CN208933990U - Combined type tower-crane foundation structure - Google Patents

Combined type tower-crane foundation structure Download PDF

Info

Publication number
CN208933990U
CN208933990U CN201821021997.9U CN201821021997U CN208933990U CN 208933990 U CN208933990 U CN 208933990U CN 201821021997 U CN201821021997 U CN 201821021997U CN 208933990 U CN208933990 U CN 208933990U
Authority
CN
China
Prior art keywords
steel
concrete pile
bored concrete
foundation structure
combined type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821021997.9U
Other languages
Chinese (zh)
Inventor
吴�荣
邹子义
徐欢
姚元朝
崔秀生
袁蜜花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201821021997.9U priority Critical patent/CN208933990U/en
Application granted granted Critical
Publication of CN208933990U publication Critical patent/CN208933990U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to tower crane technical fields, disclose a kind of combined type tower-crane foundation structure.The utility model includes the bored concrete pile for being arranged in foundation pit, matching with tower crane tower body, the steel lattice column above bored concrete pile, and the rood beam at the top of steel lattice column;Framework of steel reinforcement in bored concrete pile is made of vertical main reinforcement, the tie hoop being set around on the outside of vertical main reinforcement and the stirrup of putting more energy on the inside of vertical main reinforcement;The top of framework of steel reinforcement is the encrypted section of tie hoop, and middle part is changeover portion, and vertical main reinforcement includes the long main reinforcement along the elongated setting of bored concrete pile short transverse, and the short main reinforcement of encrypted section and changeover portion is arranged in;Steel lattice column includes main chord and the concrete column core inside main chord, and steel lattice column lower part is the anchoring section anchored into bored concrete pile;Rood beam is fixedly connected by pile cover steel plate with steel lattice column;The supporting leg of tower crane is fixedly connected by bolt with rood beam.For the utility model convenient for construction, fastness and stability are good.

Description

Combined type tower-crane foundation structure
Technical field
The utility model relates to tower crane technical fields, more particularly to a kind of combined type tower-crane foundation structure.
Background technique
Tower crane is the common hoisting machinery in construction site, and what is run is steady and safe, and the foundation structure being secured to is No firm stable has direct relationship.
Existing tower-crane foundation structure is generally cast-in-place reinforced concrete pile cap, and standard section of tower crane passes through pre-buried or high-strength Bolt is connect with cast-in-place concrete cushion cap, and tower crane pile foundation anchors into cast-in-place concrete cushion cap, by tower crane pile foundation realize resistance to compression and Resistance to plucking is resisted by concrete bearing platform and is punched.But this tower crane long construction period, fastness and stability are poor, safety It is low.
Utility model content
The utility model provides a kind of convenient for construction, fastness and the good combined type tower-crane foundation structure of stability.
Technical problems to be solved are: existing tower crane, long construction period, fastness and stability are poor, safety It is low.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model combined type tower-crane foundation structure, the perfusion matched including being arranged in foundation pit, with tower crane tower body Stake, the steel lattice column above bored concrete pile, and the rood beam at the top of steel lattice column;
Framework of steel reinforcement in bored concrete pile by vertical main reinforcement, the tie hoop being set around on the outside of vertical main reinforcement and is located at vertical main Stirrup composition of putting more energy on the inside of muscle;The top of framework of steel reinforcement is the encrypted section of tie hoop, and middle part is changeover portion, vertical main reinforcement packet The long main reinforcement along the elongated setting of bored concrete pile short transverse is included, and the short main reinforcement of encrypted section and changeover portion is set;
Steel lattice column is correspondingly arranged with bored concrete pile, the concrete column core including main chord and inside main chord, steel lattice Structure column lower part is the anchoring section anchored into bored concrete pile;
Rood beam is fixedly connected by pile cover steel plate with steel lattice column;The supporting leg of tower crane connects by the way that bolt and rood beam are fixed It connects.
The utility model combined type tower-crane foundation structure, further, the height a1 of the encrypted section are not less than bored concrete pile The 1/3 of total height, the height a2 of changeover portion are not less than the 1/4 of bored concrete pile total height;The length of the short main reinforcement is no more than perfusion The 3/4 of stake total height.
The utility model combined type tower-crane foundation structure, further, the bored concrete pile top surface and steel lattice column junction It is provided with the bottom plate that thickness is not less than 700mm, bottom plate is formed using concreting, and lower surface is not less than lower than bored concrete pile top surface 30mm。
The utility model combined type tower-crane foundation structure is further provided on the bottom outside wall of the main chord Ring seal steel plate, ring seal steel plate is horizontally disposed, is located in bottom plate, and width is not less than 100mm, ring seal steel plate and bottom The distance of plate upper surface is not less than 300mm.
The utility model combined type tower-crane foundation structure, further, the anchoring depth of the steel lattice column is not less than 5m。
The utility model combined type tower-crane foundation structure is further arranged on the main chord lateral wall of the anchoring section There is length to be not less than the eel-like figure bolt of 80mm, the arrangement of eel-like figure bolt uniform intervals.
The utility model combined type tower-crane foundation structure is further provided with horizontal brace in the middle part of the main chord, Both ends are fixed with main chord sidewall weld;Horizontal brace is square steel tube, and the cross-sectional area of square steel tube is not less than main chord cross section Long-pending 1/6.
The utility model combined type tower-crane foundation structure is further additionally provided with diagonal brace between the adjacent main chord Bar, the angle between hound and main chord are not less than 45 °, and the hound is square steel tube, and the cross-sectional area of square steel tube is not small In the 1/6 of main chord cross-sectional area.
The utility model combined type tower-crane foundation structure, further, the pile cover steel plate are thickness not less than 20mm's Steel plate is arranged at the top of main chord;Gusset of putting more energy into is vertically arranged with below pile cover steel plate.
The utility model combined type tower-crane foundation structure, further, the gusset of putting more energy into are in a rectangular trapezoid, and adjacent two is straight Lateral wall of the arm of angle respectively with pile cover lower surface of steel plate and main chord is welded and fixed, and gusset of putting more energy into is along main chord circumferential direction uniform intervals Setting is not less than the steel plate of 20mm for thickness.
The utility model combined type tower-crane foundation structure has the following beneficial effects: compared with prior art
The utility model combined type tower-crane foundation structure is the composite type base structure of bored concrete pile and steel lattice column composition, altogether With the vertical supporting for constituting tower crane, the framework of steel reinforcement sectional encryption in bored concrete pile is arranged, and not only increases bored concrete pile and steel latticework The connectivity robustness of column, and increase the breakout capacity and anti-pressure ability of foundation structure.Steel lattice column anchors into bored concrete pile Anchoring depth is not less than 5m, it is ensured that the anchoring stability of steel lattice column and the bearing capacity of foundation structure;The lateral wall of anchoring section It is provided with eel-like figure bolt, the frictional force of main chord and bored concrete pile can be increased in bored concrete pile, improves the bearing capacity of fundamental mechanism; Organic whole is connected by horizontally-supported and hound between steel lattice column, the load of shared tower crane improves entirety The stability of foundation structure also improves the weight bearing power of foundation structure.
Setting rood beam is connect with tower crane tower body at the top of the utility model steel lattice column, is effective against tower crane and was being run The horizontal direction torque generated in journey, improves the punch resistant capability of foundation structure.
The combined type tower-crane foundation structure of the utility model is described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model combined type tower-crane foundation structure;
Fig. 2 is the structural schematic diagram of the framework of steel reinforcement in bored concrete pile;
Fig. 3 is the cross-sectional view of framework of steel reinforcement;
Fig. 4 is the structural schematic diagram of steel lattice column;
Fig. 5 is the top view of basic structure.
Appended drawing reference:
1- bored concrete pile;11- long main reinforcement;The short main reinforcement of 12-;13- tie hoop;14- puts more energy into stirrup;2- bottom plate;21- annular is stopped Water steel plate;3- steel lattice column;31- anchoring section;32- eel-like figure bolt;4- horizontal brace;5- hound;6- pile cover steel plate;7- adds Strength gusset;8- rood beam;9- supporting leg.
Specific embodiment
As shown in Figure 1 and Figure 5, the utility model combined type tower-crane foundation structure include be arranged in foundation pit, with tower crane tower The bored concrete pile 1 that body matches, the steel lattice column 3 above bored concrete pile 1, and the rood beam 8 positioned at 3 top of steel lattice column.
As shown in Figures 2 and 3, the framework of steel reinforcement in bored concrete pile 1 is by vertical main reinforcement, the spiral being set around on the outside of vertical main reinforcement Stirrup 13 and the composition of stirrup 14 of putting more energy on the inside of vertical main reinforcement;The top of framework of steel reinforcement is the encrypted section of tie hoop 13, The height a1 of encrypted section is not less than the 1/3 of 1 total height of bored concrete pile, and the middle part of framework of steel reinforcement is changeover portion, the height a2 of changeover portion Not less than the 1/4 of 1 total height of bored concrete pile;Vertical main reinforcement includes the long main reinforcement 11 along the elongated setting of 1 short transverse of bored concrete pile, and The short main reinforcement 12 of encrypted section and changeover portion is set, and the length of short main reinforcement 12 is not more than the 3/4 of 1 total height of bored concrete pile.
Steel lattice column 3 is correspondingly arranged with bored concrete pile 1, and bottom is anchored by spiral welded pipe and bored concrete pile 1,1 top surface of bored concrete pile, 3 junction of steel lattice column is provided with the bottom plate 2 that thickness is not less than 700mm, bottom plate 2 is formed using concreting, lower surface It is not less than 30mm lower than 1 top surface of bored concrete pile;Steel lattice column 3 includes main chord and the concrete column core inside main chord, master Chord member is the round steel pipe that wall thickness is not less than 10mm, and the strength grade of concrete of concrete column core is not less than C40;As shown in figure 4, steel 3 lower part of lattice column is the anchoring section 31 anchored into bored concrete pile 1, and the length of anchoring section 31 is not less than 5m, the main chord of anchoring section 31 The eel-like figure bolt 32 that length is not less than 80mm is provided on lateral wall, the arrangement of 32 uniform intervals of eel-like figure bolt can in bored concrete pile 1 To increase the frictional force of main chord Yu bored concrete pile 1, the bearing capacity of fundamental mechanism is improved;Ring is provided on main chord bottom outside wall Shape steel plate for sealing water 21, ring seal steel plate 21 is horizontally disposed, is located in bottom plate 2, and width is not less than 100mm, ring seal steel plate 21 are not less than 300mm at a distance from 2 upper surface of bottom plate, are welded and fixed with main chord lateral wall.
Horizontal brace 4 is provided in the middle part of main chord, both ends are fixed with main chord sidewall weld;Between adjacent main chord also It is provided with hound 5, the angle between hound 5 and main chord is not less than 45 °, and horizontal brace 4 and hound 5 are square steel Pipe, the cross-sectional area of square steel tube are not less than the 1/6 of main chord cross-sectional area.
It is provided with pile cover steel plate 6 at the top of main chord, pile cover steel plate 6 is the steel plate that thickness is not less than 20mm, under pile cover steel plate 6 Side be vertically arranged with gusset 7 of putting more energy into, gusset 7 of putting more energy into is in a rectangular trapezoid, adjacent two right-angle side respectively with 6 lower surface of pile cover steel plate and The lateral wall of main chord is welded and fixed, and gusset 7 of putting more energy into is arranged along main chord circumferential direction uniform intervals, and the steel of 20mm is not less than for thickness Plate.
Rood beam 8 is arranged above pile cover steel plate 6, is welded and fixed with pile cover steel plate 6, and rood beam 8 is the side of horizontal Two bors d's oeuveres Steel pipe.
The supporting leg 9 of tower crane is fixedly connected by bolt with rood beam 8.
The construction method of the utility model combined type tower-crane foundation structure, specifically includes the following steps:
Step 1: according to the design position of tower crane, accurately measured and unwrapping wire;
Step 2: prefabricated steel lattice column 3;
Step 3: construction bored concrete pile 1;Bored concrete pile 1, perfusion are made using concrete direct pipe method pouring underwater concrete Embedded bar skeleton in stake 1;
Step 4: the anchoring section 31 of steel lattice column 3 is sent into bored concrete pile 1, fixed with the framework of steel reinforcement of bored concrete pile 1, and set Set ring seal steel plate 21;Steel lattice column 3 abolishes the plain concrete of outer layer covers before constructing, it is more that excision designs capital absolute altitude or more Remaining steel pipe;
Step 5: the concrete column core inside main chord is poured, the concreting in main chord to capital absolute altitude;
Step 6: abolishing column inner concrete column core to design capital absolute altitude or less 50mm, rood beam 8 is installed;Rood beam 8 The weld seam effective height of position must not be lower than 16mm, and 8 upper surface flatness of rood beam controls within 5mm, to meet stabilizer blade weldering Levelness when connecing;
Step 7: installation tower crane;The right angle of tower crane is fixedly connected with rood beam 8;
Step 8: quality-monitoring;Once for half a month for the sedimentation detection of tower crane, and the measurement of verticality is when tower crane is in unattached height Within when answer half a month primary.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines In range.

Claims (10)

1. combined type tower-crane foundation structure, it is characterised in that: the bored concrete pile matched including being arranged in foundation pit, with tower crane tower body (1), the steel lattice column (3) being located above bored concrete pile (1), and it is located at the rood beam (8) at the top of steel lattice column (3);
Framework of steel reinforcement in bored concrete pile (1) by vertical main reinforcement, the tie hoop being set around on the outside of vertical main reinforcement (13) and is located at perpendicular To stirrup of putting more energy into (14) composition on the inside of main reinforcement;The top of framework of steel reinforcement is the encrypted section of tie hoop (13), and middle part is transition Section, vertical main reinforcement includes the long main reinforcement (11) along the elongated setting of bored concrete pile (1) short transverse, and is arranged in encrypted section and transition The short main reinforcement (12) of section;
Steel lattice column (3) is correspondingly arranged with bored concrete pile (1), the concrete column core including main chord and inside main chord, steel Lattice column (3) lower part is the anchoring section (31) anchored into bored concrete pile (1);
Rood beam (8) is fixedly connected by pile cover steel plate (6) with steel lattice column (3);The supporting leg (9) of tower crane passes through bolt and cross Beam (8) is fixedly connected.
2. combined type tower-crane foundation structure according to claim 1, it is characterised in that: the height a1 of the encrypted section is not small In the 1/3 of bored concrete pile (1) total height, the height a2 of changeover portion is not less than the 1/4 of bored concrete pile (1) total height;Short main reinforcement (12) Length is not more than the 3/4 of bored concrete pile (1) total height.
3. combined type tower-crane foundation structure according to claim 1, it is characterised in that: bored concrete pile (1) top surface and steel Lattice column (3) junction is provided with the bottom plate (2) that thickness is not less than 700mm, and bottom plate (2) is formed using concreting, following table Face is not less than 30mm lower than bored concrete pile (1) top surface.
4. combined type tower-crane foundation structure according to claim 3, it is characterised in that: the bottom outside wall of the main chord On be provided with ring seal steel plate (21), ring seal steel plate (21) is horizontally disposed, is located in bottom plate (2), and width is not less than 100mm, ring seal steel plate (21) are not less than 300mm at a distance from bottom plate (2) upper surface.
5. combined type tower-crane foundation structure according to claim 1, it is characterised in that: the anchoring of the steel lattice column (3) Section (31) length is not less than 5m.
6. combined type tower-crane foundation structure according to claim 1, it is characterised in that: the main chord of the anchoring section (31) The eel-like figure bolt (32) that length is not less than 80mm, the arrangement of eel-like figure bolt (32) uniform intervals are provided on lateral wall.
7. combined type tower-crane foundation structure according to claim 1, it is characterised in that: be provided in the middle part of the main chord Horizontal brace (4), both ends are fixed with main chord sidewall weld;Horizontal brace (4) is square steel tube, and the cross-sectional area of square steel tube is not small In the 1/6 of main chord cross-sectional area.
8. combined type tower-crane foundation structure according to claim 1, it is characterised in that: be arranged between the adjacent main chord Have hound (5), the angle between hound (5) and main chord is not less than 45 °, and the hound (5) is square steel tube, square steel tube Cross-sectional area be not less than main chord cross-sectional area 1/6.
9. combined type tower-crane foundation structure according to claim 1, it is characterised in that: the pile cover steel plate (6) is thickness Steel plate not less than 20mm is arranged at the top of main chord;Gusset of putting more energy into (7) are vertically arranged with below pile cover steel plate (6).
10. combined type tower-crane foundation structure according to claim 9, it is characterised in that: the gusset of putting more energy into (7) is rectangular Trapezoidal, lateral wall of adjacent two right-angle side respectively with pile cover steel plate (6) lower surface and main chord is welded and fixed, gusset of putting more energy into (7) It is arranged along main chord circumferential direction uniform intervals, the steel plate of 20mm is not less than for thickness.
CN201821021997.9U 2018-06-29 2018-06-29 Combined type tower-crane foundation structure Expired - Fee Related CN208933990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821021997.9U CN208933990U (en) 2018-06-29 2018-06-29 Combined type tower-crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821021997.9U CN208933990U (en) 2018-06-29 2018-06-29 Combined type tower-crane foundation structure

Publications (1)

Publication Number Publication Date
CN208933990U true CN208933990U (en) 2019-06-04

Family

ID=66715700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821021997.9U Expired - Fee Related CN208933990U (en) 2018-06-29 2018-06-29 Combined type tower-crane foundation structure

Country Status (1)

Country Link
CN (1) CN208933990U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685295A (en) * 2019-09-16 2020-01-14 中国二十冶集团有限公司 Bored concrete pile shaped steel combination assembled tower crane basis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685295A (en) * 2019-09-16 2020-01-14 中国二十冶集团有限公司 Bored concrete pile shaped steel combination assembled tower crane basis

Similar Documents

Publication Publication Date Title
CN104389313B (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof
CN105544587B (en) The construction method of tower crane is fixed using combined type foundation for tower crane
CN102926400B (en) Combined earth retaining wall structure and construction method thereof
CN202466845U (en) Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN201891123U (en) Single-wall steel hanging box with concrete bottom plate
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
CN208933990U (en) Combined type tower-crane foundation structure
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN208251156U (en) It is a kind of to reduce the grand heavy device of underground structure using building enclosure
CN204898717U (en) Shaft major structure of built -in lattice stand
CN203144907U (en) Large-span dual-layer bailey truss structure
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN109356190A (en) A kind of lattice column piers and abutments concrete tower crane foundation and its construction method
CN109653226A (en) A kind of cofferdam structure based on the double steel sheet pile of core filling type
CN103981810A (en) Steel tube arch main arch splicing and supporting system
CN211228109U (en) External-wrapping anti-collision guardrail for highway bridge
CN204343294U (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column
CN213203667U (en) Supporting structure for post-cast strip-striding temporary lane of top plate of ground depot
CN209353365U (en) A kind of lattice column piers and abutments concrete tower crane foundation
CN213204139U (en) Cantilever combined soil retaining structure for sinking square
CN210194657U (en) Foundation of prefabricated substation distribution device building
CN212200050U (en) Assembled reinforced concrete side anti-collision guardrail for connecting bridge
CN107841952A (en) Adhesion type high-altitude mount support and rigid frame-continuous girder end bay cast-in-place section construction method
CN202881971U (en) Combined retaining wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604