CN208967784U - CFB boiler material returning device bed material power loss loosens air feed system - Google Patents

CFB boiler material returning device bed material power loss loosens air feed system Download PDF

Info

Publication number
CN208967784U
CN208967784U CN201821721248.7U CN201821721248U CN208967784U CN 208967784 U CN208967784 U CN 208967784U CN 201821721248 U CN201821721248 U CN 201821721248U CN 208967784 U CN208967784 U CN 208967784U
Authority
CN
China
Prior art keywords
returning device
power loss
material returning
vapour
cfb boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821721248.7U
Other languages
Chinese (zh)
Inventor
李仁�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
North China Power Engineering Beijing Co Ltd
Original Assignee
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Power Engineering Co Ltd of China Power Engineering Consulting Group filed Critical North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority to CN201821721248.7U priority Critical patent/CN208967784U/en
Application granted granted Critical
Publication of CN208967784U publication Critical patent/CN208967784U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Supply (AREA)

Abstract

The utility model gives a kind of CFB boiler material returning device bed material power loss loosening air feed system, including at least sequentially connected stream-jet ejector and surge tank, the outlet of the surge tank is connected to material returning device blast pipe, the steam inlet of the stream-jet ejector is connected with cold reheat vapour system or other vapour systems for meeting pressure requirements, connecting line is equipped with pneumatic on-off valve, air inlet is additionally provided on stream-jet ejector, surge tank outlet sets gradually check-valves and pneumatic air door, the meter pressure that the vapour gas gaseous mixture of material returning device is eventually entered into after surge tank is ~ 50kPa, temperature is ~ 90 DEG C, the utility model is in material return blower power loss, utilize steam pumping unit air, it forms vapour gas mixture and substitutes returning charge wind, phenomenon is killed to eliminate revert system material stock, convenient for being again started up.

Description

CFB boiler material returning device bed material power loss loosens air feed system
Technical field
The utility model relates to CFB boilers, belong to field of dynamic engineering.
Background technique
CFB boiler material returning device is one of key component of circulating fluidized bed boiler, including the charging of material returning device ontology, material returning device Standpipe and to burner hearth discharge nozzle.By material flow pattern, material returning device can be divided into U, J or L-type, and J or L-type are initial production, substantially It eliminates, U-shaped body lower part left and right sides is matched there are two regulating valve, and left side is feed back air-valve, and aperture is big, makes on the left of U-shaped body fluidized bed Particle is in intensive fluidization condition;And right side loosening valve area is smaller, as long as regulated quantity guarantees on the right side of U-shaped internal fluidized bed Particle loosen.
In this way, the particle column of splicing leg on the right side of U-shaped body is made to be in inflation slip state;And it is able to maintain in dipleg and stablizes height It the particle column of degree and is not influenced by load fluctuation.The pressure head as possessed by the close phase particle column of this in dipleg in burner hearth than expanding Spend pressure head caused by high opposite Discrete solid particles column and want high, thus easily cause particle automatically through on the left of U-shaped body into Enter burner hearth, realizes that material reliably recycles.Therefore material returning device is the important portion for being related to boiler combustion, overheating steam temperature and load Part.Good material returning device can guarantee material normal through maintaining the fast fluidized condition of combustion chamber, guarantee fuel and desulfurizing agent It repeatedly recycles, burn repeatedly, be conducive to reach ideal burning and desulfuration efficiency.
But the material return system of many CFB boilers is abnormal in the presence of running at present, and the not smooth phenomenon of feed back especially works as electricity When Chang Quan factory power loss or material return blower power loss, if cannot divulge information in time, material returning device is fed in standpipe and material returning device ontology and is deposited Material carries out loose type cooling, and only leans on the natural cooling of system, it will causing material stock to kill phenomenon, (i.e. material loses flowing Property).When electricity consumption recovery, when material returning device is again started up, returning charge wind is depended merely on, it is difficult to reach the requirement of material normal circulation power, no Normal Matter Transfer state can be set up, the circulation of especially charging standpipe needs to carry out artificial treatment, time-consuming and laborious.
When boiler power loss, existing processing mode usually adopts low capacity material return blower since its power of motor is small With low voltage motor, backup power source can be connected to diesel-driven generator;But for large capacity material return blower, since its power of motor is big, lead to Frequently with high-voltage motor, and high pressure backup power source it is difficult to ensure that.At the same time, when boiler power loss, material and wear-resisting in bed Refractory material will continue to heat release, and boiler circuit is heated in furnace, pressure rise, and when being more than safety valve jumping up pressure, boiler steam discharge is let out Pressure, there is presently no be utilized effectively for this part working medium and energy.Therefore, the full factory's power loss of power plant or material return blower how to be avoided Material stock caused by when power loss kills the generation of phenomenon, at the same when reducing boiler steam discharge pressure release caused by heat loss, be at present urgently It solves the problems, such as.
Utility model content
The technical issues of the utility model is solved is providing a kind of CFB boiler material returning device bed material power loss loosening air feed system System.
Technological means used by the utility model is as described below.
A kind of CFB boiler material returning device bed material power loss loosening air feed system, includes at least sequentially connected stream-jet ejector 12 With surge tank 13, the outlet of the surge tank is connected to material returning device blast pipe.
The steam inlet of the stream-jet ejector 12 and cold reheat vapour system 11 or other steamings for meeting pressure requirements Vapour system is connected.
The stream-jet ejector 12 is provided with air inlet.
The surge tank outlet sets gradually check-valves and pneumatic air door.
It is arranged before the steam inlet of the stream-jet ejector 12.
The material returning device is U-shaped material returning device.
Meter pressure into the vapour gas gaseous mixture of material returning device is ~ 50kPa, and temperature is ~ 90 DEG C.
The beneficial effects of the utility model are as follows.
1, air feed when the utility model can effectively solve the problems, such as CFB boiler material returning device bed material power loss, and can be effective Working medium and energy loss caused by boiler steam discharge pressure release when eliminating or reducing power loss.
2, air feed problem mainly passes through CFB boiler cold reheat vapour system or other when CFB boiler material return blower power loss Meeting the energy stored by the vapour system of pressure requirements replaces electric energy to utilize steam pumping unit in material return blower power loss Air forms vapour gas mixture substitution returning charge wind and introduces material returning device.
3, after the utility model is implemented, it is ensured that after material returning device will not be because of unexpected power loss when working normally, thermal material is long Time calm loosening, and only cause material stock to kill phenomenon by static cooling.
4, the utility model is because of unrelated electric energy, and backup power source voltage and capacity needed for by motor are not limited, capacity configuration Flexibly, to reduce engineering initial cost and operation power consumption.
Detailed description of the invention
Fig. 1 is that CFB boiler material returning device bed material power loss loosens air feed system schematic diagram.
Specific embodiment
The utility model protects a kind of CFB boiler material returning device bed material power loss to loosen air feed system.
As shown in Fig. 1, it is full to be mainly derived from CFB boiler cold reheat vapour system 11 or other for steam in power vapour source The vapour system of sufficient pressure requirements, the portion of energy replace electric energy to be done in the full factory's power loss of power plant or material return blower power loss Function.Material returning device 14 therein can be U-shaped material returning device or other material returning device types that can be used cooperatively.
It includes stream-jet ejector 12 and surge tank 13, surge tank 13 that CFB boiler material returning device bed material power loss, which loosens air feed system, Outlet pipe is connected to the blast pipe of material returning device 14.
Safety valve 131 and drain valve 132 are provided on surge tank 13, to adjust the pressure and temperature of vapour gas gaseous mixture, Pressure and temperature when gaseous mixture being made to discharge is respectively ~ 50kPa, ~ 90 DEG C.
In actual use, the other steam for meeting pressure requirements of steam in the cold system again of CFB boiler pass through jettron Valve 111 enters stream-jet ejector 12 and aspirates the air of air inlet entrance, forms vapour gas gaseous mixture, which enters equal Pressure case 13 and is adjusted to ~ 50kPa, ~ 90 DEG C of vapour gas gaseous mixture.Vapour gas mixture adjusted in the full factory's power loss of power plant or will return Expect to replace returning charge wind to introduce in material returning device through 13 gas outlet pipe of surge tank when blower power loss, the material in material returning device is carried out Dynamic is cooled to 260 DEG C or so, avoids thermal material calm loosening for a long time after material returning device power loss, and only occurs by static cooling Kill phenomenon, to guarantee the noncoking in loopback of material device, keep its flowing smooth.
The utility model can effectively solve the problems, such as air feed when CFB boiler material return blower power loss, and superpressure can be made to arrange Its working medium of some vapor put and energy are effectively utilized, and air feed problem is mainly led to when CFB boiler material return blower power loss It crosses the cold system again of CFB boiler or other energy met stored by the vapour system of pressure requirements replaces electric energy, in material return blower When power loss, using steam pumping unit air, forms vapour gas mixture substitution returning charge wind and spray into material returning device.To guarantee material returning device After will not be because of unexpected power loss when normal work, thermal material calm loosening for a long time, and only material stock pressure is caused by static cooling Dead phenomenon.After the utility model is implemented, working medium caused by the pressure release of boiler steam discharge and energy damage when can effectively eliminate or reduce power loss It loses.
In addition, the utility model is limited as not backup power source voltage and capacity needed for by motor, capacity configuration is flexible, Low cost, so as to reduce engineering initial cost and operation power consumption.

Claims (7)

1. a kind of CFB boiler material returning device bed material power loss loosens air feed system, which is characterized in that penetrate vapour including at least sequentially connected Air ejector (12) and surge tank (13), the outlet of the surge tank are connected to material returning device blast pipe.
2. CFB boiler material returning device bed material power loss as described in claim 1 loosens air feed system, which is characterized in that described to penetrate vapour The steam inlet of air ejector (12) and cold reheat vapour system (11) or other vapour systems for meeting pressure requirements are connected.
3. CFB boiler material returning device bed material power loss as described in claim 1 loosens air feed system, which is characterized in that described to penetrate vapour Air ejector (12) is provided with air inlet.
4. CFB boiler material returning device bed material power loss as described in claim 1 loosens air feed system, which is characterized in that described to press Case outlet sets gradually check-valves and pneumatic air door.
5. CFB boiler material returning device bed material power loss as claimed in claim 2 loosens air feed system, which is characterized in that described to penetrate vapour Pneumatic on-off valve (111) are set before the steam inlet of air ejector (12).
6. CFB boiler material returning device bed material power loss as described in claim 1 loosens air feed system, which is characterized in that the returning charge Device is U-shaped material returning device.
7. the CFB boiler material returning device bed material power loss as described in claim 1 to 6 is any loosens air feed system, which is characterized in that into The meter pressure for entering the vapour gas gaseous mixture of material returning device is 50kPa, and temperature is 90 DEG C.
CN201821721248.7U 2018-10-23 2018-10-23 CFB boiler material returning device bed material power loss loosens air feed system Active CN208967784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821721248.7U CN208967784U (en) 2018-10-23 2018-10-23 CFB boiler material returning device bed material power loss loosens air feed system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821721248.7U CN208967784U (en) 2018-10-23 2018-10-23 CFB boiler material returning device bed material power loss loosens air feed system

Publications (1)

Publication Number Publication Date
CN208967784U true CN208967784U (en) 2019-06-11

Family

ID=66760535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821721248.7U Active CN208967784U (en) 2018-10-23 2018-10-23 CFB boiler material returning device bed material power loss loosens air feed system

Country Status (1)

Country Link
CN (1) CN208967784U (en)

Similar Documents

Publication Publication Date Title
KR910009058B1 (en) Integrated gas turbine power generation system and process
CN212869719U (en) Steam generating system
CN103807868B (en) Be applicable to the internal heating fluidized bed drying system of brown coal air cooling turbo-generator
CN102047039A (en) Method of and system for generating power by oxyfuel combustion
CN208967784U (en) CFB boiler material returning device bed material power loss loosens air feed system
CN114909647A (en) Cogeneration unit and method for low-load stable combustion and thermoelectric deep decoupling
US5435123A (en) Environmentally acceptable electric energy generation process and plant
KR100205798B1 (en) A combined gas and steam cycle pressurized fluidized bed boiler power plant and a method of establishig and operating the same
CN105605564A (en) Smokeless oil-saving starting system of circulating fluidized bed boiler
CN214148094U (en) Coal gas power generation double-desuperheating water heating system
CN212644577U (en) Low-oil-consumption starting system of circulating fluidized bed boiler
CN208967785U (en) CFB boiler external bed power loss cools down air feed system
CN208473941U (en) A kind of heat supply cooling system
CN205480962U (en) Circulating fluidized bed boiler with quick start -up system
CN114459051A (en) Treatment system and treatment method for thermal deviation of heated surfaces of boiler furnace and tail flue
CN210320143U (en) System for reducing boiler exhaust gas temperature and inhibiting low-temperature corrosion of air preheater
CN103335502B (en) Energy comprehensive utilization system used in rice drying process
US9482127B2 (en) Booster air heater for high moisture fuels
JP3670791B2 (en) Steam supply method and apparatus for coke dry fire extinguishing equipment
CN219014372U (en) Coal-fired boiler utilizing steam turbine to heat
CN220471603U (en) High-pressure fluidization air system of circulating fluidized bed
CN221375727U (en) Boiler coal supply distribution system
CN220828844U (en) Novel combustion type three-pressure steam superheating furnace system
Guo et al. Operation experience and performance of the first 300MWe CFB boiler developed by DBC in China
CN111853739B (en) Sludge and fire coal integrated processing system based on steam-water coupling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant