CN208995191U - Biochemical tank packing fixing device - Google Patents

Biochemical tank packing fixing device Download PDF

Info

Publication number
CN208995191U
CN208995191U CN201821323245.8U CN201821323245U CN208995191U CN 208995191 U CN208995191 U CN 208995191U CN 201821323245 U CN201821323245 U CN 201821323245U CN 208995191 U CN208995191 U CN 208995191U
Authority
CN
China
Prior art keywords
fixedly installed
wall
plate
reaction chamber
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821323245.8U
Other languages
Chinese (zh)
Inventor
唐珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Huande Technology Co Ltd
Original Assignee
Chongqing Huande Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Huande Technology Co Ltd filed Critical Chongqing Huande Technology Co Ltd
Priority to CN201821323245.8U priority Critical patent/CN208995191U/en
Application granted granted Critical
Publication of CN208995191U publication Critical patent/CN208995191U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The utility model relates to technical field of biochemistry, and a kind of biochemical tank packing fixing device, including reaction chamber are disclosed, the bottom wall of inner cavity of the reaction chamber is fixedly installed with support plate, the top of the support plate is fixedly installed with filling pipe, is communicated with probe tube at left and right sides of the inner wall of the reaction chamber.The biochemical tank packing fixing device, by the way that mounting groove is arranged, balancing device is fixedly installed in the inner wall of mounting groove, and balancing device includes hollow pipe and solid hopkinson bar, solid hopkinson bar can move in the inner wall of hollow pipe, it is put into the inner wall of reaction chamber by the way that filling pipe will be mentioned, when fixture block and clamping plate contact, rotor plate is enabled to rotate by rotating fixing bolt, to which rotor plate moves push plate to the left, to which kelly can move to the left, and then fixture block can squeeze two clamping plates, so that fixture block is located between the opposite side of two clamping plates, it is easy for installation, and it is such installation it is more stable, using effect is more preferable.

Description

Biochemical tank packing fixing device
Technical field
The utility model relates to technical field of biochemistry, specially a kind of biochemical tank packing fixing device.
Background technique
Biochemistry pool provides the sewage treatment of time-program(me), rather than the sewage treatment of the space program continuously provided, raw Change cell system and be not required to primary sedimentation tank, secondary settling tank and sludge recirculation system, ideal quiet heavy, good separating effect can be applied to chemical industry, stone Oil, electric power, steel, weaving, printing and dyeing, transport, storage, food brewing, fermentation, water process and sea water desalination etc..
Traditional biochemistry pool is very troublesome when installing filler device, and is not easy to dismantle filler device, Rear stability still inadequate is installed simultaneously, therefore has herein proposed a kind of fixed dress of biochemical tank packing to solve problems It sets.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of biochemical tank packing fixing device, and it is steady to have installation The advantages that fixed easy to disassemble, it is very troublesome when filler device is installed to solve traditional biochemistry pool, and is not easy to filling out Material device is dismantled, while installing the inadequate problem of rear stability still.
(2) technical solution
To realize that purpose easy to disassemble is stablized in above-mentioned installation, the utility model is provided the following technical solutions: a kind of biochemistry Pond packing fixing device, including reaction chamber, the bottom wall of inner cavity of the reaction chamber are fixedly installed with support plate, the top of the support plate End is fixedly installed with filling pipe, is communicated with probe tube at left and right sides of the inner wall of the reaction chamber, the inner wall of the reaction chamber is opened If the inner wall of the left side mounting groove is fixedly installed with the first spring there are two mounting groove, the inner wall of the left side mounting groove is left Side is fixedly installed with balancing device, and latch plate, the left side mounting groove inner cavity top are fixedly installed on the right side of first spring Wall and bottom wall of inner cavity are fixedly installed with sliding seat, and the opposite side of two sliding seat is fixedly installed with connecting rod, and two The opposite side of a connecting rod is fixedly installed with clamping plate, and the inner wall of the clamping plate is fixedly installed with second spring, and described Movable plate is fixedly installed on the left of two springs, the opposite side of two clamping plates is connected with fixture block, the fixture block Right side is fixedly installed with kelly, and push plate is fixedly installed on the right side of the kelly, is fixedly installed with movement on the right side of the push plate Bar, the bottom end of the mobile bar are fixedly installed with limited block, and the outer wall of the limited block is arranged with adjusting rod, the reaction chamber Right side is fixedly installed with fixed plate, and the top of the fixed plate is fixedly installed with fixing bolt, the fixed peace in the bottom end of the fixing bolt Equipped with rotor plate.
Preferably, the quantity of the probe tube is 14, and 14 probe tube seven are evenly distributed on reaction for one group The left and right sides of case.
Preferably, the balancing device includes hollow pipe and solid hopkinson bar, and the outer wall of solid hopkinson bar is greater than in the inner wall of hollow pipe Diameter, hollow pipe and solid hopkinson bar are adapted.
Preferably, the left side of the second spring is fixedly connected with movable plate, the right side of second spring and the inner cavity of clamping plate Right side wall is fixedly connected.
Preferably, the push plate is located inside the mounting groove on right side, and right mounting slot is run through simultaneously in the right side of the mobile bar Extend to the right side of reaction chamber.
Preferably, the bottom end of the rotor plate is fixedly connected by limited block with adjusting rod, and the adjusting rod, which is located at, to be stablized In the inner wall of block.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of biochemical tank packing fixing device, has following beneficial to effect Fruit:
1, the biochemical tank packing fixing device is fixedly installed with balance dress by the way that mounting groove is arranged in the inner wall of mounting groove It sets, and balancing device includes hollow pipe and solid hopkinson bar, solid hopkinson bar can move in the inner wall of hollow pipe, by that will propose filling Pipe is put into the inner wall of reaction chamber, when fixture block is contacted with clamping plate, enables to rotor plate to rotate by rotating fixing bolt, thus Rotor plate moves push plate to the left, so that kelly can move to the left, and then fixture block can squeeze two clamping plates, so that card Block is located between the opposite side of two clamping plates, easy for installation, and such installation is more stable, and using effect is more preferable.
2, the biochemical tank packing fixing device, by rotating backward rotor plate, the bottom end of rotor plate will drive limited block and exist It is rotated in the inner wall of adjusting rod, therefore enables to mobile bar to move right by rotation, and then push plate will drive far from first Spring, and then two clamping plates so that two clamping plates reset, therefore are being incited somebody to action by the elastic force of second spring and the reset force of sliding seat Pipe to be filled to take out, such method enhanced convenience dismantles filling pipe, and it is convenient that it is repaired and is replaced, effectively The efficiency for improving work.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is schematic enlarged-scale view at A in the utility model;
Fig. 3 is schematic enlarged-scale view at B in the utility model.
In figure: 1 reaction chamber, 2 support plates, 3 filling pipes, 4 probe tubes, 5 mounting grooves, 6 balancing devices, 7 first springs, 8 bullets Spring plate, 9 sliding seat, 10 connecting rods, 11 clamping plates, 12 second springs, 13 movable plates, 14 fixture blocks, 15 kellies, 16 push plates, 17 movements Bar, 18 limited blocks, 19 adjusting rods, 20 fixed plates, 21 fixing bolts, 22 rotor plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of biochemical tank packing fixing device, including reaction chamber 1 are please referred to, the bottom wall of inner cavity of reaction chamber 1 is fixed Support plate 2 is installed, the top of support plate 2 is fixedly installed with filling pipe 3, is communicated with and takes at left and right sides of the inner wall of reaction chamber 1 Sample pipe 4, the quantity of probe tube 4 are 14, and 14 probe tube 4 seven are evenly distributed on the left and right two of reaction chamber 1 for one group Side, the inner wall of reaction chamber 1 are opened up there are two mounting groove 5, and the inner wall of left mounting slot 5 is fixedly installed with the first spring 7, left side peace It is fixedly installed with balancing device 6 on the left of the inner wall of tankage 5, by the way that mounting groove 5 is arranged, is fixedly installed in the inner wall of mounting groove 5 Balancing device 6, and balancing device 6 includes hollow pipe and solid hopkinson bar, solid hopkinson bar can move in the inner wall of hollow pipe, pass through Filling pipe 3 will be mentioned to be put into the inner wall of reaction chamber 1, when fixture block 14 is contacted with clamping plate 11, can be made by rotating fixing bolt 21 It obtains rotor plate 22 to rotate, so that rotor plate 22 moves push plate 16 to the left, so that kelly 15 can move to the left, and then fixture block 14 can squeeze two clamping plates 11, so that fixture block 14 is located between the opposite side of two clamping plates 11, it is easy for installation and such Installation is more stable, and using effect is more preferable, and balancing device 6 includes hollow pipe and solid hopkinson bar, is greater than in the inner wall of hollow pipe real The outer diameter of core bar, hollow pipe and solid hopkinson bar are adapted, and the right side of the first spring 7 is fixedly installed with latch plate 8, left side installation 5 inner cavity roof of slot and bottom wall of inner cavity are fixedly installed with sliding seat 9, the opposite side of the two sliding seat 9 company of being fixedly installed with Extension bar 10, the opposite side of two connecting rods 10 are fixedly installed with clamping plate 11, and the inner wall of clamping plate 11 is fixedly installed with second spring 12, the left side of second spring 12 is fixedly connected with movable plate 13, and the right side of second spring 12 and the inner cavity right side wall of clamping plate 11 are solid Fixed connection, the left side of second spring 12 are fixedly installed with movable plate 13, and the opposite side of two clamping plates 11 is connected with fixture block 14, the right side of fixture block 14 is fixedly installed with kelly 15, and the right side of kelly 15 is fixedly installed with push plate 16, and push plate 16 is located at right side The right side of mounting groove 5, mobile bar 17 runs through right mounting slot 5 and extends to the right side of reaction chamber 1, the fixed peace in the right side of push plate 16 Equipped with mobile bar 17, the bottom end of mobile bar 17 is fixedly installed with limited block 18, and the outer wall of limited block 18 is arranged with adjusting rod 19, instead The right side of case 1 is answered to be fixedly installed with fixed plate 20, the top of fixed plate 20 is fixedly installed with fixing bolt 21, the bottom end of fixing bolt 21 It is fixedly installed with rotor plate 22, by rotating backward rotor plate 22, the bottom end of rotor plate 22 will drive limited block 18 in adjusting rod It is rotated in 19 inner wall, therefore enables to mobile bar 17 to move right by rotation, and then push plate 16 will drive 15 far from the One spring 7, and then two clamping plates 11 pass through the elastic force of second spring 12 and the reset force of sliding seat 9, so that two clamping plates 11 are multiple Position, therefore taken out pipe 3 will be filled, such method enhanced convenience dismantles filling pipe 3, convenient to tie up to it It repairs and replaces, effectively raise the efficiency of work, the bottom end of rotor plate 22 is fixedly connected by limited block 18 with adjusting rod 19, Adjusting rod 19 is located in the inner wall for stablizing block.
In conclusion the biochemical tank packing fixing device is fixedly mounted in the inner wall of mounting groove 5 by the way that mounting groove 5 is arranged There is balancing device 6, and balancing device 6 includes hollow pipe and solid hopkinson bar, solid hopkinson bar can move in the inner wall of hollow pipe, lead to Filling pipe 3 will be mentioned by, which crossing, is put into the inner wall of reaction chamber 1, can by rotation fixing bolt 21 when fixture block 14 is contacted with clamping plate 11 So that rotor plate 22 rotates, so that rotor plate 22 moves push plate 16 to the left, so that kelly 15 can move to the left, and then block Block 14 can squeeze two clamping plates 11, so that fixture block 14 is located between the opposite side of two clamping plates 11, it is easy for installation, and this Kind installation is more stable, and using effect is more preferable, and by rotating backward rotor plate 22, the bottom end of rotor plate 22 will drive limited block 18 rotate in the inner wall of adjusting rod 19, therefore enable to mobile bar 17 to move right by rotation, and then push plate 16 can band Dynamic 15 far from the first spring 7, and then two clamping plates 11 pass through the elastic force of second spring 12 and the reset force of sliding seat 9, so that two A clamping plate 11 resets, therefore takes out that will fill pipe 3, and such method enhanced convenience dismantles filling pipe 3, convenient It is repaired and is replaced, the efficiency of work is effectively raised.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. biochemical tank packing fixing device, including reaction chamber (1), it is characterised in that: the bottom wall of inner cavity of the reaction chamber (1) is fixed It is equipped with support plate (2), the top of the support plate (2) is fixedly installed with filling pipe (3), and the inner wall of the reaction chamber (1) is left Right two sides are communicated with probe tube (4), and the inner wall of the reaction chamber (1) is opened up there are two mounting groove (5), the left side mounting groove (5) inner wall is fixedly installed with the first spring (7), is fixedly installed with balancing device on the left of the inner wall of the left side mounting groove (5) (6), it is fixedly installed with latch plate (8) on the right side of first spring (7), the left side mounting groove (5) inner cavity roof and inner cavity Bottom wall is fixedly installed with sliding seat (9), and the opposite side of two sliding seat (9) is fixedly installed with connecting rod (10), The opposite side of two connecting rods (10) is fixedly installed with clamping plate (11), and the inner wall of the clamping plate (11) is fixedly installed with Two springs (12) are fixedly installed with movable plate (13) on the left of the second spring (12), two clamping plates (11) it is opposite Side is connected with fixture block (14), is fixedly installed with kelly (15) on the right side of the fixture block (14), the right side of the kelly (15) Side is fixedly installed with push plate (16), is fixedly installed with mobile bar (17) on the right side of the push plate (16), the mobile bar (17) Bottom end is fixedly installed with limited block (18), and the outer wall of the limited block (18) is arranged with adjusting rod (19), the reaction chamber (1) Right side is fixedly installed with fixed plate (20), and the top of the fixed plate (20) is fixedly installed with fixing bolt (21), the fixing bolt (21) bottom end is fixedly installed with rotor plate (22).
2. biochemical tank packing fixing device according to claim 1, it is characterised in that: the quantity of the probe tube (4) is 14,14 probe tube (4) seven are evenly distributed on the left and right sides of reaction chamber (1) for one group.
3. biochemical tank packing fixing device according to claim 1, it is characterised in that: the balancing device (6) includes sky Heart pipe and solid hopkinson bar are greater than the outer diameter of solid hopkinson bar in the inner wall of hollow pipe, and hollow pipe and solid hopkinson bar are adapted.
4. biochemical tank packing fixing device according to claim 1, it is characterised in that: the left side of the second spring (12) It is fixedly connected with movable plate (13), the right side of second spring (12) is fixedly connected with the inner cavity right side wall of clamping plate (11).
5. biochemical tank packing fixing device according to claim 1, it is characterised in that: the push plate (16) is located at right side Mounting groove (5) is internal, and the right side of the mobile bar (17) runs through right mounting slot (5) and extends to the right side of reaction chamber (1).
6. biochemical tank packing fixing device according to claim 1, it is characterised in that: the bottom end of the rotor plate (22) is logical It crosses limited block (18) to be fixedly connected with adjusting rod (19), the adjusting rod (19) is located in the inner wall for stablizing block.
CN201821323245.8U 2018-08-16 2018-08-16 Biochemical tank packing fixing device Expired - Fee Related CN208995191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821323245.8U CN208995191U (en) 2018-08-16 2018-08-16 Biochemical tank packing fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821323245.8U CN208995191U (en) 2018-08-16 2018-08-16 Biochemical tank packing fixing device

Publications (1)

Publication Number Publication Date
CN208995191U true CN208995191U (en) 2019-06-18

Family

ID=66798180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821323245.8U Expired - Fee Related CN208995191U (en) 2018-08-16 2018-08-16 Biochemical tank packing fixing device

Country Status (1)

Country Link
CN (1) CN208995191U (en)

Similar Documents

Publication Publication Date Title
CN202296350U (en) Single-tube material shifting and stopping device for seamless steel tube
CN208995191U (en) Biochemical tank packing fixing device
CN201600053U (en) Volumetric heat exchanger with stirring device
CN211398066U (en) Quick assembly disassembly formula dive tubular pump
CN204626623U (en) A kind of novel prefabricated pumping plant
CN207091071U (en) A kind of tubular type capacitive deionization desalter
CN206189426U (en) Light -duty well point drainage system
CN216780498U (en) Cutting device for water conservancy and hydropower pipeline
CN207649127U (en) A kind of electric heater convenient for suspension
CN212857266U (en) Bending device for machining prefabricated direct-buried engineering pipeline
CN211036915U (en) Strutting arrangement is used in water conservancy water and electricity construction
CN101037242A (en) Disk type electrical ion-removing water softening apparatus
CN2793060Y (en) Electric disk-style deionizing water purifier
CN210311853U (en) Oil storage tank for oil extraction
CN216618778U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN208162936U (en) A kind of novel tower barrel flange combination tooling platform
CN220643287U (en) Continuous water supply device for hydrogen production
CN206881225U (en) A kind of sewage treatment pot
CN207079061U (en) A kind of water decanter
CN202506176U (en) Automatic oil slick collection device for precipitation tank
CN216692560U (en) Pipe connecting structure for building
CN210885419U (en) Sewage treatment plant for environmental protection engineering
CN210499376U (en) Novel seamless steel pipe tip chamfer anchor clamps
CN218510330U (en) Drainage pipe construction tool
CN219506754U (en) Enamel steel plate spliced tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190618