CN208953460U - One kind can rapid survey wall plastering saturation degree building monitoring device - Google Patents

One kind can rapid survey wall plastering saturation degree building monitoring device Download PDF

Info

Publication number
CN208953460U
CN208953460U CN201821773219.5U CN201821773219U CN208953460U CN 208953460 U CN208953460 U CN 208953460U CN 201821773219 U CN201821773219 U CN 201821773219U CN 208953460 U CN208953460 U CN 208953460U
Authority
CN
China
Prior art keywords
main body
piston
monitoring device
saturation degree
snib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821773219.5U
Other languages
Chinese (zh)
Inventor
张鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Construction Guangdong Engineering Detection Co Ltd
Original Assignee
Guangdong Construction Guangdong Engineering Detection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Construction Guangdong Engineering Detection Co Ltd filed Critical Guangdong Construction Guangdong Engineering Detection Co Ltd
Priority to CN201821773219.5U priority Critical patent/CN208953460U/en
Application granted granted Critical
Publication of CN208953460U publication Critical patent/CN208953460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses one kind can rapid survey wall plastering saturation degree build monitoring device, including foot prop, apparatus main body and button are fixedly connected with two foot props below apparatus main body, and the insertion of apparatus main body surface is provided with button.This kind builds monitoring device and is provided with snib and piston, piston its be used for telescopic rod is securing simultaneously, telescopic rod can be enable to stretch in piston, snib its be used for when people are being against on the wall of measurement on the left of apparatus main body, people adjust telescopic rod to suitable length, it rotates clockwise snib snib is made to be against telescopic rod surface and telescopic rod is fixed in piston, to make apparatus main body be tightly attached to surface of wall, greatly reduce the installment work of people's monitoring device, the two combine enable this kind can rapid survey wall plastering saturation degree building monitoring device better meet the demand of people.

Description

One kind can rapid survey wall plastering saturation degree building monitoring device
Technical field
The utility model relates to technical field of buildings, and specially one kind can the building monitoring of rapid survey wall plastering saturation degree Equipment.
Background technique
Building is that people use all utilizable materials such as soil, stone, wood, steel, glass, reed, plastics, ice cube, is built Structures, building is not purpose, and the purpose of building is to obtain building to be formed by " space ", is people to meet Social life needs, and utilizes grasped material technology means, and with certain scientific law, geomantic omen theory and aesthetic principle The artificial environment of creation.
But existing measurement wall plastering saturation degree builds monitoring device, when measurement process starts, equipment requiring installation, Step complexity wastes a large amount of time and it is complicated the step of measuring, and keeps people unrestrained when measuring wall plastering saturation degree The problems such as taking a large amount of time, bringing many inconvenience to people's construction account.
So how to design one kind can rapid survey wall plastering saturation degree building monitoring device, become us and currently want It solves the problems, such as.
Utility model content
The purpose of this utility model is to provide one kind can rapid survey wall plastering saturation degree build monitoring device, with solution Certainly the problems mentioned above in the background art.
To achieve the above object, the utility model provides the following technical solutions: one kind can rapid survey wall plastering saturation Degree building monitoring device, including foot prop, apparatus main body and button, described device main body lower section are fixedly connected with two foot props, institute It states the insertion of apparatus main body surface and is provided with button, described device bottom part body is rotatably connected to two telescopic foot stools, described device Main body inner wall is fixedly connected with expansion bend, and described device main body inner wall is fixedly connected there are two air pump, and the expansion bend is located at two On the right side of a air pump, it is fixedly connected with motor on the left of the expansion bend, the motor left pivot movement is connected with drill bit, the gas The insertion of pump surface is provided with tracheae, and the bit face is closely fitted with washer, and described device bottom part body is rotatably connected to work Plug, the piston underside are connected with telescopic rod, and the piston face is provided through snib.
Further, it is equipped with runner on the left of the piston, and internal piston sets that there are two openings.
Further, the snib is fitted tightly over telescopic rod surface through piston, and snib surface is equipped with and opens with piston The embedding line that mouth mutually agrees with.
Further, there are two the tracheae is set, two tracheaes are separately positioned in two air pumps, and two tracheaes One end is respectively positioned in the opening on the left of apparatus main body.
Further, the washer is fixedly connected on two tracheae surfaces.
Compared with prior art, the utility model has the beneficial effects that this kind can rapid survey wall plastering saturation degree build Monitoring device is built provided with washer, tracheae, snib and piston, it is used for telescopic rod is securing simultaneously piston, can make to stretch Bar can stretch in piston and it is equipped with two openings, and an opening is for snib to be fixed in piston, another opening It is used to internal piston connecting atmospheric pressure, and atmospheric pressure is avoided to influence the flexible of telescopic rod, snib its be used for when people are device When being against on the wall of measurement on the left of main body, people adjust telescopic rod to suitable length, and rotating clockwise snib makes snib It is against telescopic rod surface telescopic rod is fixed in piston, so that apparatus main body be made to be tightly attached to surface of wall, greatly reduces people Monitoring device installment work, tracheae its after be used to drill on wall when drill bit, the dust of bore inner is blown off, is made one Can intuitively observe the saturation degree of wall plastering, greatly facilitate measurement work, washer its be used to prevent drill bit turn hole When, dust enters in apparatus main body, influences the operation of apparatus main body, considerably increases the service life of the equipment, various structures In conjunction with make this kind can rapid survey wall plastering saturation degree building monitoring device, solve just existing measurement wall plastering saturation degree Build the problems such as its installation steps of monitoring device are complicated.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the diagrammatic cross-section of utility model device main body;
Fig. 3 is the diagrammatic cross-section of the utility model telescopic foot stool.
In figure: 1- foot prop;2- apparatus main body;201- expansion bend;202- air pump;203- motor;204- tracheae;205- pad Circle;206- drill bit;3- button;4- telescopic foot stool;401- piston;402- snib;403- telescopic rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, the utility model provides a kind of technical solution: one kind can rapid survey wall plastering saturation degree build Monitoring device, including foot prop 1, apparatus main body 2 and button 3 are built, is fixedly connected with two foot props 1, device master below apparatus main body 2 The insertion of 2 surface of body is provided with button 3, and 2 lower rotation of apparatus main body is connected with two telescopic foot stools 4, and 2 inner wall of apparatus main body is fixed It is connected with expansion bend 201,2 inner wall of apparatus main body is fixedly connected there are two air pump 202, and expansion bend 201 is located at two air pumps, 202 right side Side is fixedly connected with motor 203 on the left of expansion bend 201, and 203 left pivot movement of motor is connected with drill bit 206,202 table of air pump Face insertion is provided with tracheae 204, and 206 surface of drill bit is closely fitted with washer 205, and 2 lower rotation of apparatus main body is connected with piston 401,401 underside of piston is connected with telescopic rod 403, and 401 surface of piston is provided through snib 402.
Further, it is equipped with runner on the left of piston 401, and is set inside piston 401 there are two being open, fills in 401 its use while still alive In telescopic rod 403 is securing simultaneously, it can enable that telescopic rod 403 stretches in piston 401 and it is equipped with two openings, One opening is for snib 402 to be fixed in piston 401, another is open, and it is used to that atmospheric pressure will to be connected inside piston 401, Atmospheric pressure is avoided to influence the flexible of telescopic rod 403.
Further, snib 402 is fitted tightly over 403 surface of telescopic rod through piston 401, and 402 surface of snib is equipped with Be open the embedding line that mutually agrees with piston 401, snib 402 its be used for when people are the wall for being against measurement on the left of apparatus main body 2 When, telescopic rod 403 is adjusted and arrives suitable length by people, and rotating clockwise snib 402 makes snib 402 be against 403 table of telescopic rod Telescopic rod 403 is fixed in piston 401 by face, so that apparatus main body 2 be made to be tightly attached to surface of wall, greatly reduces people's monitoring The installment work of equipment.
Further, there are two tracheae 204 is set, two tracheaes 204 are separately positioned in two air pumps 202, and two gas 204 one end of pipe is respectively positioned in the opening in the left side of apparatus main body 2, tracheae 204 its after be used to drill on wall when drill bit 206, general The dust of bore inner is blown off, so that people is intuitively observed the saturation degree of wall plastering, is greatly facilitated measurement work.
Further, washer 205 is fixedly connected on two 204 surfaces of tracheae, washer 205 its be used to prevent 206 turns of drill bit Kong Shi, dust enter in apparatus main body 2, influence the operation of apparatus main body 2, considerably increase the service life of the equipment.
Working principle: this kind can rapid survey wall plastering saturation degree building its piston 401 of monitoring device its be used to stretch Contracting bar 403 is securing simultaneously, and telescopic rod 403 can be enable flexible in piston 401 and it is equipped with two openings, one is opened Mouth is for snib 402 to be fixed in piston 401, another is open, and it is used to that atmospheric pressure will to be connected inside piston 401, avoids big Effects of air pressure telescopic rod 403 stretches, it is used for when people on the left of apparatus main body 2 being against on the wall of measurement snib 402, Telescopic rod 403 is adjusted and arrives suitable length by people, and rotating clockwise snib 402 makes snib 402 be against 403 surface of telescopic rod general Telescopic rod 403 is fixed in piston 401, so that apparatus main body 2 be made to be tightly attached to surface of wall, greatly reduces people's monitoring device Installment work, tracheae 204 its after be used to drill on wall when drill bit 206, the dust of bore inner is blown off, makes people can Intuitively to observe the saturation degree of wall plastering, greatly facilitate measurement work, washer 205 its be used to prevent 206 turns of drill bit Kong Shi, dust enter in apparatus main body 2, influence the operation of apparatus main body 2, considerably increase the service life of the equipment, a variety of Structure combine make this kind can rapid survey wall plastering saturation degree building monitoring device, the demand of people can be better met.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. one kind can rapid survey wall plastering saturation degree build monitoring device, including foot prop (1), apparatus main body (2) and button (3), be fixedly connected with two foot props (1) below described device main body (2), the insertion of described device main body (2) surface be provided with by Button (3), it is characterised in that: described device main body (2) lower rotation is connected with two telescopic foot stools (4), described device main body (2) Inner wall is fixedly connected with expansion bend (201), and described device main body (2) inner wall is fixedly connected there are two air pump (202), described flexible Device (201) is located on the right side of two air pumps (202), is fixedly connected with motor (203), the electricity on the left of the expansion bend (201) Motivation (203) left pivot movement is connected with drill bit (206), and air pump (202) the surface insertion is provided with tracheae (204), the brill Head (206) surface is closely fitted with washer (205), and described device main body (2) lower rotation is connected with piston (401), the work Plug (401) underside is connected with telescopic rod (403), and piston (401) surface is provided through snib (402).
2. one kind according to claim 1 can rapid survey wall plastering saturation degree build monitoring device, it is characterised in that: Opening there are two being set equipped with runner on the left of the piston (401), and inside piston (401).
3. one kind according to claim 1 can rapid survey wall plastering saturation degree build monitoring device, it is characterised in that: The snib (402) is fitted tightly over telescopic rod (403) surface through piston (401), and snib (402) surface is equipped with and piston (401) be open the embedding line mutually agreed with.
4. one kind according to claim 1 can rapid survey wall plastering saturation degree build monitoring device, it is characterised in that: There are two the tracheae (204) sets, two tracheaes (204) are separately positioned in two air pumps (202), and two tracheaes (204) one end is respectively positioned in the opening on the left of apparatus main body (2).
5. one kind according to claim 1 can rapid survey wall plastering saturation degree build monitoring device, it is characterised in that: The washer (205) is fixedly connected on two tracheae (204) surfaces.
CN201821773219.5U 2018-10-30 2018-10-30 One kind can rapid survey wall plastering saturation degree building monitoring device Expired - Fee Related CN208953460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821773219.5U CN208953460U (en) 2018-10-30 2018-10-30 One kind can rapid survey wall plastering saturation degree building monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821773219.5U CN208953460U (en) 2018-10-30 2018-10-30 One kind can rapid survey wall plastering saturation degree building monitoring device

Publications (1)

Publication Number Publication Date
CN208953460U true CN208953460U (en) 2019-06-07

Family

ID=66743427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821773219.5U Expired - Fee Related CN208953460U (en) 2018-10-30 2018-10-30 One kind can rapid survey wall plastering saturation degree building monitoring device

Country Status (1)

Country Link
CN (1) CN208953460U (en)

Similar Documents

Publication Publication Date Title
CN207296098U (en) A kind of dismountable building decoration curtain wall
CN205449086U (en) Line pendant for building construction
CN211775537U (en) Wall ceramic tile laminating auxiliary device
CN208953460U (en) One kind can rapid survey wall plastering saturation degree building monitoring device
CN215864145U (en) Anti-freezing structure for air source heat pump
CN215768493U (en) Pump suction type miniature environmental air quality monitor
CN214951993U (en) Manage and use building outer wall infiltration testing arrangement
CN206235330U (en) The levelling laser rays of one kind finishing launches chi
CN208946346U (en) A kind of drilling equipment of the polyurethane composite heat-conservation board with auxiliary positioning mechanism
CN203296383U (en) Plugging rod for split bolt holes
CN207998215U (en) A kind of planar structure dynamic absorption pulling apparatus
CN205918988U (en) Energy -conserving flow regulator of water
CN205558210U (en) Plaster trowel
CN206837742U (en) A kind of air cleaning unit for the watering and lowering dust that is self-regulated
CN210997865U (en) Corner grinding device for interior decoration
CN217998885U (en) Exterior wall coating construction platform
CN208079980U (en) A kind of stereoscopic landscape device based on living environment space
CN221382913U (en) Data storage device for quality management of building engineering
CN219048265U (en) Cleaning machine convenient for butt joint
CN207673024U (en) The water-saving type spraying curing means of concrete building structures
CN110153008A (en) A kind of left-right movable type Sand screen with shock-absorbing function
CN203867102U (en) Novel crank arm elasticity structure for flexible awning
CN216446324U (en) Heat-insulating energy-saving autoclaved aerated concrete block
CN213868562U (en) Energy-saving antique building material with vacuum heat insulation effect
CN203856670U (en) Beach gas filling station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607