CN208965811U - A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame - Google Patents

A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame Download PDF

Info

Publication number
CN208965811U
CN208965811U CN201821267045.5U CN201821267045U CN208965811U CN 208965811 U CN208965811 U CN 208965811U CN 201821267045 U CN201821267045 U CN 201821267045U CN 208965811 U CN208965811 U CN 208965811U
Authority
CN
China
Prior art keywords
frame
aluminum alloy
alloy auxiliary
assembled aluminum
auxiliary frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821267045.5U
Other languages
Chinese (zh)
Inventor
周进中
曹军刚
叶文峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN STYLE DECORATION CO Ltd
Original Assignee
SHENZHEN STYLE DECORATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN STYLE DECORATION CO Ltd filed Critical SHENZHEN STYLE DECORATION CO Ltd
Priority to CN201821267045.5U priority Critical patent/CN208965811U/en
Application granted granted Critical
Publication of CN208965811U publication Critical patent/CN208965811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame.It includes building body, steel skeleton is fixed with outside building body, assembled aluminum alloy auxiliary frame is fixed with by fixing screws on the gooseneck of steel skeleton, the assembled aluminum alloy auxiliary frame is connect with upper cladding glass and lower cladding glass, and overhang steel step is equipped between the floor and assembled aluminum alloy auxiliary frame of building body.After adopting the above structure, the utility model passes through the decorated structure of assembled aluminum alloy auxiliary frame, simplify mounting process, and, one assembled aluminum alloy auxiliary frame can install the bottom end of cladding glass and the top of lower cladding glass simultaneously, instead of traditional two independent aluminum alloy auxiliary frames, reduces component, reduce costs;Also, building body and glass curtain wall are carried out seamless connection by overhang steel step structure by the utility model, ensure that the spacing between glass curtain wall and building body.

Description

A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame
Technical field
The utility model is related to decorations glass curtain wall technical field, refer in particular to a kind of assembled aluminum alloy auxiliary frame glass curtain wall and Assembled aluminum alloy auxiliary frame.
Background technique
In the curtain wall construction of existing large public building, the application range of glass curtain wall is the most extensive, existing glass Connection structure between curtain wall and building building body should guarantee stabilized structure securely and reliably again with building body with enough Spacing, traditional technique are distinguished by the fixed steel skeleton of corner brace by several whole aluminum alloy auxiliary frames in structural beams Come the bottom and top of secured curtain wall glass, when in use, and material cost more there are component is high, mounting process is multiple for this structure Miscellaneous, two adjacent aluminum alloy auxiliary frames close up trouble the problems such as, therefore, how optimizing existing structure and becoming improving the above problem has Problem to be solved.
Summary of the invention
The purpose of the utility model aiming above situation shortcoming and a kind of assembled aluminum alloy auxiliary frame glass for proposing Glass curtain wall and assembled aluminum alloy auxiliary frame.
In order to achieve the above objectives, the technical solution of the utility model are as follows: a kind of assembled aluminum alloy auxiliary frame glass curtain wall includes Building body is fixed with steel skeleton outside building body, is fixed with assembled by fixing screws on the gooseneck of steel skeleton Aluminum alloy auxiliary frame, the assembled aluminum alloy auxiliary frame are connect with upper cladding glass and lower cladding glass, building body floor with Overhang steel step is equipped between assembled aluminum alloy auxiliary frame.
The assembled aluminum alloy auxiliary frame includes left frame, upper connection frame, lower connection frame and right frame, in left frame Right upper portion is equipped with upper hook one, has upper hook two in the lower right side of left frame, upper connection frame is in class inverted " L " character form structure And its left side has lower draw-bar one, and lower connection frame has lower draw-bar two in class " L " character form structure and its left side, after assembly, Lower draw-bar one on upper connection frame be hung on the lower draw-bar one of left frame after is fixed by lateral screw, on lower connection frame under Hook two is fixed after being hung on the lower draw-bar two of left frame by lateral screw, right frame and upper connection frame and lower connection frame Engaged by several detents.
Upper installation groove is formed after the left frame and upper connection frame are fixed, the bottom of upper cladding glass passes through its bottom The encapsulation adhesive tape of chock block and its two sides is mounted on this in installation groove;Under being formed after the left frame and lower connection frame are fixed Installation groove, the top of lower cladding glass encapsulate adhesive tape by U-shaped aluminium block and two sides and are mounted on this in installation groove;The left side It is fixed on the gooseneck of steel skeleton in the middle part of side frame by the fixing screws.
Gasket has been installed in the gooseneck fixing screws fixed bit of the left frame and steel skeleton.
The overhang steel step includes: steel step column, steel Cantilever Beams, base's clamping plate, step architectural surface, steel step Column is fixed on the floor of building body by corner brace and expansion bolt, and steel Cantilever Beams one end is welded on the top of steel step column End, for base's Boards wall on steel step column and steel Cantilever Beams, step architectural surface is solid by corresponding adhesives bonding It is scheduled on base's clamping plate.
Sealant is filled between the overhang steel step and assembled aluminum alloy auxiliary frame.
The floor of the building body is equipped with cement mortar screed-coat and floor decoration face layer.
After adopting the above structure, the utility model passes through the decorated structure of assembled aluminum alloy auxiliary frame, simplifies mounting process, Also, an assembled aluminum alloy auxiliary frame can install the bottom end of cladding glass and the top of lower cladding glass simultaneously, substitution Traditional two independent aluminum alloy auxiliary frames, reduce component, reduce costs;Also, the utility model passes through overhang steel Step-edge Junction Building body and glass curtain wall are carried out seamless connection by structure, ensure that the spacing between glass curtain wall and building body.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure of the utility model;
Fig. 2 is the structural exploded view of the assembled aluminum alloy auxiliary frame of the utility model.
Specific embodiment
1-2 is described in further details the specific embodiment of the utility model with reference to the accompanying drawing.
A kind of assembled aluminum alloy auxiliary frame glass curtain wall includes building body 10, is fixed with steel outside building body 10 Skeleton 20 is fixed with assembled aluminum alloy auxiliary frame 40 by fixing screws 30 on the gooseneck 21 of steel skeleton 20, the assembled Aluminum alloy auxiliary frame 40 is connect with upper cladding glass 51 and lower cladding glass 52, is closed in the floor 11 and assembled aluminum of building body 10 Overhang steel step 60 is equipped between golden pair frame 40.
Assembled aluminum alloy auxiliary frame 40 includes left frame 41, upper connection frame 42, lower connection frame 43 and right frame 44, on a left side The right upper portion of side frame 41 is equipped with upper hook 1, has upper hook 2 412, upper connection frame in the lower right side of left frame 41 42 have lower draw-bar 1 in class inverted " L " character form structure and its left side, and lower connection frame 43 is in class " L " character form structure and its left side Side has lower draw-bar 2 431, and after assembly, the lower draw-bar 1 on upper connection frame 42 is hung on the lower draw-bar one of left frame 41 Fixed by lateral screw 45 after on 411, the lower draw-bar 2 431 on lower connection frame 43 is hung on the lower draw-bar two of left frame 41 Fixed by lateral screw 45 after on 412, right frame 44 and upper connection frame 42 and lower connection frame 43 pass through several detents 40a Engaging.
Upper installation groove 46 is formed after the left frame 41 and upper connection frame 42 are fixed, the bottom of upper cladding glass 51 passes through The chock block 47 of its bottom and the encapsulation adhesive tape 48 of its two sides are mounted on this in installation groove 46;The left frame 41 and lower company It connects and forms lower installation groove 46 after frame 43 is fixed, the top of lower cladding glass encapsulates adhesive tape by U-shaped aluminium block 48 and two sides and installs On this in installation groove 47;The gooseneck 21 of steel skeleton 20 is fixed in the middle part of the left frame 41 by the fixing screws 30 On.
Gasket 31 has been installed in 21 fixing screws of gooseneck, 30 fixed bit of the left frame 41 and steel skeleton 20.
The overhang steel step 60 includes: steel step column 61, steel Cantilever Beams 62, base's clamping plate 63, step decorative cover Layer 64, steel step column 61 are fixed on the floor 11 of building body 10 by corner brace 65 and expansion bolt 66, steel Cantilever Beams 62 One end is welded on the top of steel step column 61, and base's clamping plate 63 is fixed on steel step column 61 and steel Cantilever Beams 62, step Architectural surface 64 is adhesively fixed on base's clamping plate 63 by corresponding adhesives.
Sealant 70 is filled between the overhang steel step 60 and assembled aluminum alloy auxiliary frame 40.
The floor 11 of the building body 10 is equipped with cement mortar screed-coat 12 and floor decoration face layer 13.
When assembly, first then installation steel skeleton 20 by the combination assembled aluminum alloy auxiliary frame 40 of above structure, and will be filled With formula aluminum alloy auxiliary frame 40 by being fixed on the gooseneck 21 of steel skeleton 20 by the fixing screws 30;Then, it installs Cladding glass 51 and lower cladding glass 52 carry out building body 10 with glass curtain wall seamless finally, carrying out overhang steel step 60 Linking.
Certainly, the utility model can also have other numerous embodiments, without departing substantially from the spirit of the present invention and essence In the case of, those skilled in the art work as can make various corresponding changes and modifications, but these phases according to utility model The change and modification answered all should belong to the protection scope of utility model the attached claims.

