CN209006817U - A kind of steel scrap pipe Repair gene device - Google Patents
A kind of steel scrap pipe Repair gene device Download PDFInfo
- Publication number
- CN209006817U CN209006817U CN201821872728.3U CN201821872728U CN209006817U CN 209006817 U CN209006817 U CN 209006817U CN 201821872728 U CN201821872728 U CN 201821872728U CN 209006817 U CN209006817 U CN 209006817U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- fixed
- steel scrap
- block
- fixed block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model discloses a kind of steel scrap pipe Repair gene devices, including station, the upper end of the station is fixedly connected there are two symmetrically arranged mounting plate, through equipped with fluting on two mounting plates, fixed mechanism is equipped on two mounting plates, cross bar is connected between two fixed mechanisms, the lower end of the station is fixedly installed with electric pushrod, the telescopic end of the electric pushrod downward and is fixedly connected on cross bar, the upper end of two mounting plates is fixedly connected with the same mounting rack, the inside level of the mounting rack is equipped with reciprocal lead screw, the both ends of the reciprocal lead screw are rotatably connected on the inner wall of mounting rack, motor is fixedly installed on the side wall of the mounting rack.The utility model can quickly fix steel scrap pipe, and can quickly and easily remove the extra rust of steel scrap pipe surface, improve the efficiency of steel pipe recycling processing.
Description
Technical field
The utility model relates to steel scrap pipe processing technique field more particularly to a kind of steel scrap pipe Repair gene devices.
Background technique
Steel pipe is for trandfer fluid and powdery solid, exchange thermal energy, manufacture machine components and container and a kind of economy
Steel.Steel pipe can be divided into two major classes by production method: seamless steel pipe and seamed steel pipe, seamed steel pipe divide steel pipes with straight and spiral seam
Two kinds of welded tube.
For steel pipe after long-term use, surface can usually generate extra rust, be recycled again to steel scrap pipe
When utilization, generally requires and strike off the extra rust of steel tube surface, it is existing to mostly use manual operation greatly, to steel scrap pipe surface
Wiped, polishing removes rust, cumbersome efficiency is lower, and then drags the processing behaviour of slow entire steel scrap pipe repairing and reusing
Make.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of steel scrap pipe reparation proposed
Processing unit (plant).
To achieve the goals above, the utility model adopts the technical scheme that
A kind of steel scrap pipe Repair gene device, including station, the upper end of the station are fixedly connected with that there are two symmetrical
The mounting plate of setting is equipped with fixed mechanism through fluting is equipped on two mounting plates on two mounting plates, and two
Cross bar is connected between a fixed mechanism, the lower end of the station is fixedly installed with electric pushrod, the electric pushrod
Telescopic end downward and be fixedly connected on cross bar, the upper end of two mounting plates is fixedly connected with the same mounting rack, institute
The inside level for stating mounting rack is equipped with reciprocal lead screw, and the both ends of the reciprocal lead screw are rotatably connected on the inner wall of mounting rack,
Motor is fixedly installed on the side wall of the mounting rack, the end of the motor output shaft through mounting rack and is fixedly connected on past
On multifilament thick stick, feed screw nut is socketed on the reciprocal lead screw, the lower end of the feed screw nut is fixedly connected with telescopic rod, described
The telescopic end of telescopic rod is removably connected with scraper mechanism.
Preferably, the vertical bar that the fixed mechanism is fixedly connected on crossbar end and is vertically arranged, the upper end of the vertical bar
It is fixedly connected with horizontally disposed second connecting rod, the both ends of the second connecting rod are rotatably connected to first connecting rod, the installation
Fixed ring there are two being fixedly connected on the outside side wall of plate, and two fixed rings are located at the two sides of fluting, two are described solid
To determine to slidably connect motion bar in ring, the motion bar is fixedly connected with fixture block close to one end of fluting, and two described first
The one end of connecting rod far from second connecting rod is rotatably connected on respectively on two motion bars.
Preferably, the scraper mechanism includes two semicircle scraping rings, and the upper end of two semicircle scraping rings is fixed
It is connected with the first fixed block, link block is equipped between two first fixed blocks, and the first fixed block and link block rotation connect
It connects, the lower end of two semicircle scraping rings is fixedly connected to the second fixed block, passes through on one of them described second fixed block
It is equipped with inserted link, and inserted link is slidably connected with it, spring is socketed on the inserted link, the both ends of the spring are respectively fixedly connected with
On inserted link and the second fixed block, through equipped with slot corresponding with inserted link on another described second fixed block.
Preferably, the telescopic end of the telescopic rod is fixedly connected with U-shaped piece, and the link block is located at U-shaped piece of inside, institute
It states link block and is detachably connected with U-shaped piece by clamping screw.
Preferably, the fixture block is fixedly connected with antiskid rubber on the one side of fluting.
Preferably, first fixed block, the second fixed block are integrally formed with semicircle scraping ring.
The utility model has the beneficial effects that
By the way that fixed mechanism is arranged, steel pipe to be processed is passed through, and horizontal on station from fluting, started electronic
Push rod drives cross bar to move down, and then drives motion bar movement by first connecting rod, and then press from both sides steel pipe by two fixture blocks
Firmly fix.
By the way that scraper mechanism is arranged, two semicircles are scraped into cyclization in the outside of steel pipe, by inserted link be inserted in another second
In slot on fixed block, two semicircle scraping rings can be fixed and be bonded with the outer wall of steel pipe.
By the way that motor, reciprocal lead screw, feed screw nut is arranged, the reciprocal lead screw rotation of starting motor driven may make lead screw
Nut is moved back and forth along reciprocal lead screw, and then scraper mechanism is driven to carry out stripping operation to steel pipe, by the extra rust of steel tube surface
Erosion object strikes off.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of steel scrap pipe Repair gene device structural schematic diagram;
Fig. 2 the utility model proposes a kind of steel scrap pipe Repair gene device fixed mechanism structural schematic diagram;
Fig. 3 is enlarged drawing at A in Fig. 1;
Fig. 4 is enlarged drawing at B in Fig. 1.
In figure: 1 station, 2 electric pushrods, 3 cross bars, 4 vertical bars, 5 mounting plates, 6 mounting racks, 7 reciprocal lead screws, 8 lead screw spiral shells
Mother, 9 motors, 10 flutings, 11 fixture blocks, 12 fixed rings, 13 motion bars, 14 first connecting rods, 15 second connecting rods, 16 telescopic rods, 17 U
Type block, 18 clamping screws, 19 link blocks, 20 semicircle scraping rings, 21 first fixed blocks, 22 second fixed blocks, 23 springs, 24 are inserted
Bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-4, a kind of steel scrap pipe Repair gene device, including station 1, the upper end of station 1 are fixedly connected with
Two symmetrically arranged mounting plates 5 are equipped with fixed machine on two mounting plates 5 through fluting 10 is equipped on two mounting plates 5
Structure is connected with cross bar 3 between two fixed mechanisms, and the lower end of station 1 is fixedly installed with electric pushrod 2, and electric pushrod 2 is stretched
Contracting end downward and is fixedly connected on cross bar 3, and the upper end of two mounting plates 5 is fixedly connected with the same mounting rack 6, mounting rack 6
Inside level be equipped with reciprocal lead screw 7, the both ends of reciprocal lead screw 7 are rotatably connected on the inner wall of mounting rack 6, mounting rack 6
Motor 9 is fixedly installed on side wall, motor 9 exports the tip of the axis through mounting rack 6 and is fixedly connected on reciprocal lead screw 7, past
Feed screw nut 8 is socketed on multifilament thick stick 7, the lower end of feed screw nut 8 is fixedly connected with telescopic rod 16, and the telescopic end of telescopic rod 16 can
Dismantling connection has scraper mechanism, and by the way that motor 9, reciprocal lead screw 7, feed screw nut 8 is arranged, starting motor 9 drives 7 turns of reciprocal lead screw
It is dynamic, that is, it may make feed screw nut 8 to move back and forth along reciprocal lead screw 7, and then scraper mechanism is driven to carry out stripping operation to steel pipe, it will
The extra rust of steel tube surface is struck off.
In the utility model, the vertical bar 4 that fixed mechanism is fixedly connected on 3 end of cross bar and is vertically arranged, the upper end of vertical bar 4
It is fixedly connected with horizontally disposed second connecting rod 15, the both ends of second connecting rod 15 are rotatably connected to first connecting rod 14, mounting plate 5
Outside side wall on be fixedly connected there are two fixed ring 12, and two fixed rings 12 are located at the two sides of fluting 10, and two are solid
Determine to slidably connect motion bar 13 in ring 12, motion bar 13 is fixedly connected with fixture block 11, fixture block 11 close to one end of fluting 10
It is fixedly connected with antiskid rubber on the one side of fluting 10, effective anti-skidding fixed steel pipe effect is more preferable, two first connecting rods
14 one end far from second connecting rod 15 are rotatably connected on respectively on two motion bars 13, will be to be processed by the way that fixed mechanism is arranged
Steel pipe passed through from fluting 10, and it is horizontal on station 1, start electric pushrod 2, drive cross bar 3 to move down, Jin Ertong
It crosses first connecting rod 14 and drives the movement of motion bar 13, and then steel pipe is clamped into fixation by two fixture blocks 11.
Scraper mechanism includes two semicircle scraping rings 20, and it is solid that the upper end of two semicircle scraping rings 20 is fixedly connected to first
Determine block 21, link block 19 is equipped between two the first fixed blocks 21, and the first fixed block 21 is rotatablely connected with link block 19, two
The lower end of semicircle scraping ring 20 is fixedly connected to the second fixed block 22, through equipped with inserted link on one of them second fixed block 22
24, and inserted link 24 is slidably connected with it, and spring 23 is socketed on inserted link 24, the both ends of spring 23 are respectively fixedly connected in inserted link 24
Run through on the second fixed block 22, on another second fixed block 22 and is equipped with slot corresponding with inserted link 24, the first fixed block 21,
Second fixed block 22 is integrally formed with semicircle scraping ring 20, and by the way that scraper mechanism is arranged, two semicircle scraping rings 20 are closed
Inserted link 24 is inserted in the slot on another second fixed block 22 by the outside of steel pipe, can consolidate two semicircle scraping rings 20
Determine and is bonded with the outer wall of steel pipe.
The telescopic end of telescopic rod 16 is fixedly connected with U-shaped piece 17, and link block 19 is located at U-shaped piece 17 of inside, link block 19
It is detachably connected with U-shaped piece 17 by clamping screw 18, it can be for the steel pipe of different-diameter, quick-replaceable scraper mechanism, i.e.,
The steel pipe of different-diameter corresponds to the semicircle scraping ring 20 of different model.
When the utility model is used, steel pipe to be processed is passed through from fluting 10, and horizontal on station 1, starting
Electric pushrod 2 drives cross bar 3 to move down, and then drives motion bar 13 mobile by first connecting rod 14, and then passes through two folders
Steel pipe is clamped fixation by block 11, and two semicircle scraping rings 20 are closed in the outside of steel pipe, and inserted link 24 is inserted in another and second is consolidated
Determine in the slot on block 22, two semicircle scraping rings 20 can be fixed and be bonded with the outer wall of steel pipe, starting motor 9 drives past
Multifilament thick stick 7 rotates, that is, feed screw nut 8 may make to move back and forth along reciprocal lead screw 7, and then scraper mechanism is driven to scrape steel pipe
Except operation, the extra rust of steel tube surface is struck off.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of steel scrap pipe Repair gene device, including station (1), which is characterized in that the upper end of the station (1) is fixed
There are two connections symmetrically arranged mounting plate (5), runs through on two mounting plates (5) and is equipped with fluting (10), described in two
It is equipped with fixed mechanism on mounting plate (5), is connected between two fixed mechanisms cross bar (3), under the station (1)
End is fixedly installed with electric pushrod (2), and the telescopic end of the electric pushrod (2) downward and is fixedly connected on cross bar (3), two
The upper end of the mounting plate (5) is fixedly connected with the same mounting rack (6), and the inside level of the mounting rack (6) is equipped with reciprocal
The both ends of lead screw (7), the reciprocal lead screw (7) are rotatably connected on the inner wall of mounting rack (6), the side of the mounting rack (6)
It is fixedly installed on wall motor (9), motor (9) the output the tip of the axis is through mounting rack (6) and is fixedly connected on toward multifilament
It on thick stick (7), is socketed with feed screw nut (8) on the reciprocal lead screw (7), the lower end of the feed screw nut (8), which is fixedly connected with, stretches
The telescopic end of contracting bar (16), the telescopic rod (16) is removably connected with scraper mechanism.
2. a kind of steel scrap pipe Repair gene device according to claim 1, which is characterized in that the fixed mechanism is fixed to be connected
It connects in cross bar (3) end and the vertical bar (4) that is vertically arranged, the upper end of the vertical bar (4) is fixedly connected with horizontally disposed second
The both ends of connecting rod (15), the second connecting rod (15) are rotatably connected to first connecting rod (14), the outside side of the mounting plate (5)
There are two being fixedly connected on wall fixed ring (12), and two fixed rings (12) are located at the two sides of fluting (10), described in two
It is slidably connected motion bar (13) in fixed ring (12), the motion bar (13) is fixedly connected with close to one end of fluting (10)
Fixture block (11), two first connecting rods (14) are rotatably connected on two motion bars far from the one end of second connecting rod (15) respectively
(13) on.
3. a kind of steel scrap pipe Repair gene device according to claim 1, which is characterized in that the scraper mechanism includes two
The upper end of a semicircle scraping ring (20), two semicircle scraping rings (20) is fixedly connected to the first fixed block (21), and two
Link block (19) are equipped between first fixed block (21), and the first fixed block (21) and link block (19) are rotatablely connected, two
The lower end of a semicircle scraping ring (20) is fixedly connected to the second fixed block (22), one of them described second fixed block
(22) run through on and be equipped with inserted link (24), and inserted link (24) is slidably connected with it, is socketed with spring (23), institute on the inserted link (24)
The both ends for stating spring (23) are respectively fixedly connected on inserted link (24) and the second fixed block (22), another described second fixed block
(22) through equipped with slot corresponding with inserted link (24) on.
4. a kind of steel scrap pipe Repair gene device according to claim 3, which is characterized in that telescopic rod (16) are stretched
Contracting end is fixedly connected with U-shaped piece (17), and the link block (19) is located at the inside of U-shaped piece (17), the link block (19) with it is U-shaped
Block (17) is detachably connected by clamping screw (18).
5. a kind of steel scrap pipe Repair gene device according to claim 2, which is characterized in that the fixture block (11) is close to open
Antiskid rubber is fixedly connected on the one side of slot (10).
6. a kind of steel scrap pipe Repair gene device according to claim 3, which is characterized in that first fixed block
(21), the second fixed block (22) is integrally formed with semicircle scraping ring (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821872728.3U CN209006817U (en) | 2018-11-14 | 2018-11-14 | A kind of steel scrap pipe Repair gene device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821872728.3U CN209006817U (en) | 2018-11-14 | 2018-11-14 | A kind of steel scrap pipe Repair gene device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209006817U true CN209006817U (en) | 2019-06-21 |
Family
ID=66842370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821872728.3U Expired - Fee Related CN209006817U (en) | 2018-11-14 | 2018-11-14 | A kind of steel scrap pipe Repair gene device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209006817U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113000528A (en) * | 2021-02-27 | 2021-06-22 | 陈莲英 | Dry type iron container rust cleaning equipment |
CN113751784A (en) * | 2021-08-31 | 2021-12-07 | 上上德盛集团股份有限公司 | Intelligent robot for assisting in machining stainless steel pipeline |
CN114192893A (en) * | 2021-12-06 | 2022-03-18 | 江苏锦航机械制造有限公司 | Roller surface treatment equipment and treatment method thereof |
-
2018
- 2018-11-14 CN CN201821872728.3U patent/CN209006817U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113000528A (en) * | 2021-02-27 | 2021-06-22 | 陈莲英 | Dry type iron container rust cleaning equipment |
CN113751784A (en) * | 2021-08-31 | 2021-12-07 | 上上德盛集团股份有限公司 | Intelligent robot for assisting in machining stainless steel pipeline |
CN114192893A (en) * | 2021-12-06 | 2022-03-18 | 江苏锦航机械制造有限公司 | Roller surface treatment equipment and treatment method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209006817U (en) | A kind of steel scrap pipe Repair gene device | |
CN111014110B (en) | Motor dust and oil dirt cleaning equipment | |
CN208928786U (en) | A kind of apparatus for eliminating sludge for pure water inner wall of the pipe | |
CN209364949U (en) | It is a kind of for processing the blank remedying device of porcelain tube | |
CN113351597A (en) | Chemical barrel cleaning system | |
CN207839710U (en) | A kind of bender with cleaning plant | |
CN108620364B (en) | Mould cleaning device | |
CN206083838U (en) | Machining suppresses full -automatic burring high pressure cleaner of power | |
CN112123185A (en) | Metal material processing waste treatment device | |
CN108114955B (en) | Cleaning device for inner wall of container | |
CN218017372U (en) | Chip cleaner for lathe | |
CN210586164U (en) | Belt cleaning device is used in longspur epimedium processing | |
CN214854160U (en) | High-efficient edible salt crystallization forming device | |
CN211538842U (en) | Pipe scraping machine suitable for removing inner welding ribs of steel pipes of different sizes | |
CN210189329U (en) | Grinding machine capable of automatically cleaning scraps | |
CN209393623U (en) | A kind of metal die cleaning plant | |
CN207401825U (en) | Improve the cleaning device of cylinder cover interior surface cleannes | |
CN210264635U (en) | Paraffin removal device for oil production well machinery | |
CN211247470U (en) | Aluminum scrap removing device for aluminum spraying rubber sleeve | |
CN221501313U (en) | Spinneret plate cleaning device | |
CN204818958U (en) | Lathe collecting tank chip removal device | |
CN205275183U (en) | A automatic discharge device for liquid is collected | |
CN220223737U (en) | Hydrogen peroxide copper wire stripping tank for PCB board production | |
CN213316322U (en) | Customization mould of drilling processing of walking slowly silk | |
CN219631286U (en) | Reaction tower with wall scale cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190621 Termination date: 20201114 |