CN209024893U - Assembled ballastless track structure for vibration damping location - Google Patents

Assembled ballastless track structure for vibration damping location Download PDF

Info

Publication number
CN209024893U
CN209024893U CN201821342167.6U CN201821342167U CN209024893U CN 209024893 U CN209024893 U CN 209024893U CN 201821342167 U CN201821342167 U CN 201821342167U CN 209024893 U CN209024893 U CN 209024893U
Authority
CN
China
Prior art keywords
concrete slab
track
prefabricated concrete
fill part
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821342167.6U
Other languages
Chinese (zh)
Inventor
娄会彬
孙立
王森荣
朱彬
张政
李秋义
叶松
郭积程
詹彩娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201821342167.6U priority Critical patent/CN209024893U/en
Application granted granted Critical
Publication of CN209024893U publication Critical patent/CN209024893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the assembled ballastless track structures for vibration damping location, including prefabricated concrete slab sleeper or precast track plate, in-situ layer, damping layer, rail inferior portion basis and connection fill part, several pieces of prefabricated concrete slab sleepers or precast track plate longitudinal gap are arranged, and pass through longitudinal connecting member assembly connection each other respectively in the transverse ends of each prefabricated concrete slab sleeper of spacer region or precast track plate;In part or all of spacer region, using reinforced concrete structure as connection fill part.The assembled sleeper for vibration damping location of the utility model is board-like or track platy ballastless track structure, so that connection fill part and prefabricated concrete slab sleeper or precast track plate form cast in place and precast construction, prefabricated concrete slab sleeper or precast track plate form same stress long slab cellular construction body, while realizing assembly connection, limit and damping effect.

