CN208952085U - Circulating fluidized bed boiler stripping gas co-combustion system - Google Patents

Circulating fluidized bed boiler stripping gas co-combustion system Download PDF

Info

Publication number
CN208952085U
CN208952085U CN201821653817.9U CN201821653817U CN208952085U CN 208952085 U CN208952085 U CN 208952085U CN 201821653817 U CN201821653817 U CN 201821653817U CN 208952085 U CN208952085 U CN 208952085U
Authority
CN
China
Prior art keywords
stripping gas
combustion
fluidized bed
inlet pipe
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821653817.9U
Other languages
Chinese (zh)
Inventor
赵明星
宋如昌
田玉民
刘向明
徐波
张伟锋
严成军
刘长命
高宏寅
任立胜
陈红安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Dongxinyuan Chemical Co Ltd
Original Assignee
Shaanxi Dongxinyuan Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Dongxinyuan Chemical Co Ltd filed Critical Shaanxi Dongxinyuan Chemical Co Ltd
Priority to CN201821653817.9U priority Critical patent/CN208952085U/en
Application granted granted Critical
Publication of CN208952085U publication Critical patent/CN208952085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The utility model discloses a kind of circulating fluidized bed boiler stripping gas co-combustion systems, including boiler furnace, the combustion gas inlet pipe being connected to the intracorporal burner hearth of Boiler Furnace is provided on boiler furnace, combustion gas inlet pipe is more, and more combustion gas inlet pipes are along the setting of the short transverse interval of boiler furnace to convey stripping gas to the intracorporal burner hearth of Boiler Furnace;Wherein, the internal diameter of combustion gas inlet pipe is not less than 100mm.So as to effectively improve the air inflow of circulating fluidized bed boiler, and then that improves stripping gas mixes burning amount.Solve the problems, such as stripping gas co-combustion system stripping gas in the prior art mix burning measure it is lower.

Description

Circulating fluidized bed boiler stripping gas co-combustion system
Technical field
The utility model relates to boiler plant fields, mix burning in particular to a kind of circulating fluidized bed boiler stripping gas System.
Background technique
The hydrogen that the raw coke oven gas of existing semi-coke device production extracts is used for the raw materials for production of coal tar hydrogenating, and stripping gas is used Make magnesium metal production fuel, stripping gas more than needed mixes burning for electricity generation boiler.
And the stripping gas of existing Boiler Mixed Burning system mixes that burning amount is lower, can not adapt to the desorption more than needed of semi-coke device generation Gas causes the significant wastage of stripping gas.
Summary of the invention
The main purpose of the utility model is to provide a kind of circulating fluidized bed boiler stripping gas co-combustion systems, at least to solve Stripping gas co-combustion system stripping gas certainly in the prior art mixes burning and measures lower problem.
To achieve the goals above, the utility model provides a kind of circulating fluidized bed boiler stripping gas co-combustion system, packet Include: boiler furnace is provided with the combustion gas inlet pipe being connected to the intracorporal burner hearth of Boiler Furnace on boiler furnace, and combustion gas inlet pipe is more, More combustion gas inlet pipes are along the setting of the short transverse interval of boiler furnace to convey stripping gas to the intracorporal burner hearth of Boiler Furnace;Wherein, The internal diameter of combustion gas inlet pipe is not less than 100mm.
Further, more combustion gas inlet pipes include: the first combustion gas inlet pipe, and the first combustion gas inlet pipe is more, more first combustions The front of boiler furnace is arranged in be connected to the intracorporal burner hearth of Boiler Furnace in gas inlet pipe.
Further, more combustion gas inlet pipes include: the second combustion gas inlet pipe, and the second combustion gas inlet pipe is more, more second combustions The rear portion of boiler furnace is arranged in be connected to the intracorporal burner hearth of Boiler Furnace in gas inlet pipe.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: connecting branch, connecting branch are more, More connecting branches and more combustion gas inlet pipes are interconnected correspondingly to convey stripping gas to the intracorporal burner hearth of Boiler Furnace.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: fast cut valve, fast cut valve be it is multiple, it is multiple Fast cut valve is arranged in correspondingly on more connecting branches;Wherein, every connecting branch by a corresponding fast cut valve with Corresponding combustion gas inlet pipe connection.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: connection general pipeline, connection general pipeline and each company Branch pipe is connect to be connected to convey stripping gas to the intracorporal burner hearth of Boiler Furnace.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: the first water seal arrangement, connection general pipeline pass through First water seal arrangement is connected to each connecting branch.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: stripping gas main pipe, the one of stripping gas main pipe End is connected to stripping gas gas source, and the other end of stripping gas main pipe is connected to general pipeline is connect to solve to the intracorporal burner hearth conveying of Boiler Furnace Air-breathing.
Further, the internal diameter of connecting branch is not less than 150mm, connects the internal diameter of general pipeline not less than 450mm, stripping gas is female The internal diameter of pipe is not less than 1200mm.
Further, circulating fluidized bed boiler stripping gas co-combustion system further include: bleeding device;Second water seal arrangement, puts In bulk set is connected to by the second water seal arrangement with stripping gas main pipe to diffuse to the stripping gas from stripping gas gas source.
Using the circulating fluidized bed boiler stripping gas co-combustion system of technical solutions of the utility model, including boiler furnace, pot The combustion gas inlet pipe being connected to the intracorporal burner hearth of Boiler Furnace is provided on furnace body, combustion gas inlet pipe is more, more combustion gas inlet pipe edges The short transverse interval setting of boiler furnace is to convey stripping gas to the intracorporal burner hearth of Boiler Furnace;Wherein, the internal diameter of combustion gas inlet pipe Not less than 100mm.So as to effectively improve the air inflow of circulating fluidized bed boiler, and then that improves stripping gas mixes burning amount.Solution Stripping gas co-combustion system stripping gas in the prior art of having determined mixes burning and measures lower problem.
Detailed description of the invention
Attached drawing described herein is used to provide a further understanding of the present invention, and is constituted part of this application, The exemplary embodiment of the utility model and the description thereof are used to explain the utility model, does not constitute to the improper of the utility model It limits.In the accompanying drawings:
Fig. 1 is according to optionally a kind of structure of circulating fluidized bed boiler stripping gas co-combustion system of the utility model embodiment Schematic diagram.
Wherein, the above drawings include the following reference numerals:
10, boiler furnace;20, combustion gas inlet pipe;21, the first combustion gas inlet pipe;22, the second combustion gas inlet pipe;30, connecting branch; 31, the first connecting branch;32, the second connecting branch;40, general pipeline is connected;41, the first connection general pipeline;42, the second connection general pipeline; 50, the first water seal arrangement;60, stripping gas main pipe;70, bleeding device;80, the second water seal arrangement;90, fast cut valve.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, below in conjunction with the utility model reality The attached drawing in example is applied, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described Embodiment is only the embodiment of the utility model a part, instead of all the embodiments.Based on the reality in the utility model Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts is all answered When the range for belonging to the utility model protection.
According to the circulating fluidized bed boiler stripping gas co-combustion system of the utility model embodiment, as shown in Figure 1, comprising: pot Furnace body 10 is provided with the combustion gas inlet pipe 20 being connected to the burner hearth in boiler furnace 10 on boiler furnace 10, and combustion gas inlet pipe 20 is More, more combustion gas inlet pipes 20 convey solution along the setting of the short transverse interval of boiler furnace 10 with the burner hearth into boiler furnace 10 Air-breathing;Wherein, the internal diameter of combustion gas inlet pipe 20 is not less than 100mm.
Using the circulating fluidized bed boiler stripping gas co-combustion system of technical solutions of the utility model, including boiler furnace 10, The combustion gas inlet pipe 20 being connected to the burner hearth in boiler furnace 10 is provided on boiler furnace 10, combustion gas inlet pipe 20 is more, more Combustion gas inlet pipe 20 conveys stripping gas along the setting of the short transverse interval of boiler furnace 10 with the burner hearth into boiler furnace 10;Its In, the internal diameter of combustion gas inlet pipe 20 is not less than 100mm.So as to effectively improve the air inflow of circulating fluidized bed boiler, Jin Erti High stripping gas mixes burning amount.Solve the problems, such as stripping gas co-combustion system stripping gas in the prior art mix burning measure it is lower.
When it is implemented, in order to further increase the air inflow of circulating fluidized bed boiler, more combustion gas inlet pipes 20 include the One combustion gas inlet pipe 21 and the second combustion gas inlet pipe 22, the first combustion gas inlet pipe 21 are more, and more first combustion gas inlet pipes 21 are arranged in pot The front of furnace body 10 with the burner hearth in boiler furnace 10 to be connected to;Second combustion gas inlet pipe 22 be more, more second combustion gas into The rear portion of boiler furnace 10 is arranged in be connected to the burner hearth in boiler furnace 10 in pipe 22.To pass through the front of boiler furnace 10 Stripping gas is conveyed to boiler furnace 10 by more larger-diameter combustion gas inlet pipes 20 simultaneously with rear portion, is effectively improved ciculation fluidized The stripping gas of bed boiler mixes burning amount.
Further, circulating fluidized bed boiler stripping gas co-combustion system further includes connecting branch 30 and fast cut valve 90, connection Branch pipe 30 is more, and more connecting branches 30 and more combustion gas inlet pipes 20 are interconnected into boiler furnace 10 correspondingly Burner hearth convey stripping gas;Fast cut valve 90 be it is multiple, multiple fast cut valves 90 are arranged in correspondingly on more connecting branches 30; Wherein, every connecting branch 30 is connected to a corresponding combustion gas inlet pipe 20 to stripping gas by a corresponding fast cut valve 90 Conveying controlled.
Further, connecting branch 30 includes the first connecting branch 31 and the second connecting branch 32, the first connecting branch 31 It is more with the second connecting branch 32, more first connecting branches 31 correspond and connect with more first combustion gas inlet pipes 21 Logical, more second connecting branches 32 are corresponded and are connected to more second combustion gas inlet pipes 22 to pass through boiler furnace 10 respectively Front and rear conveys stripping gas.
Further, circulating fluidized bed boiler stripping gas co-combustion system further includes connection general pipeline 40 and the first water seal arrangement 50, connection general pipeline include the first connection general pipeline 41 and the second connection general pipeline 42, and the first connection general pipeline 41 connect branch with each first Pipe 31 is connected to, and the second connection general pipeline 42 is connected to each second connecting branch 32, and the first water seal arrangement 50 is two, two First water seal arrangement 50 is separately positioned on the first connection general pipeline 41 and the second connection general pipeline 42, so that stripping gas is passed through each point Branch is delivered to boiler furnace 10.First water seal arrangement 50 plays the role of that stripping gas is isolated.
Further, circulating fluidized bed boiler stripping gas co-combustion system further includes stripping gas main pipe 60, stripping gas main pipe 60 One end be connected to stripping gas gas source, the other end of stripping gas main pipe 60 with first connect general pipeline 41 and second connection general pipeline 42 connect Pass to the burner hearth conveying stripping gas into boiler furnace 10.
Optionally, the internal diameter of connecting branch 30 is not less than 150mm, and the internal diameter of connection general pipeline 40 is not less than 450mm, stripping gas The internal diameter of main pipe 60 is not less than 1200mm.It is adapted to mix burning amount with the stripping gas of boiler furnace 10.
In order to guarantee safety when co-combustion system breaks down, further, circulating fluidized bed boiler stripping gas mixes burning system System further include: bleeding device 70 and the second water seal arrangement 80, bleeding device 70 pass through the second water seal arrangement 80 and stripping gas main pipe 60 connections, extra stripping gas can be vented in atmosphere by bleeding device 70 when co-combustion system breaks down, to guarantee The safety of co-combustion system.Optionally, the internal diameter of the pipeline that bleeding device 70 is connected to stripping gas main pipe 60 is not less than 700mm.
Above are merely preferred embodiments of the utility model, it is noted that for the ordinary skill people of the art For member, without departing from the principle of this utility model, several improvements and modifications can also be made, these improvements and modifications Also it should be regarded as the protection scope of the utility model.

Claims (10)

1. a kind of circulating fluidized bed boiler stripping gas co-combustion system characterized by comprising
Boiler furnace (10) is provided with the combustion gas being connected to the burner hearth in the boiler furnace (10) on the boiler furnace (10) Inlet pipe (20), the combustion gas inlet pipe (20) are more, height of the more combustion gas inlet pipes (20) along the boiler furnace (10) The setting of direction interval conveys stripping gas with the burner hearth into the boiler furnace (10);
Wherein, the internal diameter of the combustion gas inlet pipe (20) is not less than 100mm.
2. circulating fluidized bed boiler stripping gas co-combustion system according to claim 1, which is characterized in that the more combustion gas Inlet pipe (20) includes:
First combustion gas inlet pipe (21), the first combustion gas inlet pipe (21) are more, more first combustion gas inlet pipe (21) settings In the front of the boiler furnace (10) to be connected to the burner hearth in the boiler furnace (10).
3. circulating fluidized bed boiler stripping gas co-combustion system according to claim 2, which is characterized in that the more combustion gas Inlet pipe (20) includes:
Second combustion gas inlet pipe (22), the second combustion gas inlet pipe (22) are more, more second combustion gas inlet pipe (22) settings At the rear portion of the boiler furnace (10) to be connected to the burner hearth in the boiler furnace (10).
4. circulating fluidized bed boiler stripping gas co-combustion system according to claim 1, which is characterized in that described ciculation fluidized Bed boiler stripping gas co-combustion system further include:
Connecting branch (30), the connecting branch (30) are more, more connecting branches (30) and the more combustion gas into (20) are managed to be interconnected correspondingly with the burner hearth conveying stripping gas into the boiler furnace (10).
5. circulating fluidized bed boiler stripping gas co-combustion system according to claim 4, which is characterized in that described ciculation fluidized Bed boiler stripping gas co-combustion system further include:
Fast cut valve (90), the fast cut valve (90) be it is multiple, multiple fast cut valves (90) are arranged in described more correspondingly On connecting branch described in root (30);
Wherein, the every connecting branch (30) passes through corresponding one fast cut valve (90) and a corresponding combustion gas Inlet pipe (20) connection.
6. circulating fluidized bed boiler stripping gas co-combustion system according to claim 4, which is characterized in that described ciculation fluidized Bed boiler stripping gas co-combustion system further include:
It connects general pipeline (40), the connection general pipeline (40) and each connecting branch (30) are connected to the boiler furnace (10) burner hearth in conveys stripping gas.
7. circulating fluidized bed boiler stripping gas co-combustion system according to claim 6, which is characterized in that described ciculation fluidized Bed boiler stripping gas co-combustion system further include:
First water seal arrangement (50), the connection general pipeline (40) pass through first water seal arrangement (50) and each connection branch Manage (30) connection.
8. circulating fluidized bed boiler stripping gas co-combustion system according to claim 6, which is characterized in that described ciculation fluidized Bed boiler stripping gas co-combustion system further include:
One end of stripping gas main pipe (60), the stripping gas main pipe (60) is connected to stripping gas gas source, the stripping gas main pipe (60) the other end is connected to connection general pipeline (40) and conveys stripping gas with the burner hearth into the boiler furnace (10).
9. circulating fluidized bed boiler stripping gas co-combustion system according to claim 8, which is characterized in that the connecting branch (30) internal diameter is not less than 150mm, and the internal diameter of connection general pipeline (40) is not less than 450mm, and the internal diameter of stripping gas main pipe (60) is not small In 1200mm.
10. circulating fluidized bed boiler stripping gas co-combustion system according to claim 8, which is characterized in that the recycle stream Fluidized bed boiler stripping gas co-combustion system further include:
Bleeding device (70);
Second water seal arrangement (80), the bleeding device (70) pass through second water seal arrangement (80) and the stripping gas main pipe (60) connection is to diffuse the stripping gas from the stripping gas gas source.
CN201821653817.9U 2018-10-11 2018-10-11 Circulating fluidized bed boiler stripping gas co-combustion system Active CN208952085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821653817.9U CN208952085U (en) 2018-10-11 2018-10-11 Circulating fluidized bed boiler stripping gas co-combustion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821653817.9U CN208952085U (en) 2018-10-11 2018-10-11 Circulating fluidized bed boiler stripping gas co-combustion system

Publications (1)

Publication Number Publication Date
CN208952085U true CN208952085U (en) 2019-06-07

Family

ID=66741204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821653817.9U Active CN208952085U (en) 2018-10-11 2018-10-11 Circulating fluidized bed boiler stripping gas co-combustion system

Country Status (1)

Country Link
CN (1) CN208952085U (en)

Similar Documents

Publication Publication Date Title
CN201535508U (en) Gas combustor
CN208952085U (en) Circulating fluidized bed boiler stripping gas co-combustion system
CN204534555U (en) A kind of flue gas recirculation device for reducing NO_x formation
CN203298300U (en) Natural gas pipe system of heat treatment furnace
CN204240350U (en) Brown coal coal dust homogeneous combustion device
CN105674264A (en) Methanol combustor
CN212119520U (en) Urea pyrolysis furnace with bypass flue
CN204923048U (en) Boiler automatic feeding
CN210373415U (en) Gas type low-nitrogen combustion device
CN203413632U (en) Gas infrared burner system
CN205640900U (en) Methanol combustion engine
CN204404171U (en) The fly ash re-injection system of boiler coke can be alleviated
CN205979713U (en) Safer reasonable waste -heat oven top tuber pipe structure
CN203518216U (en) Combustion type gas preheater
CN206222319U (en) Heating gas burner
CN205480998U (en) Gas-solid dual-combustion low-nitrogen burner
CN206222311U (en) Burner pipeline structure
CN205783076U (en) A kind of oxygen-enriched micro-oil grading ignition device
CN213178309U (en) Device for adjusting flue gas backflow
CN204438114U (en) Mix and burn special flow wide cut adaptation burner
CN214095587U (en) Coke oven gas co-combustion system shared by multiple units
CN205174439U (en) Fire -retardant system of wind screen divides wind device
CN207702486U (en) The combustion gas furnace of incendivity oven gas
CN203320043U (en) Oxygen enrichment device for combustion air
CN203744276U (en) Boiler with bagasse as fuel