CN209010096U - A kind of New-support erector - Google Patents
A kind of New-support erector Download PDFInfo
- Publication number
- CN209010096U CN209010096U CN201821522964.2U CN201821522964U CN209010096U CN 209010096 U CN209010096 U CN 209010096U CN 201821522964 U CN201821522964 U CN 201821522964U CN 209010096 U CN209010096 U CN 209010096U
- Authority
- CN
- China
- Prior art keywords
- steel
- nailing gun
- nailing
- bracket
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of New-support erector, is related to electromechanical installation field, by steel pipe both ends mantle fiber as holding rod, opens 20 holes among channel steel, channel steel is fixed on steel pipe using nut and washer;Long hole is opened from this channel steel two sides again, in order to adjusting bracket width, stay bolt is worn into long hole using nut and washer and is fixed on channel steel;There is screw thread in nailing gun bottom end, and nailing gun is connected on stay bolt;Nailing gun is connected together with nail and connection sheet, and prefabricated integral support is fixed on bracket erector using nut and washer, it can be achieved that the integral installation of bracket.The utility model is compared to the prior art, it is possible to reduce the use for equipment of ascending a height, the holding rod being made of steel pipe, which can use, to be directly lengthened, and can be operated on the ground, and bracket one-pass molding, is reduced process, has been saved engineering cost, and reduce operating risk of ascending a height.
Description
Technical field
The utility model relates to electromechanical mounting and construction equipment field, specifically a kind of New-support erector.
Background technique
Engineering construction at present project bracket installing engineering amount is huge.Because bracket installation generally relates to high altitude operation, install
It needs to ascend a height in the process and equipment and protects equipment accordingly, not only increase the engineering constructions cost such as artificial, mechanical, cause resource
Waste, also brings security risk.
Summary of the invention
The purpose of this utility model seeks to solve the above problems, and provides a kind of New-support erector, to overcome building
The deficiency of construction field conventional stent installation high and medium operation.
Technical solution adopted in the utility model is:
A kind of New-support erector, mainly by hand-held pipe, channel steel, stay bolt, nut, washer, nailing gun, nailing and company
Contact pin is constituted;Nail is located in nailing gun,
Channel steel opening upwards, hand-held pipe upper end penetrate from the middle position of channel steel bottom and are consolidated with it by nut and washer
It is scheduled on together,
The nailing gun being vertically arranged sets there are two and sets up separately on the channel steel at left and right sides of hand-held pipe, corresponding nailing gun position
Channel steel on offer long hole, there is screw thread in nailing gun bottom end, nailing gun is connected on stay bolt, nailing gun bottom pass through long spiral shell
Bolt is fixed in long hole, adjusts the distance between nailing gun in the sliding in long hole by stay bolt;
It further include having angle steel and round steel, round steel upper end is linked together by connection sheet and nailing, and round steel lower end passes through angle
Steel is simultaneously bolted together;
Further, hand-held pipe connects corresponding steel pipe by connector and is lengthened.It, can be after holding rod extended length
Terrestrial operation, without operation of ascending a height.
Further, round steel is provided with two, is arranged in parallel between two round steel;It is vertically arranged between round steel and angle steel.
The beneficial effects of the utility model
The utility model can make bracket installation procedure, and once mounting is completed on the ground, accelerates bracket installation speed, no
The increase of engineering cost brought by high altitude operation has only been saved, for robbing for work project, time cost has been also ad save, drops simultaneously
Security risk brought by low high altitude operation.Nailing gun spacing can be adjusted by bolt, can meet the bracket of sizes simultaneously
Installment work.
Detailed description of the invention
Fig. 1 is bracket erector structural upright schematic diagram;
Fig. 2 is bracket erector structure top view;
Fig. 3 is bracket erector structure front view;
Fig. 4 is bracket erector structure rearview;
Fig. 5 is bracket erector the structure left view;
Fig. 6 is bracket erector structure right view.
Wherein: 1, channel steel;2, stay bolt;3, nut and washer;4, nailing gun;5, nailing;6, connection sheet;7, round steel;8,
Angle steel;9, steel pipe;10 directly;11, bolt hole.
Specific embodiment
The utility model is described in detail below with reference to the accompanying drawing.
As shown in Figure 1,5, a kind of its structure of New-support erector of the utility model is by channel steel 1, nailing gun 4, nailing
Rifle fixes stay bolt 2, nailing 5, connection sheet 6, bracket fixing bolt 3, steel pipe 9, direct 10 composition.As shown in Figure 1,5, nailing gun
4 are fixed on channel steel 1 by stay bolt 2, and stay bolt can adjust position by bolt hole 11, and then adjust the width of nailing gun, i.e.,
Adjust support width.As shown in Figure 1, 2,9 both ends mantle fiber of steel pipe holding rod, is fixed on channel steel 1 by nut and washer, is held
Bar can be lengthened by direct 10.As a shown in Figure 6, nailing 5 and connection sheet 6 are the finished parts to link together, can directly be purchased.
The application method of electric wire straightening applicator is as follows:
(1) according to determining stent size is designed, nailing gun 4 is adjusted by stay bolt 2 and arrives required width;
(2) length that steel pipe holding rod 9 is determined according to the height of bracket mounting face connects two sections of steel pipes by direct 10,
The whole height of bracket erector is set to meet the needs of mounting bracket;
(3) bracket is processed prefabricated in advance, and bracket is integrally attached to the connection sheet of bracket erector using nut and washer 3
On 6, by 4 nailing of nailing gun, bracket overall time can be installed.
Except for the technical features described in the specification, it all is technically known to those skilled in the art.
Claims (3)
1. a kind of New-support erector, which is characterized in that mainly by holding pipe, channel steel, stay bolt, nut, washer, nailing
Rifle, nailing and connection sheet are constituted;Nail is located in nailing gun,
Channel steel opening upwards, hand-held pipe upper end penetrate from the middle position of channel steel bottom and are fixed on it by nut and washer
Together,
The nailing gun being vertically arranged sets there are two and sets up separately on the channel steel at left and right sides of hand-held pipe, the slot of corresponding nailing gun position
Long hole is offered on steel, there is screw thread in nailing gun bottom end, nailing gun is connected on stay bolt, and nailing gun bottom is solid by stay bolt
It is scheduled in long hole, the distance between nailing gun is adjusted in the sliding in long hole by stay bolt;
It further include having angle steel and round steel, round steel upper end is linked together by connection sheet and nailing, and round steel lower end passes through angle steel simultaneously
It is bolted together.
2. New-support erector according to claim 1, which is characterized in that
Hand-held pipe is connected corresponding steel pipe by connector and is lengthened.
3. New-support erector according to claim 1, which is characterized in that
Round steel is provided with two, is arranged in parallel between two round steel;It is vertically arranged between round steel and angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821522964.2U CN209010096U (en) | 2018-09-18 | 2018-09-18 | A kind of New-support erector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821522964.2U CN209010096U (en) | 2018-09-18 | 2018-09-18 | A kind of New-support erector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209010096U true CN209010096U (en) | 2019-06-21 |
Family
ID=66833393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821522964.2U Active CN209010096U (en) | 2018-09-18 | 2018-09-18 | A kind of New-support erector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209010096U (en) |
-
2018
- 2018-09-18 CN CN201821522964.2U patent/CN209010096U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101956438A (en) | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof | |
CN209010096U (en) | A kind of New-support erector | |
CN102312540A (en) | Vertical dry-hanging mounting structure of stone | |
CN204298955U (en) | Assembled steel reinforced canopy | |
CN203741724U (en) | Anti-collision wall formwork system | |
CN202466923U (en) | Suspended ceiling counter support | |
CN208518307U (en) | A kind of fast pylon easy to install of adjustable platform width | |
CN204081475U (en) | A kind of adjustable floor one-piece keel structure | |
CN204006613U (en) | A kind of collector lifting fixed support | |
CN207122039U (en) | A kind of ceiling joist | |
CN209211793U (en) | A kind of assembled water-proof railing | |
CN211775947U (en) | Structure is built to interim facility | |
CN204609352U (en) | Vertical turn terraced adjustable wall attaching parts | |
CN203961069U (en) | Self-locking reinforced aluminum plate curtain wall system | |
CN104500512A (en) | Cluster line squaring collector and electric pole fixing structure | |
CN206385772U (en) | One kind exempts from welding steel structure attachment structure | |
CN209591366U (en) | A kind of dedicated installation frame structure of display screen | |
CN208415627U (en) | A kind of T steel column bottom connection structure | |
CN206349600U (en) | Inverted " t " type high-tension connector suspends bracket in midair | |
CN201155877Y (en) | Module frame | |
CN209509268U (en) | Steel construction for aluminium alloy curtain wall | |
CN204940673U (en) | A kind of heat insulating tile with lightning protection structure | |
CN204879048U (en) | Novel pipeline support | |
CN209324144U (en) | Integral disassembly, assembly fence assembly | |
CN207572725U (en) | For the stent of grounding flat steel main line installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |