CN209021195U - The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture - Google Patents
The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture Download PDFInfo
- Publication number
- CN209021195U CN209021195U CN201821625228.XU CN201821625228U CN209021195U CN 209021195 U CN209021195 U CN 209021195U CN 201821625228 U CN201821625228 U CN 201821625228U CN 209021195 U CN209021195 U CN 209021195U
- Authority
- CN
- China
- Prior art keywords
- transition
- screw
- mold
- point
- stepped hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Continuous Casting (AREA)
Abstract
The interstitial structure for running aluminium is broken the utility model discloses a kind of type core that anti-band point is cold, including mold and point fortune hydrophone, point fortune hydrophone includes transition screw successively nested from outside to inside, point fortune water pipe and water-supply-pipe, minimum clearance size between transition screw and mold is less than 0.5mm, and the minimum clearance size between transition screw and point fortune water pipe is less than 0.5mm.Gap structure can make to form closed cavity between mold and point fortune hydrophone around here, after the liquid tension of reasonable analysis molten aluminum, it was found that the maximal clearance of transition screw and mold is less than 0.5mm, and transition screw and point transport the minimum clearance of water pipe less than 0.5mm, when cold head is broken, molten aluminum is difficult to overflow, such anti-race aluminium.In addition, this gap can rationally design tolerance fit when processing, then self-assembling formation, also extremely convenient for the angle of processing.This utility model is used for die casting field.
Description
Technical field
The utility model relates to die casting fields, and the gap for running aluminium is broken more particularly to a kind of type core that anti-band point is cold
Structure.
Background technique
Die casting needs to inject molten aluminum into type chamber.Since structure is complicated for mould inside, while molten aluminum is in type chamber
Flowing time is different, causes the different location in type chamber that may have different cooling velocities;This when is in order to ensure type chamber
Whole cooling velocity is uniform, needs to do specially treated for certain positions.Cooling is given directions in the specially treated, in the interior table of mold
Cold head is arranged in face, this time point cold head is fixedly mounted and a part as type core, and the extraneous inside toward point cold head is passed through
Recirculated water, the temperature for putting cold head is lower, this when of point cold head realizes the effect for reducing cavity temperature nearby.
In actual use, due to the impact by molten aluminum, the side wall for putting cold head is possible to crack, or even occurs disconnected
It splits.This when, molten aluminum may gush from the inside of cold head to the external world, be commonly called as running aluminium.Occur after running aluminium, high temperature molten aluminum is splashed
It is breakneck on to other equipment or personnel.So needing to solve this technical problem.
Utility model content
The interstitial structure for running aluminium is broken the purpose of this utility model is to provide a kind of type core that anti-band point is cold.
Technical solution adopted in the utility model is:
The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture, including mold and the Dian Yunshui being mounted on mold
Device, point fortune hydrophone include transition screw successively nested from outside to inside, point fortune water pipe and water-supply-pipe, and point fortune hydrophone further includes installation
In the point cold head of die inside, putting has the first stepped hole inside cold head, and the opening of the first stepped hole is towards on the outside of mold, this
One stepped hole is gradually reduced from outside to inside, and the outer wall for putting cold head is threadedly coupled with mold, the larger diameter end and mistake of the first stepped hole
The head threads connection of screw is crossed, the smaller diameter end of the first stepped hole encases a head for fortune hydrophone, and water-supply-pipe is located at the first rank
In terraced hole, the minimum clearance size between transition screw and mold is less than 0.5mm, the minimum between transition screw and point fortune water pipe
Gap size is less than 0.5mm.
As an improvement of the above scheme, the partial sidewall of transition screw swells to form multi-diameter shaft, the multi-diameter shaft and mold it
Between gap size be less than 0.5mm.
As an improvement of the above scheme, the inner wall of transition screw shrinks to form the second stepped hole, and the second stepped hole and point are transported
Gap size between water pipe is less than 0.5mm.
As an improvement of the above scheme, the axial direction along transition screw is seen, it is long that the length of multi-diameter shaft is greater than transition screw
The half of degree, the multi-diameter shaft extend from the nut of transition screw.
As an improvement of the above scheme, the axial direction along transition screw is seen, the length of multi-diameter shaft is long between transition screw
The half and a quarter of degree, the multi-diameter shaft are located among the shaft of transition screw.
As an improvement of the above scheme, the axial direction along transition screw is seen, the length of the second stepped hole is greater than transition spiral shell
The half of length is followed closely, which extends from the head of transition screw.
As an improvement of the above scheme, the axial direction along transition screw is seen, the length of the second stepped hole is between transition spiral shell
The half and a quarter of length are followed closely, the second ladder hole location is among the shaft of transition screw.
The utility model has the beneficial effects that gap structure can make to form closed sky between mold and point fortune hydrophone around here
Chamber finds that the maximal clearance of transition screw and mold is less than 0.5mm and mistake after the liquid tension of reasonable analysis molten aluminum
The minimum clearance for crossing screw and point fortune water pipe is less than 0.5mm, and when cold head is broken, molten aluminum is difficult to overflow, such anti-race aluminium.This
Outside, this gap can rationally design tolerance fit when processing, then self-assembling formation, for the angle of processing,
It is extremely convenient.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is the overall schematic of interstitial structure;
Fig. 2 is the magnified partial view on the interstitial structure left side;
Fig. 3 is the magnified partial view among interstitial structure;
Fig. 4 is the magnified partial view on the right of interstitial structure.
Specific embodiment
Referring to figs. 1 to Fig. 4, the utility model is the interstitial structure that aluminium is run in a kind of fracture of type core that anti-band point is cold, including mould
Tool 8 and the point being mounted on mold 8 fortune hydrophone, point fortune hydrophone include transition screw 3 successively nested from outside to inside, point fortune water pipe
4 and water-supply-pipe 5, point fortune hydrophone further includes the point cold head 6 for being mounted on 8 inside of mold, and putting has the first stepped hole 1 inside cold head 6,
The opening of first stepped hole 1 is gradually reduced from outside to inside towards the outside of mold 8, first stepped hole 1, put the outer wall of cold head 6 with
Mold 8 is threadedly coupled, and the larger diameter end of the first stepped hole 1 connect with the head threads of transition screw 3, the first stepped hole 1 it is small
Diameter end encases a head for fortune hydrophone, and water-supply-pipe 5 is located in the first stepped hole 1, the minimum between transition screw 3 and mold 8
Gap size is less than 0.5mm, and the minimum clearance size between transition screw 3 and point fortune water pipe 4 is less than 0.5mm.
Left side in Fig. 1 indicates on the outside of mold that the right side intracavitary side of expression type of courses, and the intracavitary side of type is compared to closed
Cavity.Gap structure can make to form closed cavity between mold 8 and point fortune hydrophone around here, in the liquid of reasonable analysis molten aluminum
After power, the maximal clearance of discovery transition screw 3 and mold 8 is less than the minimum of 0.5mm and transition screw 3 and point fortune water pipe 4
Gap is less than 0.5mm, and when cold head 6 is broken, molten aluminum is difficult to overflow, such anti-race aluminium.In addition, this gap processing when
Time can rationally design tolerance fit, and then self-assembling formation, also extremely convenient for the angle of processing.
Specifically, the partial sidewall of transition screw 3 swells to form multi-diameter shaft 7, the gap between the multi-diameter shaft 7 and mold 8
Size is less than 0.5mm.When forming gap, there are mainly two types of embodiments, first is that the axial direction along transition screw 3 is seen, ladder
The length of axis 7 is greater than the half of 3 length of transition screw, which extends from the nut of transition screw 3;Second is that edge
The axial direction of transition screw 3 sees, half and a quarter of the length of multi-diameter shaft 7 between 3 length of transition screw, the rank
Terraced axis 7 is located among the shaft of transition screw 3, and multi-diameter shaft 7 at this moment is more like the Duan Yuanhuan being on shaft.
Meanwhile the inner wall of transition screw 3 shrinks to form the second stepped hole 2, between the second stepped hole 2 and point fortune water pipe 4
Gap size is less than 0.5mm.There are mainly two types of embodiments, first is that, the axial direction along transition screw 3 is seen, the second stepped hole 2
Length is greater than the half of 3 length of transition screw, which extends from the head of transition screw 3;Second is that edge
The axial direction of transition screw 3 sees, the length of the second stepped hole 2 between 3 length of transition screw half and a quarter,
Second stepped hole 2 is located among the shaft of transition screw 3, and the second stepped hole 2 is more like one end annulus for being in shaft at this time.
Certainly, the design creation is not limited to above embodiment, and the combination of the various embodiments described above different characteristic can also
To reach good effect.Those skilled in the art can also make without departing from the spirit of the present invention
It is all included in the scope defined by the claims of the present application with deformation or replacement, these equivalent variation or replacement.
Claims (7)
1. the interstitial structure that aluminium is run in a kind of type core that anti-band point is cold fracture, it is characterised in that: including mold (8) and be mounted on mold
(8) point on transports hydrophone, and the point fortune hydrophone includes that successively the transition screw (3) of nesting, point fortune are water pipe (4) and defeated from outside to inside
Water pipe (5), the point fortune hydrophone further includes the point cold head (6) being mounted on the inside of mold (8), is had inside described cold head (6)
First stepped hole (1), the opening of the first stepped hole (1) is towards on the outside of mold (8), and first stepped hole (1) is from outside to inside gradually
It reduces, the outer wall of described cold head (6) is threadedly coupled with mold (8), the larger diameter end and transition spiral shell of first stepped hole (1)
The head threads connection of (3) is followed closely, the smaller diameter end of first stepped hole (1) encases a head for fortune hydrophone, the water-supply-pipe
(5) it is located in the first stepped hole (1), the minimum clearance size between the transition screw (3) and mold (8) is less than 0.5mm, institute
The minimum clearance size stated between transition screw (3) and point fortune water pipe (4) is less than 0.5mm.
2. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 1, it is characterised in that: the transition
The partial sidewall of screw (3) swells to form multi-diameter shaft (7), and the gap size between the multi-diameter shaft (7) and mold (8) is less than
0.5mm。
3. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 2, it is characterised in that: the transition
The inner wall of screw (3) shrinks to be formed the second stepped hole (2), and the gap size between the second stepped hole (2) and point fortune water pipe (4) is small
In 0.5mm.
4. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 3, it is characterised in that: along transition spiral shell
The axial direction of nail (3) sees, the length of multi-diameter shaft (7) is greater than the half of transition screw (3) length, the multi-diameter shaft (7) from
Extend at the nut of transition screw (3).
5. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 3, it is characterised in that: along transition spiral shell
Nail (3) axial direction see, half and a quarter of the length of multi-diameter shaft (7) between transition screw (3) length, the rank
Terraced axis (7) is located among the shaft of transition screw (3).
6. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 4 or 5, it is characterised in that: along mistake
The axial direction for crossing screw (3) sees that the length of the second stepped hole (2) is greater than the half of transition screw (3) length, this second
Stepped hole (2) extends from the head of transition screw (3).
7. the interstitial structure that aluminium is run in the cold type core fracture of anti-band point according to claim 4 or 5, it is characterised in that: along mistake
The axial direction for crossing screw (3) sees that the length of the second stepped hole (2) is between the half of transition screw (3) length and four points
One of, which is located among the shaft of transition screw (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821625228.XU CN209021195U (en) | 2018-09-30 | 2018-09-30 | The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821625228.XU CN209021195U (en) | 2018-09-30 | 2018-09-30 | The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209021195U true CN209021195U (en) | 2019-06-25 |
Family
ID=66905580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821625228.XU Active CN209021195U (en) | 2018-09-30 | 2018-09-30 | The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209021195U (en) |
-
2018
- 2018-09-30 CN CN201821625228.XU patent/CN209021195U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209021195U (en) | The interstitial structure of aluminium is run in a kind of type core that anti-band point is cold fracture | |
CN202087758U (en) | Material gathering mold | |
CN209021169U (en) | The compressing structure of aluminium is run in a kind of type core that anti-band point is cold fracture | |
CN209021197U (en) | The mounting structure of aluminium is run in a kind of type core that anti-band point is cold fracture | |
CN204842962U (en) | Side trompil immersion nozzle inside lining | |
CN206065359U (en) | A kind of aluminium bar cooler crystallizer for up casting machine | |
CN207386541U (en) | A kind of high temperature pinion steering mechanism for the casting of industrial robot molten aluminum | |
CN103611992B (en) | A kind of electric spark machine machine | |
CN109128077B (en) | Installation structure for preventing core with spot cooling from breaking and running aluminum | |
CN203556820U (en) | Crystallization device with polygonal curved inner wall used for continuous casting of tube blank | |
CN203859621U (en) | Liquid-cooled enclosure | |
CN208644028U (en) | A kind of air-cooled chilling roller | |
CN208714280U (en) | A kind of pillar for mold | |
CN208894874U (en) | A kind of Wire drawing die box | |
CN208923977U (en) | A kind of water cooling motor housing | |
CN206405391U (en) | A kind of rafifinal dedicated processing mould for being easy to operate | |
CN207553841U (en) | A kind of connection structure for the electronic strut guide rod of automobile tail gate and bulb | |
CN206869021U (en) | Novel riser and its casting mould of application | |
CN202207772U (en) | Sand mould structure | |
CN206937844U (en) | Novel die plug and the injection mold provided with the plug | |
CN205816438U (en) | A kind of trapezoidal mould for carbon steel wire rod wire drawing | |
CN206731997U (en) | A kind of air blowing drawing mechanism for punching compound die | |
CN206732059U (en) | Aviation casing Mg alloy castings Superstrong heat-preserving fire-retardant heat insulation rising head | |
CN205217974U (en) | Centrifugal casting mold | |
CN107931550A (en) | A kind of copper and copper alloy tube stretching graphite jig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |