CN209025097U - A kind of tier building basis building in the landform of hillside fields - Google Patents

A kind of tier building basis building in the landform of hillside fields Download PDF

Info

Publication number
CN209025097U
CN209025097U CN201821659489.3U CN201821659489U CN209025097U CN 209025097 U CN209025097 U CN 209025097U CN 201821659489 U CN201821659489 U CN 201821659489U CN 209025097 U CN209025097 U CN 209025097U
Authority
CN
China
Prior art keywords
earth
surface base
base
building
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821659489.3U
Other languages
Chinese (zh)
Inventor
李生辉
温科旭
吴文纳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821659489.3U priority Critical patent/CN209025097U/en
Application granted granted Critical
Publication of CN209025097U publication Critical patent/CN209025097U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tier building bases building in the landform of hillside fields, including earth's surface base, the earth's surface base is by the first earth's surface base, second earth's surface base and third earth's surface base are constituted, first earth's surface base is adjacent with the second earth's surface base, second earth's surface base is adjacent with third earth's surface base, and the top height above sea level relationship of three is that third earth's surface base is higher than the second earth's surface base higher than the first earth's surface base, the tier building scheme of foundation design in the landform of hillside fields in the utility model can solve the big faulting of slab ends problem in upper tier building basis positioned at abrupt slope, also it can solve and build the big faulting of slab ends problem in basis of the tier building with basement in slope, in addition, due to step concrete structure, the presence of prestressed anchor rod structure and retaining wall structure, the utility model is also able to satisfy the resistant slide of building, side The problems such as slope is stable and lateral confinement constrains, and structure's practice is simple, project cost is low.

Description

A kind of tier building basis building in the landform of hillside fields
Technical field
The utility model relates to building construction technology field, specially a kind of tier building base building in the landform of hillside fields Plinth.
Background technique
China it is vast in territory, it is with a varied topography, recently as the high speed development of real estate, built in slope more Layer house is more and more.The scheme of foundation design that the tier building of slope generallys use is that strip footing puts staircase regime, Strip footing is exactly subjected to multiple faulting of slab ends by a small margin to adapt to the fluctuations of soil supporting layer, strip footing is put every when step A step height is usually no more than 0.5 meter, and width height ratio of steps is generally 2:1, the above scheme of foundation design be only applicable to the gradient compared with Slow hillside fields and there is no the case where basement.When house location is placed exactly in the steeper location of the gradient, put using strip footing The scheme that step carries out repeatedly faulting of slab ends by a small margin just cannot achieve, and need to carry out basis into biggish faulting of slab ends, faulting of slab ends height is long-range In 0.5 meter.It is to need to carry out base plate biggish faulting of slab ends, faulting of slab ends height if design has basement there are also a kind of situation An about layer height, putting step progress using strip footing, repeatedly the scheme of faulting of slab ends also cannot achieve by a small margin, for this purpose, this reality It is proposed that a kind of tier building basis building in the landform of hillside fields is used to solve the above problems with novel.
Summary of the invention
The purpose of this utility model is to provide a kind of tier building bases building in the landform of hillside fields, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the utility model provides the following technical solutions: a kind of multilayer room building in the landform of hillside fields Toft plinth, including earth's surface base, the earth's surface base is by the first earth's surface base, the second earth's surface base and third earth's surface base structure At, first earth's surface base is adjacent with the second earth's surface base, and the second earth's surface base is adjacent with third earth's surface base, and three Top height above sea level relationship is that third earth's surface base is higher than the second earth's surface base higher than the first earth's surface base, the second earth's surface base Layer close to the first earth's surface base side and third earth's surface base be respectively provided with close to the side of the second earth's surface base it is stepped, And the top of step structure is equipped with reinforcing bar and reinforces cage, the bottom surface that the reinforcing bar reinforces cage is in step, and reinforcing bar reinforces cage Bottom surface fitted closely with the upper surface of step structure, reinforcing bar reinforce cage inside be equipped with prestressed anchor, reinforcing bar adds The inside of strong cage, which is filled, is equipped with step concrete, and the top of the earth's surface base is equipped with bed course, the top of the bed course End is equipped with base plate, and the top of the base plate in first earth's surface base is equipped with gear close to the side of the second earth's surface base The top of cob wall, the base plate in second earth's surface base is equipped with retaining wall, the gear close to the side of third earth's surface base Cob wall and adjacent reinforcing bar reinforce filling at the gap between cage and are equipped with medium coarse sand, the end of the base plate and adjacent reinforcing bar Reinforce cage between gap at be equipped with malthoid interlayer, the two sides of the malthoid interlayer respectively with the end of base plate and reinforcing bar Reinforce fitting closely on the outside of cage.
Preferably, the prestressed anchor is obliquely installed, and one end of prestressed anchor is placed in the platform inside reinforcing bar reinforcement cage In stepped concrete, the other end of prestressed anchor is inserted into diagonally downward in earth's surface base.
Preferably, the top of the base plate in first earth's surface base is equipped with first unit building, the second earth's surface base The top of base plate on floor is equipped with second unit building, and the top of the base plate in third earth's surface base is equipped with third unit Building.
Preferably, the top on the top of the retaining wall in first earth's surface base and the base plate in the second earth's surface base It flushes, the top of the retaining wall in second earth's surface base is flushed with the top of the base plate in third earth's surface base.
Compared with prior art, the utility model has the beneficial effects that the multilayer in hillside fields landform in the utility model House foundation design scheme can solve the big faulting of slab ends problem in upper tier building basis positioned at abrupt slope, also can solve in slope The big faulting of slab ends problem in basis of the tier building with basement is built, in addition, due to step concrete structure, prestressed anchor rod structure And the presence of retaining wall structure, originally the problems such as practical resistant slide for being also able to satisfy building, stability of slope and lateral confinement constraint, and Structure's practice is simple, and project cost is low.
Detailed description of the invention
Fig. 1 is the utility model earth's surface base partial cutaway view;
Fig. 2 is the utility model entirety sectional view;
Fig. 3 is the utility model overall appearance schematic diagram.
In figure: 1 earth's surface base, 101 first earth's surface bases, 102 second earth's surface bases, 103 third earth's surface bases, 2 reinforcing bars Reinforce cage, 3 prestressed anchors, 4 step concrete, 5 bed courses, 6 base plates, 7 malthoid interlayers, 8 retaining walls, 9 medium coarse sands, 10 the One unit building, 11 second unit buildings, 12 third unit buildings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of tier building base building in the landform of hillside fields Plinth, including earth's surface base 1, earth's surface base 1 is by the first earth's surface base 101, the second earth's surface base 102 and third earth's surface base 103 are constituted, and the first earth's surface base 101 is adjacent with the second earth's surface base 102, the second earth's surface base 102 and third earth's surface base 103 It is adjacent, and the top height above sea level relationship of three is that third earth's surface base 103 is higher than the second earth's surface base 102 higher than the first earth's surface Base 101, the second earth's surface base 102 is close to the side of the first earth's surface base 101 and third earth's surface base 103 close to the second The side of table base 102 is respectively provided with stepped, and stepped sides are manually to dig, and the purpose is to by the big height of big faulting of slab ends The low height that degree difference is changed to multiple small faulting of slab ends is poor, prevents the side occurrence of large-area of big faulting of slab ends from collapsing, and is conducive to improve building Security performance;
And the top of step structure is equipped with reinforcing bar and reinforces cage 2, the bottom surface that reinforcing bar reinforces cage 2 is in step, and reinforcing bar The bottom surface for reinforcing cage 2 is fitted closely with the upper surface of step structure, and the inside that reinforcing bar reinforces cage 2 is equipped with prestressed anchor 3, the inside that reinforcing bar reinforces cage 2, which is filled, is equipped with step concrete 4, and the top of earth's surface base 1 is equipped with bed course 5, bed course 5 Top be equipped with base plate 6, the top of the base plate 6 in the first earth's surface base 101 is close to the one of the second earth's surface base 102 Side is equipped with retaining wall 8, and the top of the base plate 6 in the second earth's surface base 102 is equipped with gear close to the side of third earth's surface base 103 Cob wall 8, retaining wall 8 and adjacent reinforcing bar reinforce filling at the gap between cage 2 and are equipped with medium coarse sand 9, end and the phase of base plate 6 Adjacent reinforcing bar is reinforced being equipped with malthoid interlayer 7 at the gap between cage 2, the two sides of the malthoid interlayer 7 end with base plate 6 respectively And the outside of reinforcing bar reinforcement cage 2 fits closely;
Prestressed anchor 3 is obliquely installed, and one end of prestressed anchor 3 is placed in the step coagulation inside reinforcing bar reinforcement cage 2 In soil 4, the other end of prestressed anchor 3 is inserted into diagonally downward in earth's surface base 1;One end of prestressed anchor 3 is embedded in step In shape concrete 4, then oblique cutting enters in earth's surface base 1 other end, plays the role of fixed step concrete 4, prevents earth's surface base There is the case where landslide, collapse in layer 1, and guarantees the safety of building construction;
The top of base plate 6 in first earth's surface base 101 is equipped with first unit building 10, in the second earth's surface base 102 The top of base plate 6 is equipped with second unit building 11, and the top of the base plate 6 in third earth's surface base 103 is equipped with third unit building 12;Three pieces of base plates 6 are horizontal to be laid with, and first unit building 10, second unit building 11 and third unit building 12 are built in respectively The top of self-corresponding base plate 6;
The top of retaining wall 8 in first earth's surface base 101 and the top of the base plate 6 in the second earth's surface base 102 are neat Flat, the top of the retaining wall 8 in the second earth's surface base 102 is flushed with the top of the base plate 6 in third earth's surface base 103, gear Cob wall 8 is close to step concrete 4 and is built, and by being filled with medium coarse sand 9 at gap between the two, effect is fixed step The position of concrete 4 prevents the position of step concrete 4 from shifting, to cause safety accident.
Working principle: the utility model is in the building course of hillside fields, it is necessary first to foundation trench is excavated, it, need to be into after foundation trench scrapes out One end of prestressed anchor 3 is inserted into earth's surface base 1 by the construction of row prestressed anchor 3 diagonally downward, then manually will Second earth's surface base 102 is close to the side of the first earth's surface base 101 and third earth's surface base 103 close to the second earth's surface base Into a ladder, then cage 2 is reinforced in assembling reinforcement, and the bottom surface that reinforcing bar reinforces cage 2 is bound into step for 102 side cleaning, Reinforcing bar is finally reinforced cage 2 to prevent setting on step structure, and the outer end of prestressed anchor 3 is placed in the inside that reinforcing bar reinforces cage 2, The inside fill concrete for reinforcing cage 2 in reinforcing bar again, then becomes 4 structure of step concrete after concrete hardening.Above-mentioned step Suddenly after the completion of, start earth's surface base 1 top be laid with bed course 5, then bed course 5 top be laid with base plate 6, in base plate Retaining wall 8 is built in 6 top side, is embedded in malthoid between the end of base plate 6 and the outside of adjacent step concrete 4 Interlayer 7, medium coarse sand 9 is filled at the gap between retaining wall 8 and step concrete 4, and integral house foundation construction is completed.Its The effect of middle prestressed anchor 3 and step concrete 4 is to prevent soil avalanche, and the effect of retaining wall 8 is then protection platform Stepped concrete 4 prevents its position in building course from shifting.The effect filling irrigating sealant of malthoid interlayer 7 and medium coarse sand 9 Gap keeps 4 structure stress of step concrete more uniform, and overall structure is more firm.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of tier building basis building in the landform of hillside fields, including earth's surface base (1), it is characterised in that: the earth's surface base Layer (1) is made of the first earth's surface base (101), the second earth's surface base (102) and third earth's surface base (103), and described first Earth's surface base (101) is adjacent with the second earth's surface base (102), the second earth's surface base (102) and third earth's surface base (103) phase Neighbour, and the top height above sea level relationship of three is that third earth's surface base (103) is higher than the second earth's surface base (102) higher than the first Table base (101), side and third earth's surface base of second earth's surface base (102) close to the first earth's surface base (101) (103) side of close second earth's surface base (102) is respectively provided with stepped, and the top of step structure is equipped with reinforcing bar and adds Strong cage (2), the bottom surface that the reinforcing bar reinforces cage (2) is in step, and reinforcing bar reinforce the bottom surface of cage (2) with step structure Upper surface fits closely, and the inside that reinforcing bar reinforces cage (2) is equipped with prestressed anchor (3), and the inside that reinforcing bar reinforces cage (2) is filled out It fills and is equipped with step concrete (4), the top of the earth's surface base (1) is equipped with bed course (5), the top of the bed course (5) It is equipped with base plate (6), the top of the base plate (6) in first earth's surface base (101) is close to the second earth's surface base (102) side is equipped with retaining wall (8), and the top of the base plate (6) in second earth's surface base (102) is close to third earth's surface The side of base (103) is equipped with retaining wall (8), and the retaining wall (8) and adjacent reinforcing bar are reinforced filling out at the gap between cage (2) It fills and is equipped with medium coarse sand (9), the end of the base plate (6) and adjacent reinforcing bar are reinforced being equipped with malthoid at the gap between cage (2) Interlayer (7), the outside that cage (2) are reinforced with the end of base plate (6) and reinforcing bar respectively in the two sides of the malthoid interlayer (7) are tight Closely connected conjunction.
2. a kind of tier building basis building in the landform of hillside fields according to claim 1, it is characterised in that: described pre- to answer Power anchor pole (3) is obliquely installed, and one end of prestressed anchor (3) is placed in reinforcing bar and reinforces cage (2) internal step concrete (4) In, the other end of prestressed anchor (3) is inserted into diagonally downward in earth's surface base (1).
3. a kind of tier building basis building in the landform of hillside fields according to claim 1, it is characterised in that: described first The top of base plate (6) in earth's surface base (101) is equipped with first unit building (10), in second earth's surface base (102) The top of base plate (6) is equipped with second unit building (11), and the top of the base plate (6) in third earth's surface base (103) is set There are third unit building (12).
4. a kind of tier building basis building in the landform of hillside fields according to claim 1, it is characterised in that: described first The top of retaining wall (8) in earth's surface base (101) is flushed with the top of the base plate (6) in the second earth's surface base (102), institute State the top of the retaining wall (8) in the second earth's surface base (102) and the top of the base plate (6) in third earth's surface base (103) It flushes.
CN201821659489.3U 2018-10-13 2018-10-13 A kind of tier building basis building in the landform of hillside fields Expired - Fee Related CN209025097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821659489.3U CN209025097U (en) 2018-10-13 2018-10-13 A kind of tier building basis building in the landform of hillside fields

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821659489.3U CN209025097U (en) 2018-10-13 2018-10-13 A kind of tier building basis building in the landform of hillside fields

Publications (1)

Publication Number Publication Date
CN209025097U true CN209025097U (en) 2019-06-25

Family

ID=66906140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821659489.3U Expired - Fee Related CN209025097U (en) 2018-10-13 2018-10-13 A kind of tier building basis building in the landform of hillside fields

Country Status (1)

Country Link
CN (1) CN209025097U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982653A (en) * 2021-03-17 2021-06-18 中冶建工集团有限公司 Construction method of mountain-based building stable structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982653A (en) * 2021-03-17 2021-06-18 中冶建工集团有限公司 Construction method of mountain-based building stable structure

Similar Documents

Publication Publication Date Title
CN206655248U (en) A kind of assembly concrete empty van soil-baffling structure
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN104988948A (en) Rib plate type retaining wall and construction method thereof
CN109555153A (en) A kind of pin-connected panel ecology gravity retaining wall
CN209025097U (en) A kind of tier building basis building in the landform of hillside fields
CN113250240A (en) Combined side slope protection structure and process of layered net type gabion and concrete
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
IT9047689A1 (en) STRUCTURE FOR THE CONTAINMENT OF NATURAL AND / OR ARTIFICIAL GROUNDS
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN209129028U (en) A kind of cast-in-situ steel reinforced concrete gravity retaining wall structure
CN110295573B (en) River bank protection engineering slope protection structure capable of adapting to severe hydrological meteorological conditions in construction period
CN204780991U (en) Floor formula retaining wall
KR101235826B1 (en) The method of constructing block for wall
KR200263961Y1 (en) Sectional block for retaining wall building
CN209693554U (en) A kind of pin-connected panel ecology gravity retaining wall
CN210263127U (en) A panel modular unit and reinforced earth retaining wall for reinforced earth retaining wall
CN211547830U (en) Structure for preventing ground from being wetted
CN104895090B (en) Combined ladder key structure and construction method thereof
CN113417301A (en) Slope support construction method combined with building main structure
CN109137887B (en) Underground continuous wall structure penetrating through karst cave, construction method and supporting device
CN207004520U (en) A kind of robust structure of subway protection area shaft excavation
KR100982658B1 (en) Foundation part constructing method of block of retaining wall
CN211621616U (en) Steel mould guide wall for reservoir dam impervious wall
CN108532611A (en) A kind of foundation pit supporting construction and construction method
CN215715426U (en) Bridge deep foundation pit cofferdam structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190625

Termination date: 20201013

CF01 Termination of patent right due to non-payment of annual fee