A kind of building outer guard steel frame construction
Technical field
The utility model relates to build steelframe technical field, specially a kind of building outer guard steel frame construction.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, carry out to building
Outside of the building needs to use protection steelframe when construction, and steelframe is protected to be made of the connection of many steel pipes.
And between steel pipe connection be usually weld, to protection steelframe build when weld it is relatively time consuming, thus influence build
The progress of process is built, while being welded in prolonged oxidation process between steel pipe, will lead to the pine of pad between steel pipe
It is dynamic, the loosening of steelframe is caused, so as to cause accident occurs, thus it is proposed that a kind of building outer guard steel frame construction.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of building outer guard steel frame construction, has fast
Speed assembling and the advantages that stablize, solving between steel pipe connection is usually to weld, when being built to protection steelframe welding compared with
It is time-consuming, to influence the progress of building process, while being welded in prolonged oxidation process between steel pipe, it will lead to steel pipe
Between pad loosening, the loosening of steelframe is caused, so as to cause the problem that accident occurs.
(2) technical solution
To realize that above-mentioned quick assembling and stable purpose, the utility model provide the following technical solutions: a kind of building
Outer guard steel frame construction, including upper steel pipe, the lower section of the upper steel pipe are equipped with lower steel pipe, and the upper steel pipe is outer with lower steel pipe
Surface activity is socketed with stable block, and the left end of the upper steel pipe is fixedly connected with link block, the outer surface of the link block and steady
Determine block pivot bush unit, the top of the lower steel pipe is fixedly connected with limited block, the outer surface of the limited block and stablizes block activity
It is socketed, protecting crust is fixedly installed at the top of the stable block, the inside of the protecting crust is equipped with pumping rod, the pumping rod
Bottom end, which is run through, stablizes block and extends to the inside of link block, the outer surface of the pumping rod respectively with link block and to stablize block movable
Socket, the top of the pumping rod is fixedly connected with fritter, limit spring, the limit is fixedly installed at the top of the fritter
The other end of spring is fixedly connected with the inner wall of protecting crust, and the bottom on the right side of the stable block is fixedly installed with open box, described
The right side movable sleeve of limited block is connected to bar, and the right end of the bar runs through the inside stablized block and extend to open box, described
The right end of bar is fixedly connected with block, and the outer surface movable sleeve of the bar is connected to baffle ring, the right side of the baffle ring and block
It being flexibly connected, is fixedly connected with brace at the top of the baffle ring, the other end of the brace is fixedly connected with the inner wall of open box,
The middle part fixing sleeve of the bar is connected to movable block, and the left side of the movable block is flexibly connected with the right side for stablizing block, the gear
The outer surface movable sleeve of bar is connected to returning spring, and the bottom of the movable block is fixedly connected with push rod, and the bottom end of the push rod is prolonged
It extends to the outside of open box and is fixedly connected with throw-out collar, the outer surface of the push rod is flexibly connected with the bottom of open box, described
The outer surface of throw-out collar is flexibly connected with the bottom of open box.
Preferably, it is fixedly connected on the right side of one end of the returning spring and movable block, the other end of the returning spring
It is fixedly connected on the left of baffle ring.
Preferably, the internal activity of the stable block is socketed with positioning pin, the right end of the positioning pin and a left side for link block
Side is fixedly connected.
Preferably, the bottom movable sleeve of the link block is connected to small bar, and the bottom end of the small bar and the top of limited block are solid
Fixed connection.
Preferably, steel wire is fixedly connected at the top of the fritter, the other end of the steel wire passes through limit spring and prolongs
The outside of protecting crust is extended to, the outer surface of the steel wire and the top movable of protecting crust are socketed.
Preferably, the top of the steel wire is fixedly connected with pull ring, and the outer surface of the pull ring and the top of protecting crust are living
Dynamic connection.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of building outer guard steel frame construction, and having following has
Beneficial effect:
1, the building outer guard steel frame construction, by upper steel pipe and lower steel pipe and the pivot bush unit for stablizing block, thus
Fast Installation is achieved the effect that, in addition the cooperation of pumping rod and small bar, is respectively fixed upper steel pipe and lower steel pipe, simultaneously
Using the recovery of limit spring and returning spring, so that pumping rod and small bar respectively fix more upper steel pipe and lower steel pipe
Securely.
2, the building outer guard steel frame construction, by the effect of positioning pin, so that the position of upper steel pipe is more stable,
The phenomenon that will not shaking, under the action of protecting crust and open box, slows down limit to improve the stability of connection
The area that spring and returning spring are contacted with air, to delay the service life of limit spring and returning spring.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is enlarged structure schematic diagram at A;
Fig. 3 is enlarged structure schematic diagram at B.
In figure: 1, upper steel pipe;2, lower steel pipe;3, stablize block;4, link block;5, limited block;6, protecting crust;7, pumping rod;
8, fritter;9, limit spring;10, open box;11, bar;12, block;13, baffle ring;14, brace;15, movable block;16, it replys
Spring;17, push rod;18, throw-out collar;19, positioning pin;20, small bar;21, steel wire;22, pull ring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of building outer guard steel frame construction, including upper steel pipe 1 are please referred to, the lower section of upper steel pipe 1 is equipped with
The outer surface movable sleeve of lower steel pipe 2, upper steel pipe 1 and lower steel pipe 2 is connected to stable block 3, by upper steel pipe 1 and lower steel pipe 2 and stablizes
The pivot bush unit of block 3, to achieve the effect that Fast Installation, the left end of upper steel pipe 1 is fixedly connected with link block 4, stablizes block 3
Internal activity be socketed with positioning pin 19, the right end of positioning pin 19 is fixedly connected with the left side of link block 4, passes through positioning pin 19
Effect the phenomenon that will not shaking, to improve the stability of connection, connects so that the position of upper steel pipe 1 is more stable
The outer surface of block 4 and stablize 3 pivot bush unit of block, the top of lower steel pipe 2 is fixedly connected with limited block 5, the outer surface of limited block 5 with
Stablize 3 pivot bush unit of block, the bottom movable sleeve of link block 4 is connected to small bar 20, and the bottom end of small bar 20 and the top of limited block 5 are fixed
Connection, the top for stablizing block 3 are fixedly installed with protecting crust 6, and the inside of protecting crust 6 is equipped with pumping rod 7, and the bottom end of pumping rod 7 is passed through
Wear stable block 3 and extend to the inside of link block 4, the outer surface of pumping rod 7 respectively with link block 4 and stablize 3 pivot bush unit of block,
Under the cooperation of pumping rod 7 and small bar 20, upper steel pipe 1 and lower steel pipe 2 are fixed respectively, while utilizing 9 He of limit spring
The recovery of returning spring 16, so that pumping rod 7 and small bar 20 fix stronger, pumping with lower steel pipe 2 to upper steel pipe 1 respectively
The top of pull rod 7 is fixedly connected with fritter 8, and the top of fritter 8 is fixedly installed with limit spring 9, the other end of limit spring 9 with
The inner wall of protecting crust 6 is fixedly connected, and the top of fritter 8 is fixedly connected with steel wire 21, and the other end of steel wire 21 passes through limit spring 9
And the outside of protecting crust 6 is extended to, the outer surface of steel wire 21 and the top movable of protecting crust 6 are socketed, and the top of steel wire 21 is fixed
It is connected with pull ring 22, the outer surface of pull ring 22 is connect with the top movable of protecting crust 6, and the bottom for stablizing 3 right side of block is fixedly mounted
There is open box 10, under the action of protecting crust 6 and open box 10, slows down limit spring 9 and returning spring 16 is contacted with air
Area, to delay the service life of limit spring 9 Yu returning spring 16, the right side movable sleeve of limited block 5 is connected to bar
11, the right end of bar 11 runs through the inside stablized block 3 and extend to open box 10, and the right end of bar 11 is fixedly connected with block
12, the outer surface movable sleeve of bar 11 is connected to baffle ring 13, and the right side of baffle ring 13 is flexibly connected with block 12, and the top of baffle ring 13 is solid
Surely it is connected with brace 14, the other end of brace 14 is fixedly connected with the inner wall of open box 10, and the middle part fixing sleeve of bar 11 is connected to
Movable block 15, the left side of movable block 15 are flexibly connected with the right side for stablizing block 3, and the outer surface movable sleeve of bar 11 is connected to reply bullet
One end of spring 16, returning spring 16 is fixedly connected with the right side of movable block 15, the other end of returning spring 16 and a left side for baffle ring 13
Side is fixedly connected, under the action of returning spring 16, while using the recovery of returning spring 16, so that bar 11 and limited block
What is connected between 5 is more stable, avoids the phenomenon that lower steel pipe 2 shakes, the bottom of movable block 15 is fixedly connected with push rod
17, the bottom end of push rod 17 extends to the outside of open box 10 and is fixedly connected with throw-out collar 18, the outer surface of push rod 17 and open box
10 bottom is flexibly connected, and the outer surface of throw-out collar 18 is flexibly connected with the bottom of open box 10.
In conclusion the building outer guard steel frame construction, pass through upper steel pipe 1 and lower steel pipe 2 and the activity of stablizing block 3
Socket, thus achieved the effect that Fast Installation, in addition the cooperation of pumping rod 7 and small bar 20, respectively to upper steel pipe 1 and lower steel pipe
2 are fixed, while using the recovery of limit spring 9 and returning spring 16, so that pumping rod 7 and small bar 20 are respectively to upper steel
Pipe 1 is fixed stronger with lower steel pipe 2;By the effect of positioning pin 19, so that the position of upper steel pipe 1 is more stable, it will not
The phenomenon that shaking under the action of protecting crust 6 and open box 10, slows down limit to improve the stability of connection
The area that spring 9 and returning spring 16 are contacted with air, to delay the service life of limit spring 9 Yu returning spring 16;
Solving between steel pipe connection is usually to weld, welded when being built to protection steelframe it is relatively time consuming, to influence to build work
The progress of sequence, while being welded in prolonged oxidation process between steel pipe, will lead to the loosening of pad between steel pipe, make
At the loosening of steelframe, so as to cause the problem that accident occurs.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.