CN209039978U - A kind of bridge construction cover half device - Google Patents

A kind of bridge construction cover half device Download PDF

Info

Publication number
CN209039978U
CN209039978U CN201820819622.0U CN201820819622U CN209039978U CN 209039978 U CN209039978 U CN 209039978U CN 201820819622 U CN201820819622 U CN 201820819622U CN 209039978 U CN209039978 U CN 209039978U
Authority
CN
China
Prior art keywords
column
orifice plate
cover half
bridge construction
construction cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820819622.0U
Other languages
Chinese (zh)
Inventor
刘荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Wanxiang Xing Rong Science And Technology Culture Development Co Ltd
Original Assignee
Beijing Wanxiang Xing Rong Science And Technology Culture Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Wanxiang Xing Rong Science And Technology Culture Development Co Ltd filed Critical Beijing Wanxiang Xing Rong Science And Technology Culture Development Co Ltd
Priority to CN201820819622.0U priority Critical patent/CN209039978U/en
Application granted granted Critical
Publication of CN209039978U publication Critical patent/CN209039978U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge construction cover half devices, including pedestal, the pedestal is equipped with and a pair of of moving template, and standing template includes the first column and the first orifice plate being arranged between the first column, first orifice plate includes multiple, and has different pitch-rows and aperture;Moving template includes the second column and the second orifice plate being arranged between the second column, and the second column and column are clamped, and the second orifice plate is equipped with height adjuster.The utility model, structure is simple, swift to operate, can adjust the specification of the first orifice plate and the height of the second orifice plate according to actual needs in real time, so that the road bridge module of different reinforcing bar density is obtained, it is practical.

Description

A kind of bridge construction cover half device
Technical field
The utility model relates to road bridge constructions, and in particular to a kind of bridge construction cover half device.
Background technique
The development trend of road bridge construction is modularization and high efficiency, can greatly shorten the duration, while in order to guarantee safety Property, need high-efficient and operation convenient, while there is high fastness.Road bridge module is connected on cement according to different needs The device for connecing fixed steel bars generally requires and cover half device is taken to realize, cover half device needs to meet the use of multiple groups reinforcing bar Have multiple groups through-hole and multiple groups positioning column, therefore need to insert multiple groups locating part in place in installation process, use is cumbersome.
In conclusion current cover half device, which exists, uses cumbersome, ineffective problem.
Utility model content
Technical problem to be solved in the utility model is that current cover half device exists using cumbersome, ineffective Problem.
In order to solve the above-mentioned technical problem, technical solution used by the utility model is to provide including pedestal, the bottom Seat is equipped with:
A pair stands template, including the first column and the first orifice plate being arranged between first column, described first Orifice plate includes multiple, and has different pitch-rows and aperture;
A pair of of moving template, it is vertical including the second column and the second orifice plate being arranged between second column, described second Column and the column are clamped, and second orifice plate is equipped with height adjuster.
In another preferred embodiment, first column is equipped with card slot, and first orifice plate is arranged described In card slot, the lateral surface of first column is equipped with holding device, and the holding device passes through first column and is resisted against On first orifice plate.
In another preferred embodiment, the holding device includes the compressor arm being arranged on first column, The compressor arm is equipped with pressure head, and first column is equipped with and the one-to-one through-hole of the pressure head.
In another preferred embodiment, the compressor arm includes fixed part, pars contractilis and setting in the pars contractilis On bull stick, the telescopic direction of the pars contractilis is arranged on the bull stick perpendicular to first column, the pressure head, outward The pars contractilis is pulled, it is parallel with the fixed plate to rotate the bull stick, then presses inward against, and passes through each pressure head described Through-hole is simultaneously resisted against on first orifice plate.
In another preferred embodiment, the height adjuster includes the waveform being arranged on second column Limiting tooth, the two sides of second orifice plate are respectively equipped with an arc convex, the arc convex and the limiting tooth its In the cooperation of wave channel.
In another preferred embodiment, the outside of first column is equipped with prominent item, second column it is interior Side is equipped with the crack being adapted to the prominent item.
In another preferred embodiment, the medial surface of first column and first orifice plate, described second stand Sealing strip is equipped between column and the medial surface of second orifice plate.
The utility model, structure is simple, swift to operate, can adjust the specification of the first orifice plate according to actual needs in real time, And second orifice plate height, it is practical to obtain the road bridge module of different reinforcing bar density.
Detailed description of the invention
Fig. 1 is the decomposition texture schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of first column of the utility model;
Fig. 3 is the structural schematic diagram of second column of the utility model.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings of the specification.
As shown in Figure 1, a kind of bridge construction cover half device provided by the utility model, including pedestal, the bottom Seat is equipped with a pair of of standing template and a pair of of moving template.Template is stood to include the first column 11 and be arranged between the first column 11 The first orifice plate 12, the first orifice plate 12 include it is multiple, and have different pitch-rows and aperture.Moving template includes 21 He of the second column The second orifice plate 22 between second column 21 is set, and the second column 21 is clamped with column, and the second orifice plate 22 is equipped with height and adjusts Save device.
The utility model can convert the first orifice plate 12 of plurality of specifications as needed, and then the height of the second orifice plate 22 can Up and down adjustment places transverse steel on the first orifice plate 12, places longitudinal reinforcement on the second orifice plate 22, if therefore wanting to adjust laterally The gap size of reinforcing bar and longitudinal reinforcement can reach a variety of reinforcing bar density, and easy to use, easy to connect, work efficiency is high.
As shown in Fig. 2, the first column 11 is equipped with card slot 111, the first orifice plate 12 is arranged in card slot 111, the first column 11 lateral surface is equipped with holding device, and holding device passes through the first column 11 and is resisted against on the first orifice plate 12.Holding device energy Reinforcement fixation is carried out after the installation of the first orifice plate 12, displacement is placed and causes error.
Holding device includes the compressor arm 13 being arranged on the first column 11, and compressor arm 13 is equipped with pressure head 134, and first is vertical Column 11 is equipped with and the one-to-one through-hole of pressure head 134.The structure of compressor arm 13 is simple, occupies smaller space, easy to operate.Into One step, compressor arm 13 includes fixed part 131, pars contractilis 132 and the bull stick 133 being arranged on pars contractilis 132, pars contractilis 132 Telescopic direction perpendicular to the first column 11, pressure head 134 is arranged on bull stick 133, pulls out pars contractilis 132, rotates bull stick 133 is parallel with fixed plate, then presses inward against, and so that each pressure head 134 is passed through through-hole and is resisted against on the first orifice plate 12.It stretches and turns The structure of dynamic combination, when both can guarantee compression bar extraction, by rotating adjusting position, in pressing, the indentation of energy vertical direction is logical again Hole, structure is simple, and it is convenient to operate.
As shown in figure 3, height adjuster includes the wavy limiting tooth 212 being arranged on the second column 21, the second hole The two sides of plate 22 are respectively equipped with an arc convex 221, one of wave channel cooperation of arc convex 221 and limiting tooth 212. Arc convex 221 is limited using wavy limiting tooth 212, thus the position of the second orifice plate 22 of control, in practical operation Second orifice plate 22 is swung left and right until arc convex 221 is placed on suitable position by Cheng Zhong.
The outside of first column 11 is equipped with prominent item 112, and the medial surface of the second column 21 is equipped with and protrudes what item 112 was adapted to Crack 211.Using the snap fit of prominent item 112 and crack 211, can front vertical insertion, can also be slid and be inserted into side.
It is all provided between the medial surface of first column 11 and the first orifice plate 12, the second column 21 and the medial surface of the second orifice plate 22 There is sealing strip.When concrete pours into, it can guarantee that the sealing of concrete and shape are smooth.
The utility model, structure is simple, swift to operate, can adjust the specification of the first orifice plate according to actual needs in real time, And second orifice plate height, it is practical to obtain the road bridge module of different reinforcing bar density.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn that under the enlightenment of the utility model The structure change made, it is all that there is same or similar technical solution with the utility model, each fall within the guarantor of the utility model Within the scope of shield.

Claims (7)

1. a kind of bridge construction cover half device, which is characterized in that including pedestal, the pedestal is equipped with:
A pair stands template, including the first column and the first orifice plate being arranged between first column, first orifice plate Including multiple, and there is different pitch-rows and aperture;
A pair of of moving template, including the second column and the second orifice plate being arranged between second column, second column with The first column clamping, second orifice plate are equipped with height adjuster.
2. bridge construction cover half device as described in claim 1, which is characterized in that first column is equipped with card Slot, first orifice plate are arranged in the card slot, and the lateral surface of first column is equipped with holding device, described to hold out against dress It sets and is resisted against on first orifice plate across first column.
3. bridge construction cover half device as claimed in claim 2, which is characterized in that the holding device includes setting Compressor arm on first column, the compressor arm are equipped with pressure head, and first column is equipped with and the pressure head one One corresponding through-hole.
4. bridge construction cover half device as claimed in claim 3, which is characterized in that the compressor arm includes fixing Portion, pars contractilis and the bull stick being arranged on the pars contractilis, the telescopic direction of the pars contractilis is perpendicular to first column, institute It states pressure head to be arranged on the bull stick, pulls out the pars contractilis, it is parallel with fixed plate to rotate the bull stick, then inwardly presses Pressure makes each pressure head pass through the through-hole and is resisted against on first orifice plate.
5. bridge construction cover half device as described in claim 1, which is characterized in that the height adjuster includes setting The wavy limiting tooth on second column is set, the two sides of second orifice plate are respectively equipped with an arc convex, institute The one of wave channel for stating arc convex and the limiting tooth cooperates.
6. bridge construction cover half device as described in claim 1, which is characterized in that set on the outside of first column There is prominent item, the medial surface of second column is equipped with the crack being adapted to the prominent item.
7. bridge construction cover half device as described in claim 1, which is characterized in that first column and described Sealing strip is equipped between the medial surface of one orifice plate, second column and the medial surface of second orifice plate.
CN201820819622.0U 2018-05-30 2018-05-30 A kind of bridge construction cover half device Expired - Fee Related CN209039978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820819622.0U CN209039978U (en) 2018-05-30 2018-05-30 A kind of bridge construction cover half device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820819622.0U CN209039978U (en) 2018-05-30 2018-05-30 A kind of bridge construction cover half device

Publications (1)

Publication Number Publication Date
CN209039978U true CN209039978U (en) 2019-06-28

Family

ID=67028565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820819622.0U Expired - Fee Related CN209039978U (en) 2018-05-30 2018-05-30 A kind of bridge construction cover half device

Country Status (1)

Country Link
CN (1) CN209039978U (en)

Similar Documents

Publication Publication Date Title
CN202364531U (en) Component pin adjusting device
CN103207517B (en) Mask plate gripper frame
CN209039978U (en) A kind of bridge construction cover half device
CN209756399U (en) screen printing plate
CN205315966U (en) Communication equipment fixed bolster
CN107965111B (en) A kind of decorative panel for building being easily installed
CN204109539U (en) A kind of printing apparatus of position-adjustable
CN101623168A (en) Height adjustable hook
CN206334822U (en) Artificial glue spreading apparatus
CN106425588B (en) More than one piece attaches together fastening milling positioning device
CN207480544U (en) A kind of photovoltaic module rack
CN209223649U (en) Copying tooling
CN206195705U (en) Limit presses fixed knot to construct and solar cell panel fixing device
CN207859481U (en) A kind of automatic coating equipment of automotive upholstery product
CN208438879U (en) A kind of silk-screen printing test cloth pressing engagement positions
CN206923908U (en) Adjust spatial mode bookcase
CN204820065U (en) A quick delivery tool for car rubber spare
CN201684865U (en) Bending and reshaping fixture for pin of optical device
CN207289649U (en) One kind polishing perforating needle fixture
CN208483569U (en) The tooling that is loaded of long pole
CN208687512U (en) A kind of adjustment angle quantization wall lamp
CN208702414U (en) Robot clamping device
CN208450430U (en) A kind of positioning device for punching machine
CN207896441U (en) One kind is for the fixed installation side block of mounting plate in low-voltage cabinet
CN208773433U (en) A kind of slotting balance sheet devices applied to tubular wine wheel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628