CN208951538U - Central heating prefabricated thermal insulation plastic conduit - Google Patents

Central heating prefabricated thermal insulation plastic conduit Download PDF

Info

Publication number
CN208951538U
CN208951538U CN201821497624.9U CN201821497624U CN208951538U CN 208951538 U CN208951538 U CN 208951538U CN 201821497624 U CN201821497624 U CN 201821497624U CN 208951538 U CN208951538 U CN 208951538U
Authority
CN
China
Prior art keywords
thermal insulation
central heating
plastic conduit
medium pipeline
prefabricated thermal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821497624.9U
Other languages
Chinese (zh)
Inventor
吴文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG EFIELD PIPING SYSTEM CO Ltd
Original Assignee
SHANDONG EFIELD PIPING SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG EFIELD PIPING SYSTEM CO Ltd filed Critical SHANDONG EFIELD PIPING SYSTEM CO Ltd
Priority to CN201821497624.9U priority Critical patent/CN208951538U/en
Application granted granted Critical
Publication of CN208951538U publication Critical patent/CN208951538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model relates to a kind of central heating prefabricated thermal insulation plastic conduits, belong to utilidor technical field.It is made of jacket ducts, at least one medium pipeline being arranged in the jacket ducts and the insulation portion being arranged between the jacket ducts and the medium pipeline;The insulation portion is made of the first fiber insulation layer being coated on outside the medium pipeline and the filling heat insulating wall being filled between first fiber insulation layer and the jacket ducts.The heat-preservation plastic pipeline is used for the hot water delivery of central heating, for the thermo-insulating pipe line compared to existing polyethylene collocation polyurethane, further improves thermal insulation property, is more adaptive to the actual environment of cash energy shortage.

Description

Central heating prefabricated thermal insulation plastic conduit
Technical field
The utility model belongs to utilidor technical field, and in particular to a kind of central heating prefabricated thermal insulation plastic conduit.
Background technique
Currently, the domestic existing prefabricated pipeline for central heating is mostly by pe sheath, refractory polyethylene inner tube And the polyurethane heat-insulation of filling between is constituted, compared with more traditional steel insulating pipe, environmentally friendly, energy saving, economical, The various aspects such as safety and stability are improved.
Such as application No. is the Chinese invention patents of 20140494004X to disclose a kind of intelligent prefabricated direct buried crosslinked polyethylene Two-tube variable diameter work insulating tube and installation method, as above-mentioned insulation construction.
As the energy is increasingly in short supply, need further to promote the thermal insulation property of thermo-insulating pipe line, it is novel to adapt to Demand under energy environment.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of central heating prefabricated thermal insulation plastic conduit, it to be used for central heating Hot water delivery, compared to existing polyethylene collocation polyurethane thermo-insulating pipe line for, further improve thermal insulation property, It is more adaptive to the actual environment of cash energy shortage.
The technical solution that the utility model solves the above problems is as follows:
Central heating prefabricated thermal insulation plastic conduit is situated between by jacket ducts, at least one being arranged in the jacket ducts Matter pipeline and the insulation portion being arranged between the jacket ducts and the medium pipeline are constituted;
The insulation portion is by the first fiber insulation layer for being coated on outside the medium pipeline and is filled in first fiber Filling heat insulating wall between insulating layer and the jacket ducts is constituted.
Fibrous material itself has porosity characteristic, and part air adiabatic can be formed between filling heat insulating wall and medium pipeline Layer, to enhance the thermal insulation property of heat-preservation plastic pipeline;
Jacket ducts, medium pipeline are usually made of polythene material resistant to high temperature.
As a preferred embodiment of the above technical solution, the jacket ducts and the medium pipeline are bellows.
In the prior art, pipeline needs the part turned round usually to be realized by three-way connection, and the junction of three-way connection The often weakness of heat insulation effect, which reduce the integral heat insulation effects of pipeline, and increase the production cost of pipeline.
As a preferred embodiment of the above technical solution, first fiber insulation layer be fibrous material it is woven made of cover Pipe.
The first insulation fibre layer worked out, each weaving unit interlock place in the presence of more apparent air layer, energy Enough enhance the integral heat insulation performance of pipeline.
And in bending, the medium pipeline and filling heat insulating wall in knee are moved both with respect to the first fiber insulation layer, are made Pipeline still maintains preferable intensity and structural stability in bending section, and knee is released by material bring stress.
As a preferred embodiment of the above technical solution, first fiber insulation layer includes superimposed by fibrous material two layers Casing made of woven.
Two layers of woven manufactured casing is superimposed, in knee, the opposite fortune of medium pipeline and filling heat insulating wall Dynamic to be respectively acting on the first fiber insulation layer adjacent thereto, two layers of casing also can be movable relatively, relative to one layer of structure The first fiber insulation layer for, the structural stability in knee is more preferable.
As a preferred embodiment of the above technical solution, the insulation portion also includes be set to the jacket ducts internal layer second Fiber insulation layer.
As a preferred embodiment of the above technical solution, second fiber insulation layer be fibrous material it is woven made of cover Pipe.
As a preferred embodiment of the above technical solution, second fiber insulation layer includes superimposed by fibrous material two layers Casing made of woven.
The setting reason and principle of second fiber insulation layer are the same as the first fiber insulation layer.
As a preferred embodiment of the above technical solution, the quantity of the medium pipeline is two, and the setting at interval is in the sheath In pipeline.
As a preferred embodiment of the above technical solution, the filling heat insulating wall is polyurethane material insulating layer flexible.
As a preferred embodiment of the above technical solution, the internal diameter of the jacket ducts is between 75 ~ 225mm, correspondingly, being given an account of The outer diameter of matter pipeline is between 25 ~ 160mm.
In conclusion the utility model has the following beneficial effects:
The application provides a kind of central heating prefabricated thermal insulation plastic conduit and compares for the hot water delivery of central heating For the thermo-insulating pipe line of existing polyethylene collocation polyurethane, thermal insulation property can promote 5% ~ 11.7%, be more adaptive to cash The actual environment of energy shortage;
And by being directly bent instead of three-port structure, the structure in knee is more stable in its knee, also further protects Thermal insulation property is demonstrate,proved.
Detailed description of the invention
Fig. 1 is prefabricated thermal insulation plastic conduit cross section structure schematic diagram described in embodiment 1;
Fig. 2 is prefabricated thermal insulation plastic conduit cross section structure schematic diagram described in embodiment 2;
Fig. 3 is prefabricated thermal insulation plastic conduit cross section structure schematic diagram described in embodiment 3;
In figure, 1- jacket ducts, 2- medium pipeline, the first fiber insulation layer of 31-, 32- filling heat insulating wall, 33- second are fine Tie up insulating layer.
Specific embodiment
Below by the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described Embodiment is only the utility model a part of the embodiment, instead of all the embodiments.The embodiments of the present invention, this It is practical new to belong to this for field those of ordinary skill all other embodiment obtained under the premise of not doing creative work The range of type protection.
The utility model is described in detail with embodiment with reference to the accompanying drawing.
Embodiment 1: Fig. 1, central heating prefabricated thermal insulation plastic conduit, the jacket ducts made of refractory polyethylene are referred to 1, it the medium pipeline 2 made of refractory polyethylene of two in the sheath pipeline and is filled between the two Filling polyurethane insulating layer 32 is made;
The first fiber insulation layer made of high modulus fibre is additionally provided between filling heat insulating wall 32 and medium pipeline 2 31, with a thickness of 2mm.
For the polyethylene prefabricated pipeline of existing same specification, thermal insulation property improves 5% ~ 5.6%.
Embodiment 2: refer to Fig. 2, central heating prefabricated thermal insulation plastic conduit, difference from example 1 is that, sheath Pipeline 1 and medium pipeline 2 are bellows, and the quantity of medium pipeline 2 is one, filling heat insulating wall 32 and medium pipeline 2 it Between be provided with fibrous material it is woven made of the first fiber insulation layer 31, with a thickness of 2.2mm.
For the polyethylene prefabricated pipeline of existing same specification, thermal insulation property improves 6.5% ~ 7.3%.
Embodiment 3: refer to Fig. 3, central heating prefabricated thermal insulation plastic conduit, difference from example 1 is that, sheath Pipeline 1 and medium pipeline 2 are bellows, and the quantity of medium pipeline 2 is three, filling heat insulating wall 32 and medium pipeline 2 it Between be provided with fibrous material it is woven made of the first fiber insulation layer 31 for being superimposed of bilayer, with a thickness of 3.5mm, filling heat preservation Layer 32 and jacket ducts 1 between be provided with fibrous material it is woven made of bilayer superposition the second fiber insulation layer 31, thickness Degree is 3.5mm.
For the polyethylene prefabricated pipeline of existing same specification, thermal insulation property improves 9% ~ 11.7%.

Claims (10)

1. central heating prefabricated thermal insulation plastic conduit, it is characterised in that: by jacket ducts (1), be arranged in the jacket ducts (1) Interior at least one medium pipeline (2) and the heat preservation being arranged between the jacket ducts (1) and the medium pipeline (2) Portion is constituted;
The insulation portion is by being coated on outer the first fiber insulation layer (31) of the medium pipeline (2) and to be filled in described first fine The filling heat insulating wall (32) tieed up between insulating layer (31) and the jacket ducts (1) is constituted.
2. central heating prefabricated thermal insulation plastic conduit according to claim 1, it is characterised in that: the jacket ducts (1) It is bellows with the medium pipeline (2).
3. central heating prefabricated thermal insulation plastic conduit according to claim 1 or 2, it is characterised in that: first fiber Insulating layer (31) be fibrous material it is woven made of casing.
4. central heating prefabricated thermal insulation plastic conduit according to claim 3, it is characterised in that: first fiber thermal insulation Layer (31) include two layers it is superimposed fibrous material it is woven made of casing.
5. central heating prefabricated thermal insulation plastic conduit according to claim 1, it is characterised in that: the insulation portion also includes There is the second fiber insulation layer (33) for being set to the jacket ducts (1) internal layer.
6. central heating prefabricated thermal insulation plastic conduit according to claim 5, it is characterised in that: second fiber thermal insulation Layer (33) be fibrous material it is woven made of casing.
7. central heating prefabricated thermal insulation plastic conduit according to claim 6, it is characterised in that: second fiber thermal insulation Layer (33) include two layers it is superimposed fibrous material it is woven made of casing.
8. central heating prefabricated thermal insulation plastic conduit according to claim 1, it is characterised in that: the medium pipeline (2) Quantity be two, the setting at interval is in the jacket ducts (1).
9. central heating prefabricated thermal insulation plastic conduit according to claim 1, it is characterised in that: the filling heat insulating wall It (32) is polyurethane material insulating layer flexible.
10. central heating prefabricated thermal insulation plastic conduit according to claim 1, it is characterised in that: the jacket ducts (1) Internal diameter between 75 ~ 225mm, correspondingly, the outer diameter of the medium pipeline (2) is between 25 ~ 160mm.
CN201821497624.9U 2018-09-13 2018-09-13 Central heating prefabricated thermal insulation plastic conduit Expired - Fee Related CN208951538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821497624.9U CN208951538U (en) 2018-09-13 2018-09-13 Central heating prefabricated thermal insulation plastic conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821497624.9U CN208951538U (en) 2018-09-13 2018-09-13 Central heating prefabricated thermal insulation plastic conduit

Publications (1)

Publication Number Publication Date
CN208951538U true CN208951538U (en) 2019-06-07

Family

ID=66737915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821497624.9U Expired - Fee Related CN208951538U (en) 2018-09-13 2018-09-13 Central heating prefabricated thermal insulation plastic conduit

Country Status (1)

Country Link
CN (1) CN208951538U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027526A (en) * 2018-09-13 2018-12-18 山东艾菲尔管业有限公司 Central heating prefabricated thermal insulation plastic conduit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027526A (en) * 2018-09-13 2018-12-18 山东艾菲尔管业有限公司 Central heating prefabricated thermal insulation plastic conduit

Similar Documents

Publication Publication Date Title
CN109027526A (en) Central heating prefabricated thermal insulation plastic conduit
CN202955418U (en) Steam direct buried pipe composite thermal insulation structure
CN204942919U (en) The thermal compensation short tube of a kind of watt/bubble composite heat-insulating layer
CN103383053B (en) The insulating structure part of pipeline
CN208951538U (en) Central heating prefabricated thermal insulation plastic conduit
CN201715112U (en) Winding reinforcement type composite pipe material
CN103244758A (en) Directly-embedded energy-saving steam conveying method
CN204592601U (en) The prefabricated composite adiabatic tubular construction of a kind of nanoporous aerogel
CN106195464A (en) A kind of bamboo is wound around composite pressure pipe
CN203230966U (en) Conveying pipeline with multilayer composite heat insulation structure
CN103195985B (en) There is the conveyance conduit of multilayer composite heat insulation structure
CN206563137U (en) A kind of direct-burried high-temperature resistant composite thermal insulating tube
CN102777730A (en) Directly-buried steam pipeline for long-distance transportation
CN204785141U (en) Prefabricated heat preservation plastic conduit of flexible reinforcing
CN105351684A (en) Pipeline system with vacuum heat preservation function
CN206018152U (en) A kind of high prefabricated direct-buried thermal insulation pipe of structural strength
CN206861152U (en) A kind of double inner tube formula polyurethane thermal pipe
CN205278677U (en) Take vacuum insulation's pipe -line system
CN105257917A (en) Variable-diameter type corrosion-preventing high-temperature-resisting buried composite thermal insulation pipeline and mounting method
CN101846218A (en) Cold/heat flow media varying-area channel
CN202812659U (en) Novel long-distance directly-buried steam pipeline
CN214331903U (en) PPR composite heat-insulating pipe
CN205207940U (en) Anticorrosive compound incubation pipeline that buries of diameter -variable high temperature resistantly
CN2365503Y (en) High-temperature steam pipeline steel bushing steel direct-buried sealing pipe fitting
CN210890616U (en) Compound heat-preservation prefabricated overhead steam heat-preservation pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

Termination date: 20210913