panel butt end;
Attached drawing 3 is the decomposition diagram of spirally-wound tubes butt end Yu the first docking section;
Attached drawing 4 is the decomposition diagram of tube panel butt end Yu the second docking section;
In figure: 1- spirally-wound tubes butt end;2- intermediate header;3- tube panel butt end;The second docking section 5-;6- first is docked Portion;7- spirally-wound tubes dock pipe fitting;8- tube panel docks pipe fitting.
Specific embodiment
As shown in Figs 1-4, the transition structure of the spirally-wound tubes of boiler water wall and vertical wall pipe is used for boiler water wall bottom Connection transition between portion's spirally-wound tubes and water-cooling wall upper vertical tube panel, the transition structure include spirally-wound tubes butt end 1, in Between header 2 and tube panel butt end 3;The intermediate header 2 is equipped with and adjacent first docking section 6 in spirally-wound tubes butt end;First Docking section is equipped with multiple spirally-wound tubes docking pipe fitting 7 and docks with spirally-wound tubes butt end 1;The intermediate header 2 is equipped with and tube panel Adjacent second docking section 5 in butt end;Second docking section is equipped with multiple tube panels docking pipe fitting 8 and docks with tube panel butt end 3.
The spirally-wound tubes docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
Multiple spirally-wound tubes nozzles are equipped at the spirally-wound tubes butt end;The first docking section inside spin pipeloop docking Pipe fitting corresponds interface position and spirally-wound tubes butt end spirally-wound tubes nozzle position.
The tube panel docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
Multiple wall pipe nozzles are equipped at the tube panel butt end;Tube panel butt tube part to interface in second docking section End wall pipe nozzle position one-to-one correspondence is docked with tube panel in position.
Each spirally-wound tubes in first docking section dock the uniform dense arrangement of pipe fitting;Each pipe of second docking section The screen docking uniform dense arrangement of pipe fitting.

Claims (6)

1. the transition structure of the spirally-wound tubes of boiler water wall and vertical wall pipe is used for boiler water wall bottom spirally-wound tubes and water Connection transition between cold wall upper vertical tube panel, it is characterised in that: the transition structure includes spirally-wound tubes butt end, intermediate collection Case and tube panel butt end;The intermediate header is equipped with and adjacent first docking section in spirally-wound tubes butt end;First docking section is set There are multiple spirally-wound tubes docking pipe fittings to dock with spirally-wound tubes butt end;The intermediate header is equipped with adjacent with tube panel butt end Second docking section;Second docking section is equipped with multiple tube panels docking pipe fitting and docks with tube panel butt end.
2. the transition structure of the spirally-wound tubes of boiler water wall according to claim 1 and vertical wall pipe, it is characterised in that: The spirally-wound tubes docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
3. the transition structure of the spirally-wound tubes of boiler water wall according to claim 2 and vertical wall pipe, it is characterised in that: Multiple spirally-wound tubes nozzles are equipped at the spirally-wound tubes butt end;Pair of the first docking section inside spin pipeloop butt tube part Interface position and spirally-wound tubes butt end spirally-wound tubes nozzle position correspond.
4. the transition structure of the spirally-wound tubes of boiler water wall according to claim 1 and vertical wall pipe, it is characterised in that: The tube panel docking pipe fitting includes one of two-way pipe fitting, tee pipe fitting or a variety of.
5. the transition structure of the spirally-wound tubes of boiler water wall according to claim 4 and vertical wall pipe, it is characterised in that: Multiple wall pipe nozzles are equipped at the tube panel butt end;In second docking section tube panel butt tube part to interface position and pipe Screen docking end wall pipe nozzle position corresponds.
6. the transition structure of the spirally-wound tubes of boiler water wall according to claim 1 and vertical wall pipe, it is characterised in that: Each spirally-wound tubes in first docking section dock the uniform dense arrangement of pipe fitting;Each tube panel butt tube of second docking section The uniform dense arrangement of part.
CN201821545838.9U 2018-09-21 2018-09-21 The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe Active CN209054547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821545838.9U CN209054547U (en) 2018-09-21 2018-09-21 The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821545838.9U CN209054547U (en) 2018-09-21 2018-09-21 The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe

Publications (1)

Publication Number Publication Date
CN209054547U true CN209054547U (en) 2019-07-02

Family

ID=67049246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821545838.9U Active CN209054547U (en) 2018-09-21 2018-09-21 The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe

Country Status (1)

Country Link
CN (1) CN209054547U (en)

Similar Documents

Publication Publication Date Title
RU2554679C2 (en) Air heater with flue gas, installation method, air pipe component for air heater with flue gas
CN102976312B (en) Heat exchanger structure capable of prolonging service life of calcined coke heat exchanger
CN201327013Y (en) 100t/h fuel or gas steam injection boiler
CN209054547U (en) The spirally-wound tubes of boiler water wall and the transition structure of vertical wall pipe
CN104191069A (en) Manufacturing process of smoke waste heat exchanger for radiant tube burner
CN203880946U (en) Novel water circulation structure of gas angular tube hot water boiler
CN110906309B (en) Nozzle tube panel device with angle for water-cooling wall of spiral tube ring
CN211311508U (en) Oxygen lance mouth cooling device
CN207787215U (en) A kind of copper pipe inner surface dirt purging remove device
CN112813211A (en) High-efficient buggy preheating device
CN109954451A (en) A kind of reactor for the production of silver-colored formaldehyde
CN104180367A (en) Slagging tube of fluidized-bed boiler
CN104791836A (en) Heat exchange device of heating furnace
CN204128196U (en) Radiation type electric heater
CN102607279B (en) Long-service-life flow-equalizing type high-temperature blanking device and working method thereof
CN202582208U (en) Long-life flow-equalizing type high-temperature discharging device
CN201935401U (en) Fin type vertical water pipe return stroke
CN202521633U (en) Water-spacer-bush cooled secondary blowpipe
CN215637082U (en) Steam generator of gas boiler
CN201413071Y (en) Heat exchanger with spiral annular studded tube
CN207418797U (en) For the blanking water jacket of converter evaporation cooling air flue system
CN217253818U (en) Internal flame heating device for thick-wall header
CN207394810U (en) Slide positioner and with its boiler heating surface tube panel
CN214172199U (en) Header structure for preventing header tube seat from generating cracks
CN215893372U (en) Heat insulation structure of radiant tube heat exchanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant