CN208932819U - A kind of revolution door type boom hoisting for sloping area small space pipeline butt - Google Patents
A kind of revolution door type boom hoisting for sloping area small space pipeline butt Download PDFInfo
- Publication number
- CN208932819U CN208932819U CN201821633704.2U CN201821633704U CN208932819U CN 208932819 U CN208932819 U CN 208932819U CN 201821633704 U CN201821633704 U CN 201821633704U CN 208932819 U CN208932819 U CN 208932819U
- Authority
- CN
- China
- Prior art keywords
- column
- diagonal brace
- sleeve
- small space
- pipeline butt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a kind of revolution door type boom hoistings for sloping area small space pipeline butt, it include crossbeam, column, sleeve and diagonal brace, the sleeve is fixed below the crossbeam, is socketed in the upper end of column, multiple threaded holes are also provided on sleeve, sleeve is fastened on column by bolt, the diagonal brace is fixed on sleeve, and diagonal brace and column are set as extension type, and form an angle, the column bottom is equipped with channel steel base, and the diagonal brace bottom is equipped with horizontal steel plate.The boom hoisting replaces crane in the narrow sloping area lifting operation in region, is saved greatly cost, and structure is simple, it is mobile flexible, assembly and disassembly is convenient, is rotated at random according to condition of construction, can guarantee to be accurately performed pipeline butt, welding operation under steady status.
Description
Technical field
The utility model relates to pipeline butt construction equipment technical fields, specifically a kind of narrow for sloping area
The revolution door type boom hoisting of space pipeline counterpart.
Background technique
In the pipeline engineering such as heating power, petroleum construction, the butt welding of pipeline or installation are used as one of critical process, it is necessary to
Guarantee that 100% is qualified, it is desirable that counterpart pipeline coaxial error is small, and precision is high, while it is time-consuming short to construct.Existing pipeline butt construction
In, it generallys use crane and carries out butt welding of pipelines, installation exercise.
But when the narrow location in slope and region is constructed, crane enters lifting region difficulty or construction site
Lifting ground is unsatisfactory for requiring, and is required to build builder's road or smooth location meets the requirement of crane foundation bearing capacity, institute
Need the problems such as time is long, and it is at high cost that there are crane operations, and consumption costs is high.
Utility model content
The purpose of this utility model is to be not easy to lifting pipeline progress in the narrow sloping area crane in region for solution is above-mentioned
The technical issues of pipeline butt, provides a kind of revolution door type boom hoisting for sloping area small space pipeline butt, should
Boom hoisting replaces crane in the narrow sloping area lifting operation in region, is saved greatly cost, and structure is simple, mobile spirit
Living, assembly and disassembly is convenient, is rotated at random according to condition of construction, can guarantee to be accurately performed under steady status pipeline butt,
Welding operation.
Used technical solution is the utility model to solve above-mentioned technical problem: one kind is for the narrow sky of sloping area
Between pipeline butt revolution door type boom hoisting, include crossbeam, column, sleeve and diagonal brace, the sleeve is fixed under crossbeam
Side, is socketed in the upper end of column, multiple threaded holes is also provided on sleeve, sleeve is fastened on column by bolt, described
Diagonal brace is fixed on sleeve, and diagonal brace and column are set as extension type, and form an angle, and the column bottom is equipped with channel steel
Pedestal, the diagonal brace bottom are equipped with horizontal steel plate.
Preferably, the sleeve weld is immediately below crossbeam, and diagonal brace oblique weld is in sleeve one side wall.
Preferably, the column and diagonal brace are set as multisection type, and every section of upper interval certain altitude is arranged threaded hole, passes through height
Strength bolt fastening, the height of sectional adjusting post and diagonal brace.
Preferably, the crossbeam is set as telescopic, to be suitable for the pipeline butt of different pore size size.
Preferably, the diagonal brace can be set as two-sided diagonal-bracing type or multiple tracks diagonal-bracing type according to the height of column, to increase gate-type
The stability of boom hoisting.
Preferably, the column is welded and fixed with channel steel base, and channel steel base opening upwards are welded on column bottom face,
Reinforcing rib is set between column and channel steel base.
The beneficial effects of the utility model are:
1, the utility model solves the problems, such as to construct in the narrow sloped region part crane in region of constructing not convenient, this
Utility model boom hoisting can complete pipeline butt installation in the narrow sloping area in region, evaded crane and marched into the arena expense, section
About crane is marched into the arena cost and equipment leasing cost;
2, using the utility model gate-type boom hoisting carry out pipeline butt, construction worker can directly close-ups,
Operation installation counterpart, commander need to be linked up at a distance and lead to the problem that counterpart precision is low, the operating time is long by avoiding crane, be improved
Operation precision and construction efficiency, the device of the utility model multiple can be applied in combination, and be conveniently adjusted inclining for pipeline butt
Gradient, and then improve the precision and stability of pipeline butt;
3, the utility model structure is simple, and piece weight is light, mobile to be flexibly connected by screw bolts, and assembly and disassembly is convenient, mentions
High service efficiency reduces labor intensity, is flexibly connected, can be made using sleeve and bolt between the crossbeam and upright bar of the utility model
Entire door type hoisting device is obtained according to condition of construction around a column rotation, and then adjusts the strut angle of door type hoisting device
Degree when especially carrying out butt welding to bend pipe, operates more simple and fast;
4, the utility model is set as adjustable length, has stronger adaptability in construction, applicable different straight
On diameter pipeline or in different size of construction space, while it can also better adapt to the narrow sloped region space feelings of different geographical
Condition can also install multiple tracks diagonal brace using the threaded hole on column, increase stability when door type hoisting device height is higher.
Detailed description of the invention
Fig. 1 is the utility model structure diagram.
Fig. 2 is the utility model using state structure diagram.
Fig. 3 is another using state structure diagram of the utility model.
Fig. 4 is the utility model rotational structure schematic diagram in the installation of bend pipe counterpart.
Marked in the figure: 1, crossbeam, 2, sleeve, 3, column, 4, channel steel base, 5, diagonal brace, 6, steel plate, 7, reinforcing rib, 8, ditch
Slot, 9, bend pipe.
Specific embodiment
Embodiment 1
The present embodiment is to carry out the pipeline in sloping area small space undercut 8 to be used in counterpart operation
Example.The revolution door type boom hoisting of the present embodiment includes that a crossbeam 1,3, two sleeves 2 of two root posts and at least two are oblique
Support 5.Sleeve 2 is welded on 1 lower section of crossbeam, is socketed in the upper end of column 3, at least three threaded holes are offered on sleeve, are passed through
Bolt fastening is in 3 upper end of column.Diagonal brace 5 is welded on sleeve 2, and diagonal brace 5 forms an angle with column 3, in the present embodiment
It can be accordingly to set a diagonal brace 5, diagonal brace 5 and the angle at 45 ° of column 3 on a column.Column 3 can be set as porous with diagonal brace 5
Multisection type, column 3 can be formed with diagonal brace 5 by three sections or two sections of steel pipe combinations in the present embodiment, and multiple spiral shells are opened up on steel pipe
Pit passes through the hole of different height by bolt come the height of adjusting post 3 and diagonal brace 5.3 bottom of column is equipped with channel steel base 4,
4 opening upwards of channel steel base are welded on 3 bottom end of column, and reinforcing rib 7 is welded between column 3 and channel steel base 4.5 bottom of diagonal brace
Equipped with horizontal steel plate 6.
When pipeline butt in sloping area small space, above-mentioned apparatus branch is located at pipeline two sides, guarantees channel steel
4 close proximity to ground of pedestal, and keep horizontal, steel plate 6 is embedded in groove 8.Need to adjust present apparatus column 3 and diagonal brace according to lifting
5 height adjusts pipeline nozzle position using jack up and down, reaches the requirement of nozzle alignment.It is higher in present apparatus height
When, in order to consolidate the stability of the present apparatus, diagonal brace 5 can be set as to two-sided diagonal-bracing type or multiple tracks diagonal-bracing type.In the present embodiment, it can incite somebody to action
The steel pipe of suitable length is fixed on column 3 by the threaded hole cooperation on bolt and column 3.During constructing operation in order to
Realize that the present apparatus is suitable for the pipeline butt of different pore size size or can be applicable in different dimensional space grooves, by crossbeam 1
Also it is set as telescopic, is formed by porous multistage steel pipe combination.
The utility model meets implementation sloping area small space interior conduit counterpart operation and wants instead of crane lifting
It asks, and operation precision and construction efficiency is enabled to improve.
Embodiment 2
The present embodiment carries out counterpart with the pipeline in the sloping area small space undercut 8 different to the gradient and operates institute
For using.
Above-mentioned apparatus is adjusted to 1 width of crossbeam of device according to the case where pipe diameter size and live sloping area,
Device branch is set on the burnishing surface of 8 two sides of groove by the height of two root posts 3 and diagonal brace 5, and adjustment channel steel base 4 is horizontal, such as
Shown in Fig. 3.
Embodiment 3
The present embodiment is for carrying out butt welding operation to bend pipe.
When carrying out butt welding to 9 one end of bend pipe, can be carried out according to above-described embodiment 1.When completion one end pair
It is using the design feature of sleeve 2 and 3 loose joint of column, the position of a root post is fixed after mouth welding, it unclamps two and stands
Then bolt on 3 upper end sleeve 2 of column is pivoted about crossbeam 1 with another root post with fixed column, adjustment is closed
Right position is set to carry out butt welding operation to 9 other end of bend pipe, is fixed device after adjusting and is carried out counterpart with jack, is such as schemed
Shown in 4.
The utility model structure is simple, and installation, convenient disassembly are constructed in use convenient for worker, can satisfy difference tiltedly
Butt welding operation is carried out to the pipeline of different size or shape in the case of the section small space of hillside fields, have stronger applicability and
Practicability, while construction cost is saved, improve operation precision and construction efficiency.
The components that the utility model uses can commercially, and shaped piece is according to specification and attached drawing
Record can carry out customized, what the specific connection type of each part did not explained be all made of mature spiral shell in the prior art
The conventional means such as bolt, rivet, welding, mechanical and equipment are all made of model conventional in the prior art, and this will not be detailed here, this theory
The content being not described in detail in bright book belongs to the prior art well known to professional and technical personnel in the field.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (6)
1. a kind of revolution door type boom hoisting for sloping area small space pipeline butt, it is characterised in that: include cross
Beam (1), column (3), sleeve (2) and diagonal brace (5), the sleeve (2) are fixed below crossbeam (1), are socketed in the upper of column (3)
End, sleeve are also provided with multiple threaded holes on (2), are fastened by bolt and column (3), and the diagonal brace (5) is fixed on sleeve (2)
On, and diagonal brace (5) and column (3) are set as extension type, and form an angle, column (3) bottom is equipped with channel steel base
(4), diagonal brace (5) bottom is equipped with horizontal steel plate (6).
2. a kind of revolution door type boom hoisting for sloping area small space pipeline butt as described in claim 1,
Be characterized in that: the sleeve (2) is welded with crossbeam (1), diagonal brace (5).
3. a kind of revolution door type boom hoisting for sloping area small space pipeline butt as described in claim 1,
Be characterized in that: the column (3) and diagonal brace (5) are set as porous multisection type, by bolt pass through the hole fastening of different height come
The height of adjusting post (3) and diagonal brace (5).
4. a kind of revolution door type boom hoisting for sloping area small space pipeline butt as described in claim 1,
Be characterized in that: the crossbeam (1) is set as telescopic.
5. a kind of revolution door type boom hoisting for sloping area small space pipeline butt as described in claim 1,
Be characterized in that: the diagonal brace (5) is set as two-sided diagonal-bracing type or multiple tracks diagonal-bracing type.
6. a kind of revolution door type boom hoisting for sloping area small space pipeline butt as described in claim 1,
Be characterized in that: the column (3) is welded and fixed with channel steel base (4), and reinforcing rib (7) are arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821633704.2U CN208932819U (en) | 2018-10-09 | 2018-10-09 | A kind of revolution door type boom hoisting for sloping area small space pipeline butt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821633704.2U CN208932819U (en) | 2018-10-09 | 2018-10-09 | A kind of revolution door type boom hoisting for sloping area small space pipeline butt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208932819U true CN208932819U (en) | 2019-06-04 |
Family
ID=66723769
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821633704.2U Active CN208932819U (en) | 2018-10-09 | 2018-10-09 | A kind of revolution door type boom hoisting for sloping area small space pipeline butt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208932819U (en) |
-
2018
- 2018-10-09 CN CN201821633704.2U patent/CN208932819U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313589A (en) | Outer wall of basement one side steel form support system and its construction method | |
CN206225917U (en) | A kind of cable connector support frame | |
CN109610474B (en) | Multi-platform enclosure structure for ultra-deep foundation pit | |
CN210395435U (en) | Collapse-proof supporting device for open excavation method construction of urban underground comprehensive pipe gallery | |
CN115727199A (en) | Municipal pipe gallery structure and construction method thereof | |
CN205604719U (en) | Superelevation, jumbo size board structural template braced system that encorbelments | |
CN208932819U (en) | A kind of revolution door type boom hoisting for sloping area small space pipeline butt | |
CN208034022U (en) | A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities | |
CN202957493U (en) | Transformer rack overall installation device | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN207484482U (en) | A kind of steel pile casting pile foundation locating rack | |
CN206625552U (en) | Conversion boom device in disk buckle frame | |
CN206530078U (en) | A kind of support meanss | |
CN206128814U (en) | Iron tower is salvageed chevron shape and is embraced pole | |
CN209874484U (en) | Aluminum alloy template bracing device | |
CN108661301B (en) | Modular assembly platform for vertical frames of well frames and use method | |
CN207436952U (en) | Oil pipe bridge seat | |
CN207144456U (en) | Builder's jack I-steel built-in fitting | |
CN104045014A (en) | Pole arraying frame for pole welding | |
CN210563435U (en) | Slope supporting device for top rising of inclined heavy-load steel net rack | |
CN205709666U (en) | A kind of jib fittable slackening device | |
CN202055506U (en) | Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container | |
CN205933000U (en) | Super high-rise external hanging movable arm tower crane climbing supporting device | |
CN108756440A (en) | A kind of civilian power transmission rod is fixed temporarily pedestal | |
CN110607764B (en) | Bridge rotation construction structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 030032 No. 8, Xinhua Road, Tanghuai Industrial Park, Shanxi transformation and comprehensive reform demonstration zone, Taiyuan City, Shanxi Province Patentee after: Shanxi Installation Group Co.,Ltd. Address before: 030021 No.8 Xinhua Road, Taiyuan Economic and Technological Development Zone, Xiaodian District, Taiyuan City, Shanxi Province Patentee before: SHANXI INDUSTRIAL EQUIPMENT INSTALLATION GROUP Co.,Ltd. |