CN208930065U CN201821580013.0U CN201821580013U CN208930065U CN 208930065 U CN208930065 U CN 208930065U CN 201821580013 U CN201821580013 U CN 201821580013U CN 208930065 U CN208930065 U CN 208930065U
Authority
CN
China
Prior art keywords
clamping bar
clamping
fixing seat
heat treatment
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821580013.0U
Other languages
Chinese (zh)
Inventor
章莉
王吉利
闫鹏
张缨
吴巧云
陈永方
曾纪芳
周广
张明倡
李广义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhongda Yangyi Machinery Co., Ltd.
Original Assignee
Henan Xinkaili Pump Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Xinkaili Pump Industry Co Ltd filed Critical Henan Xinkaili Pump Industry Co Ltd
Priority to CN201821580013.0U priority Critical patent/CN208930065U/en
Application granted granted Critical
Publication of CN208930065U publication Critical patent/CN208930065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

Pipeline fixture for heat treatment, it is related to tooling and fixture technical field, including fixing seat, first clamping bar, second clamping bar and third clamping bar, first clamping bar, second clamping bar and third clamping bar are two, two the first clamping bars are hinged in fixing seat, the other end of two the first clamping bars is flexibly connected with the second clamping bar respectively, the other end of two the second clamping bars is flexibly connected with third clamping bar respectively, first clamping bar, the first bolt hole is equipped on second clamping bar and third clamping bar, vertical first clamping bar of first bolt hole, second clamping bar and the setting of third clamping bar length direction, bolt hole internal activity is connected with the first shank of bolt, the movable end of first shank of bolt is fixed with fixed block, the utility model provides the position that can be affixed directly to required welding on pipeline, and fixation is relatively firm, it can be adjusted simultaneously according to outer diameter tube variation, outer diameter can be become Change the pipeline fixture for heat treatment that biggish pipeline carries out clamping work.

Description

Pipeline fixture for heat treatment
Technical field
The utility model relates to tooling and fixture technical field, and in particular to pipeline fixture for heat treatment.
Background technique
Pipeline-weld heat treatment and process control are the key link in the construction of pipeline welding engineering, heat treatment process quality It controls and very important effect is played to the welding quality of guarantee Pressure Piping Engineering.Existing pipeline fixture for heat treatment is logical Often it is closed support frame, passes through the collet on pipeline, then fastening support frame with support frame in use and realize fastening.Cause This, needs support frame to come from wherein one end of pipeline across pipeline when in use, then support frame is moved to what needs welded Position, when pipeline is too long, needing to move biggish displacement can just make support frame reach weld, this is whole operation process band To bother.
And existing support frame pipe clamp be only applicable to a kind of diameter pipeline or pipeline diameter change it is little, when consolidating Fixed outer diameter tube needs replacing pipe clamp when changing greatly so that pipe clamp use limitation it is larger.
Summary of the invention
For above situation, it is closed support frame to solve existing pipeline heat treatment tooling folder, cannot directly fixes To welding position is needed, needing to move biggish displacement in use can be only achieved needs, make troubles to use, simultaneously There is limitation in support frame pipe clamp use, the utility model provides the portion that can be affixed directly to required welding on pipeline Position, and fixation is relatively firm, while can be adjusted according to outer diameter tube variation, can clamp to the pipeline that outer diameter changes greatly The pipeline fixture for heat treatment of work.
Technical solution are as follows: including fixing seat, the first clamping bar, the second clamping bar and third clamping bar, the first clamping bar, the second clamping bar and Third clamping bar is two, and two the first clamping bars are hinged in fixing seat, and the other end of two the first clamping bars is pressed from both sides with second respectively Bar is flexibly connected, and the other end of two the second clamping bars is flexibly connected with third clamping bar respectively, the first clamping bar, the second clamping bar and third The first bolt hole is equipped on clamping bar, vertical first clamping bar of the first bolt hole, the second clamping bar and third clamping bar length direction are arranged, Bolt hole internal activity is connected with the first shank of bolt, and the movable end of the first shank of bolt is fixed with fixed block, and fixing seat upper end is removable It is imperial to be connected with handrail.
Preferably, brute spring is equipped between two the first clamping bars at fixing seat.
Preferably, elastic cushion is offered on fixed block.
Preferably, elastic cushion surface is equipped with asbestos layer.
Preferably, the connecting pin of the first clamping bar and the second clamping bar is equipped with U-type groove, and the second clamping bar is equipped with opposite with U-type groove The connecting pin of the strip answered, the second clamping bar and third clamping bar also is provided with U-type groove, also is provided on third clamping bar corresponding with U-type groove Strip, the second bolt hole is equipped in U-type groove and strip, is equipped with fastening bolt, one end of fastening bolt in the second bolt hole Equipped with fastening nut, the first clamping bar passes through fastening bolt and fastening nut phase with the second clamping bar, the second clamping bar and third clamping bar Cooperation is fixed.
Preferably, handrail one end is equipped with thread segment, and the top of fixing seat is equipped with the third spiral shell to match with the thread segment Pit, handrail are threadedly attached in the top of fixing seat, and the handrail other end is equipped with Anti-slip cover.
The utility model provides pipeline fixture for heat treatment, has the beneficial effect that compared with prior art
1, fixing seat, the first clamping bar, the second clamping bar and third clamping bar are set, position the fixture can directly, are fixed to institute The position for needing to weld is equipped with shank of bolt and fixed block on the first clamping bar, the second clamping bar and third clamping bar, pipeline can be made each A direction is clamped, and firm grip is made;
2, fixing seat and the first clamping bar are by being articulated and connected, the first clamping bar and the second clamping bar, the second clamping bar and third clamping bar Using flexible connection, user can adjust fixing seat and the first clamping bar, the first clamping bar and the second folder according to outer diameter tube variation Angle between bar, the second clamping bar and third clamping bar clamp the fixture can to different pipelines, and fixing seat and the first folder Bar, the first clamping bar and the second clamping bar and the second clamping bar and third clamping bar relative rotation amplitude are larger, change greatly in outer diameter tube When do not need replacement fixture;
3, brute spring is set between two the first clamping bars, when clamping to pipeline, brute spring itself is generated Restoring force further increase the fixture to the aid power of pipeline, keep clamping more secured;
4, elastic cushion is set on fixed block, and when fixed block generates pressure to pipeline, elastic cushion, which is pressurized, generates elastic force, bullet Power increases fixed block to pipeline pressure, and then increases the frictional force with tube contacts, make to clamp it is stronger, prevent fixture sliding and It goes to, while playing buffer function, prevent extruding from damaging to pipeline;
5, asbestos layer is set on fixed block, and asbestos layer has preferable heat insulation, can be in pipeline, fixed block and entire Protection is formed between fixture, is reduced in heat transfer to the fixture, is reduced the fixture heated the case where being damaged, is extended this Fixture service life.
Detailed description of the invention
Fig. 1 the utility model provides pipeline fixture for heat treatment direct-view figure;
Fig. 2 the utility model provides the second clamping bar direct-view figure;
Fig. 3 the utility model provides the second clamping bar side view;
Fig. 4 the utility model provides the first clamping bar and the direct-view of the second clamping bar junction is schemed;
Fig. 5 the utility model provides fixing seat top view;
Fig. 6 the utility model provides armrest straight view.
In figure: 1 fixing seat, 2 first clamping bars, 3 second clamping bars, 4 third clamping bars, 5 first bolts hole, 6 first shanks of bolt, 7 fixed blocks, Final 8's power spring, 9 U-type grooves, 10 strips, 11 second bolts hole, 12 fastening bolts, 13 elastic cushions, 14 asbestos layers, 15 fastening nuts, 16 handrails, 17 thread segments, 18 second bolts hole, 19 Anti-slip covers.
Specific embodiment
The utility model is described in further detail presently in connection with attached drawing.Attached drawing is simplified schematic diagram, only to show Meaning mode illustrates the utility model basic structure, therefore it only shows composition related with the utility model.
Embodiment one, as shown in Figure 1, pipeline fixture for heat treatment, including fixing seat 1, the first clamping bar 2, the second clamping bar 3 With third clamping bar 4.Fixing seat 1 can set that there are two hinged mouths for rectangular block shape made of metal material, 1 upper end of fixing seat.First Clamping bar 2, the second clamping bar 3 and third clamping bar 4 are solid rectangles shape made of metal material, with a thickness of 3~5cm, length 5 ~8cm.First clamping bar 2, the second clamping bar 3 and third clamping bar 4 are two.Two the first clamping bars 2 are hinged in fixing seat 1.The One clamping bar 2 can be rotated in fixing seat 1 be a certain included angle two the first clamping bars 2 can.
The other end of two the first clamping bars 2 is flexibly connected with the second clamping bar 3 respectively.Make the first clamping bar 2 and the second clamping bar 3 can Relative rotation is a certain included angle.The other end of two the second clamping bars 3 is flexibly connected with third clamping bar 4 respectively.Make third clamping bar 4 With the second clamping bar 3 can relative rotation be a certain included angle.
The first bolt hole 5 is equipped on first clamping bar 2, the second clamping bar 3 and third clamping bar 4.First bolt hole 5 vertical first Clamping bar 2, the second clamping bar 3 and the setting of 4 length direction of third clamping bar.5 internal activity of bolt hole is connected with the first shank of bolt 6.First The movable end of shank of bolt 6 is fixed with fixed block 7.Rectangular-shape can be made for metal material in fixed block 7, and vertical direction section is Side length is the square of 2~3cm, and with a thickness of 2~3cm, and fixed block 7 can be directly fixed with the first shank of bolt 6 by welding, Bolt hole can also be set in fixed block 7, fixed block 7 is threadedly attached in the movable end of the first shank of bolt 6.7 upper end of fixing seat It can dismantle and be connected with handrail 16.
Operating process: fixing seat and the first clamping bar 2, the first clamping bar 2 and the second clamping bar 3, the are adjusted according to outer diameter tube Angle between two clamping bars 3 and third clamping bar 4, the position welded required for which is fixed on, the first shank of bolt 6 of rotation make The fixed block 7 and tube contacts of the movable end of first shank of bolt 6, and chucking power is generated to pipeline, pipeline is fixed.
Embodiment two, on the basis of example 1, further, as shown in Figure 1, close to solid between two the first clamping bars 2 Brute spring 8 is equipped at reservation 1.The both ends of brute spring 8 are respectively fixedly connected with can be used in the first clamping bar 2, the present embodiment It is welded and fixed.When clamping to pipeline, two the first clamping bars 2 are a certain included angle.Brute spring 8 generates restoring force at this time, this When restoring force further increase the aid power to pipeline.
Embodiment three, on the basis of above embodiments, further, as shown in Figure 1, being opened up on fixed block 7 flexible Pad 13.Elastic cushion 13 can be made of rubber material, and 13 size of elastic cushion matches with 7 size of fixed block, and elastic cushion 13 is with a thickness of 1 ~2cm, elastic cushion 13 can be fixed on 7 surface of fixed block by viscose.
7 surface of fixed block is equipped with asbestos layer 14.Asbestos layer 14 can be fixed on 7 surface of fixed block by viscose.
Example IV, on the basis of above embodiments, further, as shown in figs. 2 to 4, the first clamping bar 2 and the second clamping bar 3 connecting pin is equipped with U-type groove 9.U-type groove 9 and the first clamping bar 2, which are integrally formed, to be arranged.
Second clamping bar 3 is equipped with strip 10 corresponding with U-type groove 9.Strip 10 and the second clamping bar 3, which are integrally formed, to be arranged.
The connecting pin of second clamping bar 3 and third clamping bar 4 also is provided with U-type groove 9.The U-type groove 9 and the second clamping bar 3 are integrally formed Setting.
Strip 10 corresponding with U-type groove 9 also is provided on third clamping bar 4.The strip 10 is set with the integrated molding of third clamping bar 4 It sets.
The second bolt hole 11 is equipped in U-type groove 9 and strip 10.Fastening screw 12 is equipped in second bolt hole 11.Fastening Bolt 12 is equipped with fastening nut 15.First clamping bar 2 and the second clamping bar 3, the second clamping bar 3 and third clamping bar 4 pass through fastening Bolt 12 is matched with fastening nut 15 and is fixedly connected.Fastening bolt 12 and fastening nut 15 are that metal material is made.
Example IV, on the basis of above embodiments, further, as it can be seen in figures 5 and 6, handrail 16 can be metal material It being made, 16 one end of handrail is equipped with thread segment 17, and the top of fixing seat 1 is equipped with the third threaded hole 18 to match with thread segment 17, Handrail 16 is threadedly attached in the top of fixing seat 1.16 other end of handrail is equipped with Anti-slip cover 19.Anti-slip cover 19 can be rubber material Matter is made, and the upper end is equipped with anti-skid chequer.
The above embodiments are merely examples for clarifying the description, and does not limit the embodiments.For institute For the those of ordinary skill in category field, other various forms of variations or change can also be made on the basis of the above description It is dynamic.Among the protection scope that variation or variation extended from this are created still in the utility model.

Claims (6)

1. pipeline fixture for heat treatment, which is characterized in that including fixing seat (1), the first clamping bar (2), the second clamping bar (3) and Three clamping bars (4), first clamping bar (2), the second clamping bar (3) and third clamping bar (4) are two, two first clamping bars (2) it is hinged on fixing seat (1), the other end of two first clamping bars (2) connects with the second clamping bar (3) activity respectively It connecing, the other end of two second clamping bars (3) is flexibly connected with the third clamping bar (4) respectively, first clamping bar (2), It is equipped with the first bolt hole (5) on second clamping bar (3) and third clamping bar (4), vertical first folder of first bolt hole (5) Bar (2), the second clamping bar (3) and the setting of third clamping bar (4) length direction, bolt hole (5) internal activity are connected with the first spiral shell The movable end of tightening latch (6), first shank of bolt (6) is fixed with fixed block (7), and fixing seat (1) upper end can dismantle connection There are handrail (16).
2. pipeline fixture for heat treatment according to claim 1, which is characterized in that two first clamping bars (2) it Between be equipped with brute spring (8) at the fixing seat (1).
3. pipeline fixture for heat treatment according to claim 1 or 2, which is characterized in that opened on the fixed block (7) Equipped with elastic cushion (13).
4. pipeline fixture for heat treatment according to claim 3, which is characterized in that elastic cushion (13) surface is equipped with Asbestos layer (14).
5. pipeline fixture for heat treatment according to claim 1, which is characterized in that first clamping bar (2) with it is described The connecting pin of second clamping bar (3) is equipped with U-type groove (9), and second clamping bar (3) is equipped with card corresponding with the U-type groove (9) The connecting pin of item (10), second clamping bar (3) and the third clamping bar (4) also is provided with U-type groove (9), the third clamping bar (4) On also be provided with strip (10) corresponding with the U-type groove (9), be equipped with second on the U-type groove (9) and the strip (10) Bolt hole (11), second bolt hole (11) is interior to be equipped with fastening bolt (12), and one end of the fastening bolt (12) is equipped with tight Gu nut (15), first clamping bar (2) and second clamping bar (3), second clamping bar (3) and the third clamping bar (4) It is matched and is fixedly connected with the fastening nut (15) by fastening bolt (12).
6. pipeline fixture for heat treatment according to claim 1, which is characterized in that described handrail (16) one end is equipped with spiral shell Line section (17), the top of the fixing seat (1) is equipped with the third threaded hole (18) to match with the thread segment (17), described to help Hand (16) is threadedly attached in the top of fixing seat (1), and handrail (16) other end is equipped with Anti-slip cover (19).
CN201821580013.0U 2018-09-27 2018-09-27 Pipeline fixture for heat treatment Active CN208930065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821580013.0U CN208930065U (en) 2018-09-27 2018-09-27 Pipeline fixture for heat treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821580013.0U CN208930065U (en) 2018-09-27 2018-09-27 Pipeline fixture for heat treatment

Publications (1)

Publication Number Publication Date
CN208930065U true CN208930065U (en) 2019-06-04

Family

ID=66722620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821580013.0U Active CN208930065U (en) 2018-09-27 2018-09-27 Pipeline fixture for heat treatment

Country Status (1)

Country Link
CN (1) CN208930065U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714731A (en) * 2019-11-05 2020-01-21 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Joint loading and unloading device and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714731A (en) * 2019-11-05 2020-01-21 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Joint loading and unloading device and using method thereof

Similar Documents

Publication Publication Date Title
CN208930065U (en) Pipeline fixture for heat treatment
CN202377960U (en) Friction pipe wrench with adjustable quickly-replaceable jaw
CN104493569A (en) Clamping mechanism of cylindrical workpieces
CN210452236U (en) Dust and rust removing device for inner wall of large-diameter steel pipe
CN207810218U (en) A kind of adjustable pipe clamp holder
CN107756428A (en) A kind of clamping device of surface imperfection workpiece
CN207007616U (en) A kind of fixture of GSZ tensile strength test
CN112720215B (en) Machining device for steel pipe
CN206345601U (en) A kind of seamless steel pipe Pneumatic clamping hand
CN107120479A (en) A kind of stainless steel lathe dog of service life length
CN208470161U (en) A kind of clamping device being packaged for tubing winding
CN207642544U (en) The fixture of reinforcing bar cage seam welding
CN212494993U (en) Material supporting device of pipe bending machine
CN206299654U (en) Brake block manufactures instrument
CN206053332U (en) A kind of sealing for building can have enough to meet the need split bolt
CN214524859U (en) Steel pipe packing apparatus
CN207326209U (en) The main chuck jaws of laser pipe cutting machine
CN109333414A (en) A kind of automobile parts fixture
CN207893261U (en) A kind of conduit saddle convenient for adjusting
CN210552986U (en) Plastic pipe sealing machine
CN210024283U (en) Channel-section steel anti-deformation device
CN207668245U (en) It is a kind of can bi-directional expansion tube bending jig
CN207840323U (en) Tapping machine
CN206625568U (en) A kind of pipe clamp
CN213916914U (en) Pipe clamp with positioning function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190708

Address after: 062150 Wang Kong Village, Hao Village Town, Botou City, Cangzhou City, Hebei Province

Patentee after: Hebei Zhongda Yangyi Machinery Co., Ltd.

Address before: 450000 Area B, Science Park, 123 Lianyun Road, Erqi District, Zhengzhou City, Henan Province

Patentee before: Henan Xinkaili Pump Industry Co., Ltd.