Description

Assembled ballastless track structure for vibration damping location
Technical field
The utility model belongs to non-fragment orbit technical field, more particularly, to the assembled sleeper for vibration damping location Board-like or track platy ballastless track structure.
Background technique
Non-fragment orbit refers to the track knot for replacing shot ballast bed using mass-type foundations such as concrete, asphalts Structure.Non-fragment orbit avoids railway ballast splashing, ride comfort is good, and stability is good, long service life, durability compared with Ballast track Good, maintenance work is few, is applied more and more.Plate-type ballastless track construction relate generally to track plates, asphalt mortar, bituminous mortar or The structures such as self-compacting concrete filling layer, pedestal or supporting course, wherein pedestal or supporting course use concrete structure, are layed in bottom Seat or the asphalt mortar, bituminous mortar on supporting course or self-compacting concrete filling layer are the structures of ballastless track structure adjustment and bearing power transmission Layer.
Currently, China's plate-type ballastless track pattern mainly has III plate-type of I plate-type of CRTS, II plate-type of CRTS and CRTS Non-fragment orbit.I plate-type non-fragment orbit of CRTS is cell board, not vertical between plate and plate to connect, and does not set lateral block, is laid on cast-in-place The reinforced concrete footing with convex block machine on, limited by convex block machine.In unit plate type ballastless track structure, it is laid with peace Be between every piece of track plates after dress it is independent, shortcoming is, line road transport row for a period of time after, track plates and tar sand Starch filled layer can peeling-off, the longitudinal end of track plates is also easy to produce warpage, this undoubtedly can to train operation stationarity, comfortably The service life of property and track structure adversely affects.Although total presently, there are the scheme for being correspondingly improved connection type It is still difficult to meet stress deformation and preparation process challenge between plate body from the point of view of body, and can not overcome at present without the tiny fragments of stone, coal, etc. Track sketch plate excessively leads to problems such as the assembly of entire non-fragment orbit, maintenance difficult.
It uses longitudinal-connecting type to II plate-type fragment-free track slab of CRTS, and the company of indulging, passes through longitudinal essence between fragment-free track slab and plate It pricks spiral and tensioning latch fitting forms vertical connection structure, be equipped with lateral block, I plate-type non-fragment orbit of CRTS can be overcome to exist Segmental defect.Such as tensioning lock for longitudinal connection of ballastless track slab disclosed in patent document 201695285U, by from rail It is longitudinally connected that the longitudinally projecting reinforcing bar of guidance tape is attached locking realization.But this linked vector graph is essentially identical to longitudinal direction and answers in advance The mode of power reinforcing bar, connecting structure is complicated, constructs more loaded down with trivial details, and this is rigidly attached to the excessive situation of TEMPERATURE FORCE Under, there are still the possibility of arch for track plates, this causes the stationarity in service life and train operation to track structure, comfort not The influence of benefit.
To overcome drawbacks described above, presently, there are the technical solutions that two basic plate longitudinal ends are directly bolted, such as Patent document CN 201495454U discloses a kind of high-speed railway plate type ballastless track longitudinal connecting structure comprising along route The track plates being longitudinally laid with, the longitudinal end of track plates are arranged at intervals at least two groups pit and arc-shaped through-hole, arc-shaped through-hole Both ends are communicated in pit with the longitudinal terminal surface of track plates respectively, are set to pit with the arch screw bolt in arc-shaped through-hole and are connected group Part is longitudinally connected by adjacent two pieces of track plates.This connection structure, which can overcome, is rigidly attached to the excessive situation lower rail of TEMPERATURE FORCE The problem of guidance tape arches up, but need to open up the pit of certain depth at plate body both ends in this scheme, then by a groove On the one hand the bolt hole for opening up perforation connecting pin end additionally opens up pit on plate body and needs to increase process, it is difficult to increase manufacture Degree and cost, in addition pit therein is in order to meet opening up for bolt hole and being connected and fixed for bolt, inner wall size and shape With high requirement, so that manufacture difficulty increases;In particular, the setting of this pit causes rainwater, dirt etc. to deposit, and make It is bolted and is corroded or is difficult to dismount reparation, to increase later maintenance maintenance difficulty.
To overcome drawbacks described above, disclosed in the patent document CN107190584A of applicant's earlier application a kind of for nothing The assembled position limiting structure of tiny fragments of stone, coal, etc. track, wherein the non-fragment orbit of this assembled position limiting structure of the correspondence disclosed to drawbacks described above into Targetedly Curve guide impeller is gone.Non-fragment orbit in the technical solution is on the one hand by using the basic plate of multiple various specifications Flexible configuration and combination are carried out, can need to be assembled into various sizes of cell board according to scene, combining form more diversity, and And prefabricated basic plate miniaturization, lightness, it is more convenient for manufacturing, stacks transport and assembled in situ, reduce existing Special-shaped Plates Use;On the other hand it, which is used, is arranged the protrusion and recessed portion to match in the connecting pin of prefabricated basic plate, so as to form Mortise structure simultaneously carries out fastening using arch screw bolt by the arch screw bolt hole that wherein opens up to anchor basic plate, may be implemented First several basic plates of assembled non-fragment orbit of Prefabrication, then basic plate is assembled at the scene by certain size by attachment device Cell board, so as to flexibly arrange in pairs or groups and combine formation length be suitable for scene needs cell board.The non-fragment orbit knot Structure can make manufacture difficulty therein reduce, and rainwater dirt deposition is not present, and connector corrosion and dismounting difficulty reduce, Later period repairs easy maintenance.
But the connection of the ballastless track structure each unit plate is realized by the lug boss and recessed portion to match, structure Still complex, track plates needs are especially prefabricated, and above-mentioned bulge-structure makes protrusion in the middle part of entire raceway surface, in example Be unsatisfactory for safe escape requirement in such as subway occasion, in addition, between each unit plate of track male-female engagement connection belong to it is mixed The direct Hard link of concrete board, connection precision is poor, and there is no bufferings between each unit plate, so that whole to entire non-fragment orbit Body precision is affected;On the other hand, the track plates limiting device of this non-fragment orbit uses special position limiting structure, wherein not But it is prefabricated to locating part progress, and it will carry out aperture to the basic plate surface connecting with track plates, need specially to base Plinth plate is designed and is transformed, and not only complex procedures project amount is big, and limit effect is not ideal enough.In particular, this track Connection structure is arranged between each unit track plates in structure, and position limiting structure is that multiple connectors connect into after certain length again Setting, i.e., connection structure is individually separated setting with position limiting structure and the two is not corresponded with track plate unit, connects and limits Position is required to be separately provided and is designed and constructs respectively, and design process is more and project amount is larger, if increase with The corresponding multiple position limiting structures of connection structure, then prefabricated and improvement project amount is big, if the position-limit mechanism that setting is less, limit effect Fruit not can guarantee.
Utility model content
At least one aiming at the above defects or improvement requirements of the prior art, the utility model are provided for vibration damping The assembled sleeper platy ballastless track structure of section, multiple prefabricated short concrete slab sleeper intervals are arranged and pass through longitudinal connecting member and connection Fill part assembly connection forms long concrete slab sleeper, and limit steel bar and spacing collar, limit steel bar and limit sleeve is arranged in spacer region One of them is fixed cylinder with fill part is connect, another is fixed with rail inferior portion basis, forms limit steel bar and spacing collar Slide construction, and convenient for connection fill part move up and down, play vertically and horizontally limit while realize to vehicle generate vibration Dynamic buffering, wherein connection fill part is that the connection realized realizes limit simultaneously, process is few easy for construction.
To achieve the goals above, according to the one aspect of the utility model, the assembled rail for vibration damping location is provided Under board for pillow formula or track platy ballastless track structure, including prefabricated concrete slab sleeper or precast track plate, in-situ layer, damping layer, track Portion basis and connection fill part;
Several pieces of prefabricated concrete slab sleepers or precast track plate longitudinal gap are arranged, in each prefabricated rail of spacer region Board for pillow or the transverse ends of precast track plate pass through longitudinal connecting member assembly connection each other respectively;In part or all of spacer region, Using reinforced concrete structure as connection fill part, so that connection fill part and prefabricated concrete slab sleeper or precast track plate shape At cast in place and precast construction, prefabricated concrete slab sleeper or precast track plate form same stress long slab cellular construction body.
Further, the transverse ends of at least partly spacer region are respectively arranged with connection fill part, are at least partly spaced The rail inferior portion basis upper surface in area is provided with limit steel bar outstanding;And it is provided with connection fill part and limit simultaneously In the spacer region of component, it is embedded with spacing collar in the connection fill part, the spacing collar is slidably sleeved on institute The periphery of limit steel bar is stated, the longitudinal connecting member, the limit steel bar, the spacing collar are covered by same described It connects in fill part, four are integrally formed realization while limiting and connecting, thus several pieces of prefabricated concrete slab sleepers or prefabricated Track plates are assembled to form the track element of predetermined length and form same force structure body;
Alternatively,
The transverse ends of at least partly spacer region are respectively arranged with connection fill part, at least partly rail of spacer region Road infrastructure upper surface is provided with spacing collar outstanding;And it is provided with the interval of connection fill part and limit component simultaneously Qu Zhong is embedded with limit steel bar, the outside wall surface of the spacing collar and the connection fill part in the connection fill part Do not contact, the limit steel bar is slidably disposed in the spacing collar, the longitudinal connecting member, the limit steel bar, The spacing collar is covered by the same connection fill part, and four are integrally formed realization while limiting and connecting Connect, thus several pieces of prefabricated concrete slab sleepers or precast track plate be assembled to form the track element of predetermined length and formed it is same by Power structural body.
It further, include multipair fastener track, preferably 2-10 in the prefabricated concrete slab sleeper or precast track plate It is right, more preferably 4-6 pairs.
Further, the prefabricated concrete slab sleeper or the setting of precast track plate longitudinal direction both ends are jagged, are arranged on the notch Cover board forms smooth fire escape.
Further, the rail inferior portion basis is configured with gutter along its longitudinal direction.
Further, the both lateral sides of the prefabricated concrete slab sleeper or precast track plate are configured with gutter.
Further, the long plate unit two sides, which are arranged in the first position limiting structure or plate, is arranged the second position limiting structure.
Further, plate stitch is set between multiple adjacent track elements, is arranged in the part or all of plate stitch Third position limiting structure.
Above-mentioned further improvement technical characteristic can be combined with each other as long as they do not conflict with each other.
In general, it can obtain down the above technical solutions conceived by the present invention are compared with the prior art, Column the utility model has the advantages that
(1) the assembled ballastless track structure for vibration damping location of the utility model, by the way that multiple correspond to is arranged Its direction along ng a path interval on track infrastructure is arranged in the prefabricated concrete slab sleeper or precast track plate of assembly connection, and right Longitudinal connecting member should be arranged between two contiguous prefabricated concrete slab sleepers or precast track plate to connect with Corresponding matching, and in join domain Casting concrete, so that prefabricated concrete slab sleeper or precast track plate form assembled overall structure, to realize each prefabricated sleeper Effective connection of plate or precast track plate forms the long slab cellular construction body of same stress, ensure that prefabricated concrete slab sleeper or pre- The globality that track plates processed are linked and packed improves the assembly precision and reliability of ballastless track structure.
(2) the assembled ballastless track structure for vibration damping location of the utility model, multiple prefabricated short concrete slab sleeper intervals Be arranged and pass through longitudinal connecting member and connection fill part assembly connection forms long concrete slab sleeper, spacer region be arranged limit steel bar and One of them is fixed with fill part is connect for spacing collar, limit steel bar and spacing collar, another is solid with rail inferior portion basis It is fixed, the slide construction of limit steel bar and spacing collar is formed, and move up and down convenient for connection fill part, is vertically and horizontally limited playing The buffering that vibration is generated to vehicle is realized while position, wherein connection fill part is that the connection realized realizes limit simultaneously, Process is few easy for construction.
(3) the assembled ballastless track structure for vibration damping location of the utility model, longitudinal connecting member include longitudinal steel Muscle and sleeve are embedded in the prefabricated concrete slab sleeper in advance by longitudinal reinforcement and are arranged with another longitudinal reinforcement interval finally by sleeve It is connected to each other, or by the way that the sleeve is embedded in advance in the prefabricated concrete slab sleeper, the both ends difference of a longitudinal reinforcement Two sleeves are connected, the connection between two neighboring prefabricated concrete slab sleeper is realized by the flexible setting of reinforcing bar and sleeve.
(4) the assembled ballastless track structure for vibration damping location of the utility model passes through multiple prefabricated concrete slab sleepers Correspondence is assembled, and is generally fabricated construction, once there is track disease in later period application process in ballastless track structure, Can to poured behind track structure disease position region carry out correspondence abolish, to unlock the prefabricated concrete slab sleeper of the position, so as to right The prefabricated concrete slab sleeper or track element of disease position are replaced or are adjusted, and the maintenance time of non-fragment orbit is significantly reduced And maintenance cost;
(5) the assembled rail ballastless track structure for vibration damping location of the utility model passes through setting certain length Prefabricated concrete slab sleeper, track element is assembled into it, according to the difference of using area, the sleeper of different length specification can be used Plate, and short slab is set by prefabricated concrete slab sleeper by adopting, the curve adaptability of prefabricated concrete slab sleeper can be further promoted, is reduced non- The type and quantity of target and curve ruler reduce the prefabricated cost of concrete slab sleeper, improve the economy of ballastless track structure, also facilitate The laying accurate adjustment in later period;
Detailed description of the invention
Fig. 1 is signal of the utility model embodiment for the assembled sleeper platy ballastless track structure in vibration damping location Figure;
Fig. 2 is the assembled sleeper platy ballastless track structure explosive view that the utility model embodiment is used for vibration damping location;
Fig. 3 is utility model embodiment for the assembled sleeper plate ballastless track structure in vibration damping location and lateral section view Figure;
Fig. 4 is the structural schematic diagram of the first embodiment of limit component;
Fig. 5 is the structural schematic diagram of the second embodiment of limit component;
Fig. 6 is the structural schematic diagram of the 3rd embodiment of limit component;
Fig. 7 is the structural schematic diagram of the fourth embodiment of limit component.
In all attached drawings, identical label indicates same structure or part, in which: the prefabricated concrete slab sleeper of 1-, 101- plate body, 102- longitudinal reinforcement, 2- in-situ layer, 3- rail inferior portion basis, the gutter 301-, 4- limit component, 401- limit steel bar, 402- Connect fill part, 403- spacing collar, 404- disrance sleeve, 5- rail, 6- damping layer.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this Utility model is not used to limit the utility model.
As long as in addition, technical characteristic involved in the various embodiments of the present invention described below each other it Between do not constitute conflict and can be combined with each other.
Assembled sleeper is board-like in the preferred embodiment in the utility model or the overall structure of track platy ballastless track structure Schematic diagram is as shown in Figures 1 and 2, wherein ballastless track structure pass through the prefabricated concrete slab sleeper that is sequentially arranged at intervals along longitudinal direction or Precast track plate, which is correspondingly connected with, to be assembled, and in the following preferred embodiment of the utility model, is preferably with prefabricated concrete slab sleeper 1 Example is illustrated, and certainly, precast track plate can also carry out being correspondingly connected with assembly by the setting form in following preferred embodiment, Form ballastless track structure.
In the preferred embodiment of the utility model, ballastless track structure include the prefabricated concrete slab sleeper 1 for successively matching setting, In-situ layer 2 and rail inferior portion basis 3;Further specifically, basic 3 direction along ng a paths of rail inferior portion in preferred embodiment are set It sets, concrete bed made of can further preferably being poured as cement concrete or basis backfill layer are prefabricated for carrying Concrete slab sleeper 1 and the rail 5 being arranged on the concrete slab sleeper 1, and operate in the train on rail 5;Under preferred embodiment middle orbit The width and thickness on portion basis 3 is not specifically limited, and can be carried out according to actual needs preferably, so this will not be repeated here;Into One step preferably, as shown in Figure 3, is correspondingly arranged on gutter 301 on track infrastructure 3, to exclude and reduce in time Ponding in track, the gutter 301 in preferred embodiment can be more preferably direction along ng a path setting, and be preferably provided at The middle part on rail inferior portion basis 3;Certainly, gutter 301, which may also preferably be, is disposed side by side on the two of basic 3 two sides of rail inferior portion It is a, or one with the basic 3 any sides of rail inferior portion is set, this can be carried out preferably according to actual needs, and this will not be repeated here.
Further, it is preferable to the in-situ layer 2 in embodiment is arranged between prefabricated concrete slab sleeper 1 and rail inferior portion basis 3, Can be placed on rail inferior portion basis 3 by prefabricated concrete slab sleeper 1 and by being correspondingly connected with, coarse adjustment, accurate adjustment after-pouring obtain so that Prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 fit closely, to bear the vertical force transmitted on prefabricated concrete slab sleeper 1, play buffering by The effect of power and uniform stressed, the setting of in-situ layer 2 can sufficiently realize the adjustment of prefabricated concrete slab sleeper 1 in work progress, it is ensured that nothing The levelness or flatness of each position track in tiny fragments of stone, coal, etc. track guarantee the planarization of track operation;In a preferred embodiment, prefabricated After concrete slab sleeper 1 is correspondingly placed on rail inferior portion basis 3, adjust between each prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 away from From so that the rail 5 being arranged on each prefabricated concrete slab sleeper 1 can be correspondingly connected with, and guaranteeing the corresponding splicing precision of track;Further tool Body, in a preferred embodiment, after prefabricated concrete slab sleeper 1 is arranged on the track infrastructure 3, between the two between be separated with it is certain Distance then carries out coarse adjustment and accurate adjustment to prefabricated concrete slab sleeper 1, and between the two every space in pour the coagulation of corresponding thickness Soil, to form the in-situ layer 2 of ballastless track structure.
It is further preferred that reliable to improve the connection between in-situ layer 2 and prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 Property has carried out at " texturing " lower surface of prefabricated concrete slab sleeper 1 and/or the upper surface on rail inferior portion basis 3 in preferred embodiment Reason, i.e., so that the upper surface roughness on the lower surface of prefabricated concrete slab sleeper 1 and/or rail inferior portion basis 3 increases, flatness is reduced, The stiction for connecting in-situ layer 2 with prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 increases, and is further promoted cast-in-place The connective stability of layer 2 and prefabricated concrete slab sleeper 1 and rail inferior portion basis 3, so that prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 are logical It crosses in-situ layer 2 and forms same track structure beaer, to further promote the force stability of ballastless track structure.
Further, it is preferable to the prefabricated concrete slab sleeper 1 in embodiment is as shown in Fig. 1~2, plate-like structure, and it is prefabricated Concrete slab sleeper 1 is preferably that non-prestressed plate may be alternatively provided as the form of prestressed slab certainly, this can be used according to actual needs Related art method in the prior art is realized;Further, the prefabricated concrete slab sleeper 1 of muti-piece can successively be set at direction along ng a path interval It sets on track infrastructure 3 and corresponding connect forms whole ballastless track structure, with side between adjacent two prefabricated concrete slab sleeper 1 In face of just matching connection afterwards;Further, it is preferable in embodiment the top direction along ng a path of prefabricated concrete slab sleeper 1 be arranged at intervals with it is more To the fastener track that can correspond to installation rail 5, spaced fastener support rail number of units on prefabricated concrete slab sleeper 1 in preferred embodiment Amount is 4 pairs, and certainly, the setting quantity of prefabricated 1 upper fastener track of concrete slab sleeper can be according to the length of prefabricated concrete slab sleeper 1 or adjacent Interval between two fastener tracks carries out preferably, being such as set as 2 pairs, 3 pairs, 5 pairs, 6 pairs, 7 pairs, 8 pairs, 9 pairs, 10 equities, In can further be particularly preferred as 4~6 pairs.
Further, it is preferable to it is provided with longitudinal connecting member between two contiguous prefabricated concrete slab sleepers 1 in embodiment, it can be into one Respectively arranged longitudinal reinforcement 102 on the side that two prefabricated concrete slab sleepers 1 can be correspondingly connected in step specially preferred embodiment, it is longitudinal Reinforcing bar 102 is arranged along the length direction of prefabricated concrete slab sleeper 1, i.e., is arranged along the orbital direction of ballastless track structure, and longitudinal reinforcement 102 is multiple on prefabricated 1 side of concrete slab sleeper to be arranged at intervals in a preferred embodiment, and then two prefabricated concrete slab sleepers 1 are being to after just, Each longitudinal reinforcement 102 on two prefabricated 1 opposite flanks of concrete slab sleeper can be respectively to just, and then realizes and be correspondingly connected with;It is further excellent Selection of land respectively corresponds in preferred embodiment and two positive longitudinal reinforcements 102 is provided with sleeve, and one end can be correspondingly connected with wherein one A longitudinal reinforcement 102 on prefabricated 1 side of concrete slab sleeper of block, the other end can be correspondingly connected with another piece of prefabricated 1 side of concrete slab sleeper Upper corresponding longitudinal reinforcement 102, so as to be correspondingly connected with two prefabricated concrete slab sleepers 1 by sleeve.
Certainly, the connection of longitudinal reinforcement 102 is not limited to above-mentioned form, can also be arranged by corresponding longitudinal reinforcement 102 Bridge piece is respectively welded two longitudinal reinforcements 102 with the both ends of bridge piece, realizes the longitudinally connected of two prefabricated concrete slab sleepers 1;And And longitudinal connecting member is also not limited to the form of above-mentioned setting longitudinal reinforcement 102, can according to actual needs be preferably other shape Such as in another preferred embodiment connecting plate is arranged on the side of two prefabricated concrete slab sleepers 1 respectively, then be correspondingly arranged longitudinal direction in formula Two prefabricated concrete slab sleepers 1 to be correspondingly connected with by bolt, to realize the longitudinally connected of prefabricated concrete slab sleeper 1;Or it is excellent at another It selects in embodiment, bolt is passed through by the plate end pre-buried structure in prefabricated concrete slab sleeper 1, such as pre-embedded steel slab, embedded iron parts, later period Connection, welding or the patterns such as hinged form solid and reliable connection, complete the assembly connection of prefabricated concrete slab sleeper 1.
Further, it is preferable to which the prefabricated concrete slab sleeper 1 in embodiment is used to be provided with multiple longitudinal reinforcements on the side of connection 102, the both ends of above-mentioned side are divided into, and the respectively arranged longitudinal reinforcement 102 in above-mentioned side both ends in preferred embodiment Quantity be 4, i.e., the longitudinal reinforcement 102 being arranged on prefabricated 1 connecting end surface of concrete slab sleeper is 8, then two prefabricated concrete slab sleepers 1 it Between can be to being just correspondingly connected with afterwards by 8 sleeves, corresponding composition is vertical in a preferred embodiment with sleeve 105 for longitudinal reinforcement 102 To connector, the longitudinally connected of prefabricated concrete slab sleeper 1 is realized, and then form the integral unit of direction along ng a path;Certainly, two is prefabricated Longitudinal reinforcement 102 can partially can also be correspondingly connected with by sleeve all with the connection of sleeve Corresponding matching between concrete slab sleeper 1.
Further, multiple prefabricated concrete slab sleepers 1 can be correspondingly connected with into along longitudinal direction by being correspondingly connected with by longitudinal connecting member The long plate unit of certain length, then the ballastless track structure in preferred embodiment can pass through one or more long plate unit pair Composition should be combined;Further, it is preferable to which the long plate unit in embodiment can be whole by in-situ layer 2 and 3 formation of rail inferior portion basis Body force structure forms track element, then ballastless track structure can be filled by longitudinally disposed multiple track elements are corresponding With forming, each track element completes the stress of ballastless track structure respectively as whole force structure.
Further, it is preferable to be provided with plate stitch between each long plate unit in embodiment, and it is correspondingly arranged in plate stitch There is position limiting structure, with the corresponding limit for realizing long plate unit of position limiting structure, which can be more preferably boss, circle Column etc., the position limiting structure property of can choose setting, can also be respectively provided in each plate stitch, this can be carried out preferably according to the actual situation, This will not be repeated here.
Certainly, the limit of long plate unit is also not limited to the above-mentioned position limiting structure of setting, can be set as according to actual needs Other form is such as in a preferred embodiment respectively arranged with position limiting structure in the two sides of long plate unit, by long slab cell side Position limiting structure on side is correspondingly connected with rail inferior portion basis, realizes the limit of long plate unit, which can be further preferred To be vertically provided at anchor bar or connection boss on prefabricated 1 side of concrete slab sleeper;Correspondingly, in another preferred embodiment In, through-hole structure or setting can be vertically opened up in the plate face by concrete slab sleeper 1 prefabricated some or all of in long plate unit It is connected to the sleeve of two plate faces, so that bar planting or setting in above-mentioned through-hole or sleeve can be passed through after long plate unit is assembled to position The mode of limit steel nail realizes the limit of long plate unit, and the reinforcing bar or limit steel nail Corresponding matching of bar planting are basic into rail inferior portion In, guarantee that the limit of long plate unit is firm.In addition, the limit of each long plate unit can also be preferably arranged to according to actual needs it is other Form, this is easier to realize with related art method in the prior art, so this will not be repeated here.
Further, it is preferable to after two contiguous prefabricated concrete slab sleepers 1 in embodiment are correspondingly connected with by longitudinal connecting member, it can be right Longitudinal connecting member setting connection fill part is answered, it is preferably mixed by the spacer region cast in place reinforced bar between two prefabricated concrete slab sleepers 1 It is obtained after solidifying soil;It is, of course, preferable to connection fill part can be correspondingly arranged in embodiment between the transverse ends of all spacer regions, Connection fill part can be only correspondingly arranged between the transverse ends of part spacer region, this can be carried out preferably according to the actual situation; It is further preferred that preferred embodiment before cast-in-situ steel reinforced concrete, is preferably set on longitudinal connecting member on longitudinal connecting member Circumferential stirrup is set, multiple longitudinal connecting members in two plate spacer regions are connected into overall structure, the setting quantity of circumferential stirrup It can be one, can also be the multiple of longitudinally spaced setting, and the type of attachment of circumferential stirrup and longitudinal connecting member is not done specifically It limits, can also be connected by binding, be not specifically limited herein by being welded to connect;Further, contiguous prefabricated to two After the longitudinal connecting member of concrete slab sleeper is correspondingly connected with, and circumferential stirrup and longitudinal connecting member matching connect into integral frame structure, Cast-in-situ steel reinforced concrete is corresponded in above-mentioned integral frame structure, so that the connection fill part between two prefabricated concrete slab sleepers 1 is set Set that stability is higher, multiple prefabricated concrete slab sleepers 1 can be correspondingly formed stable long plate unit, that is, form same force structure body, make Each prefabricated not single stress of concrete slab sleeper 1 in long plate unit, but whole stress, so that it is guaranteed that long plate unit or even without tiny fragments of stone, coal, etc. rail The force stability of road structure.
It is further preferred that correspondence opens up jagged on the side that plate body 101 is used to match connection, it is preferably in semi-ring Shape, and two prefabricated concrete slab sleepers 1 with side to just and after matching connection, two notches on two relative side can be respectively to just, and group The notch circularized, as shown in fig. 1, then corresponding cover board is arranged in the corresponding notch being composed, so that without tiny fragments of stone, coal, etc. rail The zone level between two rails 5 in road structure, convenient for walking, the rubbish also reduced on sleeper surface is fallen into gutter 301.
It is further preferred that prefabricated concrete slab sleeper 1 be used for match connection both sides of the face in the middle part of correspondence offer it is semiorbicular Notch, notch are arranged so that the both ends of each end face are respectively formed bulge-structure, and then each longitudinal reinforcement 102 can be correspondingly arranged at On the end face of two bulge-structures, i.e., when two prefabricated concrete slab sleepers 1 are correspondingly connected with, it can correspond to so that two prefabricated 1 ends of concrete slab sleeper Bulge-structure is to just, then making on bulge-structure corresponding longitudinal reinforcement 102 respectively to just, to realize prefabricated concrete slab sleeper 1 With being correspondingly connected with for longitudinal reinforcement 102.
In above preferred embodiment, the connection between adjacent two prefabricated concrete slab sleeper 1 passes through at the end of each prefabricated concrete slab sleeper 1 Pre-buried longitudinal reinforcement 102 is realized on face, this is one of the utility model embodiment preferred embodiment, but is not unique Set-up mode, such as in a further advantageous embodiment, by being correspondingly arranged sleeve on the end face of each prefabricated concrete slab sleeper 1, so that After two prefabricated concrete slab sleepers 1 are correspondingly arranged on rail inferior portion basis 3, the sleeve on two prefabricated 1 opposite flanks of concrete slab sleeper is right respectively Just, then in each group to longitudinal reinforcement is correspondingly arranged in positive sleeve, so that one end of longitudinal reinforcement is correspondingly connected at one in advance On sleeve on 1 side of concrete slab sleeper processed, the other end is connected on another prefabricated 1 side of concrete slab sleeper on corresponding sleeve, thus So that two prefabricated concrete slab sleepers 1 can be correspondingly connected with by the Corresponding matching of multiple groups sleeve and longitudinal reinforcement to realize, in every group of sleeve It is connected respectively and is provided with longitudinal reinforcement.
Certainly, the longitudinal reinforcement on prefabricated 1 end face of concrete slab sleeper or sleeve can also pass through other shapes by pre-buried setting Formula is configured, and connecting plate such as is arranged on the end face of prefabricated concrete slab sleeper 1, then that one end of longitudinal reinforcement or sleeve is corresponding It is welded on connecting plate and realizes positioning.
In order to adapt to the demand in vibration damping location, damping layer 6, damping layer are set between in-situ layer 2 and rail inferior portion basis 3 It is not fixed between 6 and self-compacting concrete layer 2 and reinforced concrete earthen backfill layer 3, train fortune is buffered by the setting of damping layer 6 The vibration that row generates.Preferably, damping layer can support pattern for point support, strip support or face, and damping layer 6 is poured after being set to Layer lower part, pours after-pouring layer and damping layer 6 constitutes unified structure, improves the mass of vibration of track, can in order to easy for construction It is levelling to be carried out to infrastructure first to perform last layer, then damping layer is directly set, adjust track plates system, pass through The vibration that the setting buffering train operation of damping layer 6 generates.
Several pieces of prefabricated concrete slab sleepers or precast track plate longitudinal gap are arranged, and lateral the two of part or all of spacer region Connection fill part 402 is respectively set in end, and some or all of spacer region is equipped with limit component 4, further, limit component It can be one or more that quantity, which is arranged, this can be carried out preferably according to the setting form or actual needs of limit component, and Along the orbital direction of non-fragment orbit, the spacer region between each prefabricated concrete slab sleeper 1 can be respectively provided with limit component, or be spaced in part Limit component is set in area, this can be carried out preferably according to actual needs, and this will not be repeated here.
Limit component 4 includes limit steel bar 401 and spacing collar 403, and connection fill part 402 is by connecting adjacent two pieces Longitudinal connecting member 102 at plate body, realization adjacent two boards body 101 is connected it is integral, connection fill part 402 be set to it is cast-in-place On layer 2 and damping layer 6, so that it be made to be suitable for the upper and lower displacement that vibration generates, limit steel bar 401 and spacing collar 403 Mating connection fill part 402 is arranged, wherein limit steel bar 401 and the matching setting of spacing collar 402, in joint gap It is interior to form whole vertical implant infrastructure, by with connect the cooperation realization of fill part 402 it is horizontal and vertical on limit, vertically The structure that implant infrastructure and rail inferior portion basic 3 piecemeal activities connects, i.e., in limit steel bar 401 and spacing collar 403 one and Rail inferior portion basis 3 is fixedly connected, another is flexibly connected with rail inferior portion basis, without forming entirely fixed connection structure, So that guarantee is vertically upper movable, to preferably buffer while vertical implant infrastructure realizes horizontal and vertical limit The vibration that train operation generates.
The embodiment one of limit component 4, as shown in figure 4, spacing collar 403 is fixed in connection fill part 402, limit The height of position sleeve 403 and the height for connecting fill part 402 are concordant, between 403 bottom of spacing collar and rail inferior portion basis 3 It is not connected to, connection fill part 402 is later period pouring structure, places spacing collar in the gap before pouring between protrusion 403, and pour and to form the height connection fill part 402 concordant with spacing collar 403;Limit steel bar 401 is set to spacing collar In 403, and its bottom is fixed in rail inferior portion basis 3, to realize horizontal and vertical limit, bottom and rail inferior portion basis 3 Be fixedly connected mode have it is several, it is preferable that 401 bottom of limit steel bar and rail inferior portion basis 3 is threadedly coupled realization fixation.
Further, embodiment two, as shown in figure 5, limit steel bar 401 is that its head of T-type stop screw is set to limit sleeve The top of cylinder 403, and be not connected between its head and spacing collar 403 and connection fill part 402, therefore without limitation on connection Fill part 402 moves up and down, to buffer the vibration of train operation generation, while realizing horizontal and vertical limit.Implement Example three, as shown in fig. 6, limit steel bar 401 or inverted T shaped stop screw, bottom, which is set in rail inferior portion basis 3, realizes limit steel The fixation of muscle 401, the top of limit steel bar 401 with connect fill part and spacing collar 403 is not connected to be slidably connected.
The example IV of limit component 4 as shown in fig. 7, limit steel bar 401 is set in connection fill part 402, and limits The top of reinforcing bar 401 is fixedly connected with fill part 402 is connect, and the bottom of limit steel bar 401 and the interval of damping layer 6 are arranged, limit The bottom of position reinforcing bar 401 is higher than damping layer 6;Spacing collar 403 is fixed on rail inferior portion basis 3, spacing collar 403 with connect Fill part 402 is not fixed connection, is equipped with distance sleeve 404, limit sleeve between spacing collar 403 and connection fill part 402 Cylinder is slidably connected with distance sleeve 404, and the height of spacing collar 403 is lower than the height of connection fill part 401, limit steel bar 401 are placed in spacing collar 403, and the limit steel bar 401 and the matching of spacing collar 403 in connection fill part 402 are realized Transverse direction and vertical spacing, while being realized in connection fill part 402 by connection limit steel bar 401 and 6 interval height of damping layer Lower movement, to buffer the vibration of train operation generation.
The prefabricated sleeper plate-type ballastless track for vibration damping location of the utility model, assembly method are briefly introduced such as Under, include the following steps:
The prefabricated concrete slab sleeper 1 manufactured in factory is carried to construction site, the prefabricated concrete slab sleeper edge of predetermined quantity by S1 Initial adjustment positioning is carried out after route longitudinal arrangement;
S2 is linked together the prefabricated concrete slab sleeper 1 by multiple longitudinal connecting members 102, carries out accurate adjustment positioning;
Multiple limit steel bars, limit steel bar housing is arranged in S3 on the basis of the rail inferior portion of part or all of spacer region If placing spacing collar, it is provided in the spacer region of longitudinal connecting member and limit component at the same time, in the transverse ends of spacer region Cast in situs armored concrete respectively, package cover the longitudinal connecting member, the limit steel bar, the spacing collar;Solidification After form the connection fill part, four are integrally formed and realize limit simultaneously and connect;Part or all of, not set described The transverse ends of the spacer region of limit steel bar distinguish cast in situs filler, and package covers the longitudinal connecting member;By primary It is cast-in-place to be completed at the same time integration, laterally/longitudinal limit and allow vertical flexible deformation, thus several pieces of prefabricated rails Board for pillow are assembled to form the track element of predetermined length and form same force structure body;
Alternatively,
Multiple spacing collars are set on the basis of the rail inferior portion of part or all of spacer region, are placed in spacing collar Limit steel bar, spacing collar are arranged protection outside, are provided in the spacer region of longitudinal connecting member and limit component, are being spaced at the same time The transverse ends in area distinguish cast in situs armored concrete, and package covers the longitudinal connecting member, the limit steel bar, the limit Position sleeve;The connection fill part is formed after solidification, four are integrally formed realization while limiting and connecting;In part or entirely Portion, the not set spacing collar the transverse ends of spacer region distinguish cast in situs armored concrete, package covering is described vertical To connector;It is completed at the same time the vertical flexible deformation of integration, the limit of laterally/longitudinal direction and permission by once cast-in-place, from And several pieces of prefabricated concrete slab sleepers are assembled to form the track element of predetermined length and form same force structure body.
Assembled sleeper platy ballastless track structure in the utility model, the structure of non-fragment orbit is simple, assembly side Method is easy, by way of setting ballastless track structure to multiple concrete slab sleepers and mutually assembling, so that quick assembling obtains no tiny fragments of stone, coal, etc. Track structure is effectively applicable to the application environment of subway.Concrete slab sleeper in the utility model by pre-formed, then passes through The form of assembly completes the assembly of ballastless track structure, and assembling form is simple, and assembly efficiency is high, and non-fragment orbit knot can be substantially improved The assembly efficiency of structure shortens the period of assembly, and by being correspondingly arranged longitudinal connecting member on the both sides of the face of prefabricated concrete slab sleeper, So that can be correspondingly connected with by longitudinal connecting member between two concrete slab sleepers, the connection of concrete slab sleeper is effectively realized;By in two sleepers Plate position interconnected is correspondingly arranged limit component, is limited by it to the lengthwise position of concrete slab sleeper, rail has been effectively ensured The stability of road operation, it is ensured that the running precision of track, and limit component and longitudinal connecting member can be integrally formed, it can be simultaneously It realizes the limit and connection of concrete slab sleeper, substantially shortens the setting period of concrete slab sleeper, promote the setting efficiency of non-fragment orbit
Wherein, 401 bottom of limit steel bar is fixed in rail inferior portion basis, and the mode being connected through a screw thread is fixed or led to The mode poured is crossed to fix, limit steel bar 401 is sheathed in spacing collar 403, spacing collar 403 with connect fill part 402 It is fixedly connected.
Wherein, vertical separation, limit steel bar 401 and company are equipped between the bottom of limit steel bar 401 and rail inferior portion basis 3 The connection of fill part 402 is connect, spacing collar 403 is fixedly connected with rail inferior portion basis 3, limit steel bar 401 and spacing collar 403 It is slidably connected, so that limit steel bar 401 is moved up and down with connection fill part 402 with buffering vibration.
Preferably, connection fill part 402 is armored concrete, and connects fill part 402 and use cast in situs coagulation Earth process.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not For limiting the utility model, any modification made within the spirit and principle of the present invention, equivalent replacement and change Into etc., it should be included within the scope of protection of this utility model.

Claims (8)

1. being used for the assembled ballastless track structure in vibration damping location, it is characterised in that:
Including prefabricated concrete slab sleeper or precast track plate, in-situ layer, damping layer, rail inferior portion basis and connection fill part;
Several pieces of prefabricated concrete slab sleepers or precast track plate longitudinal gap are arranged, in each prefabricated concrete slab sleeper of spacer region Or the transverse ends of precast track plate pass through longitudinal connecting member assembly connection each other respectively;In part or all of spacer region, use Reinforced concrete structure is as connection fill part, so that connection fill part and prefabricated concrete slab sleeper or precast track plate are formed and filled With monolithic construction, prefabricated concrete slab sleeper or precast track plate form same stress long slab cellular construction body.
2. being used for the assembled ballastless track structure in vibration damping location as described in claim 1, which is characterized in that
The transverse ends of at least partly spacer region are respectively arranged with connection fill part, at least partly under the track of spacer region Portion, upper surface, basis is provided with limit steel bar outstanding;And it is provided with the spacer region of connection fill part and limit component simultaneously In, it is embedded with spacing collar in the connection fill part, the spacing collar is slidably sleeved on the limit steel bar Periphery, the longitudinal connecting member, the limit steel bar, the spacing collar are covered by the same connection fill part In, four are integrally formed realization while limiting and connecting, so that several pieces of prefabricated concrete slab sleepers or precast track plate assemble shape At predetermined length track element and form same force structure body;
Alternatively,
The transverse ends of at least partly spacer region are respectively arranged with connection fill part, at least partly under the track of spacer region Portion, upper surface, basis is provided with spacing collar outstanding;And it is provided with the spacer region of connection fill part and limit component simultaneously In, limit steel bar is embedded in the connection fill part, the outside wall surface of the spacing collar and the connection fill part are not Contact, the limit steel bar are slidably disposed in the spacing collar, the longitudinal connecting member, the limit steel bar, institute Spacing collar is stated to be covered by the same connection fill part, four are integrally formed realization while limiting and connecting, To which several pieces of prefabricated concrete slab sleepers or precast track plate are assembled to form the track element of predetermined length and form same stress Structural body.
3. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 2, which is characterized in that the prefabricated rail It include multipair fastener track in board for pillow or precast track plate.
4. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 3, which is characterized in that the prefabricated rail Board for pillow or the setting of precast track plate longitudinal direction both ends are jagged, and cover board is arranged on the notch, forms smooth fire escape.
5. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 4, which is characterized in that under the track Portion basis is configured with gutter along its longitudinal direction.
6. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 4, which is characterized in that the prefabricated rail Board for pillow or the both lateral sides of precast track plate are configured with gutter.
7. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 2, which is characterized in that the long slab list The first position limiting structure is arranged in first two sides.
8. being used for the assembled ballastless track structure in vibration damping location as claimed in claim 2, which is characterized in that multiple adjacent Plate stitch is set between the track element, third position limiting structure is set in the part or all of plate stitch.
CN201821342167.6U 2018-08-20 2018-08-20 Assembled ballastless track structure for vibration damping location Active CN209024893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821342167.6U CN209024893U (en) 2018-08-20 2018-08-20 Assembled ballastless track structure for vibration damping location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821342167.6U CN209024893U (en) 2018-08-20 2018-08-20 Assembled ballastless track structure for vibration damping location

Publications (1)

Publication Number Publication Date
CN209024893U true CN209024893U (en) 2019-06-25

Family

ID=66873405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821342167.6U Active CN209024893U (en) 2018-08-20 2018-08-20 Assembled ballastless track structure for vibration damping location

Country Status (1)

Country Link
CN (1) CN209024893U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914715A (en) * 2018-08-20 2018-11-30 中铁第四勘察设计院集团有限公司 Assembled ballastless track structure and assembly method for vibration damping location
WO2021051706A1 (en) * 2019-09-19 2021-03-25 中铁第四勘察设计院集团有限公司 Vibration reduction section prefabricated ballastless track structure having longitudinal connecting structure, and assembly method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914715A (en) * 2018-08-20 2018-11-30 中铁第四勘察设计院集团有限公司 Assembled ballastless track structure and assembly method for vibration damping location
WO2021051706A1 (en) * 2019-09-19 2021-03-25 中铁第四勘察设计院集团有限公司 Vibration reduction section prefabricated ballastless track structure having longitudinal connecting structure, and assembly method

Similar Documents

Publication Publication Date Title
CN208995840U (en) A kind of assembled sleeper is board-like or track platy ballastless track structure
CN108914715A (en) Assembled ballastless track structure and assembly method for vibration damping location
CN108914714A (en) A kind of assembled sleeper is board-like or track platy ballastless track structure and assembly method
RU2377361C2 (en) Hard railway bed for railed vehicles
CN108914716A (en) A kind of prefabricated concrete slab sleeper or the wet of track plate-type ballastless track connect formula assembly method
CN110761119A (en) Cold-pressed longitudinal-connection-containing assembly type ballastless track structure of vibration reduction section and assembly method
CN107740339B (en) Rigidity-enhanced bridge head structure for managing bridge head jumping of operation road and construction method
CN108914713A (en) The wet of non-fragment orbit for vibration damping location connects formula assembly method
CN105887586A (en) Low implantation line double-wire section terminal spine type bearing rail beam limiting structure in medium and low speed magnetic levitation transportation engineering
CN209024893U (en) Assembled ballastless track structure for vibration damping location
CN105525541A (en) Novel prefabricated plate type damping track structure for rail traffic
CN110172869A (en) The construction method of assembled ballastless track system and assembled ballastless track system
Bastin Development of German non-ballasted track forms
CN106400613A (en) Ballastless track
KR101266111B1 (en) Sleeper having elastic member shear fixing apparatus for asphalt roadbed, and constructing method for the same
CN211340219U (en) Assembled ballastless track structure containing cold pressing longitudinal connection of vibration reduction section
CN105821764B (en) Non-fragment orbit rigidity adjuster
CN110761121A (en) Assembly type ballastless track structure and longitudinal connecting structure thereof
CN110761123A (en) Assembly type ballastless track structure containing longitudinal connecting structure of vibration reduction section and assembly method
EA006338B1 (en) Fixed track for rail vehicles and method for production thereof
RU2373317C2 (en) Prestressed reinforced concrete slab for railway roads
JP2604476B2 (en) How to build a slab track
CN206385393U (en) Non-fragment orbit
KR101270942B1 (en) Sleeper having shear fixing apparatus for asphalt roadbed, and constructing method for the same
DK2351884T3 (en) Module support for a pre-fabricated railway track, railway track, profile and method for mounting railway tracks

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant