CN209053073U - Convenient for the assembly type cooling water pipe of narrow concrete construction - Google Patents
Convenient for the assembly type cooling water pipe of narrow concrete construction Download PDFInfo
- Publication number
- CN209053073U CN209053073U CN201821760946.8U CN201821760946U CN209053073U CN 209053073 U CN209053073 U CN 209053073U CN 201821760946 U CN201821760946 U CN 201821760946U CN 209053073 U CN209053073 U CN 209053073U
- Authority
- CN
- China
- Prior art keywords
- connector
- concrete
- horizontal tube
- water pipe
- cooling water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model relates to a kind of assembly type cooling water pipes convenient for narrow concrete construction, belong to concrete pouring construction technical field.The utility model is mainly combined and is constituted by tee tube connector, horizontal tube, vertical duct and interlayer connector, the utility model according to " the pre- cloth in part, it is multidirectional connection, poured connection " principle, by the designated position that tee tube connector is fixed on to basic storehouse surface in advance, concreting is carried out after assembling vertical duct, at this time without the obstruction of horizontal direction, upper layer horizontal tube is connected to after pouring again, that is, completes a cooling line.The top connector of the cooling line is attached but also as the basis of next cooling line, circulate operation.The utility model, which avoids in thin wall concrete structure, can only depend on steel mesh binding in traditional cooling water pipe arrangement, a pipe makes the too long influence cooling effect in path on earth, vibrating not in place leads to problems such as pouring quality bad, simple process, convenient for assembling, cooling effect ensure that.
Description
Technical field
The utility model relates to a kind of assembly type cooling water pipes convenient for narrow concrete construction, belong to concrete pouring construction
Technical field.
Background technique
In hydroelectric project field, the method for pre-buried cooling water pipe is widely used in temperature of concrete during construction control process
In.But in the practical laying water pipe work progress of thin wall concrete structure, due to laying cooling water pipe in advance, so that originally wide
It is narrower to spend just more narrow concrete storehouse surface, in order to avoid damaging cooling water pipe, the difficulty vibrated after concrete warehousing
By invisible increase.Meanwhile narrow storehouse surface for convenience of water pipe arrangement, often one pipe on earth, single length of pipe it is too long and significantly
Reduce the cooling effect of the second half.In practical operation, concrete vibrating quality is bad frequent occurrence and cooling water pipe quilt occurs
The case where destruction.It not only cannot effectively reach the cooling desired effect of water flowing, but also the pouring quality of concrete is also difficult to ensure.
So reasonable Arrangement cooling water pipe is an important problem under the premise of not influencing concrete pouring quality.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of assembly type cooling waters convenient for narrow concrete construction
Pipe, can be improved the working efficiency that vibrates, and ensure concrete pouring quality.
To solve above-mentioned technical problem the technical scheme adopted by the utility model is being convenient for the assembling of narrow concrete construction
Formula cooling water pipe, including concrete and the cooling water pipe being arranged in concrete, concrete is layered arrangement structure, and each layer is mixed
Solidifying handwoven cloth sets a cooling line, and cooling line includes vertical duct, upper layer horizontal tube and lower layer's horizontal tube;Vertical duct is set in parallel
It sets, upper layer horizontal tube and lower layer's horizontal tube are staggered, and vertical duct one end connects upper layer horizontal tube, other end connection lower layer level
Pipe, forms snakelike pipeline;Upper layer horizontal tube is located at the top face of its locating number of plies concrete.
Further, vertical duct is assembled with upper layer horizontal tube by jointing;Vertical duct and lower layer's horizontal tube
It is assembled by jointing.
Further, between jointing, vertical duct between vertical duct and upper layer horizontal tube and lower layer's horizontal tube
Jointing is tee tube connector;Cooling line in adjacent two layers concrete is attached by interlayer connector, interlayer
Connector one end is connected to tee tube connector, the other end in n-th layer concrete on the horizontal tube of upper layer and is connected to N+1 layers of coagulation
Tee tube connector on Tu Nei lower layer horizontal tube;Tee tube connector on lower layer's horizontal tube of basecoat, it is directed downwardly
One wing passage is enclosed construction.
Further, the wing passage that tee tube connector is connected to interlayer connector is enclosed construction.
Further, three interfaces of tee tube connector are internal screw thread outer sleeve structure;The connector of vertical duct, upper layer
The connector of the connector of horizontal tube, the connector of lower layer's horizontal tube and interlayer connector is that external screw thread embeds pipe structure.
Further, cooling line pipeline is the hollow circular-tube of steel or HDPE material, jointing is used and cooling
The identical material of circuit line.
Further, interlayer connector is the circular bar of steel or HDPE material.
Further, each cooling line is provided with inlet and outlet, water inlet is located at the layer concrete
Top face, water outlet are located at the bottom outside of the layer concrete.
For the above-mentioned assembly type cooling water pipe convenient for narrow concrete construction, distribution method includes the following steps:
On the basis of arrangement vertical duct and lower layer's horizontal tube, and vertical duct and lower layer's horizontal tube are connected;Then start
Concreting completes first layer concreting when concreting elevation is close to vertical water pipe crest level, then group is loaded onto
Layer horizontal tube, forms a complete cooling line;Next layer of vertical duct is arranged again and lower layer's horizontal tube and is connected, and is poured
After second layer concrete, then assemble the upper layer horizontal tube in the layer concrete;The above-mentioned work progress of repetition is next to pour circulation.
The beneficial effects of the utility model are:
(1) concrete vibrating interference is reduced, pouring quality is improved.Concreting can be first carried out, then upper layer level is installed
Pipe.Interference and blocking of the horizontal direction to vibrating are reduced when pouring, it is convenient more comprehensively, reliably to vibrate, to improve mixed
Coagulate the pouring quality of soil.
(2) layered arrangement is not managed further on earth convenient for construction.Using tee tube adapter carry out interlayer connection, every layer
Water pipe can be reduced significantly by circulation assembling, length.The cooling effect for increasing the cooling water pipe second half section, reduces layer concrete
Temperature gradient.
(3) water pipe can no longer depend on steel mesh laying.Tee tube connector can be fixed deeply on basis, as concrete increases,
The connector pedestal of every layer of water pipe can all enter basis in advance.Water pipe can be laid according to design position in this way, without depending on steel again
Muscle net.
Detailed description of the invention
Fig. 1 is the utility model in schematic diagram when pouring first layer concrete.
Fig. 2 is that the utility model completes first layer concreting and cooling line schematic diagram when assembled.
Fig. 3 is the utility model in schematic diagram when pouring second layer concrete.
Marked in the figure: 1- vertical duct, the upper layer 2- horizontal tube, 3- lower layer horizontal tube, 4- jointing, 5- interlayer connector,
The basis 6-, 7- critical elevation one, 8- critical elevation two, 9- No.1 water inlet, No. bis- water inlets of 10-, 11- No.1 water outlet, 12-
No. two water outlets.
Specific embodiment
For ease of understanding with implementation the utility model, the preferred embodiment combination attached drawing work of anthology utility model is furtherly
It is bright.
As shown in Figure 1 to Figure 3, the structure of the utility model includes concrete and the cooling water pipe that is arranged in concrete,
Concrete is layered arrangement structure, and each layer concrete arranges a cooling line, and cooling line includes vertical duct 1, upper water
Flat pipe 2 and lower layer's horizontal tube 3;Vertical duct 1 is arranged in parallel, and upper layer horizontal tube 2 and lower layer's horizontal tube 3 are staggered, vertical duct 1 one
End connection upper layer horizontal tube 2, the other end connect lower layer's horizontal tube 3, form snakelike pipeline;Upper layer horizontal tube 2 is located at its locating layer
The top face of number concrete.
To be easily installed, vertical duct 1 is assembled with upper layer horizontal tube 2 by jointing 4;Vertical duct 1 and lower water
Flat pipe 3 is assembled by jointing 4.
Jointing 4, vertical duct 1 between vertical duct 1 and upper layer horizontal tube 2 and the connection between lower layer's horizontal tube 3 connect
First 4 be tee tube connector;Cooling line in adjacent two layers concrete is attached by interlayer connector 5, interlayer connection
5 one end of part is connected to tee tube connector, the other end in n-th layer concrete on upper layer horizontal tube 2 and is connected to N+1 layer concrete
Tee tube connector on interior lower layer's horizontal tube 3;Tee tube connector on lower layer's horizontal tube 3 of basecoat, it is directed downwardly
One wing passage is enclosed construction.Tee tube connector can be fixed deeply on basis in this way, as concrete increases, the connector of every layer of water pipe
Pedestal can all enter basis in advance.Water pipe can be laid according to design position in this way, without depending on steel mesh again.
The wing passage that tee tube connector is connected to interlayer connector 5 is enclosed construction, can avoid in addition being arranged so close
Seal structure facilitates the assembling of interlayer connector 5.
In addition, to facilitate assembly, three interfaces of tee tube connector are internal screw thread outer sleeve structure;Vertical duct 1 connects
The connector of head, the connector of upper layer horizontal tube 2, the connector of lower layer's horizontal tube 3 and interlayer connector 5 is that external screw thread embeds pipe knot
Structure.
To be economical and practical, cooling line pipeline is the hollow circular-tube of steel or HDPE material, and jointing 4 uses and cooling
The identical material of circuit line.Interlayer connector 5 is the circular bar of steel or HDPE material.
Each cooling line is provided with inlet and outlet, and water inlet is located at the top face of the layer concrete, out
The mouth of a river is located at the bottom outside of the layer concrete.It is arranged, can be reduced to hydraulic pressure by the way of lower in upper, water outlet using water inlet
Requirement.
As shown in Figure 1 to Figure 3, distribution method includes the following steps:
Vertical duct 1 and lower layer's horizontal tube 3 are arranged on basis 6, and vertical duct 1 and lower layer's horizontal tube 3 are connected;Then
Start concreting, when concreting elevation is close to vertical 1 crest level of water pipe, completion first layer concreting, then
Upper layer horizontal tube 2 is assembled, a complete cooling line is formed;Arrange again next layer vertical duct 1 and lower layer's horizontal tube 3 and even
It connects, after pouring the second layer concrete, then assembles the upper layer horizontal tube 2 in the layer concrete;It is next to repeat above-mentioned work progress
It is a to pour circulation.
Preferred embodiment:
The utility model includes tee tube connector, vertical duct 1, upper layer horizontal tube 2, lower layer's horizontal tube 3, interlayer connector 5.
Tee tube connector, for the structure for playing fixed, connection and connection.Shape is the T-type pipe fitting of three openings,
For middle long side for one side closed, side is hollow, short side is hollow.Material is steel or HDPE, internal diameter 20mm~30mm, wall thickness 3mm
~5mm, three interfaces are internal screw thread outer sleeve structure.
Upper layer horizontal tube 2 and lower layer's horizontal tube 3 are collectively referred to as horizontal water tube, are the hollow circular-tube of steel or HDPE material.It is interior
Diameter 20mm~30mm, wall thickness 2mm~4mm, both ends interface are that external screw thread embeds pipe structure.Interface is slightly less than tee tube and connects
Head, and it is matching.Length is set by temperature control technology requirement.
Vertical duct 1 is the hollow circular-tube of steel or HDPE material.Internal diameter 20mm~30mm, wall thickness 2mm~4mm, both ends connect
Mouth is that external screw thread embeds pipe structure.Interface is slightly less than tee tube connector, and matching.Length is set by temperature control technology requirement
It is fixed.
Interlayer connector 5 is the solid circles bar of steel or HDPE material.Internal diameter 20mm~30mm, length 15mm~
25cm, both ends interface are that external screw thread embeds pipe structure.Interface is slightly less than tee tube connector, and matching.
When implementation, as shown in Figure 1, carrying out the work that tee tube connector is fixed on to concrete storehouse surface first.According to design
Cooling water pipe arrangement position and path, along the base surface that tee tube connector bottom is fixed on concreting by this path.
Arranged direction such as Fig. 1, tee tube connector direction is consistent with design water pipe path, and closed side is downward.It is checked after the completion of operation.
Vertical duct 1 is moved into working face, the top of vertical duct 1 installs another tee tube connector additional, and closed side upward, is used
Interlayer connector 5 is connected in postorder.1 bottom of vertical duct is attached with the tee tube connector top in basis 6.Base is assembled again
Lower layer's horizontal tube 3 in plinth 6 between tee tube connector.It can start concreting and work of vibrating after the completion.
When concreting is to apart from 1 crest level 30cm~50cm of vertical duct, i.e. arrival critical elevation 1, interval assembling
Upper layer horizontal tube 2 between two vertical ducts 1, to form a complete cooling line.Complete an operation circulation.Fig. 2
First layer concreting and cooling line schematic diagram when assembled are completed for the utility model.
According to design, continue to pacify on the tee tube connector of the upper layer horizontal tube 2 for first cooling line completed
Dress interlayer connector 5 and other one layer of tee tube connector, vertical duct 1,5 interface of interlayer connector correspond to tee tube connector
Closed side assembles lower layer's horizontal tube 3 of this layer, and after pouring the second layer concrete, then the upper layer assembled in the layer concrete is horizontal
Pipe 2 forms the complete cooling line of Article 2.Aforesaid operations are repeated, next cooling line is completed.Fig. 3 is the utility model
In schematic diagram when pouring second layer concrete.
The utility model according to " the pre- cloth in part, it is multidirectional connection, poured connection " principle, by advance by tee tube connector
It is fixed on the designated position of basic 6 storehouse surfaces, concreting is carried out after assembling vertical duct 1, at this time without the obstruction of horizontal direction, pours
Upper layer horizontal tube 2 is connected to after building again, that is, completes a cooling line.The top connector of the cooling line is cold but also as next
But the basis of pipeline is attached, circulate operation.Avoiding can only in traditional cooling water pipe arrangement in thin wall concrete structure
Depend on steel mesh binding, a pipe makes the too long influence cooling effect in path on earth, vibrating not in place causes pouring quality bad etc.
Problem, simple process ensure that cooling effect convenient for assembling.
Claims (8)
1. be convenient for the assembly type cooling water pipe of narrow concrete construction, including concrete and the cooling water pipe that is arranged in concrete,
It is characterized by: concrete is layered arrangement structure, each layer concrete arranges that a cooling line, cooling line include vertical
Manage (1), upper layer horizontal tube (2) and lower layer's horizontal tube (3);Vertical duct (1) is arranged in parallel, and upper layer horizontal tube (2) and lower layer are horizontal
Pipe (3) is staggered, and vertical duct (1) one end connects upper layer horizontal tube (2), other end connection lower layer's horizontal tube (3), is formed snakelike
Pipeline;Upper layer horizontal tube (2) is located at the top face of its locating number of plies concrete.
2. being convenient for the assembly type cooling water pipe of narrow concrete construction as described in claim 1, it is characterised in that: vertical duct (1)
It is assembled with upper layer horizontal tube (2) by jointing (4);Vertical duct (1) and lower layer's horizontal tube (3) pass through jointing
(4) it is assembled.
3. being convenient for the assembly type cooling water pipe of narrow concrete construction as claimed in claim 2, it is characterised in that: vertical duct (1)
Jointing (4), vertical duct (1) between upper layer horizontal tube (2) and the jointing (4) between lower layer's horizontal tube (3) are equal
For tee tube connector;Cooling line in adjacent two layers concrete is attached by interlayer connector (5), interlayer connector
(5) one end is connected to tee tube connector, the other end in n-th layer concrete on upper layer horizontal tube (2) and is connected to N+1 layers of coagulation
Tee tube connector on Tu Nei lower layer horizontal tube (3);Tee tube connector on lower layer's horizontal tube (3) of basecoat,
A wing passage directed downwardly is enclosed construction.
4. being convenient for the assembly type cooling water pipe of narrow concrete construction as claimed in claim 3, it is characterised in that: tee tube connector
The wing passage for being connected to interlayer connector (5) is enclosed construction.
5. being convenient for the assembly type cooling water pipe of narrow concrete construction as claimed in claim 3, it is characterised in that: tee tube connector
Three interfaces be internal screw thread outer sleeve structure;The connector of vertical duct (1), the connector of upper layer horizontal tube (2), lower layer's horizontal tube
(3) connector of connector and interlayer connector (5) is that external screw thread embeds pipe structure.
6. the assembly type cooling water pipe convenient for narrow concrete construction as described in any one of claim 2 to 5, feature exist
In: cooling line pipeline is the hollow circular-tube of steel or HDPE material, and jointing (4) is using identical with cooling line pipeline
Material.
7. the assembly type cooling water pipe convenient for narrow concrete construction as described in any one of claim 3 to 5, feature exist
In: interlayer connector (5) is the circular bar of steel or HDPE material.
8. the assembly type cooling water pipe convenient for narrow concrete construction as described in any one of claim 1 to 5, feature exist
In: each cooling line is provided with inlet and outlet, and water inlet is located at the top face of the layer concrete, water outlet position
In the bottom outside of the layer concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821760946.8U CN209053073U (en) | 2018-10-29 | 2018-10-29 | Convenient for the assembly type cooling water pipe of narrow concrete construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821760946.8U CN209053073U (en) | 2018-10-29 | 2018-10-29 | Convenient for the assembly type cooling water pipe of narrow concrete construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209053073U true CN209053073U (en) | 2019-07-02 |
Family
ID=67051794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821760946.8U Active CN209053073U (en) | 2018-10-29 | 2018-10-29 | Convenient for the assembly type cooling water pipe of narrow concrete construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209053073U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235388A (en) * | 2018-10-29 | 2019-01-18 | 中国电建集团成都勘测设计研究院有限公司 | Convenient for the assembly type cooling water pipe of narrow concrete construction |
-
2018
- 2018-10-29 CN CN201821760946.8U patent/CN209053073U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235388A (en) * | 2018-10-29 | 2019-01-18 | 中国电建集团成都勘测设计研究院有限公司 | Convenient for the assembly type cooling water pipe of narrow concrete construction |
CN109235388B (en) * | 2018-10-29 | 2023-08-22 | 中国电建集团成都勘测设计研究院有限公司 | Assembled cooling water pipe convenient to construction of narrow and small storehouse face |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821364A (en) | Method for constructing reinforced concrete pond | |
CN103866780B (en) | A kind of construction method of carrying out quick seepage preventing curtain grouting in karst blowby area | |
CN207194467U (en) | Extension type prevents different labels concrete is mixed from pouring device | |
CN109235388A (en) | Convenient for the assembly type cooling water pipe of narrow concrete construction | |
CN103643657A (en) | Deep-hole chemical grouting construction method applied to water leakage treatment of hydroelectric dam | |
CN209053073U (en) | Convenient for the assembly type cooling water pipe of narrow concrete construction | |
CN210104578U (en) | Mass concrete curing equipment capable of timely transmitting and reducing hydration heat | |
CN104233960A (en) | Workpiece and construction method for bridge continuous beam web grouting | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN103437556A (en) | Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering | |
CN208056683U (en) | Pre-buried grouting device at a kind of concrete structure construction seam | |
CN109235270A (en) | A kind of main pier bearing platform construction technology | |
CN206928954U (en) | Concrete delamination pours into a mould piping installation and the lining trolley comprising this piping installation | |
CN103628575A (en) | Large-altitude-difference variable-section concrete structure construction joint and construction method thereof | |
CN108412094A (en) | The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN105332511B (en) | A kind of huge steel core concrete column filling core, which pours, smashes device and method | |
CN207260441U (en) | A kind of grout sleeve of mortar leakage prevention | |
CN210767886U (en) | Vibrating device for sleeve grouting and sleeve grouting system | |
CN206843334U (en) | The combined cooling water pipe of mass concrete | |
CN206844652U (en) | Pipe hole need not hang the new template of mould | |
CN207619995U (en) | A kind of material for diaphragm wall of Cofferdam construction high-pressure rotary jet grouting pile equipment | |
CN206539722U (en) | Pump line tailing control valve | |
CN108661672A (en) | A kind of two serve as a contrast the construction method and its pouring structure that trolley divides window to pour | |
CN104912209B (en) | Bars In Poured Concrete Slab reserved holes of pipes plugging device and processing and plugging construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |