CN209013781U - A kind of energy saving and environment friendly cooling tower - Google Patents
A kind of energy saving and environment friendly cooling tower Download PDFInfo
- Publication number
- CN209013781U CN209013781U CN201821459087.9U CN201821459087U CN209013781U CN 209013781 U CN209013781 U CN 209013781U CN 201821459087 U CN201821459087 U CN 201821459087U CN 209013781 U CN209013781 U CN 209013781U
- Authority
- CN
- China
- Prior art keywords
- tower body
- water
- cooling chamber
- water storage
- energy saving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses a kind of energy saving and environment friendly cooling towers, including tower body, pedestal is arranged in the tower body bottom, and safety escalator is installed in the tower body side, shield is arranged in the tower body side wall, water storage room is set inside the tower body, two water pumps are installed inside the water storage room, packing layer is set above the water storage room, setting cooling chamber occurs in described filler layer, spray tube is installed, partition is arranged in described filler layer side, and recovery room is arranged in the partition side wall inside the cooling chamber.The utility model beneficial effect achieved is: the utility model is compact-sized, it is easy to use, the vapor generated in cooling chamber can be recycled by the way that recovery room is arranged, and then reduce the waste of water resource, and then be conducive to the energy conservation and environmental protection of cooling tower, water remaining in cooling chamber can be filtered by the way that packing layer is arranged, and then convenient for the cycling and reutilization of residual water in cooling chamber, the replacement frequency of water storage indoor water is thereby reduced, and then convenient for saving water resource.
Description
Technical field
The utility model relates to a kind of cooling tower, specially a kind of energy saving and environment friendly cooling tower belongs to cooling tower technology neck
Domain.
Background technique
Cooling tower is to use water as circulating coolant, from heat dissipation is absorbed in system into atmosphere, to reduce water temperature
Device;It is to carry out cold and hot exchange after contacting using water with air flowing to generate steam that its is cold, and steam volatilization takes away heat and reaches steaming
The principles such as diverging heat, convective heat transfer and radiant heat transfer reduce water temperature to disperse the waste heat generated in industrial or refrigeration air-conditioner
Evaporating radiator, to guarantee the normal operation of system, device is generally tubbiness, and therefore named is cooling tower.Existing cooling tower exists
Generally spray system is used to cool down pipeline when cooling down to pipeline, and the water that spray head sprays is in the pipeline of contact high temperature
When will become vapor, be then discharged out of exhaust fan, in turn resulted in the waste of water resource, and then be unfavorable for the section of cooling tower
It can environmental protection.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies of existing technologies, and provides a kind of energy saving and environment friendly cooling
Tower.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
Pedestal, the tower body is arranged in a kind of energy saving and environment friendly cooling tower of the utility model, including tower body, the tower body bottom
Safety escalator is installed in side, and shield is arranged in the tower body side wall, setting water storage room inside the tower body, inside the water storage room
Two water pumps are installed, packing layer is arranged in the water storage room top, generation setting cooling chamber in described filler layer, in the cooling chamber
Spray tube is installed in portion, and partition is arranged in described filler layer side, and recovery room, the recovery room side wall installation is arranged in the partition side wall
Two outlet tubes, and two blast pipes are inserted into recovery room inside, setting air duct above the recovery room, inside the air duct
Exhaust fan is installed, two air inlets, setting escape pipe and air inlet pipe inside the tower body, the tower body is arranged in the tower body bottom
Sewage draining exit is arranged in bottom.
As a kind of optimal technical scheme of the utility model, connected between the water pump and spray tube by pipeline, and
Spray tube is located at the underface of air inlet.
As a kind of optimal technical scheme of the utility model, the air inlet pipe is connected to escape pipe, and is located at cooling chamber
The serpentine-like bending of shape of internal air inlet pipe.
As a kind of optimal technical scheme of the utility model, described blast pipe one end passes through partition and is connected to cooling chamber,
And in close connection between blast pipe and partition.
As a kind of optimal technical scheme of the utility model, fan housing is installed by fixing bolt in the air duct top.
The utility model beneficial effect achieved is: the utility model is compact structure and easy to use, is recycled by setting
Room can recycle the vapor generated in cooling chamber, and then reduce the waste of water resource, and then be conducive to cooling tower
Energy conservation and environmental protection, water remaining in cooling chamber can be filtered by the way that packing layer is arranged, and then convenient for residual in cooling chamber
The cycling and reutilization of water thereby reduces the replacement frequency of water storage indoor water, and then convenient for saving water resource.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this
Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the whole overlooking structure diagram of the utility model;
Fig. 3 is the whole side structure schematic view of the utility model.
In figure: 1, pedestal;2, escape pipe;3, air inlet pipe;4, water storage room;5, tower body;6, packing layer;7, cooling chamber;8, it sprays
Shower pipe;9, air inlet;10, exhaust fan;11, air duct;12, blast pipe;13, outlet tube;14, recovery room;15, partition;16, water
Pump;17, safety escalator;18, sewage draining exit;19, fan housing;20, shield.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing.In the utility model
Description in, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside"
The orientation or positional relationship of equal instructions is to be based on the orientation or positional relationship shown in the drawings, and being merely for convenience of description, this is practical new
Type and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation
Construction and operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second ", " third " are only used
In description purpose, it is not understood to indicate or imply and faces ground importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
As shown in Figure 1-3, pedestal 1, tower body 5 one is arranged in a kind of energy saving and environment friendly cooling tower, including tower body 5,5 bottom of tower body
Safety escalator 17 is installed in side, and 5 side wall of tower body is arranged shield 20, water storage room 4 is arranged inside tower body 5, installs two inside water storage room 4
Packing layer 6 is arranged above water storage room 4 for a water pump 16, and setting cooling chamber 7 occurs on packing layer 6, installs spray inside cooling chamber 7
Partition 15 is arranged in pipe 8,6 side of packing layer, and recovery room 14 is arranged in 15 side wall of partition, and 14 side wall of recovery room installs two outlet tubes
13, and two blast pipes 12 are inserted into inside recovery room 14, air duct 11 is set above recovery room 14, exhaust fan is installed inside air duct 11
10, two air inlets 9 are arranged in 5 bottom of tower body, and escape pipe 2 and air inlet pipe 3 are arranged inside tower body 5, and sewage draining exit is arranged in 5 bottom of tower body
18。
It is connected between water pump 16 and spray tube 8 by pipeline, and spray tube 8 is located at the underface of air inlet 9.Air inlet pipe 3
It is connected to escape pipe 2, and is located at the serpentine-like bending of shape of the air inlet pipe 3 inside cooling chamber 7.12 one end of blast pipe passes through partition
15 are connected to cooling chamber 7, and in close connection between blast pipe 12 and partition 15.11 top of air duct wind is installed by fixing bolt
Cover 19.
Specifically, then high-temperature gas is moved along air inlet pipe 3 in use, high-temperature gas is imported in air inlet pipe 3, when
When high-temperature gas is moved to the air inlet pipe 3 in cooling chamber 7, by spray tube 8 and air inlet 9 in cooling chamber 7
Air inlet pipe 3 cools down, then because water a part that 3 high temperature of air inlet pipe sprays spray tube 8 becomes vapor, then vapor
Enter in the recovery room 14 for filling water from blast pipe 12 and then vapor is enable to be easy water in recovery room 14, then air enters
It in air duct 11, is discharged under the action of exhaust fan 10, can be flowed into water storage room 4 to from cooling chamber 7 by setting packing layer 6
Water is filtered, and right gas after cooling is discharged from escape pipe 2, and when the water overfill in recovery room 14, water is flowed from outlet tube 13
Out, it and then flows into water storage room 4, by installing water pump 16 in water storage room 4, and then water can be provided for spray tube 8, work as water storage
When water in room 4 becomes cloudy, sewage can be discharged by sewage draining exit 18.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of energy saving and environment friendly cooling tower, which is characterized in that including tower body (5), pedestal (1) is arranged in tower body (5) bottom,
Safety escalator (17) are installed in tower body (5) side, and shield (20) are arranged in tower body (5) side wall, and the tower body (5) is internal
It is arranged water storage room (4), two water pumps (16) is installed inside the water storage room (4), packing layer is set above the water storage room (4)
(6), setting cooling chamber (7) occurs in described filler layer (6), spray tube (8) are installed inside the cooling chamber (7), the filler
Recovery room (14) are arranged in layer (6) side setting partition (15), partition (15) side wall, recovery room (14) the side wall installation two
Root outlet tube (13), and two blast pipes (12) are inserted into inside the recovery room (14), wind is set above the recovery room (14)
Road (11), the air duct (11) is internal to install exhaust fan (10), and two air inlets (9), the tower is arranged in tower body (5) bottom
Sewage draining exit (18) are arranged in setting escape pipe (2) and air inlet pipe (3) inside body (5), tower body (5) bottom.
2. a kind of energy saving and environment friendly cooling tower according to claim 1, which is characterized in that the water pump (16) and spray tube
(8) it is connected between by pipeline, and spray tube (8) is located at the underface of air inlet (9).
3. a kind of energy saving and environment friendly cooling tower according to claim 1, which is characterized in that the air inlet pipe (3) and outlet
(2) connection is managed, and is located at the serpentine-like bending of shape of cooling chamber (7) internal air inlet pipe (3).
4. a kind of energy saving and environment friendly cooling tower according to claim 1, which is characterized in that wear described blast pipe (12) one end
It crosses partition (15) to be connected to cooling chamber (7), and is in closely to connect between blast pipe (12) and partition (15).
5. a kind of energy saving and environment friendly cooling tower according to claim 1, which is characterized in that air duct (11) top passes through
Fixing bolt installs fan housing (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821459087.9U CN209013781U (en) | 2018-09-06 | 2018-09-06 | A kind of energy saving and environment friendly cooling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821459087.9U CN209013781U (en) | 2018-09-06 | 2018-09-06 | A kind of energy saving and environment friendly cooling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209013781U true CN209013781U (en) | 2019-06-21 |
Family
ID=66831225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821459087.9U Active CN209013781U (en) | 2018-09-06 | 2018-09-06 | A kind of energy saving and environment friendly cooling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209013781U (en) |
-
2018
- 2018-09-06 CN CN201821459087.9U patent/CN209013781U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203904327U (en) | White liquor distilling apparatus | |
CN204113364U (en) | The waste heat recovering device of lack of water cold area Direct Air-cooled Unit | |
CN209540854U (en) | A kind of power generation station-service boiler overheating cooling device | |
CN105202824A (en) | Evaporative type condenser | |
CN106813391A (en) | A kind of trilogy supply indoor set heat-exchanger rig | |
CN209013781U (en) | A kind of energy saving and environment friendly cooling tower | |
CN203810940U (en) | Cooling water medium-frequency induction heating system | |
CN207622566U (en) | A kind of cooling tower auxiliary cooler | |
CN208279557U (en) | A kind of coke oven threeway bridge tube heat exchanger apparatus | |
CN206989741U (en) | A kind of chemical industry cooling tower | |
CN109855439A (en) | A kind of cooling tower auxiliary cooler | |
CN206073125U (en) | A kind of Direct Air-Cooled tower waste heat circulation system | |
CN205279512U (en) | Cold, hot water unit of flue gas hot water type lithium bromide absorption formula that heating normal atmospheric temperature is discharged fume | |
CN209672865U (en) | A kind of evaporation type oil cooler | |
CN209621560U (en) | A kind of residual heat of air compressor recycling supplying hot water circulating water saving system | |
CN212057454U (en) | Boiler flue gas waste heat recovery system | |
CN211346412U (en) | Cooling tower for central air-conditioning system | |
CN205784671U (en) | A kind of condenser high temperature water charging system | |
CN205808145U (en) | Steam output absorber | |
CN205119860U (en) | Intelligence temperature control technology improves condenser vacuum energy saving optimization device | |
CN104949100B (en) | A kind of energy saving for power plants system | |
CN214842659U (en) | Steam water melting device | |
CN208457943U (en) | A kind of efficient attemperator of circulation | |
CN208794735U (en) | A kind of novel minute-pressure phase change boiler | |
CN204313486U (en) | System using exhaust steam in steam turbine as steam air heater of utility boiler thermal medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221122 Address after: No. 88, Jiaojing Road, Jingkou Village, Jingkou Town, Sihui City, Zhaoqing City, Guangdong Province, 526000 Patentee after: Guangdong Zero Environmental Technology Co.,Ltd. Address before: First Card on the Bottom Floor of No. 1 Workshop of "Longshengwei" Li Xuebang and Ma Hongan, Tongle Village, Dongsheng Town, Zhongshan City, Guangdong Province Patentee before: GUANGDONG LINGDU COOLING & WARMING TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |