CN208981563U - A kind of shear wall structure system - Google Patents

A kind of shear wall structure system Download PDF

Info

Publication number
CN208981563U
CN208981563U CN201821109124.3U CN201821109124U CN208981563U CN 208981563 U CN208981563 U CN 208981563U CN 201821109124 U CN201821109124 U CN 201821109124U CN 208981563 U CN208981563 U CN 208981563U
Authority
CN
China
Prior art keywords
shear wall
steel bar
precast shear
bar groove
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821109124.3U
Other languages
Chinese (zh)
Inventor
张季超
王可怡
童华炜
简伟通
张岩
沈冬儿
左正轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou University
Original Assignee
Guangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou University filed Critical Guangzhou University
Priority to CN201821109124.3U priority Critical patent/CN208981563U/en
Application granted granted Critical
Publication of CN208981563U publication Critical patent/CN208981563U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides a kind of shear wall structure system, the precast shear wall body and the composite beam between the neighbouring two pieces precast shear wall bodies being laid in from the bottom to top on same vertical plane including multilayer, the composite beam and the neighbouring two pieces precast shear wall bodies pass through one entirety of cast-in-place formation;The precast shear wall body includes concrete wall and several steel bar grooves for vertically opening up along the two sides up and down of the concrete wall, the upside steel bar groove of the downside steel bar groove of upper precast shear wall body and lower precast shear wall body corresponds, deformed bar is equipped in the steel bar groove, the deformed bar runs through two corresponding steel bar grooves of the upper and lower two pieces adjacent precast shear wall bodies, and the both ends of the deformed bar are stretched out steel bar groove and anchored by deformed bar Special ground tackle.There is a possibility that micro-crack in the node point connection up and down that the utility model can reduce shear wall, constructs more convenient succinct, substantially increases construction efficiency.

Description

A kind of shear wall structure system
Technical field
The utility model relates to shear wall field more particularly to a kind of shear wall structure systems.
Background technique
Precast shear wall structure is a kind of towards high-rise, small high-rise public residence structure type, most of component in Prefabrication is assembled at the construction field (site), compared with cast-in-place shear wall structure mode of construction more can energy saving and material, shorten work Phase, there is extensive development space, and the vertical connectivity problem of precast shear wall is one of node connection key technical problem.Mesh Joint reinforcing bar is generally exposed to junction and passes through mechanical sleeves connection, welding by preceding prefabrication shear wall junction The modes such as connect, be bolted, then node is connected using modes such as rear pouring concrete or overlappings.This connection method is easy There is micro-crack in the node point connection up and down of shear wall, and then influences the perception and reliability of structure.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model is to provide a kind of shear wall structure system, easy construction, can There is a possibility that micro-crack in strong operability, the node point connection up and down that can be substantially reducing at shear wall, improve the perception of structure With reliability.
To achieve the above object, a kind of shear wall structure system provided by the utility model, including multilayer is from the bottom to top The precast shear wall body being laid on same vertical plane and the overlapping between the neighbouring two pieces precast shear wall bodies Beam, the composite beam and the neighbouring two pieces precast shear wall bodies pass through one entirety of cast-in-place formation;
The precast shear wall body includes concrete wall and vertically opens up along the two sides up and down of the concrete wall Several steel bar grooves, the upside steel bar groove one of the downside steel bar groove of upper precast shear wall body and lower precast shear wall body is a pair of It answers, deformed bar is equipped in the steel bar groove, the deformed bar runs through the upper and lower two pieces adjacent precast shear walls The corresponding steel bar groove of two of body, and the both ends of the deformed bar stretch out the steel bar groove and pass through the dedicated anchor of deformed bar Tool is anchored.
Further, several mounting grooves for installing the anchorage are additionally provided on the concrete wall.
Further, several steel bar grooves that the two sides up and down of the same concrete wall open up are in be staggered.
Further, the side of the same concrete wall is opened there are two steel bar groove, and the other side is opened there are three steel bar groove, The steel bar groove of two sides is in be staggered.
Further, the adjacent two pieces precast shear wall bodies are symmetrical set.
Further, the left and right sides and bottom of the concrete wall are set to a column reinforced steel bar ring.
Further, the open end 90-degree bent of the reinforced steel bar ring.
A kind of shear wall structure system provided by the utility model compared with the prior art, has following technical effect that
Be set between the neighbouring two pieces precast shear wall bodies by designing the composite beam, the composite beam with it is upper Under adjacent two pieces of precast shear wall bodies pass through one entirety of cast-in-place formation;The precast shear wall body includes concrete wall And several steel bar grooves vertically opened up along the two sides up and down of the concrete wall, the downside reinforcing bar of upper precast shear wall body The upside steel bar groove of slot and lower precast shear wall body corresponds, and deformed bar, the prestressing force are equipped in the steel bar groove Reinforcing bar runs through two corresponding steel bar grooves of the upper and lower two pieces adjacent precast shear wall bodies, and the both ends of the deformed bar It stretches out the steel bar groove and is anchored by deformed bar Special ground tackle;Thus when carrying out the assembling of precast shear wall, Lower precast shear wall body is lifted to target position first, at the top of the precast shear wall alignment place composite beam, then Upper precast shear wall body is lifted to target position;Deformed bar is placed in the steel bar groove again, and in steel bar groove and is folded It closes injection concrete at the cast-in-place part of beam and anchorage is installed at the top of deformed bar after concrete reaches predetermined strength, be used in combination Jack tension deformed bar;It is to be tensioned to after predetermined control stress, stretching end deformed bar is anchored with anchorage;To There is a possibility that micro-crack in the node point connection up and down that can reduce shear wall after the precast shear wall body is completed, It constructs more convenient succinct, while substantially increasing construction efficiency, it is ensured that the quality of engineering.
Detailed description of the invention
It, below will be to attached needed in embodiment in order to illustrate more clearly of the technical solution of the utility model Figure is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the structural schematic diagram of the precast shear wall body of the utility model embodiment;
Fig. 2 is the whole installation diagram of the shear wall structure system of the utility model embodiment.
Wherein, 1, precast shear wall body, 11, concrete wall, 111, steel bar groove, 112, deformed bar, 113, anchorage, 114, mounting groove, 12, reinforced steel bar ring, 2, composite beam.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figures 1 and 2, the utility model embodiment provides a kind of shear wall structure system comprising multilayer by Under the supreme precast shear wall body 1 being laid on same vertical plane and be set to neighbouring two pieces precast shear wall bodies 1 it Between composite beam 2, the composite beam 2 passes through one entirety of cast-in-place formation with the neighbouring two pieces precast shear wall bodies 1;
The precast shear wall body 1 includes concrete wall 11 and vertical along the two sides up and down of the concrete wall 11 Several steel bar grooves 111 opened up, the upside steel bar groove of the downside steel bar groove of upper precast shear wall body and lower precast shear wall body It corresponds, is equipped with deformed bar 112 in the steel bar groove 111, the deformed bar 112 is adjacent through upper and lower two pieces The corresponding steel bar groove 111 of two of the precast shear wall body 1, and the steel bar groove is stretched out at the both ends of the deformed bar 112 It 111 and is anchored by deformed bar Special ground tackle 113;
It is set between the neighbouring two pieces precast shear wall bodies 1 by designing the composite beam 2, the composite beam 2 Pass through one entirety of cast-in-place formation with the neighbouring two pieces precast shear wall bodies 1;The precast shear wall body 1 includes coagulation Cob wall body 11 and several steel bar grooves 111 vertically opened up along the two sides up and down of the concrete wall 11, upper prefabricated shearing The upside steel bar groove of the downside steel bar groove of wall and lower precast shear wall body corresponds, and is equipped in the steel bar groove 111 and answers in advance Power reinforcing bar 112, the deformed bar 112 run through two corresponding reinforcing bars of the upper and lower two pieces adjacent precast shear wall bodies 1 Slot 111, and the both ends of the deformed bar 112 stretch out the steel bar groove 111 and by deformed bar Special ground tackle 113 into Row anchoring;To lower precast shear wall body be lifted to target position first when carrying out the assembling of precast shear wall body 1, Composite beam 2 is placed in the top alignment of the precast shear wall body 1, and then upper precast shear wall body is lifted to target position;Again Deformed bar 112 is placed in the steel bar groove 111, and injects coagulation at steel bar groove 111 and the cast-in-place part of composite beam 2 Soil is answering at the top of muscle 112 installation anchorage 113 after concrete reaches predetermined strength in advance, and with jack tension deformed bar 112;It is to be tensioned to after predetermined control stress, stretching end deformed bar 112 is anchored with anchorage 113;To described prefabricated There is a possibility that micro-crack in shear wall 1 can reduce shear wall node point connection up and down after being completed, and construction is more It is convenient succinct, while substantially increasing construction efficiency, it is ensured that the quality of engineering.
Preferably, several mounting grooves 114 for installing the anchorage 113 are additionally provided on the concrete wall 1.
Preferably, several steel bar grooves 111 that the two sides up and down of the same concrete wall 11 open up are in be staggered. In the utility model embodiment, it is preferable that the side of the same concrete wall 11 is opened there are two steel bar groove 111, another Side is opened there are three steel bar groove 111, and the steel bar groove of two sides is in be staggered.
Preferably, the adjacent two pieces precast shear wall bodies 1 are symmetrical set.
Preferably, the left and right sides and bottom of the concrete wall 11 are set to a column reinforced steel bar ring 12.It is practical new at this In type embodiment, it is preferable that the open end 90-degree bent of the reinforced steel bar ring 12.By in the left and right two of the concrete wall 11 Side and bottom are set to a column reinforced steel bar ring 12, so that the reinforced steel bar ring 12 is right when carrying out the assembling of the precast shear wall body 1 It should be embedded in the prefabricated post of 1 two sides of precast shear wall body, and then improve the stability of the precast shear wall body.
In the utility model embodiment, the composite beam 2 include prefabricated portion and cast-in-place portion, the prefabricated portion with it is described pre- Column processed is bolted, and the cast-in-place portion and the neighbouring two pieces precast shear wall bodies 1 pass through one entirety of cast-in-place formation.
Below with reference to Fig. 1 and Fig. 2, the Specific construction technique of the shear wall structure system described in the utility model embodiment It is described in detail, includes the following steps:
Step 1: the precast shear wall body 1 and prefabricated post, precast floor slab etc. are assembled into modular unit respectively;
Step 2: lower module unit lifting to target position to be aligned at the top of the precast shear wall body 1 and place 2 pre-erection of composite beam, then upper module unit lifting to target position;
Step 3: deformed bar 112 is placed in two corresponding steel bar grooves 111 of upper and lower precast shear wall body 1, Concrete is injected at the steel bar groove 111 and the cast-in-place part of composite beam 2, and is installed described in the both ends indwelling of steel bar groove 111 Slot 114;
Step 4: installing anchor in the mounting groove 114 at 112 both ends of deformed bar after concrete reaches predetermined strength Tool 113, and with jack tension deformed bar 112;
Step 5: after deformed bar 112 tensioning to predetermined control stress, with anchorage 113 by stretching end prestress steel Muscle 112 anchors;
Step 6: injecting concrete in mounting groove 114, that is, complete the assembling of two neighbouring modular units.
In conclusion being set between the neighbouring two pieces precast shear wall bodies 1 by designing the composite beam 2, institute It states composite beam 2 and the neighbouring two pieces precast shear wall bodies 1 passes through one entirety of cast-in-place formation;The precast shear wall body 1 includes concrete wall 11 and several steel bar grooves 111 vertically opened up along the two sides up and down of the concrete wall 11, on The upside steel bar groove of the downside steel bar groove of precast shear wall body and lower precast shear wall body corresponds, in the steel bar groove 111 Equipped with deformed bar 112, the deformed bar 112 runs through two of the upper and lower two pieces adjacent precast shear wall bodies 1 Corresponding steel bar groove 111, and the steel bar groove 111 and dedicated by deformed bar is stretched out at the both ends of the deformed bar 112 Anchorage 113 is anchored;To lower precast shear wall body be lifted to mesh first when carrying out the assembling of precast shear wall body 1 Cursor position, at the top of the precast shear wall body 1, composite beam 2 is placed in alignment, and then upper precast shear wall body is lifted to mesh Cursor position;Deformed bar 112 is placed in the steel bar groove 111 again, and in steel bar groove 111 and the cast-in-place part of composite beam 2 Injection concrete in place's is answering installation anchorage 113 at the top of muscle 112, and use jack tension after concrete reaches predetermined strength in advance Deformed bar 112;It is to be tensioned to after predetermined control stress, stretching end deformed bar 112 is anchored with anchorage 113;To There is the possibility of micro-crack in the node point connection up and down that can reduce shear wall after the precast shear wall body 1 is completed Property, it constructs more convenient succinct, while substantially increasing construction efficiency, it is ensured that the quality of engineering.
Above are merely preferred embodiments of the utility model, it is noted that for the ordinary skill people of the art Member for, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these improve and Replacement also should be regarded as the protection scope of the utility model.

Claims (6)

1. a kind of shear wall structure system, which is characterized in that be laid in from the bottom to top including multilayer prefabricated on same vertical plane Shear wall and the composite beam between the neighbouring two pieces precast shear wall bodies, the composite beam and neighbouring two Precast shear wall body described in block passes through one entirety of cast-in-place formation;
If the precast shear wall body includes concrete wall and vertically opens up along the two sides up and down of the concrete wall The upside steel bar groove of dry steel bar groove, the downside steel bar groove of upper precast shear wall body and lower precast shear wall body corresponds, institute It states and is equipped with deformed bar in steel bar groove, the deformed bar runs through the two of the upper and lower two pieces adjacent precast shear wall bodies A corresponding steel bar groove, and the both ends of the deformed bar are stretched out the steel bar groove and are carried out by deformed bar Special ground tackle Anchoring;The left and right sides and bottom of the concrete wall are equipped with a column reinforced steel bar ring.
2. shear wall structure system as described in claim 1, which is characterized in that be additionally provided on the concrete wall for pacifying Fill several mounting grooves of the anchorage.
3. shear wall structure system as described in claim 1, which is characterized in that the two sides up and down of the same concrete wall Several steel bar grooves opened up are in be staggered.
4. shear wall structure system as claimed in claim 3, which is characterized in that the side of the same concrete wall is provided with Two steel bar grooves, the other side are opened there are three steel bar groove, and the steel bar groove of two sides is in be staggered.
5. shear wall structure system as described in claim 1, which is characterized in that adjacent two pieces of precast shear wall bodies are in pair Claim setting.
6. shear wall structure system as described in claim 1, which is characterized in that the open end 90-degree bent of the reinforced steel bar ring.
CN201821109124.3U 2018-07-12 2018-07-12 A kind of shear wall structure system Active CN208981563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821109124.3U CN208981563U (en) 2018-07-12 2018-07-12 A kind of shear wall structure system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821109124.3U CN208981563U (en) 2018-07-12 2018-07-12 A kind of shear wall structure system

Publications (1)

Publication Number Publication Date
CN208981563U true CN208981563U (en) 2019-06-14

Family

ID=66779887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821109124.3U Active CN208981563U (en) 2018-07-12 2018-07-12 A kind of shear wall structure system

Country Status (1)

Country Link
CN (1) CN208981563U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876095A (en) * 2022-03-15 2022-08-09 安徽美高美高分子材料有限公司 Epidemic prevention isolation acrylic plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876095A (en) * 2022-03-15 2022-08-09 安徽美高美高分子材料有限公司 Epidemic prevention isolation acrylic plate

Similar Documents

Publication Publication Date Title
CN106869316B (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
CN103306402B (en) Non-superimposition beam type fabricated frame-shear wall connection structure and construction method thereof
CN104631659B (en) Prefabricated assembled band steel plate concealed bracings overlaid plate type concrete coupled shear wall
CN107460954A (en) A kind of post-tensioned prestressing assembling concrete frame energy dissipation component system and construction method
CN110056092B (en) Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method
CN109707037A (en) A kind of assembling frame structure Self-resetting dissipative devices and its construction method
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN103195170A (en) Prefabricated reinforced concrete frame structure system
CN105755952A (en) Embedded elastic rubber bearing device and construction method of applying bearing device to connection between prefabricated concrete bridge pier and pile cap
CN109281436A (en) Pretensioned prestressing laminated frame is set a roof beam in place and its construction method
CN107246085A (en) Built-in soap-free emulsion polymeization steel plate concealed bracings prestressing force automatic reset concrete shear wall
CN107327065A (en) The hollow groined slab floor frame structure seat of large span assembled integral and preparation method
CN106223183A (en) Assembled concrete-filled rectangular steel tube combination truss bridge and construction method
CN113026993B (en) Assembly type combined connecting beam window opening component, structure and manufacturing and construction method
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN209686708U (en) Pretensioned prestressing welding stirrup mesh sheet laminated frame is set a roof beam in place and frame connecting node
CN103711329A (en) Method for reinforcing structure by means of method of externally attaching steel-reinforced concrete framework
CN106121049A (en) Compound shear wall is connected energy dissipation node and preparation method thereof with steel bar girder combination beam
CN108824671A (en) The fabricated shear wall and its construction method of curved scissors stress separation
CN109914589B (en) Vertical connecting structure of prestressed reinforced concrete precast column and construction method thereof
CN113529946B (en) Beam column energy consumption connecting piece based on U-shaped plate and construction method thereof
CN205531016U (en) Precast concrete post component and connected node
CN208981563U (en) A kind of shear wall structure system
CN109356286A (en) Assembled steel tendon concrete frame structure node unit decomposes and assembling method