CN209023635U - A kind of civil engineering System for Large-scale Specimen transportation system - Google Patents
A kind of civil engineering System for Large-scale Specimen transportation system Download PDFInfo
- Publication number
- CN209023635U CN209023635U CN201821421806.8U CN201821421806U CN209023635U CN 209023635 U CN209023635 U CN 209023635U CN 201821421806 U CN201821421806 U CN 201821421806U CN 209023635 U CN209023635 U CN 209023635U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- vehicle body
- roller group
- civil engineering
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 62
- 239000010959 steel Substances 0.000 claims description 62
- 238000012360 testing method Methods 0.000 claims description 28
- 229910000754 Wrought iron Inorganic materials 0.000 claims description 10
- 230000003319 supportive effect Effects 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000011173 large scale experimental method Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Abstract
The utility model discloses a kind of civil engineering System for Large-scale Specimen transportation systems, belong to System for Large-scale Specimen technical field of transportation in laboratory, including conveying track and it is mounted on the conveying track and plummer can be moved along what the conveying track length direction moved, the mobile plummer includes bearing vehicle body, driving motor, retarder, drive shaft, driving roller group and driven roller group, the bearing vehicle body is mounted on the conveying track, and the driving motor, retarder and drive shaft are fixedly mounted on the bearing vehicle body;The driving roller group and driven roller group are mounted on bearing vehicle body two sides lower surface, and its bottom is contacted with the conveying track.The beneficial effects of the utility model are: mobile plummer is arranged, is cooperated in mobile plummer bottom setting roller group with conveying track, driven by driving motor, realize the high-precision automatic transport of System for Large-scale Specimen.
Description
Technical field
The utility model relates to System for Large-scale Specimen technical field of transportation in laboratory more particularly to a kind of civil engineering large size to try
The mobile transportation system of part.
Background technique
In recent years, with the progress of civil engineering experimental technique, civil engineering test very little, large scale mould towards development full size
The direction of type test is developed, and thus brings sample dimensions and quality is excessive, it is difficult to be transported to testing equipment and carry out asking for test
Topic.
Notification number is that the utility model patent of CN206447102U discloses a kind of transport device of large-scale experiment test specimen, is wrapped
Large-scale experiment test specimen, steel plate, idler wheel, ellipse bolt, bolt hole, rope are included, by forming large-scale experiment on the steel plate first
Test specimen drills through bolt hole in steel plate side, ellipse bolt is rotated in bolt hole, and rope is then passed through ellipse spiral shell
The steel plate being placed on idler wheel is drawn to experimental site, and then carries out the laboratory experiment under the conditions of triaxiality by bolt.It is used
Steel plate is towed to experimental site by idler wheel by manpower, and there are large labor intensity, accuracy is low, steel plate is easy during towing
The problems such as colliding.
Utility model content
For overcome that civil engineering test sample dimensions are excessive in the prior art and quality it is overweight caused by be difficult to be transported to examination
Test equipment, and existing transportation system is there are large labor intensity, accuracy is low, steel plate is easy to happen collision etc. during towing
Problem, the utility model provide a kind of civil engineering System for Large-scale Specimen transportation system, including conveying track and are mounted on the fortune
On defeated track and what can be moved along the conveying track length direction moves plummer, and the mobile plummer includes carrying vehicle
Body, driving motor, retarder, drive shaft, driving roller group and driven roller group, the bearing vehicle body are mounted on the transport rail
On road, the driving motor, retarder and drive shaft are fixedly mounted on the bearing vehicle body;The driving roller group and driven
Roller group is mounted on bearing vehicle body two sides lower surface, and its bottom is contacted with the conveying track.
Mobile plummer is set, is cooperated in mobile plummer bottom setting roller group with conveying track, passes through driving
Motor drives, and realizes the high-precision automatic transport of System for Large-scale Specimen.
Further, the retarder input terminal is fixedly mounted in the driving motor rotary shaft, and the drive shaft is fixed
It is mounted on the retarder output end, the driving roller group is fixedly mounted on the drive shaft both ends.
Further, the bearing vehicle body includes test specimen supporting region and the equipment being arranged on front side of test specimen supporting region installation
Area, the driving motor, the retarder, the drive shaft and the driving roller group are mounted on the equipment installing zone, institute
It states driven roller group and is mounted on the test specimen supporting region.
Further, the bearing vehicle body main body is the closing steel box structure being welded by several steel plates, is equipped with and is used in case
To the support rod iron that test specimen plays a supportive role, the closing steel box structure upper surface is evenly distributed with the screw thread for fixing test specimen
Hole;The closing steel box structure includes that upper steel plate, lower steel plate and the side for connecting the upper steel plate, the lower steel plate surrounding connect
Fishplate bar steel plate, the threaded hole are evenly distributed on the upper steel plate;The support rod iron upper and lower side is respectively and fixedly installed to institute
It states on upper steel plate and the lower steel plate, and is in concentric position with the threaded hole.
Cooperated using support rod iron and threaded hole, can not only realize the support to System for Large-scale Specimen, prevent bearing vehicle body from deforming,
But also System for Large-scale Specimen can be fixed by threaded hole, effectively prevent System for Large-scale Specimen during transportation with other component
It collides.
Further, the closing steel box structure is test specimen supporting region, and the lower steel plate width direction is beyond closing steel case knot
It is configured to vehicle body lower edge, exceeds the closing steel box structure on front side of the lower steel plate length direction and forms the equipment installing zone.
The shape of lower steel plate is designed to form vehicle body lower edge, for preventing mobile plummer from tumbling, plummer is improved and exists
Stability in transportational process.
Further, front and back is evenly distributed with five groups of roller groups on the bearing vehicle body, including actively rolling described in one group
Driven roller group described in wheel group and four groups.
Further, the conveying track includes guide rail, guide rail backing plate and steady brace, and the guide rail backing plate passes through described solid
Determine pull rod to be fixedly mounted on the ground, the guide rail backing plate length direction is equipped with guide-track groove, and the guide rail bottom surface is equipped with chamfering
Ramp blocks, the chamfering ramp blocks are welded on inside the guide-track groove.
Further, the guide rail backing plate includes long side guide rail backing plate and short side guide rail backing plate, the long side guide rail backing plate and
Junction forms guide-track groove to the short side guide rail backing plate along its length, and the guide-track groove is the chamfering inclined-plane that tilt angle is 7 °
Slot, the tilt angle of the chamfering ramp blocks are 7 °.Guide rail backing plate is set between guide rail and ground, increases conveying track and ground
The contact area in face, and realize by chamfering ramp blocks and the inclined design of guide-track groove the fixation to guide rail, improve guide rail
Stability during transportation.
Further, the guide rail top surface and lateral surface are equipped with square groove, install on the guide rail lateral surface square groove
There is anti-tipping block.
Further, the anti-tipping block is in U-shape, and described anti-tipping block U-shaped one end is fixedly mounted on outside the guide rail
In the square groove of side, with bearing vehicle body lower edge end conjunction on the inside of the U-shaped other end.U-shaped anti-tipping block is installed on guide rail, makes it
With bearing vehicle body lower edge end closing, plays the role of stable bearing vehicle body, prevent bearing vehicle body from tumbling.
Compared with prior art, the utility model has the beneficial effects that
(1) mobile plummer is set, is cooperated in mobile plummer bottom setting roller group with conveying track, passes through drive
Dynamic motor drives, and realizes the high-precision automatic transport of System for Large-scale Specimen;
(2) cooperated using support rod iron and threaded hole, can not only realize the support to System for Large-scale Specimen, prevent bearing vehicle body from becoming
Shape, but also System for Large-scale Specimen can be fixed by threaded hole, effectively prevent System for Large-scale Specimen during transportation with other
Component collides;
(3) shape of lower steel plate is designed to form vehicle body lower edge, for preventing mobile plummer from tumbling, improves plummer
Stability during transportation.
Detailed description of the invention
Fig. 1 is the utility model preferably System for Large-scale Specimen transportation system perspective view;
Fig. 2 is the utility model preferably System for Large-scale Specimen transportation system main view;
Fig. 3 is that the utility model preferably supports rod iron and thread pore structure figure;
Fig. 4 is that preferably System for Large-scale Specimen transportation system delivers perspective view in kind to the utility model.
Specific embodiment
With reference to embodiments and attached drawing, the present invention will be further described in detail.It should be appreciated that this place is retouched
The specific embodiment stated only to explain the utility model, is not used to limit the utility model.
As illustrated in fig. 1 and 2, civil engineering System for Large-scale Specimen transportation system includes conveying track 1 and is mounted on the transport rail
On road 1 and what can be moved along 1 length direction of conveying track moves plummer 2, and the mobile plummer 2 includes bearing vehicle body
21, driving motor 22, retarder 23, drive shaft 24, driving roller group 25 and driven roller group 26, the bearing vehicle body 21 are installed
On the conveying track 1, the driving motor 22, retarder 23 and drive shaft 24 are fixedly mounted on the bearing vehicle body 21
On;The driving roller group 25 and driven roller group 26 are mounted on the 21 two sides lower surface of bearing vehicle body, and its bottom and institute
State the contact of conveying track 1.Mobile plummer is set, is cooperated in mobile plummer bottom setting roller group with conveying track,
It is driven by driving motor, realizes the high-precision automatic transport of System for Large-scale Specimen.
23 input terminal of retarder is fixedly mounted in 22 rotary shaft of driving motor, and the drive shaft 24 is fixedly mounted on
On 23 output end of retarder, the driving roller group 25 is fixedly mounted on 24 both ends of drive shaft.
Bearing vehicle body 21 includes test specimen supporting region 27 and the equipment installing zone 28 being arranged on front side of the test specimen supporting region 27,
The driving motor 22, the retarder 23, the drive shaft 24 and the driving roller group 25 are mounted on the equipment installation
Area 28, the driven roller group 26 are mounted on the test specimen supporting region 27.
21 main body of bearing vehicle body is the closing steel box structure being welded by several steel plates, be equipped with referring to Fig. 3, in case for pair
The support rod iron 211 that test specimen plays a supportive role, the closing steel box structure upper surface are evenly distributed with the spiral shell for fixing test specimen
Pit 212;The closing steel box structure include upper steel plate 213, lower steel plate 214 and for connect the upper steel plate 213, it is described under
The side connecting plate steel plate 215 of 214 surrounding of steel plate, the threaded hole 212 are evenly distributed on the upper steel plate 213;The support
211 upper and lower side of rod iron is respectively and fixedly installed on the upper steel plate 213 and the lower steel plate 214, and at the threaded hole 212
In concentric position.Cooperated using support rod iron and threaded hole, can not only realize to the support of System for Large-scale Specimen 3, prevent carrying vehicle
Body deformation, but also can be fixed System for Large-scale Specimen 3 by threaded hole, effectively prevent System for Large-scale Specimen during transportation with
Other component collides.Wherein, screw thread bore dia is 90mm, two-way interval 250mm, depth 150mm, specification M48.
Closing steel box structure is test specimen supporting region 27, and 214 width direction of lower steel plate is formed beyond closing steel box structure
Vehicle body lower edge 215,214 length direction of the lower steel plate front side form the equipment installing zone beyond the closing steel box structure
28。
The shape of lower steel plate is designed to form vehicle body lower edge, for preventing mobile plummer from tumbling, plummer is improved and exists
Stability in transportational process.
Front and back is evenly distributed with five groups of roller groups on bearing vehicle body 21, including driving roller group 25 and four described in one group
The group driven roller group 26.
Referring to fig. 2, conveying track 1 includes guide rail 11, guide rail backing plate 12 and steady brace 13, and the guide rail backing plate 12 passes through
The steady brace 13 is fixedly mounted on the ground, and 12 length direction of guide rail backing plate is equipped with guide-track groove 14, the guide rail
11 bottom surfaces are equipped with chamfering ramp blocks 15, and the chamfering ramp blocks 15 are welded on inside the guide-track groove 14.Guide rail backing plate 12 includes
Long side guide rail backing plate 121 and short side guide rail backing plate 122, the long side guide rail backing plate 121 and the short side guide rail backing plate 122 are along length
It spends direction junction and forms guide-track groove 14, the guide-track groove 14 is the chamfering surface groove that tilt angle is 7 °, the chamfering inclined-plane
The tilt angle of block 15 is 7 °.Guide rail backing plate is set between guide rail and ground, increases the contact area of conveying track and ground,
And realize fixation to guide rail by chamfering ramp blocks and the inclined design of guide-track groove, improve guide rail during transportation
Stability.
11 top surface of guide rail and lateral surface are equipped with square groove, are equipped on the 1 lateral surface square groove of guide rail anti-tipping
Block 16.
Anti-tipping block 16 is in U-shape, and described anti-tipping block 16U shape one end is fixedly mounted on 11 outboard square-like of guide rail
In slot, with 21 lower edge end of bearing vehicle body conjunction on the inside of the U-shaped other end.U-shaped anti-tipping block is installed on guide rail, makes it and holds
Play the role of stable bearing vehicle body closing, prevent bearing vehicle body from tumbling in carrier vehicle body lower edge end.
Referring to fig. 4, System for Large-scale Specimen 3 is mounted on the mobile plummer 2, is fixedly installed in 27 position of test specimen supporting region
Place, connect with the threaded hole 212 on upper steel plate 213.
The preferred embodiment of the utility model has shown and described in above description, as previously described, it should be understood that this is practical new
Type is not limited to forms disclosed herein, and should not be regarded as an exclusion of other examples, and can be used for various other groups
Conjunction, modification and environment, and above-mentioned introduction or the technology of related fields can be passed through within the scope of the inventive concept described herein
Or knowledge is modified.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of the utility model, then
It all should be in the protection scope of the appended claims for the utility model.
Claims (10)
1. a kind of civil engineering System for Large-scale Specimen transportation system, which is characterized in that including conveying track and be mounted on the transport rail
On road and what can be moved along the conveying track length direction moves plummer, and the mobile plummer includes bearing vehicle body, drives
Dynamic motor, retarder, drive shaft, driving roller group and driven roller group, the bearing vehicle body are mounted on the conveying track,
The driving motor, retarder and drive shaft are fixedly mounted on the bearing vehicle body;The driving roller group and driven roller
Group is mounted on bearing vehicle body two sides lower surface, and its bottom is contacted with the conveying track.
2. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 1, which is characterized in that the retarder is defeated
Enter end to be fixedly mounted in the driving motor rotary shaft, the drive shaft is fixedly mounted on the retarder output end, institute
It states driving roller group and is fixedly mounted on the drive shaft both ends.
3. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 2, which is characterized in that the bearing vehicle body
Including test specimen supporting region and the equipment installing zone that is arranged on front side of the test specimen supporting region, the driving motor, the retarder,
The drive shaft and the driving roller group are mounted on the equipment installing zone, and the driven roller group is mounted on the test specimen and holds
Carry area.
4. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 3, which is characterized in that the bearing vehicle body
Main body is the closing steel box structure being welded by several steel plates, and the support rod iron for playing a supportive role to test specimen is equipped in case,
The closing steel box structure upper surface is evenly distributed with the threaded hole for fixing test specimen;The closing steel box structure includes upper steel
Plate, lower steel plate and the side connecting plate steel plate for connecting the upper steel plate, the lower steel plate surrounding, the threaded hole are uniformly distributed
On the upper steel plate;The support rod iron upper and lower side is respectively and fixedly installed on the upper steel plate and the lower steel plate, and with
The threaded hole is in concentric position.
5. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 4, which is characterized in that the closing steel case
Structure is test specimen supporting region, and the lower steel plate width direction forms vehicle body lower edge beyond closing steel box structure, and the lower steel plate is long
The equipment installing zone is formed beyond the closing steel box structure on front side of degree direction.
6. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 5, which is characterized in that the bearing vehicle body
Upper front and back is evenly distributed with five groups of roller groups, including driven roller group described in driving roller group described in one group and four groups.
7. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 6, which is characterized in that the conveying track
Including guide rail, guide rail backing plate and steady brace, the guide rail backing plate is fixedly mounted on the ground by the steady brace, described
Guide rail backing plate length direction is equipped with guide-track groove, and the guide rail bottom surface is equipped with chamfering ramp blocks, and the chamfering ramp blocks are welded on
Inside the guide-track groove.
8. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 7, which is characterized in that the guide rail backing plate
Including long side guide rail backing plate and short side guide rail backing plate, the long side guide rail backing plate and the short side guide rail backing plate connect along its length
The place of connecing forms guide-track groove, and the guide-track groove is the chamfering surface groove that tilt angle is 7 °, the tilt angle of the chamfering ramp blocks
It is 7 °.
9. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 8, which is characterized in that the guide rail top surface
It is equipped with square groove with lateral surface, anti-tipping block is installed on the guide rail lateral surface square groove.
10. a kind of civil engineering System for Large-scale Specimen transportation system according to claim 9, which is characterized in that described anti-tipping
Block is in U-shape, and described anti-tipping block U-shaped one end is fixedly mounted in the guide rail outboard square-like slot, on the inside of the U-shaped other end with
Bearing vehicle body lower edge end is conjunction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821421806.8U CN209023635U (en) | 2018-08-31 | 2018-08-31 | A kind of civil engineering System for Large-scale Specimen transportation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821421806.8U CN209023635U (en) | 2018-08-31 | 2018-08-31 | A kind of civil engineering System for Large-scale Specimen transportation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209023635U true CN209023635U (en) | 2019-06-25 |
Family
ID=66876768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821421806.8U Withdrawn - After Issue CN209023635U (en) | 2018-08-31 | 2018-08-31 | A kind of civil engineering System for Large-scale Specimen transportation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209023635U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109018899A (en) * | 2018-08-31 | 2018-12-18 | 中国建筑股份有限公司 | A kind of civil engineering System for Large-scale Specimen transportation system |
-
2018
- 2018-08-31 CN CN201821421806.8U patent/CN209023635U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109018899A (en) * | 2018-08-31 | 2018-12-18 | 中国建筑股份有限公司 | A kind of civil engineering System for Large-scale Specimen transportation system |
CN109018899B (en) * | 2018-08-31 | 2024-01-12 | 中国建筑股份有限公司 | Large test piece transportation system for civil engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108195664B (en) | Multifunctional mechanical property testing device for shield tunnel segment joints | |
CN209023635U (en) | A kind of civil engineering System for Large-scale Specimen transportation system | |
CN208843123U (en) | A kind of spliced delivery track | |
CN110274779A (en) | A kind of Dynamical Analyses of New Gauge-Changeable bogie becomes rail function and reliability test bench | |
CN109018899A (en) | A kind of civil engineering System for Large-scale Specimen transportation system | |
CN102950156A (en) | Mounting method of horizontal loop | |
CN209587342U (en) | A kind of architectural engineering hydraulic push bench | |
CN108645581A (en) | A kind of dynamic stiffness test experiments equipment | |
CN101892679B (en) | Test device for simulating washing and bearing coupled characteristic of underwater pile foundation | |
CN209830515U (en) | Auxiliary supporting device for steel pipe threading | |
CN204739326U (en) | Steel truss or piping lane gallows poling auxiliary device | |
CN108760356A (en) | A kind of experimental rig for testing gauge-changeable bogie carrying boots reliability | |
CN207174411U (en) | Detect bogey | |
CN206174967U (en) | Construction trolley car of bow member among tunnel and underground works | |
CN105058334A (en) | Jack support capable of sliding horizontally and earthquake resistance static test system | |
CN212830560U (en) | Floating positioning device for roller | |
CN209241145U (en) | Pipeline conveying device | |
JP2005335478A (en) | System and method for conveying and installing concrete secondary product | |
JP3051332B2 (en) | Model test method and apparatus for railway vehicle | |
CN202703378U (en) | Maintenance carrier vehicle of water feeding pump motor | |
CN207439824U (en) | A kind of concrete anti-collision guard bar load test frame and experimental rig | |
CN202175048U (en) | Adjustable suspension device | |
CN213084510U (en) | Rail transportation stop device for flatcar | |
CN219992071U (en) | Ground rail bolt fixed mounting system | |
CN216269233U (en) | Pipe cleaner transporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190625 Effective date of abandoning: 20240112 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190625 Effective date of abandoning: 20240112 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |