CN208982129U - The efficient Turbo-generator Set of the resectable wide load of partial-cylinder - Google Patents

The efficient Turbo-generator Set of the resectable wide load of partial-cylinder Download PDF

Info

Publication number
CN208982129U
CN208982129U CN201821662488.4U CN201821662488U CN208982129U CN 208982129 U CN208982129 U CN 208982129U CN 201821662488 U CN201821662488 U CN 201821662488U CN 208982129 U CN208982129 U CN 208982129U
Authority
CN
China
Prior art keywords
cylinder
excision
pressure cylinder
high pressure
low pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821662488.4U
Other languages
Chinese (zh)
Inventor
祝建飞
吕晓东
姚峻
杨天海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Original Assignee
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Minghua Electric Power Technology and Engineering Co Ltd filed Critical Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority to CN201821662488.4U priority Critical patent/CN208982129U/en
Application granted granted Critical
Publication of CN208982129U publication Critical patent/CN208982129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Turbines (AREA)

Abstract

The utility model relates to a kind of efficient Turbo-generator Sets of the resectable wide load of partial-cylinder, the Steam Turbine respectively with boiler, heater is connected with condenser, the Steam Turbine includes sequentially connected high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder, the high pressure cylinder respectively with the main steam line of boiler, the cold reheaing steam pipe of boiler is connected with heater, the high pressure cylinder includes excision high pressure cylinder and reservation high pressure cylinder, the intermediate pressure cylinder includes excision intermediate pressure cylinder and reservation intermediate pressure cylinder, the low pressure (LP) cylinder includes excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder, when load is higher than given threshold, whole cylinders work into vapour simultaneously, excision high pressure cylinder therein is cut off when load is lower than given threshold;Excision intermediate pressure cylinder therein and excision low pressure (LP) cylinder are also cut off simultaneously.Compared with prior art, the utility model has many advantages, such as to improve the cycle efficieny under sub-load, realizes the wide load high-efficiency and economic operation of Steam Turbine.

Description

The efficient Turbo-generator Set of the resectable wide load of partial-cylinder
Technical field
The utility model relates to field of thermal power, more particularly, to a kind of resectable wide load efficient gas of partial-cylinder Turbine generator group.
Background technique
The distribution way of steam of steam turbine of thermal power plant group mainly divides two major classes: i.e. full admission flow restriction control and partial admission nozzle It adjusts, since full admission unit does not have governing stage, high pressure cylinder efficiency is relatively high, all opens in newly-built super (super-) critical unit Begin in this way.It is most economical using high-pressure governing valve standard-sized sheet sliding pressure operation, but in middle-low load for this kind of unit Place makes main steam pressure decline more, often operates in subcritical region, do not give full play to super (super) face after sliding pressure operation The due clean and effective feature of boundary's unit.High-pressure governing valve is turned down, although main steam pressure can be improved, due to pitch restriction loss The reasons such as increasing lose more than gain instead.The reduction of this initial conditions of main steam pressure under middle-low load causes cycle efficieny aobvious Decline is write, net coal consumption rate rises more.
But then, due to China's energy resource structure feature, fired power generating unit as a kind of basic generation mode long-term existence, And peak load regulation network or depth peak regulation are participated in, often operate at middle-low load.It is especially a large amount of in new energy such as current wind-powered electricity generation, photovoltaics Under the background that access and extra-high voltage grid are transferred electricity from the west to the east on a large scale, thermoelectricity flexibility control and peaking operation are proposed more High request.
Utility model content
The purpose of this utility model is exactly to provide a kind of partial-cylinder to overcome the problems of the above-mentioned prior art The efficient Turbo-generator Set of resectable width load realizes the wide load of Steam Turbine to improve the cycle efficieny under sub-load High-efficiency and economic operation.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder, the Steam Turbine respectively with boiler, heating Device is connected with condenser, and the Steam Turbine includes sequentially connected high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder, the high pressure cylinder It is connect respectively with the main steam line of boiler, the cold reheaing steam pipe of boiler and heater, the high pressure cylinder includes excision High pressure cylinder and reservation high pressure cylinder, the intermediate pressure cylinder include excision intermediate pressure cylinder and retain intermediate pressure cylinder, and the low pressure (LP) cylinder is including cutting Except low pressure (LP) cylinder and retain low pressure (LP) cylinder.
Preferably, the main steam line of the boiler by respective valve and excision high pressure cylinder and retains high pressure respectively Cylinder connection.
Preferably, the excision high pressure cylinder and reservation high pressure cylinder are coaxially arranged in opposite directions, the excision intermediate pressure cylinder and guarantor Intermediate pressure cylinder is stayed coaxially to arrange in opposite directions.
Preferably, there are four the low pressure (LP) cylinder is set, wherein three are reservation low pressure (LP) cylinder, one is excision low pressure (LP) cylinder, institute The excision low pressure (LP) cylinder stated coaxially arranges that other two retains low pressure (LP) cylinder coaxially opposite cloth with one of low pressure (LP) cylinder that retains in opposite directions It sets.
Preferably, the excision high pressure cylinder and reservation high pressure cylinder have steam extraction all the way, and heater is entered after summarizing.
Preferably, boiler increase hot reheat steam line all the way, the hot reheat steam line and excision high pressure cylinder Connection.
Preferably, the excision high pressure cylinder is connect by high ventilation valve of arranging with condenser, and the excision intermediate pressure cylinder is logical Row's ventilation valve is connect with condenser in crossing.
Preferably, removed excision high pressure cylinder is the high pressure cylinder for maintaining 3000rpm rated speed, in removed excision Cylinder pressure is the intermediate pressure cylinder for maintaining 3000rpm rated speed, and removed excision low pressure (LP) cylinder is the low of maintenance 3000rpm rated speed Cylinder pressure.
Preferably, the intermediate pressure cylinder is connected with excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder respectively by intermediate pressure cylinder blow-off line It connects, is wherein equipped with low pressure (LP) cylinder between intermediate pressure cylinder blow-off line and excision low pressure (LP) cylinder and cuts off pitch.
Preferably, the excision high pressure cylinder and reservation high pressure cylinder split axle are arranged, in the excision intermediate pressure cylinder and reservation The setting of cylinder pressure split axle, the excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder split axle setting, the excision high pressure cylinder, excision intermediate pressure cylinder Sequentially coaxially it is arranged with excision low pressure (LP) cylinder, the reservation high pressure cylinder, reservation intermediate pressure cylinder and reservation low pressure (LP) cylinder are sequentially coaxially arranged.
Compared with prior art, the utility model has the advantage that
1, using the resectable arrangement of partial-cylinder, and by cut-out high pressure cylinder synchronous under middle-low load, in Cylinder pressure and low pressure (LP) cylinder improve main steam pressure, to greatly improve generating set under the premise of not sacrificing operation cylinder efficiency Performance driving economy is pushed further into energy-saving and emission-reduction;
2, coaxially arranged and split axle can choose for part excision cylinder and arranges two ways, vapour is cut off when coaxially arranged Cylinder maintains very hot state, and keeps 3000rpm rated speed, convenient for quickly restoring loaded-up into vapour;Split axle is cut off when arranging Cylinder is in jiggering state, when recovery need first to carry out red switch and and net operation, but shafting length shortens, and enhancing shafting is stablized Property.
Detailed description of the invention
Fig. 1 is the efficient steam turbine principle heating power system of wide load that the utility model partial-cylinder can cut off (coaxially arranged) System figure;
Fig. 2 is the efficient steam turbine principle heating power system of wide load that the utility model partial-cylinder can cut off (split axle arrangement) System figure;
Fig. 3 is the imaginary heat consumption rate and load relational graph that the utility model specific embodiment high pressure divides cylinder to cut off.
Wherein 1 is excision high pressure cylinder, and 2 is retain high pressure cylinder, and 3 be excision intermediate pressure cylinder, and 4 is retain intermediate pressure cylinder, and 41 be middle pressure Cylinder blow-off line, 5 is retain low pressure (LP) cylinder, and 6 be excision low pressure (LP) cylinder, and 7 be boiler, and 71 be main steam line, and 72 be reheat heat steam Pipeline, 73 be cold reheaing steam pipe, and 8 be high-pressure heater, and 9 be condenser, and 10 be feed pump, and 11 be high row's ventilation valve, 12 Pitch is cut off for middle row's ventilation valve, 13 for low pressure (LP) cylinder.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model It clearly and completely describes, it is clear that described embodiment is a part of the embodiment of the utility model, rather than is all implemented Example.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained all should belong to the range of the utility model protection.
For full admission throttle-governed turbine group, high-pressure governing valve standard-sized sheet sliding pressure operation is most economical, but in Since main steam pressure declines to a great extent under underload, so that cycle efficieny declines, this factor is fired power generating unit under middle-low load The main reason for less economical.If only simply turning down high-pressure governing valve, although main steam pressure can be improved, increase Pitch restriction loss, high pressure cylinder efficiency decline, runs counter to desire instead.If a method can be found, high pressure cylinder is not being reduced Under the premise of efficiency, main steam pressure is improved, it will greatly promote the performance driving economy under middle-low load.
The unit of super (super-) critical single reheat at present has high pressure cylinder, intermediate pressure cylinder, low pressure (LP) cylinder respectively, wherein intermediate pressure cylinder, low pressure The quantity of cylinder may be 2 or multiple, but high pressure cylinder is all 1.If 2 can be split up into 1 high pressure cylinder, in high load capacity 2, region high pressure cylinder works into vapour simultaneously, and wherein 1 is cut off under middle-low load, to reduce the overall through-current capability of high pressure cylinder, Main steam pressure can thus be increased substantially.And the high pressure cylinder for continuing to run, initial steam pressure improves but exhaust steam pressure Constant, pressure ratio increasing in front and back may be decreased flow efficiency, therefore also cut off 1 intermediate pressure cylinder simultaneously, so that high row pressure power also accordingly increases Add, the pressure ratio of such high pressure cylinder can be basically unchanged.Same reason, in order to enable the intermediate pressure cylinder pressure ratio continued to run is substantially not Become, also 1 low pressure (LP) cylinder of Synchronous resection.In this way, the high pressure cylinder continued to run, intermediate pressure cylinder, low pressure (LP) cylinder can keep higher cylinder to imitate Rate, to become a kind of Steam Turbine of novel wide load efficiency power generation.
Its principled thermal system arrangement is as shown in Figure 1, the efficient Turbo-generator Set of the resectable wide load of partial-cylinder It is connect respectively with boiler 7, high-pressure heater 8 and condenser 9, the Steam Turbine includes sequentially connected high pressure cylinder, middle pressure Cylinder and low pressure (LP) cylinder, the high pressure cylinder respectively with the main steam line 71 of boiler 7, the cold reheaing steam pipe 73 of boiler 7, high pressure Heater 8 connects, and the high pressure cylinder includes excision high pressure cylinder 1 and retains high pressure cylinder 2, and the intermediate pressure cylinder includes pressing in excision Cylinder 3 and reservation intermediate pressure cylinder 4, the low pressure (LP) cylinder include cutting off low pressure (LP) cylinder 6 and retaining low pressure (LP) cylinder 5.
Hot reheat steam line 72 increases to be connect with excision high pressure cylinder 1 all the way, high pressure cylinder after cutting off for heating, in order to Fast quick-recovery uses.In addition, using original hot reheat steam line and middle pressure pitch, or the small bypass of pitch is pressed in increase, Excision intermediate pressure cylinder 3 is heated, in order to the use of fast quick-recovery.
The excision high pressure cylinder 1 is connect by high ventilation valve 11 of arranging with condenser 9, and the excision intermediate pressure cylinder 3 passes through Middle row's ventilation valve 12 is connect with condenser 9, will be cut off high pressure cylinder respectively and is cut off the steam and air blast frictional heat in intermediate pressure cylinder Condenser is drained by vacuum suction.
The excision intermediate pressure cylinder 3 and retain intermediate pressure cylinder 4 by intermediate pressure cylinder blow-off line 41 respectively with excision low pressure (LP) cylinder 6 and Retain low pressure (LP) cylinder 5 to connect, is wherein equipped with low pressure (LP) cylinder between intermediate pressure cylinder blow-off line 41 and excision low pressure (LP) cylinder 6 and cuts off pitch 13.
Fig. 1 high pressure cylinder is divided into 2, and coaxial opposite arrangement, with balancing axial thrust, resectable high pressure cylinder is with shade table Show.The quantity of intermediate pressure cylinder remains unchanged, and original 2 intermediate pressure cylinder capacity are the same, is now fitted according to the capacity ratio of 2 high pressure cylinders Work as adjustment, resectable intermediate pressure cylinder is with shadow representation.Again 1 in original 4 low pressure (LP) cylinders is designed to cut off, referring to figure Band shade low pressure (LP) cylinder in 1.Main steam respectively enters 2 high pressure cylinder actings when high load capacity, and steam discharge enters boiler reheating after summarizing.Heat Reheated steam respectively enters 2 intermediate pressure cylinder actings, and steam discharge, which enters low pressure (LP) cylinder after summarizing, to be continued to do work.2 high pressure cylinders have all the way Steam extraction enters #1 high and adds after summarizing.Increase reheat heat steam all the way and enter removed high pressure cylinder from high-pressure governing valve, is used to add High pressure cylinder after thermally resecting, in order to the use of fast quick-recovery.The high row's ventilation valve of setting and middle row's ventilation valve, will cut off high pressure respectively Steam and air blast frictional heat in cylinder and intermediate pressure cylinder drain into condenser by vacuum suction.Original intermediate pressure cylinder steam discharge is to low pressure (LP) cylinder There is no pitch on into the mesolow cross over pipe of vapour, now increases by 1 pitch and be used to cut off low pressure (LP) cylinder.
After such arrangement, high pressure cylinder steam admission mode is changed, so that high pressure cylinder efficiency and main steam pressure It changes, cycle efficieny can be improved in terms of high pressure cylinder efficiency and initial conditions two.Intermediate pressure cylinder and low is also changed simultaneously Cylinder pressure steam admission mode, so that reheated steam pressure changes, but reheat pressure variation has substantially no effect on cycle efficieny.In addition, This scheme influences very little to boiler efficiency.Certainly under middle-low load, since the rising meeting of main steam pressure is so that feed pump Wasted work rises, and increases small machine steam consumption, but initial conditions raising substantially improves cycle efficieny, in addition feed temperature meeting under middle-low load It increases, so that backheat effect is improved, therefore generally heat consumption rate can decreased significantly.
In view of the demand of peak load regulation, it might have in one day and come into operation and cut off for several times cylinder, to avoid frequent red switch And use is coaxially arranged, removed high, medium and low cylinder pressure still maintains 3000rpm rated speed, and it is logical to need to open high row at this time Air-valve and middle row's ventilation valve are to take away air blast frictional heating.High intermediate pressure cylinder is also needed to be passed through steaming in right amount according to cylinder temperature situation of change Vapour heating, to maintain certain cylinder temperature, convenient for quickly into vapour and on-load, heating vapour source and being all made of heat steam again, wherein for Intermediate pressure cylinder can be passed through steam heating by original middle pressure pitch, can also increase and bypass pitch all the way, and for high pressure cylinder It then needs to increase pipeline all the way to be heated to introduce reheat heat steam, is detailed in Fig. 1.In addition, for low pressure (LP) cylinder, it is also necessary to be passed through A certain amount of steam, to take away air blast frictional heating.
For those using the unit of " two-shift " peak regulation method, it is also contemplated that senior middle school's low pressure (LP) cylinder of part excision will be needed Split axle arrangement, can also shorten shafting length in this way, increase shafting job stability.Its principled thermal system arrangement such as Fig. 2 Shown, the lower left Fig. 2 is resectable senior middle school's low pressure (LP) cylinder with dash area.According to this arrangement, in middle-low load A lower axis of directly stopping transport promotes main steam pressure to realize Synchronous resection to reach under middle-low load, improve cycle efficieny Purpose.Removed senior middle school's low pressure (LP) cylinder puts into jiggering stand-by heat at this time, needs first red switch to rated speed when working again 3000rpm, then grid-connected loaded-up again.
After dividing cylinder to design, so that the blade of 2 high pressure cylinders shortens, increases blade-end loss, high pressure cylinder may be will affect Efficiency, can by optimization design as close possible to using independent high pressure cylinder when efficiency value.In addition, to the appearance of original intermediate pressure cylinder Amount distribution is adjusted, and may also will affect IP efficiency, but this influence can also be reduced by optimization design, is tieed up Hold the higher operational efficiency of intermediate pressure cylinder.
This resectable scheme of partial-cylinder is also fully applicable for super (super-) critical double reheat power generation sets, need at this time by Ultra-high pressure cylinder and high pressure cylinder are divided into two, one of them can cut off, other variations are similar.
Specific embodiment
By taking a super (super-) critical 1000MW single reheat unit as an example, steam turbine is using throttling distribution way of steam, high pressure tune Door standard-sized sheet sliding pressure operation, main steam pressure is lower under middle-low load, influences unit economy.High, medium and low cylinder pressure is used thus The arrangement of part excision, it is contemplated that high pressure cylinder building block setting series and peak load regulation burden requirement, by original 1000MW The high pressure cylinder of unit is divided into 2 high pressure cylinders, respectively original 660MW unit and the corresponding high pressure cylinder of 350MW unit, 2 height The acting of cylinder pressure and through-current capability are arranged substantially according to the relationship of 2:1.In addition, original 2 intermediate pressure cylinder capacity are identical, now according to 1 in original 4 low pressure (LP) cylinders is designed to cut off by the relationship of 2:1 to adjust amount of capacity, is cut so that cylinder synchronizes Except when high pressure cylinder and the pressure ratio of intermediate pressure cylinder be basically unchanged.In this way more than 660MW load using 2 high pressure cylinders, 2 intermediate pressure cylinders and The mode that 4 low pressure (LP) cylinders work into vapour simultaneously, 1 small high pressure cylinder of the following Synchronous resection of 660MW load, 1 small intermediate pressure cylinder and One low pressure (LP) cylinder improves main steam pressure under the premise of not reducing operation cylinder efficiency, to improve cycle efficieny.Using this After mode, in the typical change curve such as Fig. 3 of thermal loss of steam turbine rate shown in " imaginary heat consumption rate ".Preliminary analysis, it is negative 50% There are about the declines of 3.8% heat consumption rate by He Chu, and unit net coal consumption rate is about made to decline 10g/kW.h, energy-saving effect highly significant.
After the resectable coaxially arranged mode of partial-cylinder, on-load and peaking operation process are as follows:
1. unit realizes red switch and load carrying using senior school biology mode, until rated load;
2. after unit has peak modulation capacity, keeping whole cylinders to run simultaneously in 660MW load area above;
3. when load is lower than 660MW and the long period of having operates in intermediate/low load region, then start to carry out excision operation, Slowly turn down corresponding high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder into vapour pitch, the transfer of throttle flow is done step-by-step, until the part vapour Cylinder complete resection;
4. removed high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder maintain rated speed, corresponding high row's ventilation valve and middle row are opened Ventilation valve, to take away air blast frictional heat;For removed low pressure (LP) cylinder, to be then passed through a small amount of steam and be used to cool down, to take away The air blast frictional heat of low-pressure rotor blade.
5. in the operation of 660MW load following region, small high pressure cylinder and small intermediate pressure cylinder are always in excision state, and according to cylinder Warm situation of change is passed through appropriate reheated steam and carries out warm cylinder heating, to maintain excision height, the suitable temperature of intermediate pressure cylinder, convenient for fast Speed is into vapour on-load;
6. when load prepare increase more than 660MW when, gradually open accordingly cut off cylinder into vapour pitch so that these vapour Cylinder is again introduced into working condition;
After the resectable split axle arrangement of partial-cylinder, on-load and peaking operation process are as follows:
1. unit realizes red switch and load carrying using senior school biology mode, until rated load;
2. after unit has peak modulation capacity, keeping whole cylinders to run simultaneously in 660MW load area above;
3. when load is lower than 660MW and the long period of having operates in intermediate/low load region, then start to carry out excision operation, Slowly turn down corresponding high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder into vapour pitch, the transfer of throttle flow is done step-by-step, until the part vapour Cylinder complete resection, the shaft generator off-the-line;
4. removed high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder waits for maintaining jiggering revolving speed after coasting operation, it is in stand-by heat shape State.
5. when load prepares to increase more than 660MW, first by axis rotor progress red switch to rated speed 3000rpm, Carry out later it is grid-connected, gradually opened again after grid-connected it is big accordingly into vapour pitch so that these cylinders are again introduced into working condition;
Dividing cylinder design and running in this way controls, and Steam Turbine economical operation can be realized in wide load area.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, can be readily occurred in various Equivalent modifications or substitutions, these modifications or substitutions should be covered within the scope of the utility model.Therefore, this is practical Novel protection scope should be subject to the protection scope in claims.

Claims (10)

1. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder, the Steam Turbine respectively with boiler, heater It is connected with condenser, the Steam Turbine includes sequentially connected high pressure cylinder, intermediate pressure cylinder and low pressure (LP) cylinder, the high pressure cylinder point It is not connect with the main steam line of boiler, the cold reheaing steam pipe of boiler and heater, which is characterized in that the high pressure cylinder Including excision high pressure cylinder and retain high pressure cylinder, the intermediate pressure cylinder is including excision intermediate pressure cylinder and retains intermediate pressure cylinder, the low pressure Cylinder includes excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder.
2. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In the main steam line of the boiler passes through respective valve respectively and connect with excision high pressure cylinder and reservation high pressure cylinder.
3. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In the excision high pressure cylinder and reservation high pressure cylinder coaxially arrange that the excision intermediate pressure cylinder and reservation intermediate pressure cylinder are coaxial in opposite directions Opposite arrangement.
4. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In there are four the low pressure (LP) cylinder is set, wherein three is retain low pressure (LP) cylinder, one is excision low pressure (LP) cylinder, the excision low pressure Cylinder coaxially arranges that other two retains low pressure (LP) cylinder and coaxially arranges in opposite directions with one of low pressure (LP) cylinder that retains in opposite directions.
5. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In the excision high pressure cylinder and reservation high pressure cylinder have steam extraction all the way, and heater is entered after summarizing.
6. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In hot reheat steam line, the hot reheat steam line are connect with excision high pressure cylinder all the way for the boiler increase.
7. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In the excision high pressure cylinder is connect by high ventilation valve of arranging with condenser, and the excision intermediate pressure cylinder passes through middle row's ventilation valve It is connect with condenser.
8. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 7, feature exist In removed excision high pressure cylinder is the high pressure cylinder for maintaining 3000rpm rated speed, and removed excision intermediate pressure cylinder is to maintain The intermediate pressure cylinder of 3000rpm rated speed, removed excision low pressure (LP) cylinder are the low pressure (LP) cylinder for maintaining 3000rpm rated speed.
9. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In the intermediate pressure cylinder is connect with excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder respectively by intermediate pressure cylinder blow-off line, wherein intermediate pressure cylinder Low pressure (LP) cylinder, which is equipped with, between blow-off line and excision low pressure (LP) cylinder cuts off pitch.
10. a kind of efficient Turbo-generator Set of the resectable wide load of partial-cylinder according to claim 1, feature exist In, the excision high pressure cylinder and reservation high pressure cylinder split axle are arranged, the excision intermediate pressure cylinder and reservation intermediate pressure cylinder split axle setting, The excision low pressure (LP) cylinder and reservation low pressure (LP) cylinder split axle setting, the excision high pressure cylinder, excision intermediate pressure cylinder and excision low pressure (LP) cylinder Sequentially coaxially it is arranged, the reservation high pressure cylinder, reservation intermediate pressure cylinder and reservation low pressure (LP) cylinder are sequentially coaxially arranged.
CN201821662488.4U 2018-10-12 2018-10-12 The efficient Turbo-generator Set of the resectable wide load of partial-cylinder Active CN208982129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821662488.4U CN208982129U (en) 2018-10-12 2018-10-12 The efficient Turbo-generator Set of the resectable wide load of partial-cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821662488.4U CN208982129U (en) 2018-10-12 2018-10-12 The efficient Turbo-generator Set of the resectable wide load of partial-cylinder

Publications (1)

Publication Number Publication Date
CN208982129U true CN208982129U (en) 2019-06-14

Family

ID=66787378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821662488.4U Active CN208982129U (en) 2018-10-12 2018-10-12 The efficient Turbo-generator Set of the resectable wide load of partial-cylinder

Country Status (1)

Country Link
CN (1) CN208982129U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042881A (en) * 2018-10-12 2020-04-21 上海明华电力技术工程有限公司 Wide-load high-efficiency steam turbine generator unit with part of cylinders capable of being cut off

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042881A (en) * 2018-10-12 2020-04-21 上海明华电力技术工程有限公司 Wide-load high-efficiency steam turbine generator unit with part of cylinders capable of being cut off

Similar Documents

Publication Publication Date Title
CN111042881A (en) Wide-load high-efficiency steam turbine generator unit with part of cylinders capable of being cut off
CN106979041A (en) A kind of turbine low pressure cylinder high vacuum takes off the remodeling method that cylinder runs thermoelectricity decoupled system
Li et al. Energy efficiency analysis of condensed waste heat recovery ways in cogeneration plant
CN108119200A (en) A kind of new bottom type back pressure heat supply steam turbine and its operation method
CN205477780U (en) A low pressure bypass turbine system for high load condition of large -scale steam turbine
CN108104887B (en) Thermodynamic system with double reheating
CN206972325U (en) A kind of small turbine vapour source automatically switches and regulating system
Liu et al. Performance analysis of partially recuperative gas turbine combined cycle under off-design conditions
CN108843412A (en) A kind of Steam Turbine Regenerative System
CN110159371B (en) System and method for cylinder cutting operation of multi-low pressure cylinder steam turbine under partial load
CN104976671A (en) Wide-load heat supply energy-saving system of back pressure type small turbine drive water supply pump
CN205744007U (en) Vapour electricity mixed power device and there is its thermal power generation system
CN106949521A (en) A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum
CN113339089A (en) Efficient peak regulation steam turbine system and working method thereof
CN107060918A (en) A kind of many low pressure (LP) cylinder steam turbine generator set system optimization device and methods
CN111749744A (en) Hot primary air heating system of secondary reheating coal-fired power generating unit
CN108060948A (en) A kind of non-high pressure cylinder sets the steam turbine of governing stage
CN208982129U (en) The efficient Turbo-generator Set of the resectable wide load of partial-cylinder
CN103363564A (en) Energy-saving heat supplying system and heat supplying method capable of improving low-grade steam heat utilization efficiency
CN112833378B (en) Reheating system capable of improving heat supply capacity
CN111042879B (en) High-load high-efficiency turbine unit with high and medium pressure cylinders cut off by separate cylinders
CN208982128U (en) The efficient Steam Turbine of wide load that high intermediate pressure cylinder divides cylinder to cut off
CN209011894U (en) Change component multiple pressure with injector evaporates non-azeotropic working medium Rankine cycle system
CN208982127U (en) The efficient Steam Turbine of wide load that high pressure cylinder coaxially divides cylinder to arrange
CN207715198U (en) A kind of condensing turbine group based on sorption type heat pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant