CN208990307U - Mobile sewage treatment multi stage precipitation device - Google Patents

Mobile sewage treatment multi stage precipitation device Download PDF

Info

Publication number
CN208990307U
CN208990307U CN201821368265.7U CN201821368265U CN208990307U CN 208990307 U CN208990307 U CN 208990307U CN 201821368265 U CN201821368265 U CN 201821368265U CN 208990307 U CN208990307 U CN 208990307U
Authority
CN
China
Prior art keywords
sewage
overflow port
stage precipitation
level
sewage treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821368265.7U
Other languages
Chinese (zh)
Inventor
王怀妹
肖养遴
雷斌
唐雪云
周明佳
崔炳辰
杨静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201821368265.7U priority Critical patent/CN208990307U/en
Application granted granted Critical
Publication of CN208990307U publication Critical patent/CN208990307U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical fields of sewage-treatment plant, disclose mobile sewage treatment multi stage precipitation device, including precipitating body and multiple lifting lugs being located at the top of precipitating body with first stage precipitation tank, second-level settling pond and three-level sedimentation basin, precipitates body and be formed with water inlet, the first overflow port, the second overflow port and water outlet;Untreated sewage is pumped into first stage precipitation tank by water inlet by water pump, the sewage after first stage precipitation tank precipitation process is set to enter second-level settling pond by the first overflow port, so that the sewage after second-level settling pond precipitation process is entered three-level sedimentation basin by the second overflow port, the sewage after three-level sedimentation basin precipitation process is discharged by city planting ductwork by water outlet;First overflow port, the second overflow port and water outlet are respectively at the top of precipitating body.In the case where construction space is relatively narrow, by the lifting to lifting lug, so that precipitating body is moved to corresponding construction space, meet and realize multi stage precipitation sewage treatment on the spot.

Description

Mobile sewage treatment multi stage precipitation device
Technical field
The utility model relates to the technical field of sewage-treatment plant, in particular to mobile sewage treatment multi stage precipitation dress It sets.
Background technique
Sewage treatment is the process purified to sewage, so that sewage is reached defined discharge standard, avoid to underground water It pollutes.
Currently, need to first carry out pipe network foundation pit or channel excavation when Urban Buried Pipeline Network burial and construction, the section of excavation is general Smaller, range is 2~4m, and the depth of excavation is usually shallower, and range is 2~6m, and gib measure is used when construction, using point Section is excavated, segmental installation Construction Arrangement, is had and is excavated that route is long, construction space is narrow, the activity duration is short, segmental operation etc. The characteristics of.
In the prior art, excavation pit or when groove, since construction space is relatively narrow, is difficult to use to the sewage of generation Three-level sedimentation basin is dug on the spot and carries out sewage treatment, leads to not meet sewage treatment.
Utility model content
The purpose of this utility model is to provide mobile sewage treatment multi stage precipitation devices, it is intended to solve in the prior art When construction space is relatively narrow, the problem of being unable to satisfy sewage treatment.
The utility model is realized in this way mobile sewage treatment multi stage precipitation device, including with first stage precipitation tank, The precipitating body of second-level settling pond and three-level sedimentation basin and multiple lifting lugs being located at the top of precipitating body, the precipitating body be formed with into The mouth of a river, the first overflow port, the second overflow port and water outlet;Water pump is sunk untreated sewage suction level-one by the water inlet Shallow lake pond makes the sewage after the first stage precipitation tank precipitation process enter the two-stage precipitation by first overflow port Pond makes the sewage after the second-level settling pond precipitation process enter the three-level sedimentation basin by second overflow port, The sewage after the three-level sedimentation basin precipitation process is discharged into city planting ductwork by the water outlet;First overflow Mouth, second overflow port and the water outlet are respectively at the top of the precipitating body.
Further, the precipitating body is equipped with the first demarcation plate and the second demarcation plate, first demarcation plate and described Precipitating body described in second divides forms the mutual disconnected first stage precipitation tank, the second-level settling pond and described three First overflow port is formed at grade sedimentation basin, the top of first demarcation plate, and the top of second demarcation plate forms described Second overflow port.
Further, first overflow port and second overflow port are in dislocation arrangement.
Further, the first stage precipitation tank has the first volume that can accommodate sewage quantity, and the second-level settling pond has The second volume of sewage quantity can be accommodated, the three-level sedimentation basin has the third volume that can accommodate sewage quantity, first volume Respectively greater than described second volume and the third volume.
Further, the lower part of the precipitating body is equipped with the sewage draining exit that multiple body refuses for settlement of sewage discharge, multiple The sewage draining exit and the first stage precipitation tank, the second-level settling pond and the three-level sedimentation basin, which correspond, arranges.
Further, the sewage draining exit is equipped with controlled valve, and when carrying out sewage treatment, the controlled valve is in closing shape State;When carrying out body refuse discharge, the controlled valve is in open state.
Further, in a rectangular parallelepiped shape, multiple lifting lugs are respectively provided at the top of the precipitating body to the precipitating body Four angles;The lifting lug has the hanged end extended to above the precipitating body, and arch upward arc-shaped shape cloth upward at the hanged end It sets.
Further, the water inlet is formed in the top of the precipitating body.
Further, the first shutter that the top of first overflow port is equipped with, first shutter is along away from institute First stage precipitation tank direction is stated to extend horizontally arrangement.
Further, the second shutter that the top of second overflow port is equipped with, second shutter is along away from institute Second-level settling pond direction is stated to extend horizontally arrangement.
Compared with prior art, mobile sewage treatment multi stage precipitation device provided by the utility model, carries out at sewage When reason, untreated sewage is pumped by water inlet by first stage precipitation tank using water pump, carries out sewage in first stage precipitation tank just Step precipitating, to make lower part of the body refuse precipitating in first stage precipitation tank, the sewage of preliminary sedimentation processing is in first stage precipitation tank The sewage on top, preliminary sedimentation processing enters second-level settling pond by the first overflow port, and the sewage for handling preliminary sedimentation is two It is precipitated again in grade sedimentation basin, to make lower part of the body refuse precipitating in second-level settling pond, the again sewage of precipitation process Top in second-level settling pond, the sewage of precipitation process enters three-level sedimentation basin by the second overflow port again, keeps body refuse heavy It forms sediment and is in the lower part of three-level sedimentation basin, the sewage of multiple precipitation process is discharged into city planting ductwork by water outlet, to realize to dirt The processing of water;Since the first overflow port, the second overflow port and water outlet are respectively at the top of precipitating body, in this way, effectively protecting Card adequately precipitates sewage;In the case where the construction spaces such as foundation pit or groove are relatively narrow, by being risen to lifting lug It hangs, realizes that, to precipitating body movement, satisfaction realizes sewage treatment on the spot.
Detailed description of the invention
Fig. 1 is the stereoscopic schematic diagram of mobile sewage treatment multi stage precipitation device provided by the embodiment of the utility model;
Fig. 2 is the portion the A enlarged diagram of mobile sewage treatment multi stage precipitation device provided by the embodiment of the utility model.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
The same or similar label correspond to the same or similar components in the attached drawing of the present embodiment;In retouching for the utility model In stating, it is to be understood that if the orientation or positional relationship for having the instructions such as term " on ", "lower", "left", "right" is based on attached drawing Shown in orientation or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion institute The device or element of finger must have a particular orientation, be constructed and operated in a specific orientation, therefore position pass is described in attached drawing The term of system only for illustration, should not be understood as the limitation to this patent, for those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term as the case may be.
The realization of the utility model is described in detail below in conjunction with specific embodiment.
Referring to Fig.1 shown in -2, preferred embodiment is provided for the utility model.
Movable type sewage treatment multi stage precipitation device provided by the utility model, for solving when construction space is relatively narrow When, the problem of being unable to satisfy sewage treatment.
Mobile sewage treatment multi stage precipitation device, including precipitating body 10 and multiple lifting lugs 40, precipitating body 10 have one Grade sedimentation basin 11, second-level settling pond 12 and three-level sedimentation basin 13, lifting lug 40 are located at the top of precipitating body 10.
Precipitating body 10 is formed with water inlet 14, the first overflow port 21, the second overflow port 31 and water outlet 15;Water pump passes through Untreated sewage is pumped into first stage precipitation tank 11 by water inlet 14, is made by the first overflow port 21 by 11 place of settling of first stage precipitation tank Sewage after reason enters second-level settling pond 12, makes the sewage after 12 precipitation process of second-level settling pond by the second overflow port 31 Into three-level sedimentation basin 13, the sewage after 13 precipitation process of three-level sedimentation basin is discharged by city planting ductwork by water outlet 15; First overflow port 21, the second overflow port 31 and water outlet 15 are respectively at the top of precipitating body 10.
Above-mentioned mobile sewage treatment multi stage precipitation device, when carrying out sewage treatment, using water pump by untreated sewage It is pumped into first stage precipitation tank 11 by water inlet 14, sewage is made to carry out preliminary sedimentation in first stage precipitation tank 11, to keep body refuse heavy It forms sediment and is in the lower part of first stage precipitation tank 11, the sewage of preliminary sedimentation processing is in the top of first stage precipitation tank 11, at preliminary sedimentation The sewage of reason enters second-level settling pond 12 by the first overflow port 21, and the sewage for handling preliminary sedimentation is in second-level settling pond 12 It is precipitated again, so that body refuse precipitating be made to be in the lower part of second-level settling pond 12, the sewage of precipitation process is in second level again The top of sedimentation basin 12, the sewage of precipitation process enters three-level sedimentation basin 13 by the second overflow port 31 again, precipitates body refuse The sewage of lower part in three-level sedimentation basin 13, multiple precipitation process is discharged into city planting ductwork by water outlet 15, thus realization pair The processing of sewage;Since the first overflow port 21, the second overflow port 31 and water outlet 15 are respectively at the top of precipitating body 10, this Sample is effectively ensured and is adequately precipitated to sewage;In the case where the construction spaces such as foundation pit or groove are relatively narrow, by right The lifting of lifting lug 40 realizes that, to the precipitating movement of body 10, satisfaction realizes sewage treatment on the spot.
It precipitates body 10 and is equipped with the first demarcation plate 20 and the second demarcation plate 30, the first demarcation plate 20 and the second demarcation plate 30 divide Mutual disconnected first stage precipitation tank 11, second-level settling pond 12 and three-level sedimentation basin 13, the first demarcation plate are formed every precipitating body 10 First overflow port 21 is formed at 20 top, and the second overflow port 31 is formed at the top of the second demarcation plate 30;Realize untreated sewage Into multiple precipitation process, to meet the discharge standard of sewage.
First overflow port 21 and the second overflow port 31 are in dislocation arrangement;The benefit being arranged in this way is, when second-level settling pond 12 When storing sewage to the second overflow port 31 of preliminary sedimentation processing, the sewage for avoiding preliminary sedimentation from handling passes through the first overflow port 21 It flows directly into the second overflow port 31 and flows into three-level sedimentation basin 13, to influence the precipitation process effect to sewage.
In addition, facilitating the movement routine of the sewage of increase preliminary sedimentation processing, to enhance the dirt of second-level settling pond 12 Water sedimentation treatment effect.
Also, the first overflow port 21 is with inlet port 14 in dislocation arrangement;The benefit being arranged in this way is, when first stage precipitation tank is deposited When storing up sewage to the first overflow port 21, sewage is avoided directly to be immediately discharged to two-stage precipitation from water inlet 14 by the first overflow port 21 Pond 12 influences the precipitation process effect to sewage;Meanwhile facilitate increase sewage first stage precipitation tank 11 movement routine, from And enhance the settlement of sewage treatment effect of first stage precipitation tank 11.
Furthermore the second overflow port 31 is with water outlet 15 in dislocation arrangement;The benefit being arranged in this way is, when three-level sedimentation basin 13 When storing sewage to water outlet 15, sewage is avoided directly to be immediately discharged to city planting ductwork from the second overflow port 31 by water outlet 15, Influence wastewater treatment efficiency;Meanwhile helping to increase sewage in the movement routine of three-level sedimentation basin 13, to enhance three-level precipitating The settlement of sewage treatment effect in pond 13.
Inlet port 14, the first overflow port 21, the second overflow port 31 and water outlet 15 successively in dislocation arrangement, greatly enhance Movement routine of the sewage in precipitating body 10, to enhance the settlement of sewage treatment effect of precipitating body 10.
Precipitating body 10 includes two side walls, and the two sides of the first demarcation plate 20 contradict two side walls, the second demarcation plate 30 respectively Two sides contradict two side walls respectively;Along towards one sidewall direction, the first demarcation plate 20 forms the first side opening, one side Wall blocks the first side and is open to form the first overflow port 21, and along towards another sidewall direction, the second demarcation plate 30 forms second side End opening, another side wall block second side end opening and form the second overflow port 31;Realize the first overflow port 21 and the second overflow port 31 in dislocation arrangement.
Along from top to bottom, the first overflow port 21 and the second overflow port 31 distinguish arrangement in rectangular shape, to guarantee to handle Sewage afterwards, which has, sufficiently longitudinally discharges distance;Guarantee repeatedly to carry out precipitation process to sewage.
First stage precipitation tank 11 has and can accommodate the first volume of sewage quantity, and second-level settling pond 12 has and can accommodate sewage quantity Second volume, three-level sedimentation basin 13 have and can accommodate the third volume of sewage quantity, and the first volume is respectively greater than the second volume and the Three volumes;The amount of untreated sewage, body refuse is larger, then needs bigger subsidence volumn, to guarantee there is enough appearances Product precipitates body refuse;Meanwhile the sewage precipitated by the sewage of preliminary sedimentation and again, body refuse amount is relatively fewer, Therefore, the second volume and third volume are opposite with for the first volume, effectively avoid the waste of volume.
First order sedimentation basin 11 is having a size of long 2m, width 2m, high 2m, and second level sedimentation basin 12 is having a size of long 1.5m, width 2m, height 2m, third level sedimentation basin 13 is having a size of long 1.5m, width 2m, high 2m;Meet in this way construction space it is relatively narrow in the case where, meet Sewage treatment is realized on the spot.
The lower part for precipitating body 10 is equipped with the sewage draining exit 16 that multiple body refuses for settlement of sewage discharge, multiple blowdowns and level-one Sedimentation basin 11, second-level settling pond 12 and three-level sedimentation basin 13 correspond arrangement;By each 16 external pipe of sewage draining exit, from And the body refuse of 13 bottom of 11 bottom of first stage precipitation tank, 12 bottom of second-level settling pond and three-level sedimentation basin is in convenient for discharge.
Furthermore sewage draining exit 16 is equipped with controlled valve 17, and when carrying out sewage treatment, controlled valve 17 is in closed state, valve Door, which is closed, prevents sewage from leaking outside;Before precipitating body 10 terminates every section of pipeline network construction displacement, controlled valve 17 is in open state, thus The body refuse of the bottom of the bottom for being deposited in first stage precipitation tank 11, the bottom of second-level settling pond 12 and three-level sedimentation basin 13 is arranged Out.
Precipitate body 10 in a rectangular parallelepiped shape, multiple lifting lugs 40 are respectively provided at four angles at the top of precipitating body 10;Hang precipitating When body 10, the equal fixed hoisting tool of lifting lug 40 on four angles of body 10 is precipitated, to improve the stability that precipitating body 10 lifts by crane And safety.
In addition, lifting lug 40 can be fixed with the side for precipitating body 10 respectively, enhance the setting stability of lifting lug 40.
Furthermore lifting lug 40 has the hanged end for extending to 10 top of precipitating body, and arch upward arc-shaped shape arrangement upward at hanged end; It is connect convenient for lifting lug 40 with lifting tool.
After deslagging, the lifting for just carrying out precipitating body 10 is mobile, in this way, hole capital after selling all securities lifting is effectively ensured, to guarantee to lift Safety.
Water inlet 14 is in the top of precipitating body 10;In this way, after the sewage in three-level sedimentation basin 13 sufficiently precipitates, just from Water inlet 14 is discharged into city planting ductwork, and making that treated, sewage meets discharge standard.
The first shutter 22 that the top of first overflow port 21 is equipped with, the first shutter 22 is along away from 11 side of first stage precipitation tank To the arrangement that extends horizontally;Under the action of the first shutter 22, the effluent flow rate for avoiding preliminary sedimentation from handling is too fast, and it is heavy to splash out Shallow lake body 10 influences the processing of sewage.
The top of second overflow port 31 also is provided with the second shutter 32 and avoids again under the action of the second shutter 32 The effluent flow rate of precipitation process is too fast, splashes out precipitating body 10, influences the processing of sewage.
The formation top opening for precipitating body 10, under the action of top opening, the top of first stage precipitation tank 11, two-stage precipitation The top in pond 12 and the top of three-level sedimentation basin 13 are in open state, in this way, convenient for the intuitive sediment effect for clearly precipitating body 10 Fruit.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (10)

1. mobile sewage treatment multi stage precipitation device, which is characterized in that including with first stage precipitation tank, second-level settling pond and three The precipitating body of grade sedimentation basin and multiple lifting lugs being located at the top of precipitating body, the precipitating body are formed with water inlet, the first overflow Mouth, the second overflow port and water outlet;Untreated sewage is pumped into first stage precipitation tank by the water inlet by water pump, by described First overflow port makes the sewage after the first stage precipitation tank precipitation process enter the second-level settling pond, passes through described second Overflow port makes the sewage after the second-level settling pond precipitation process enter the three-level sedimentation basin, will by the water outlet Sewage after the three-level sedimentation basin precipitation process is discharged into city planting ductwork;First overflow port, second overflow port And the water outlet is respectively at the top of the precipitating body.
2. movable type sewage treatment multi stage precipitation device as described in claim 1, which is characterized in that the precipitating body is equipped with the Precipitating body, which is formed, described in one demarcation plate and the second demarcation plate, first demarcation plate and second divides does not connect mutually The logical first stage precipitation tank, the second-level settling pond and the three-level sedimentation basin, the top of first demarcation plate is formed Second overflow port is formed at first overflow port, the top of second demarcation plate.
3. movable type sewage treatment multi stage precipitation device as claimed in claim 2, which is characterized in that first overflow port with Second overflow port is in dislocation arrangement.
4. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that described one Grade sedimentation basin has the first volume that can accommodate sewage quantity, and the second-level settling pond has the second volume that can accommodate sewage quantity, The three-level sedimentation basin has the third volume that can accommodate sewage quantity, and first volume is respectively greater than second volume and institute State third volume.
5. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that described heavy The lower part of shallow lake body is equipped with the sewage draining exit that multiple body refuses for settlement of sewage discharge, and multiple sewage draining exits and the level-one precipitate Pond, the second-level settling pond and the three-level sedimentation basin correspond arrangement.
6. movable type sewage treatment multi stage precipitation device as claimed in claim 5, which is characterized in that the sewage draining exit is equipped with and opens Closing valve, when carrying out sewage treatment, the controlled valve is in closed state;When carrying out body refuse discharge, the controlled valve It is in open state.
7. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that described heavy In a rectangular parallelepiped shape, multiple lifting lugs are respectively provided at four angles at the top of the precipitating body to shallow lake body;The lifting lug, which has, to be extended Hanged end to the precipitating body, arch upward arc-shaped shape arrangement upward at the hanged end.
8. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that it is described into The mouth of a river is formed in the top of the precipitating body.
9. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that described the The top of one overflow port is equipped with the first shutter, and first shutter extends horizontally along away from the first stage precipitation tank direction Arrangement.
10. movable type sewage treatment multi stage precipitation device as claimed in any one of claims 1-3, which is characterized in that described The top of second overflow port is equipped with the second shutter, and second shutter prolongs along away from the second-level settling pond direction in level Stretch arrangement.
CN201821368265.7U 2018-08-23 2018-08-23 Mobile sewage treatment multi stage precipitation device Active CN208990307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821368265.7U CN208990307U (en) 2018-08-23 2018-08-23 Mobile sewage treatment multi stage precipitation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821368265.7U CN208990307U (en) 2018-08-23 2018-08-23 Mobile sewage treatment multi stage precipitation device

Publications (1)

Publication Number Publication Date
CN208990307U true CN208990307U (en) 2019-06-18

Family

ID=66798943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821368265.7U Active CN208990307U (en) 2018-08-23 2018-08-23 Mobile sewage treatment multi stage precipitation device

Country Status (1)

Country Link
CN (1) CN208990307U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111203008A (en) * 2020-01-08 2020-05-29 广东富源科技股份有限公司 Efficient multistage precipitation tank of sapphire crystal processing equipment coolant liquid powder
CN112337147A (en) * 2020-11-17 2021-02-09 湖南祥柏生态环保科技有限公司 Oil residue separation device for treatment of animals died of diseases
CN113018915A (en) * 2021-02-24 2021-06-25 中冶东方工程技术有限公司 Slag treatment equipment and slag treatment method
CN113288652A (en) * 2021-05-20 2021-08-24 重庆北部宽仁医院 Urine collecting device for nursing
CN113562864A (en) * 2021-08-10 2021-10-29 康恒 Sewage treatment plant of edulcoration
CN115671804A (en) * 2022-11-04 2023-02-03 广东科诺勘测工程有限公司 Municipal administration sewage pipe network rubbish isolating device
CN116371022A (en) * 2023-04-03 2023-07-04 浙江宏电环保股份有限公司 Sectional type efficient sedimentation concentration treatment device suitable for rural domestic sewage

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111203008A (en) * 2020-01-08 2020-05-29 广东富源科技股份有限公司 Efficient multistage precipitation tank of sapphire crystal processing equipment coolant liquid powder
CN112337147A (en) * 2020-11-17 2021-02-09 湖南祥柏生态环保科技有限公司 Oil residue separation device for treatment of animals died of diseases
CN113018915A (en) * 2021-02-24 2021-06-25 中冶东方工程技术有限公司 Slag treatment equipment and slag treatment method
CN113288652A (en) * 2021-05-20 2021-08-24 重庆北部宽仁医院 Urine collecting device for nursing
CN113288652B (en) * 2021-05-20 2022-09-27 重庆北部宽仁医院 Urine collecting device for nursing
CN113562864A (en) * 2021-08-10 2021-10-29 康恒 Sewage treatment plant of edulcoration
CN115671804A (en) * 2022-11-04 2023-02-03 广东科诺勘测工程有限公司 Municipal administration sewage pipe network rubbish isolating device
CN115671804B (en) * 2022-11-04 2023-08-22 广东科诺勘测工程有限公司 Municipal administration sewage pipe network rubbish isolating device
CN116371022A (en) * 2023-04-03 2023-07-04 浙江宏电环保股份有限公司 Sectional type efficient sedimentation concentration treatment device suitable for rural domestic sewage
CN116371022B (en) * 2023-04-03 2024-05-03 浙江宏电环保股份有限公司 Sectional type efficient sedimentation concentration treatment device suitable for rural domestic sewage

Similar Documents

Publication Publication Date Title
CN208990307U (en) Mobile sewage treatment multi stage precipitation device
CN106746030A (en) A kind of inorganic chemical industry purification tank for liquid waste for improving waste water cleannes
CN207468338U (en) A kind of multi stage precipitation coal-contained wastewater processing system
CN105863021A (en) Fragmentation closure regulation and storage discharging system
CN206621840U (en) A kind of efficiently removable three-level sedimentation tank device
CN204825797U (en) Can subside, arrange husky hydraulic engineering pipeline
CN207101976U (en) A kind of drainage arrangement
CN204637771U (en) A kind of parallel sewage sedimentation device
CN207734659U (en) Bidirectional flow tipping plate clarifying basin
CN102108721A (en) Water distribution water yielding device and rainwater collecting pool provided with same
CN204841189U (en) Rain water treatment facilities
CN105672404A (en) Lateral water inlet water intake structure
CN109331506A (en) Vertical sedimentation tank
CN202246359U (en) Gravity settlement sludge thickening tower
CN104631612A (en) Flushing system for rainwater regulation and storage tanks
CN205954797U (en) Hold drain pipe system
CN205328665U (en) Automatic change stationary flow pipe chute oil removal sedimentation tank
CN212941854U (en) Water treatment sediment filter
CN205035190U (en) Deposit degreaser
CN212293272U (en) Mud-water slurry mud-water separation system
CN108360646A (en) Pipe gallery dmp filter blowdown is regulated and stored device
CN208742006U (en) A kind of mud-water separation settling system
CN113522856A (en) Workshop waste water, waste recovery system are built to PC intelligence
CN207324175U (en) A kind of environment-friendly sewage sedimentation basin
CN207575892U (en) Efficient waste water pumping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant