CN208949725U - A kind of pier-beam temporary consolidation device - Google Patents

A kind of pier-beam temporary consolidation device Download PDF

Info

Publication number
CN208949725U
CN208949725U CN201821419604.XU CN201821419604U CN208949725U CN 208949725 U CN208949725 U CN 208949725U CN 201821419604 U CN201821419604 U CN 201821419604U CN 208949725 U CN208949725 U CN 208949725U
Authority
CN
China
Prior art keywords
connection
block
built
pier
knock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821419604.XU
Other languages
Chinese (zh)
Inventor
刘林旺
殷胜光
吴曼
邵文泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communication North Road and Bridge Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201821419604.XU priority Critical patent/CN208949725U/en
Application granted granted Critical
Publication of CN208949725U publication Critical patent/CN208949725U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

This application provides a kind of pier-beam temporary consolidation devices, are related to bridge construction field of engineering technology.Beam block bottom is equipped with lateral anti-knock block, is equipped with the anti-knock block limiting slot to match with lateral anti-knock block shape, position, quantity at the top of pier stud.Beam block is connect with pier stud by interconnecting piece, and interconnecting piece includes the first built-in connection, the second built-in connection, diagonal brace, and the first built-in connection is arranged on the side wall of lateral anti-knock block;Second built-in connection is arranged on the side wall of pier stud, and the both ends of diagonal brace are separately connected the first built-in connection and the second built-in connection.Using the structural relation of double limb pier and beam block, built-in connection is set on beam block and pier stud, realizes the connection of beam block and pier stud, guarantees the stability of beam block, beam block can be effectively prevent because of unstability caused by vibration, unbalanced load etc..Pier-beam temporary consolidation device provided by the present application, structure is simple, at low cost, and dismounting convenience can effectively improve working efficiency, shorten construction period.

Description

A kind of pier-beam temporary consolidation device
Technical field
This application involves bridge construction field of engineering technology more particularly to a kind of pier-beam temporary consolidation devices.
Background technique
Cast-in-place cantilever method using more, refers specifically to that workbench is arranged in pier stud two sides in highway, bridge construction engineering, Evenly paragraph by paragraph to span centre cantilever pouring cement concrete beam block, and apply prestressed construction method paragraph by paragraph.
During cantilever pouring, in order to guarantee the stabilization of structural system, pier stud and pier stud top need to be poured At beam block, also referred to as 0# block carries out anchoring consolidation.Common temporary consolidation method are as follows: pier stud two is located at using steel pipe post branch Side, and connect steel pipe post with beam block with steel strand wires or fining twisted steel in steel pipe post, or use steel strand wires or essence It is pre-buried on pier stud in advance to roll screw-thread steel, and is protruded into pier stud roof beam block, then steel strand wires or fining twisted steel are opened It draws, to realize consolidation in vivo.Beam block is fixedly arranged on pier stud, make beam block have certain bending resistance, post-conditions at When ripe, using static crushing method, temporary consolidation is released.
This temporary consolidation structure, beam block is because of unstability caused by vibration, unbalanced load etc. in order to prevent, or even tumbles, Need to be arranged multiple supporting points, to guarantee stability that beam block is connect with pier stud.Number of support points is more, and connection structure is complicated, applies Work project amount is big, needs that more manpower, time is spent to be assembled and removed after being joined the two sections of a bridge, etc, long construction period, and cost input is high. It also needs to be repaired after dismounting, in engineering biggish for span, larger workload.
Utility model content
This application provides a kind of pier-beam temporary consolidation devices, and to solve traditional temporary consolidation, project amount is big, construction week The problems such as phase is long, and cost input is high.
A kind of pier-beam temporary consolidation device, comprising: lateral anti-knock block, anti-knock block limiting slot and interconnecting piece, wherein The bottom of beam block is arranged in the transverse direction anti-knock block, and be located at at pier stud link position;The anti-knock block limiting slot is set It sets at the top of the pier stud, matches with the lateral anti-knock block shape, quantity is consistent;
Interconnecting piece described in every group includes the first built-in connection, the second built-in connection, diagonal brace, wherein described first is pre-buried Connector is arranged on the side wall of the lateral anti-knock block;The side wall of the pier stud is arranged in second built-in connection On, first built-in connection, second built-in connection are respectively positioned on the phase of two pieces of pier studs inwardly;Described in two Diagonal brace inclination is arranged in a crossed manner, and is bolted by connection, and the both ends of the every diagonal brace are separately connected the described first pre-buried company Fitting and second built-in connection.
Optionally, the diagonal brace uses square tube, and it is shockproof that both ends pass through foundation bolt, nut, steel plate and the transverse direction Block, pier stud connection.
Optionally, every one end bottom of the beam block is set there are two the lateral anti-knock block, and each transverse direction is shockproof At least provided with interconnecting piece described in two groups on block, corresponding to includes two anti-knock block limiting slots at the top of the pier stud.
Optionally, the lateral anti-knock block, the anti-knock block limiting slot cross section be rectangle or inverted trapezoidal.
Optionally, first built-in connection, the spacing range of second built-in connection in the vertical direction are 60~80cm.
The technical scheme provided by the application includes following advantageous effects:
Compared with prior art, a kind of pier-beam temporary consolidation device provided by the present application, comprising: lateral anti-knock block is prevented Shake block limiting slot, interconnecting piece.Lateral anti-knock block is arranged in the bottom of beam block, and be located at at pier stud link position;It is shockproof The top of pier stud is arranged in block limiting slot, matches with lateral anti-knock block shape and quantity is consistent.Every group of interconnecting piece include First built-in connection, the second built-in connection, diagonal brace, wherein the side wall of lateral anti-knock block is arranged in the first built-in connection On;Second built-in connection is arranged on the side wall of pier stud, and the first built-in connection, the second built-in connection are respectively positioned on two pieces of piers The phase of column is inwardly;The inclination of two diagonal braces is arranged in a crossed manner, and is bolted by connection, and the both ends of every diagonal brace are separately connected the One built-in connection and the second built-in connection.Using the structural relation of double limb pier and beam block, using on beam block and pier stud Be arranged built-in connection, with diagonal brace, connect bolt composition interconnecting piece, realize beam block and pier stud connection, guarantee beam block stabilization Property, unstability caused by unbalanced load that beam block is generated by vibration, cantilever construction etc. can be effectively eliminated.Pier provided by the present application Beam temporary consolidation device, structure is simple, and few comprising component, cost input is low, and assembly and disassembly are convenient, without the excessive labour of investment Power can effectively improve working efficiency, shorten construction period.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without any creative labor, It is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of schematic perspective view of the pier-beam temporary consolidation device without beam block provided by the embodiments of the present application.
Fig. 2 is a kind of the schematic diagram of the section structure of pier-beam temporary consolidation device provided by the embodiments of the present application.
Fig. 3 is a kind of beam block structure schematic diagram provided by the embodiments of the present application.
Fig. 4 is a kind of overlooking structure diagram of the pier-beam temporary consolidation device without beam block provided by the embodiments of the present application.
Description of symbols: 1, beam block;101, lateral anti-knock block;2, pier stud;201, anti-knock block limiting slot;3, it connects Portion;301, the first built-in connection;302, the second built-in connection;303, diagonal brace;304, bolt is connected.
Specific embodiment
Please refer to attached drawing 1 and attached drawing 2, wherein Fig. 1 shows pier-beam temporary consolidation provided by the embodiments of the present application in Wu Liang Stereochemical structure when block, Fig. 2 shows the signals of the cross-section structure of pier-beam temporary consolidation device provided by the embodiments of the present application.
A kind of pier-beam temporary consolidation device, comprising: lateral anti-knock block 101, anti-knock block limiting slot 201 and interconnecting piece 3, wherein lateral anti-knock block 101 is arranged in the bottom of beam block 1, and be located at at 2 link position of pier stud;Anti-knock block limit The top of pier stud 2 is arranged in slot 201, matches with lateral 101 shape of anti-knock block, quantity is consistent;
Every group of interconnecting piece includes the first built-in connection 301, the second built-in connection 302, diagonal brace 303, wherein first is pre- Connector 301 is buried to be arranged on the side wall of lateral anti-knock block 101;The side wall of pier stud 2 is arranged in second built-in connection 302 On, the first built-in connection 301, the second built-in connection 302 are respectively positioned on the phase of two pieces of pier studs 2 inwardly;Two diagonal braces 303 incline Skewed crossing setting, and connected by connection bolt 304, the both ends of every diagonal brace 303 are separately connected 301 He of the first built-in connection Second built-in connection 302.
Consolidation device provided by the embodiments of the present application mainly includes three parts, and respectively lateral anti-knock block 101 is prevented Block limiting slot 201 and interconnecting piece 3 are shaken, wherein interconnecting piece 3 is by connecting lateral anti-knock block 101 and anti-knock block limiting slot 201, beam block 1 is connected with double limb pier, double limb pier includes two pieces of pier studs 2 being oppositely arranged.
In bottom of the beam block 1 on bridge length direction, lateral anti-knock block 101 is set, the transverse direction anti-knock block 101 and The position for the anti-knock block limiting slot 201 being arranged on pier stud 2, shape, quantity match.According to the width of pier stud 2, Ke Yishe One or more groups of lateral anti-knock blocks 101 are set, it is generally wide on lateral anti-knock block 101, along beam block 1 when being set as one group The both ends on direction are spent, two groups or three group of first built-in connection 301 are respectively set, as shown in figure 3, the transverse direction anti-knock block 1 Cross section be inverted trapezoidal, on the transverse direction anti-knock block 1, both ends are respectively provided with two group of first built-in connection 301, arrive with this The cross-sectional area of anti-knock block limiting slot 201 that trapezoid cross section matches, being arranged on pier stud 2 is also reverse trapezoid shape.Such as It is plan structure of the pier-beam temporary consolidation device without beam block provided by the embodiments of the present application shown in Fig. 4, it is laterally anti-in the structure The cross section for shaking block 1 is inverted trapezoidal.
In general, lateral anti-knock block 101 is consistent with the quantity of anti-knock block limiting slot 201, generally according to double limb pier Length is configured, if the length of lateral anti-knock block 101 is longer, can be arranged on a lateral anti-knock block 101 more A first built-in connection 301, in pairs.
It connects lateral anti-knock block 101 and anti-knock block limiting slot 201 is interconnecting piece 3, one group of interconnecting piece 3 includes two First 302, two diagonal braces 303 of the second built-in connection of built-in connection 301, two, and fix the connection of two diagonal braces 303 Bolt 304, wherein the beam block 1 and pier stud 2 of the same end are equipped with first built-in connection 301 and a second pre-buried connection Part 302, the two misplace up and down, and not on a vertical plane.
Two pieces of pier studs 1 of double limb pier are capable of forming mutually inwardly, the first built-in connection 301 and the second built-in connection 302 are respectively positioned on the phase inwardly, and diagonal brace 303 is in the mutually middle inclination interconnection inwardly.
The both ends of diagonal brace 303 are respectively fixedly connected with first built-in connection 301 of one end and the second pre-buried company of the other end Fitting 302, inclined arrangement are connected by connection bolt 304 at the crossover location of two diagonal braces 303.Arranged crosswise mode, energy The overall performance for enough improving interconnecting piece 3, improves stability.Interconnecting piece 3 can link together beam block 1 and pier stud 2 are stable, Unstability guarantees smoothly completing for closure caused by effectively eliminating unbalanced load that beam block 1 is generated by vibration, cantilever construction etc..
When construction, the first built-in connection 301, the second built-in connection 302 are embedded in laterally shockproof gear respectively in advance Block 101 and in the pier stud 2 of the lower section of anti-knock block limiting slot 201, is directed at lateral anti-knock block 101 and anti-knock block limiting slot 201, more diagonal braces 303 then can be welded on the first built-in connection 301, second by 1 inlay card of beam block in double limb pier On the steel plate of built-in connection 302, and adjacent two diagonal braces 303 are connected by connecting bolt 304.Multiple groups interconnecting piece 3 exists It using same connection type, on this basis, can join the two sections of a bridge, etc to bridge, after having joined the two sections of a bridge, etc, it is double successively to remove each group Interconnecting piece 3 on limb pier stud completes construction.
Pier-beam temporary consolidation device provided by the embodiments of the present application, the structure of two pier studs 2 based on double limb pier, is facing When consolidation process in, no setting is required steel pipe post exists 1 inlay card of beam block without carrying out tensioning to steel strand wires or fining twisted steel On two pier studs 2 of double limb pier, by setting built-in connection and diagonal brace 303, the support construction of beam block 1 and pier stud 2 is formed, The support construction quantity is few, easy assembly and disassembly, can meet during closure beam block 1 connect with pier stud 2 it is steady It is qualitative, effectively eliminate unstability caused by unbalanced load that beam block 1 is generated by vibration, cantilever construction etc..
The temporary consolidation device, structure is simple, easy to connect, during assembly and disassembly, without spending more people Power and time, construction volume is few, can greatly improve that work efficiency is high, shortens construction period.
Optionally, diagonal brace 303 uses square tube, and both ends pass through foundation bolt, nut, steel plate and lateral anti-knock block 101, pier stud 2 connects.
Diagonal brace 303 uses square tube in the embodiment of the present application, and the thickness of square tube selects 6~10mm, and cross sectional dimensions is according to beam Depending on 1 form of block, specification, length is set according to the spacing between two pier studs 2 of double limb pier, and both ends are pre-buried with first respectively Steel plate on connector 301, the second built-in connection 302 is welded to connect.As shown in Figure 1 or 2, two neighboring diagonal brace 303 exists It is connected at crossover location by connection bolt 304, the middle position of diagonal brace 303 is equipped with threaded hole, and connection bolt 304 is successively worn The threaded hole on adjacent two diagonal braces 303 is crossed, by being connect with nut, two diagonal braces 303 are fixedly connected, this connection side Formula can allow beam block 1 and the connection of pier stud 2 more stable.
First built-in connection 301, the second built-in connection 302 are made of two U-shaped foundation bolts and steel plate, Middle foundation bolt need to use the specification of M24 or M30, and performance rate need to be at least up to 10.9S grades, two U-shaped foundation bolts and steel plate It is vertically arranged, embedding anchor bolts are 480~550mm in the depth bounds of concrete;Steel plate selects Q345D, and thickness range is 14~17mm, the quadrangle of steel plate wear the end of two U-shaped foundation bolts respectively, and middle position with diagonal brace 303 for connecting.
In order to easy for construction, foundation bolt selects same specification with nut used by bolt 304 is connect, and work can be improved Make efficiency.
Optionally, every one end bottom of beam block 1 is set there are two lateral anti-knock block 101, on each transverse direction anti-knock block 101 At least provided with two groups of interconnecting pieces 3, corresponding to includes two anti-knock block limiting slots 201 at the top of pier stud 2.
As shown in Figure 1, setting in every one end bottom of beam block 1, there are two lateral anti-knock block 101, the transverse direction anti-knock blocks 101 and matched anti-knock block limiting slot 201 cross section be rectangle.
It is each transverse direction anti-knock block 101 and the anti-knock block limiting slot 201 of opposite side between be equipped with two groups of interconnecting pieces 3, two The horizontal spacing of first built-in connection 301 controls two the second built-in connections 302 being disposed below in 150~170cm Horizontal spacing control in 130~150cm, two the first built-in connections 301, two opposite with the end, positioned at the other end The setting spacing and local terminal of second built-in connection 302 are exactly the opposite, can guarantee that adjacent two diagonal braces 303 can be realized in this way Intersect, and connection bolt 304 is facilitated to connect.
Optionally, lateral anti-knock block 101, anti-knock block limiting slot 201 cross section be rectangle or inverted trapezoidal.
Lateral anti-knock block 101 needs inlay card in anti-knock block limiting slot 201, can guarantee the steady of beam block 1 and pier stud 2 Fixed connection, in general, the shape of the two is the same, in 1 width direction of beam block, the width of anti-knock block limiting slot 201 is slightly larger than The width of lateral anti-knock block 101, range are generally 1~2cm, and lateral anti-knock block 101 is placed on anti-knock block to facilitate In limiting slot 201, and connection deviation is controlled in effective range value.
Optionally, the first built-in connection 301, the spacing range of the second built-in connection 302 in the vertical direction are 60 ~80cm.
The first built-in connection 301 and the second built-in connection 302 positioned at the same end, by lateral anti-knock block 101 After inlay card is in anti-knock block limiting slot 201, the two controls in 60~80cm in the spacing of vertical direction, on the one hand guarantees material Expect that less input for cost, on the other hand can be convenient assembling, disassembly.
Pier-beam temporary consolidation device provided by the embodiments of the present application selects foundation bolt, steel plate as built-in connection, energy The enough stability for guaranteeing connection, diagonal brace 303 select square tube, can satisfy the intensity of connection.Two pier studs 2 based on double limb pier Structure guarantee the stability that beam block 1 and pier stud 2 connect by the way that multiple groups interconnecting piece 3 is arranged.The temporary consolidation device, structure letter Single, easy to connect, during assembly and disassembly, without spending more manpower and time, construction volume is few, can greatly improve Work efficiency is high, shortens construction period.
It should be noted that the relational terms of such as " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that including the article of a series of elements or equipment not only includes those elements, but also including not having The other element being expressly recited, or further include for elements inherent to such a process, method, article, or device.Do not having There is the element limited in the case where more limiting by sentence "including a ...", it is not excluded that in the mistake including the element There is also other identical elements in journey, method, article or equipment.
The above is only the specific embodiment of the application, is made skilled artisans appreciate that or realizing this Shen Please.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the application.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.
It should be understood that the application is not limited to the content being described above, and its model can not departed from It encloses and carry out various modifications and change.Scope of the present application is only limited by the accompanying claims.

Claims (5)

1. a kind of pier-beam temporary consolidation device characterized by comprising lateral anti-knock block (101), anti-knock block limiting slot (201) and interconnecting piece (3), wherein the transverse direction anti-knock block (101) is arranged in the bottom of beam block (1), and is located at and pier stud (2) at link position;The anti-knock block limiting slot (201) is arranged at the top of the pier stud (2), with the shockproof gear of the transverse direction Block (101) shape matches, and quantity is consistent;
Interconnecting piece described in every group (3) includes the first built-in connection (301), the second built-in connection (302), diagonal brace (303), Described in the first built-in connection (301) setting on the side wall of the lateral anti-knock block (101);The second pre-buried connection Part (302) is arranged on the side wall of the pier stud (2), first built-in connection (301), second built-in connection (302) it is respectively positioned on the phase of two pieces of pier studs (2) inwardly;Two diagonal brace (303) inclinations are arranged in a crossed manner, and pass through connection Bolt (304) connection, the both ends of the every diagonal brace (303) are separately connected first built-in connection (301) and described the Two built-in connections (302).
2. consolidation device according to claim 1, which is characterized in that the diagonal brace (303) uses square tube, and both ends are logical Foundation bolt, nut, steel plate is crossed to connect with the lateral anti-knock block (101), the pier stud (2).
3. consolidation device according to claim 1, which is characterized in that there are two every one end bottom of the beam block (1) is set The transverse direction anti-knock block (101), it is right at least provided with interconnecting piece (3) described in two groups on each lateral anti-knock block (101) It include two anti-knock block limiting slots (201) at the top of pier stud described in Ying Yu (2).
4. consolidation device according to claim 1, which is characterized in that the transverse direction anti-knock block (101), the shockproof gear The cross section of block limiting slot (201) is rectangle or inverted trapezoidal.
5. consolidation device according to any one of claims 1-4, which is characterized in that first built-in connection (301), the spacing range of second built-in connection (302) in the vertical direction is 60~80cm.
CN201821419604.XU 2018-08-31 2018-08-31 A kind of pier-beam temporary consolidation device Withdrawn - After Issue CN208949725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821419604.XU CN208949725U (en) 2018-08-31 2018-08-31 A kind of pier-beam temporary consolidation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821419604.XU CN208949725U (en) 2018-08-31 2018-08-31 A kind of pier-beam temporary consolidation device

Publications (1)

Publication Number Publication Date
CN208949725U true CN208949725U (en) 2019-06-07

Family

ID=66736529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821419604.XU Withdrawn - After Issue CN208949725U (en) 2018-08-31 2018-08-31 A kind of pier-beam temporary consolidation device

Country Status (1)

Country Link
CN (1) CN208949725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755443A (en) * 2018-08-31 2018-11-06 中交路桥北方工程有限公司 A kind of pier-beam temporary consolidation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755443A (en) * 2018-08-31 2018-11-06 中交路桥北方工程有限公司 A kind of pier-beam temporary consolidation device
CN108755443B (en) * 2018-08-31 2024-01-30 中交路桥北方工程有限公司 Temporary pier beam consolidation device

Similar Documents

Publication Publication Date Title
US4993094A (en) Bridge comprising a bridge floor and elements supporting said floor, particularly a long span cable-stayed bridge, and process of construction
CN104389261B (en) Prefabricated ultra-high performance concrete π ellbeam unit, bridge structure and construction method thereof
CN103410102A (en) H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN108708481A (en) Constructional column exempts from formwork construction method
CN208949725U (en) A kind of pier-beam temporary consolidation device
CN208472971U (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN108755443A (en) A kind of pier-beam temporary consolidation device
CN208472972U (en) A kind of steel bar girder plate end connecting joint structure
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN211498507U (en) Whole reassembling type protection rack
US2419843A (en) Building construction
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN208685450U (en) Steel girder bridge assembling support system
CN208632965U (en) A kind of superelevation steel pipe support adjustable-angle formula cable wind system
CN106499053B (en) A kind of assembled integral pre-stressed concrete frame structure connecting component
CN109457598A (en) A kind of bridge pier
CN209509171U (en) A kind of connection structure when the dry construction for assembled between precast beam, column component
CN108716191A (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN209620310U (en) Nuclear power plant's steel plate concrete-reinforced concrete structure wall crosses connection structure
CN210482000U (en) Limiting device for jacking construction of large-span steel pipe concrete tied arch bridge
CN204312094U (en) A kind of tunnel excavation construction grid steel frame
CN208899352U (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN209308165U (en) A kind of pin-connected panel lightweight steel construction face construction apply in feed bin canopy
CN209066837U (en) A kind of combined type construction supporting platform
CN206706556U (en) Attachment structure between prefabricated components

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190607

Effective date of abandoning: 20240130

AV01 Patent right actively abandoned

Granted publication date: 20190607

Effective date of abandoning: 20240130