CN209024969U - U-shaped steel combined panel for temporary bridge - Google Patents

U-shaped steel combined panel for temporary bridge Download PDF

Info

Publication number
CN209024969U
CN209024969U CN201821620772.5U CN201821620772U CN209024969U CN 209024969 U CN209024969 U CN 209024969U CN 201821620772 U CN201821620772 U CN 201821620772U CN 209024969 U CN209024969 U CN 209024969U
Authority
CN
China
Prior art keywords
module
baffle
shaped steel
temporary bridge
steel combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821620772.5U
Other languages
Chinese (zh)
Inventor
孟宪刚
戚良骥
沈萧
别佃奎
王威
方刚
秦九爱
朱小杰
闫龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wan Gang Bridge Installation Co Ltd
Original Assignee
Jiangsu Wan Gang Bridge Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Wan Gang Bridge Installation Co Ltd filed Critical Jiangsu Wan Gang Bridge Installation Co Ltd
Priority to CN201821620772.5U priority Critical patent/CN209024969U/en
Application granted granted Critical
Publication of CN209024969U publication Critical patent/CN209024969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to steel suspension bridge technical field more particularly to a kind of U-shaped steel combined panel for temporary bridge, including the first module and the second module;First module includes the strip main body in U-shaped section, and the inside cavity of strip main body is parallel to its two first side, is respectively arranged with two baffles, two baffles respectively with two first side spaced sets;Second module is that section is U-shaped strip structure, thirdly face successively vertically connects;In the second side insertion baffle of second module and the gap of first side, and it is bonded to form third module with two baffles respectively;In gap in the second side insertion third module of second module between second side and first side, each second Modular surface forms smooth bridge deck structure after connection;Each first module bottom is connected by bottom plate.By the panel construction in the utility model, so that it is convenient and fast connection, speed of application can be effectively improved, and its bearing capacity can be promoted by effective support construction.

Description

U-shaped steel combined panel for temporary bridge
Technical field
The utility model relates to steel suspension bridge technical field more particularly to a kind of U-shaped steel combined panel for temporary bridge.
Background technique
At present when repairing to some bridges, interruption of communication need to be temporarily carried out, although this provisional behavior is held The continuous time is shorter, but more inconvenience is brought to bridge user.Steel suspension bridge is the most common temporary bridge structure, It is used widely, is taken currently, steel suspension bridge generallys use the fast Speed Pinyin of panel, however existing panel makes in road construction There are problems that connection is complicated, speed of application is slow and low bearing capacity during.
Existing defect when in view of current bridge rush-repair, the present inventor are based on being engaged in such product engineering using abundant for many years Practical experience and professional knowledge, and cooperate the utilization of scientific principle, be subject to research and innovation, actively to found a kind of U-shaped steel suspension bridge Assembled panel makes it with more practicability.
Utility model content
The main purpose of the utility model is that providing the U-shaped steel suspension bridge that a kind of connection procedure is simple and bearing capacity is strong Assembled panel.
The above-mentioned technical purpose of the utility model has the technical scheme that
U-shaped steel combined panel for temporary bridge, including the first module and the second module;
First module includes the strip main body in U-shaped section, and three faces of the strip main body successively vertically connect, described The inside cavity of strip main body is parallel to its two first side, is respectively arranged with two baffles, two baffles are respectively and described in two First side spaced set, and its described first side in top is contour;
Second module is that section is U-shaped strip structure, and three faces of second module successively vertically connect;
The open end of second module and the open end of first module are oppositely arranged, and the second of second module Side is inserted into the gap of the baffle and the first side, and is bonded to form third module with two baffles respectively;
Each third module is connected by second module, specifically, the second side of second module is inserted into In gap in the third module between second side and the first side, each second Modular surface is formed flat after connection Whole bridge deck structure;
Each first module bottom is connected by bottom plate.
Further, the baffle between the first side at a distance from be equal to second module second side thickness 2 times.
Further, in the cavity between the baffle and the first side, flexible rubber at least is set on the side wall of side Glue-line.
Further, the cavity bottom between the baffle and the first side is provided with elastic rubber layer.
Further, after each third module is connected by second module, by penetrating through each first side, second The screw rod of side and baffle is attached, and screw rod two sides are fixed by nut.
Further, each second module top is connected by top plate.
By above-mentioned technical proposal, the utility model is at least had the advantage that
By the above-mentioned technical proposal of the utility model, U-shaped steel suspension bridge group can be formd by the setting of the first module The main body supporting structure of panel is closed, and passes through the setting of the second module, forms smooth bridge deck structure, wherein first side With the setting of baffle, reinforcing rib structure is on the one hand formd inside floorings, so that the intensity of entire panel is effectively mentioned It rises, on the other hand modules is quickly and effectively located by connecting, wherein the bottom of the first module can pass through with bottom plate The mode of welding realizes connection, and the first module and the second module can be realized by way of spot welding after assembly and quickly be connected It connects, and above-mentioned connection type can meet the stress demand of panel completely.By the panel construction in the utility model, so that connection It is convenient and efficient, speed of application can be effectively improved, and its bearing capacity can be promoted by effective support construction.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments recorded in the utility model, for those of ordinary skill in the art, is not making the creative labor Under the premise of, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of U-shaped steel combined panel for temporary bridge in the utility model;
Fig. 2 is the structural schematic diagram of the first module;
Fig. 3 is the structural schematic diagram of the second module;
Fig. 4 is the structural schematic diagram of third module;
Mark meaning in figure: the first module 1, strip main body 11, first side 11a, baffle 12, the second module 2, second side Face 21, bottom plate 3, screw rod 4, nut 5, top plate 6.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
The embodiments of the present invention are write in a progressive manner.
As shown in Fig. 1 ~ 4, U-shaped steel combined panel for temporary bridge, including the first module 1 and the second module 2;First module 1 Three faces of the strip main body 11 including U-shaped section, the strip main body 11 successively vertically connect, the cavity of the strip main body 11 Interior parallel is respectively arranged with two baffles 12 in its two first side 11a, two baffles 12 respectively with two first sides 11a spaced set, and its top first side 11a is contour;It is U-shaped strip structure that second module 2, which is section, Three faces of second module 2 successively vertically connect;The open end of the open end of second module 2 and first module 1 It being oppositely arranged, the second side 21 of second module 2 is inserted into the gap of the baffle 12 and first side 11a, and It is bonded to form third module with two baffles 12 respectively;Each third module is connected by second module 2, specifically For the second side 21 of second module 2 is inserted into the third module between second side 21 and the first side 11a In gap, each second module, 2 surface forms smooth bridge deck structure after connection;Each first module, 1 bottom passes through bottom Plate 3 connects.
By the above-mentioned technical proposal of the utility model, U-shaped steel suspension bridge can be formd by the setting of the first module 1 The main body supporting structure of assembled panel, and pass through the setting of the second module 2, form smooth bridge deck structure, wherein the first side The setting of face 11a and baffle 12, on the one hand form reinforcing rib structure inside floorings, so that the intensity of entire panel obtains It is effectively promoted, on the other hand modules is quickly and effectively located by connecting, wherein the bottom and bottom of the first module 1 Plate 3 can realize connection by welding, and the first module 1 and the second module 2 can be real by way of spot welding after assembly Now quickly connection, and above-mentioned connection type can meet the stress demand of panel completely.Pass through the panel knot in the utility model Structure, so that it is convenient and fast connection, speed of application can be effectively improved, and its bearing capacity can be promoted by effective support construction.
As the preferred of above-described embodiment, the baffle 12 between the first side 11a at a distance from be equal to described second 2 times of 21 thickness of second side of module 2.Above-mentioned size relationship can avoid entire panel perpendicular to 1 length of the first module Horizontal looseness occurs on direction, reduces the generation of noise, this purpose equally may be accomplished by, the baffle 12 and institute It states in the cavity between first side 11a, is at least provided with elastic rubber layer on the side wall of side.By the setting of elastic rubber layer, It can play the role of buffering in the transverse direction of panel, so that the purpose of reduction noise equally can be achieved.
As the preferred of above-described embodiment, the cavity bottom between the baffle 12 and the first side 11a is provided with bullet Property rubber layer.Here by the setting of elastic rubber layer, entire panel may make to form buffering in the up-down direction, reduces road It jolts, and the noise in vehicle travel process and rigidity damage.
In U-shaped steel combined panel for temporary bridge in above-described embodiment, the first module 1, the second module 2 can be prefabricated in factory It completes, only can also need to arrive scene by transporting respectively in transportational process and be spliced, for the scene of further reducing Splicing and disassembly difficulty after each third module is connected by second module 2, pass through each first side 11a of perforation, the The screw rod 4 of two side faces 21 and baffle 12 is attached, and 4 two sides of the screw rod are fixed by nut 5.It can save in this way The step of going welding, the Fast Installation and fixation of modules can be quickly realized by screw rod 4, to improve the speed of assembly Degree, while passing through the independent production and transportation of modules, placement space can be saved, reduces production difficulty, and in panel breakage Afterwards, its reusing can be improved by the replacement of part.
In order to avoid pollutant caused by due to the gap between each second module 2 enters, to reduce making for steel suspension bridge With the service life, connected at the top of each second module 2 by top plate 6, top plate 6 can be connect by connector with the second module 2 herein.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (6)

1.U shape steel combined panel for temporary bridge, which is characterized in that including the first module (1) and the second module (2);
First module (1) includes the strip main body (11) in U-shaped section, and three faces of the strip main body (11) successively vertically connect It connects, the inside cavity of the strip main body (11) is parallel to its two first side (11a), is respectively arranged with two baffles (12), two The baffle (12) respectively with two first side (11a) spaced sets, and its top and the first side (11a) etc. It is high;
It is U-shaped strip structure that second module (2), which is section, and three faces of second module (2) successively vertically connect;
The open end of second module (2) and the open end of first module (1) are oppositely arranged, second module (2) Second side (21) be inserted into the gap of the baffle (12) and the first side (11a), and respectively with two baffles (12) fitting forms third module;
Each third module is connected by second module (2), specifically, the second side of second module (2) (21) it is inserted into the gap in the third module between second side (21) and the first side (11a);
Each first module (1) bottom is connected by bottom plate (3).
2. U-shaped steel combined panel for temporary bridge according to claim 1, which is characterized in that the baffle (12) and described first Distance between side (11a) is equal to 2 times of second side (21) thickness of second module (2).
3. U-shaped steel combined panel for temporary bridge according to claim 1, which is characterized in that the baffle (12) and described first In cavity between side (11a), elastic rubber layer at least is provided on the side wall of side.
4. U-shaped steel combined panel for temporary bridge according to claim 1, which is characterized in that the baffle (12) and described first Cavity bottom between side (11a) is provided with elastic rubber layer.
5. U-shaped steel combined panel for temporary bridge according to claim 1, which is characterized in that the connection of each third module is logical Cross second module (2) and through each first side (11a), the screw rod (4) of second side (21) and baffle (12), the spiral shell Bar (4) two sides are fixed by nut (5).
6. U-shaped steel combined panel for temporary bridge according to claim 1, which is characterized in that logical at the top of each second module (2) Cross top plate (6) connection.
CN201821620772.5U 2018-09-30 2018-09-30 U-shaped steel combined panel for temporary bridge Active CN209024969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821620772.5U CN209024969U (en) 2018-09-30 2018-09-30 U-shaped steel combined panel for temporary bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821620772.5U CN209024969U (en) 2018-09-30 2018-09-30 U-shaped steel combined panel for temporary bridge

Publications (1)

Publication Number Publication Date
CN209024969U true CN209024969U (en) 2019-06-25

Family

ID=66905830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821620772.5U Active CN209024969U (en) 2018-09-30 2018-09-30 U-shaped steel combined panel for temporary bridge

Country Status (1)

Country Link
CN (1) CN209024969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111465238A (en) * 2020-04-28 2020-07-28 广东领先展示股份有限公司 Anti-interference cabinet body for control system based on 5G technology and manufacturing process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111465238A (en) * 2020-04-28 2020-07-28 广东领先展示股份有限公司 Anti-interference cabinet body for control system based on 5G technology and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN208632940U (en) A kind of assembling type steel structure arch bridge
CN209024969U (en) U-shaped steel combined panel for temporary bridge
CN206916548U (en) Suspension type sky rail rail structure out of shape
CN208376744U (en) A kind of sky iron series system
CN207896144U (en) A kind of power battery box and electric vehicle
CN215947862U (en) Stable and anti-deformation bridge tower pier
CN113665673B (en) Bearing type frame of anti-concave solar racing car
CN205369074U (en) H shaped steel stand of strenghthened type
CN204937145U (en) Low floor vehicle chair of glass fibre reinforced plastic
CN103669115B (en) Floating ballast bed plate and the vibrating isolation system comprising this floating ballast bed plate
US9970165B2 (en) Structural frame
CN209975344U (en) Medium-low speed magnetic levitation simply supported and then continuous double-line beam
CN208395666U (en) A kind of silent rib apparatus of steel bridge curve
CN209024943U (en) A kind of combination steel suspension bridge
CN218540233U (en) Railway bridge composite blocking ballast block
CN114150578A (en) Track beam monomer and track beam
CN205088560U (en) Joint construction of railway continuous beam - hunch combination bridge girder and arch rib
CN218437172U (en) Assembled foundation of box-type power station
CN218991678U (en) Mining impact-resistant drainage tank
CN209472028U (en) Battery pack bracket and battery pack with the bracket
CN216129966U (en) Noise reduction type expansion device for bridge expansion joint
CN215164208U (en) Assembled suspension type single-rail reinforced concrete combined track beam based on spiral rib connection
CN210529465U (en) H-shaped steel structure for bridge
CN113668356B (en) Tank-box mixed beam and application thereof
CN201062686Y (en) Step type horizontal curved throughout for cable line-collecting bridge frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant