CN208951687U - A kind of multi-functional interim gas supply sled - Google Patents

A kind of multi-functional interim gas supply sled Download PDF

Info

Publication number
CN208951687U
CN208951687U CN201821199351.XU CN201821199351U CN208951687U CN 208951687 U CN208951687 U CN 208951687U CN 201821199351 U CN201821199351 U CN 201821199351U CN 208951687 U CN208951687 U CN 208951687U
Authority
CN
China
Prior art keywords
gas
chassis
steam line
butterfly valve
pin shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821199351.XU
Other languages
Chinese (zh)
Inventor
陈晓斌
陈水来
陈小华
刘志伟
李景春
乔锦森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANZHOU GAS CO Ltd
Original Assignee
QUANZHOU GAS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANZHOU GAS CO Ltd filed Critical QUANZHOU GAS CO Ltd
Priority to CN201821199351.XU priority Critical patent/CN208951687U/en
Application granted granted Critical
Publication of CN208951687U publication Critical patent/CN208951687U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model proposes a kind of multi-functional interim gas supply sleds, including chassis, it is provided with lifting hole(eyelet) on chassis or is fixedly connected with hanging ring, the two sides of chassis are fixedly connected there are two riffled tube, external thread rod is connected in riffled tube, external thread rod upper end is fixedly connected with U-shaped frame, horizontal pin shaft is rotatably connected on U-shaped frame, the both ends of horizontal pin shaft are the end of thread, the both ends of horizontal pin shaft are connected with fixture nut, concave mirror is fixedly connected in horizontal pin shaft, air-heating type gasifier is fixed on chassis, gas phase steam line is connected on the gas outlet of air-heating type gasifier, first butterfly valve is connected in turn on gas phase steam line, gas pressure regulator, governor, second butterfly valve, gas turbine flowmeter and third butterfly valve.The utility model structure is simple, facilitates lifting and transport, can be used for temporarily supplying use;By adding concave mirror, air-heating type gasifier is heated, removal freezes, and saves water rate cost, reduces operational risk.

Description

A kind of multi-functional interim gas supply sled
Technical field
The utility model relates to supply sled, in particular to a kind of multi-functional interim gas supply sled.
Background technique
Air-heating type gasifier is the important component of gas supply sled, is widely used in station, is mainly used to liquid natural Gas (LNG) exchanges heat by the fin of gasifier with atmosphere, achievees the purpose that gasification, its advantage is that being not necessarily to other energy Realize gasification function.Small-sized interim gasification gas supply sled is less on the market at present, and buying is more difficult, large-scale interim gas supply sled structure Complexity is inconvenient to lift and transport, and restricted larger by place, is not suitable for the demand and emphasis work of emergency first-aid repair mobility Trade company's Emergency demand.In addition, air-heating type gasifier purely relies on air heat-exchange, into winter after freeze it is more serious, out Mouth temperature is lower, is unable to satisfy requirement, and freeze if clearing up not in time, there are some potential safety problemss;Habitually in the past all It is to be washed away using tap water, melts the ice, time-consuming, laborious, water wasting, surrounding ground is easy ponding, and employee's walking is easy to slide , there are security risks.
Utility model content
The utility model proposes a kind of multi-functional interim gas supply sleds, and solving existing gas supply sled, structure is complicated, inconvenient Lifting and transport, and it is restricted larger by place, with water deicing, time-consuming, laborious and water wasting defect when freezed in winter.
The technical solution of the utility model is achieved in that
The multi-functional interim gas supply of one kind is prized, including chassis, is provided with lifting hole(eyelet) on chassis or is fixedly connected with hanging ring, chassis Two sides are fixedly connected there are two riffled tube, are connected with external thread rod in riffled tube, external thread rod upper end is fixedly connected with U-shaped Frame is rotatably connected to horizontal pin shaft on U-shaped frame, and the both ends of horizontal pin shaft are the end of thread, and the both ends of horizontal pin shaft are connected with fixation Nut is fixedly connected with concave mirror in horizontal pin shaft, air-heating type gasifier, the gas outlet of air-heating type gasifier is fixed on chassis On be connected with gas phase steam line, be connected with first butterfly valve, gas pressure regulator, governor, second butterfly valve, combustion on gas phase steam line in turn Gas eddy flowmeters and third butterfly valve are connected with first on the gas phase steam line between first butterfly valve and gas pressure regulator, governor It manages, is connected with the first needle valve and first pressure gauge, the gas phase between gas pressure regulator, governor and second butterfly valve in turn on the first branch pipe It is connected with the second branch pipe on steam line, is connected with the second needle valve and second pressure gauge, gas turbine on the second branch pipe in turn It is connected with a release supervisor on gas phase steam line between flowmeter and third butterfly valve, is connected with two on release supervisor and puts Branch pipe is dissipated, safety valve is connected on a release branch pipe, is connected with manual ball valve, gas phase steam line on another release branch pipe It is fixedly connected by bracket with chassis.
Further, liquid phase steam line is connected on the air inlet of the air-heating type gasifier.
Further, connector is connected on the liquid phase steam line.
The utility model has the beneficial effects that the utility model structure is simple, facilitates lifting and transport, can be used for temporarily supplying It uses;By adding concave mirror, air-heating type gasifier is heated, removal freezes, and saves water rate cost, reduces operation wind Danger;Riffled tube and external thread rod can be arranged according to the orientation of the sun in two riffled tubes with dismantling connection, concave mirror In one and horizontal pin shaft can rotate above, then the angle of adjustable concave mirror is fixed by nut, is reached Optimal light-use effect.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of multi-functional interim gas supply sled of the utility model;
Fig. 2 is the structural schematic diagram of U-shaped frame and concave mirror.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig.1-2, a kind of multi-functional interim gas supply is prized, including chassis 1, is provided with lifting hole(eyelet) on chassis 1 or is fixedly connected There is a hanging ring 11, the two sides of chassis 1 are fixedly connected there are two riffled tube 12, are connected with external thread rod 21 in riffled tube 12, outside 21 upper end of threaded rod is fixedly connected with U-shaped frame 22, and horizontal pin shaft 23, the both ends of horizontal pin shaft 23 are rotatably connected on U-shaped frame 22 For the end of thread, the both ends of horizontal pin shaft 23 are connected with fixture nut 24, concave mirror 25, chassis are fixedly connected in horizontal pin shaft 23 It is fixed with air-heating type gasifier 3 on 1, gas phase steam line 4, gas phase air supply pipe are connected on the gas outlet of air-heating type gasifier 3 It is connected with first butterfly valve 51, gas pressure regulator, governor 52, second butterfly valve 53, gas turbine flowmeter 54 and third butterfly valve on road 4 in turn 55, it is connected with the first branch pipe on the gas phase steam line 4 between first butterfly valve 51 and gas pressure regulator, governor 52, on the first branch pipe successively It is connected with the first needle valve 61 and first pressure gauge 62, on the gas phase steam line between gas pressure regulator, governor 52 and second butterfly valve 53 It is connected with the second branch pipe, is connected with the second needle valve 71 and second pressure gauge 72, gas turbine flowmeter on the second branch pipe in turn It is connected with a release supervisor 81 on gas phase steam line 4 between 54 and third butterfly valve 55, is connected with two on release supervisor 81 Root diffuses branch pipe 82, is connected with safety valve 91 on a release branch pipe 82, is connected with manual ball valve on another release branch pipe 82 92, gas phase steam line 4 is fixedly connected by bracket 15 with chassis 1.
In the present embodiment, liquid phase steam line (not shown) is connected on the air inlet of the air-heating type gasifier 3.
In the present embodiment, connector (not shown) is connected on the liquid phase steam line.
The utility model structure is simple, facilitates lifting and transport, can be used for temporarily supplying use;By adding concave mirror 25, air-heating type gasifier is heated, removal freezes, and saves water rate cost, reduces operational risk;Riffled tube 12 and outer spiral shell Rasp bar 21 can be arranged on one in two riffled tubes 12 with dismantling connection, concave mirror 25 according to the orientation of the sun Face, and horizontal pin shaft 23 can rotate, the angle of adjustable concave mirror 25, it is then fixed by nut 24, reach best Light-use effect.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (3)

1. a kind of multi-functional interim gas supply sled, it is characterised in that: including chassis, lifting hole(eyelet) is provided on chassis or is fixedly connected with and is hung Ring, the two sides of chassis are fixedly connected there are two riffled tube, are connected with external thread rod in riffled tube, external thread rod upper end is fixed It is connected with U-shaped frame, horizontal pin shaft is rotatably connected on U-shaped frame, the both ends of horizontal pin shaft are the end of thread, and the both ends of horizontal pin shaft connect It is connected to fixture nut, concave mirror is fixedly connected in horizontal pin shaft, air-heating type gasifier, air-heating type gasifier are fixed on chassis Gas outlet on be connected with gas phase steam line, be connected with first butterfly valve, gas pressure regulator, governor, second on gas phase steam line in turn Butterfly valve, gas turbine flowmeter and third butterfly valve are connected on the gas phase steam line between first butterfly valve and gas pressure regulator, governor First branch pipe is connected with the first needle valve and first pressure gauge in turn on the first branch pipe, between gas pressure regulator, governor and second butterfly valve Gas phase steam line on be connected with the second branch pipe, be connected with the second needle valve and second pressure gauge on the second branch pipe in turn, fire It is connected with a release supervisor on gas phase steam line between gas eddy flowmeters and third butterfly valve, is connected on release supervisor Two release branch pipes are connected with safety valve on a piece release branch pipe, and manual ball valve is connected on another release branch pipe, and gas phase supplies Feed channel is fixedly connected by bracket with chassis.
2. multi-functional interim gas supply sled as described in claim 1, it is characterised in that: on the air inlet of the air-heating type gasifier It is connected with liquid phase steam line.
3. multi-functional interim gas supply sled as claimed in claim 2, it is characterised in that: be connected on the liquid phase steam line Connector.
CN201821199351.XU 2018-07-27 2018-07-27 A kind of multi-functional interim gas supply sled Expired - Fee Related CN208951687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821199351.XU CN208951687U (en) 2018-07-27 2018-07-27 A kind of multi-functional interim gas supply sled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821199351.XU CN208951687U (en) 2018-07-27 2018-07-27 A kind of multi-functional interim gas supply sled

Publications (1)

Publication Number Publication Date
CN208951687U true CN208951687U (en) 2019-06-07

Family

ID=66732626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821199351.XU Expired - Fee Related CN208951687U (en) 2018-07-27 2018-07-27 A kind of multi-functional interim gas supply sled

Country Status (1)

Country Link
CN (1) CN208951687U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110467299A (en) * 2019-08-28 2019-11-19 王旭 Smart city roof hydroelectric integration processing unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110467299A (en) * 2019-08-28 2019-11-19 王旭 Smart city roof hydroelectric integration processing unit

Similar Documents

Publication Publication Date Title
CN208951687U (en) A kind of multi-functional interim gas supply sled
CN102493830B (en) Temperature-controlled liquid nitrogen fire preventing and extinguishing device for mine
CN206800513U (en) A kind of new fog collection device suitable for the full landform in field
CN205605183U (en) Natural gas recovering device
CN208059625U (en) A kind of double cooling heat transferring tipping tube
CN208069955U (en) The outdoor bollard of ship with heating structure
CN202598128U (en) Skid-mounted type natural gas gasification pressure-regulating and measuring output device
CN205607204U (en) Safe high -efficient heating radiator
CN204154517U (en) A kind of wall-hung boiler proving installation
CN208109425U (en) A kind of heat pump main frame on-line testing tooling convenient for removing scale
CN206861135U (en) A kind of pipeline connection fixture
CN206944489U (en) Anti-condensation device outside a kind of boiler economizer
CN207763051U (en) A kind of easy-to-dismount heating network constant-current stabilizer
CN208106506U (en) A kind of turbine steam seal cooler
CN201527032U (en) Water heating device integrating solar-energy water heating system with electric water heater
CN206843312U (en) A kind of cooling water heating constant-temperature equipment for producing double matte glass pressing machines
CN202834738U (en) Pressurizing outlet pipe
CN217570857U (en) Electric heater for casting pipeline
CN201169946Y (en) Iron tower capable of rapidly deicing
CN2670841Y (en) Solar water heater
CN205066203U (en) Heat absorption system is pressed in tower solar energy closed area
CN203896899U (en) Solar heat storage system in sunlight greenhouse
CN203719183U (en) Double-shaft tracking adjustable type inner and outer dual-spherical surface solar collecting system complete device
CN209314429U (en) A kind of high-efficiency cleaning greenhouse brooder heater
CN219413767U (en) Pipeline stabilizing mean

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

Termination date: 20210727