Claims (8)

1. a kind of assembled aluminum alloy auxiliary frame glass curtain wall, includes building body, it is characterised in that: fixed outside building body There is steel skeleton, is fixed with assembled aluminum alloy auxiliary frame by fixing screws on the gooseneck of steel skeleton, the assembled aluminium alloy Secondary frame is connect with upper cladding glass and lower cladding glass, is equipped between the floor and assembled aluminum alloy auxiliary frame of building body outstanding Choose steel step.
2. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 1, it is characterised in that: the assembled aluminum Alloy pair frame includes left frame, upper connection frame, lower connection frame and right frame, is equipped with upper hook in the right upper portion of left frame One, there is upper hook two in the lower right side of left frame, upper connection frame has lower extension in class inverted " L " character form structure and its left side Hook one, lower connection frame has lower draw-bar two in class " L " character form structure and its left side, the lower draw-bar after assembly, on upper connection frame One be hung on the lower draw-bar one of left frame after fixed by lateral screw, it is lower connect frame on lower draw-bar two be hung on left frame Lower draw-bar two on after fixed by lateral screw, right frame and upper connection frame and lower connection frame pass through several detent cards It closes.
3. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 2, it is characterised in that: the left frame and Upper installation groove is formed after upper connection frame is fixed, the bottom of upper cladding glass passes through the chock block of its bottom and the encapsulation of its two sides Adhesive tape is mounted on this in installation groove;Lower installation groove, lower cladding glass are formed after the left frame and lower connection frame are fixed Top encapsulate adhesive tape by U-shaped aluminium block and two sides and be mounted on this in installation groove;By described solid in the middle part of the left frame Determine screw to be fixed on the gooseneck of steel skeleton.
4. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 3, it is characterised in that: in the left frame Gasket has been installed with the gooseneck fixing screws fixed bit of steel skeleton.
5. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 4, it is characterised in that: the overhang steel platform Rank includes: steel step column, steel Cantilever Beams, base's clamping plate, step architectural surface, and steel step column passes through corner brace and expanding screw Bolt is fixed on the floor of building body, and steel Cantilever Beams one end is welded on the top of steel step column, and base's Boards wall is in steel On step column and steel Cantilever Beams, step architectural surface is adhesively fixed on base's clamping plate by corresponding adhesives.
6. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 5, it is characterised in that: the overhang steel platform Sealant is filled between rank and assembled aluminum alloy auxiliary frame.
7. a kind of assembled aluminum alloy auxiliary frame glass curtain wall according to claim 6, it is characterised in that: the building body Floor be equipped with cement mortar screed-coat and floor decoration face layer.
8. a kind of assembled aluminum alloy auxiliary frame, it is characterised in that: it include left frame, upper connection frame, lower connection frame and right frame, It is equipped with upper hook one in the right upper portion of left frame, there is upper hook two in the lower right side of left frame, upper connection frame falls in class " L " character form structure and its left side have lower draw-bar one, and lower connection frame has lower draw-bar in class " L " character form structure and its left side Two, after assembly, the lower draw-bar one on upper connection frame is fixed after being hung on the lower draw-bar one of left frame by lateral screw, lower company Connect after the lower draw-bar two on frame is hung on the lower draw-bar two of left frame and fixed by lateral screw, right frame and upper connection frame with And lower connection frame is engaged by several detents.
CN201821267045.5U 2018-08-08 2018-08-08 A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame Active CN208965811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821267045.5U CN208965811U (en) 2018-08-08 2018-08-08 A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821267045.5U CN208965811U (en) 2018-08-08 2018-08-08 A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame

Publications (1)

Publication Number Publication Date
CN208965811U true CN208965811U (en) 2019-06-11

Family

ID=66749877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821267045.5U Active CN208965811U (en) 2018-08-08 2018-08-08 A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame

Country Status (1)

Country Link
CN (1) CN208965811U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794419A (en) * 2020-07-06 2020-10-20 宁波建工建乐工程有限公司 Double-cavity hanging stone reinforced curtain wall device
CN114233001A (en) * 2022-01-18 2022-03-25 中国十七冶集团有限公司 Construction method for joint of glass curtain wall and outdoor ground
CN115162542A (en) * 2022-06-29 2022-10-11 中国建筑第八工程局有限公司 Waterproof node processing structure of inner court peripheral curtain wall and processing method thereof
CN115162542B (en) * 2022-06-29 2024-04-26 中国建筑第八工程局有限公司 Inner court periphery curtain wall waterproof node processing structure and construction method of processing structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794419A (en) * 2020-07-06 2020-10-20 宁波建工建乐工程有限公司 Double-cavity hanging stone reinforced curtain wall device
CN114233001A (en) * 2022-01-18 2022-03-25 中国十七冶集团有限公司 Construction method for joint of glass curtain wall and outdoor ground
CN115162542A (en) * 2022-06-29 2022-10-11 中国建筑第八工程局有限公司 Waterproof node processing structure of inner court peripheral curtain wall and processing method thereof
CN115162542B (en) * 2022-06-29 2024-04-26 中国建筑第八工程局有限公司 Inner court periphery curtain wall waterproof node processing structure and construction method of processing structure

Similar Documents

Publication Publication Date Title
CN208965811U (en) A kind of assembled aluminum alloy auxiliary frame glass curtain wall and assembled aluminum alloy auxiliary frame
CN109162582A (en) A kind of installation method of doorframe
CN106284779A (en) A kind of bright hidden frame of curtain wall connects auxiliary frame, curtain wall system and construction method thereof
CN211774931U (en) Curtain bottom and bottom plate end connection node structure
CN208965945U (en) A kind of assembling-type metal plate mounting decorative wall
CN105040930A (en) Decorative wall protecting plate
CN207944599U (en) A kind of open aluminium sheet connection component and its aluminum facade
CN207700474U (en) A kind of splicing type waterproof metal decking curtain wall
CN103850374B (en) Element type curtain wall system
CN105178482B (en) A kind of pottery clay plates add the hybrid curtain wall construction of glass
CN205617622U (en) Removable formula metal curtain wall system of type is pieced together to secret
CN213477348U (en) Curtain wall and indoor ceiling closing-in connection node structure
CN211200862U (en) Building curtain wall concrete slab embedded part integrated system
CN209277487U (en) A kind of cellular system of overlength overhanging vertical decorative strip
CN206625355U (en) Aluminium alloy structure house
CN102561570B (en) Mounting structure for exposed frame decorating strips of building curtain wall
CN206971496U (en) Type unitized curtain wall segmentation while mounting structure
CN218292594U (en) Building exterior wall decoration dry hanging plate capable of preventing rainwater infiltration
CN206888297U (en) A kind of bright hidden conversion glass curtain wall
CN206722155U (en) A kind of attachment structure of modular aluminum facade
CN108915212A (en) A kind of skirt line mounting structure of buckle-type
CN214035282U (en) Detachable door frame
CN214144514U (en) Stone dry-hanging structure
CN220469278U (en) Wall body external corner binding off structure
CN206015981U (en) Built-in single floor curtain-wall stand-column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant