CN208921359U - SF6 gas leakage defect experiment simulator - Google Patents
SF6 gas leakage defect experiment simulator Download PDFInfo
- Publication number
- CN208921359U CN208921359U CN201822037902.9U CN201822037902U CN208921359U CN 208921359 U CN208921359 U CN 208921359U CN 201822037902 U CN201822037902 U CN 201822037902U CN 208921359 U CN208921359 U CN 208921359U
- Authority
- CN
- China
- Prior art keywords
- pressurized tank
- mold
- gas leakage
- leakage defect
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007547 defect Effects 0.000 title claims abstract description 19
- 238000002474 experimental method Methods 0.000 title claims abstract description 18
- 230000008439 repair process Effects 0.000 claims abstract description 13
- 238000004088 simulation Methods 0.000 claims abstract description 4
- 238000005485 electric heating Methods 0.000 claims description 12
- 230000000903 blocking effect Effects 0.000 claims description 10
- 238000010438 heat treatment Methods 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims 1
- 239000007789 gas Substances 0.000 description 20
- 238000000034 method Methods 0.000 description 8
- 239000000463 material Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000008033 biological extinction Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000003989 dielectric material Substances 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 239000005431 greenhouse gas Substances 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
Landscapes
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
Abstract
The utility model discloses a kind of SF6 gas leakage defect experiment simulators, including pressurized tank, the lid being located at the top of pressurized tank and pass through gas tube and the tank connected air compressor machine of the pressure;The lid body is equipped with pressure gauge and thermometer;The side wall of the pressurized tank is equipped with a leakage hole, and pressurized tank is equipped with an anxious prosthetic device, and the urgency prosthetic device repairs the leakage hole for simulating;The urgency prosthetic device includes balance positioner, the belt connecting respectively with the both ends of the balance positioner, across the balance positioner and the screw rod being threadedly coupled with it and the closure mold of one end that the screw rod is arranged in, and the described one end of mold far from the screw rod that blocks is equipped with groove;When carrying out simulation repair operation, the urgency prosthetic device is fixed on pressurized tank by the belt.
Description
Technical field
The utility model relates to a kind of SF6 gas leakage defect experiment simulators.
Background technique
SF6 gas has good electrical insulation properties and excellent arc extinction performance.Its electric strength is under same pressure
2.5 times of nitrogen, breakdown voltage are 2.5 times of air, and arc extinguishing ability is 100 times of air, are a kind of better than air and insulation
The super-pressure insulating dielectric materials of new generation of oil.But the problem of often being leaked with SF6 gas in its use process.Its shadow
Ring and be mainly reflected in two aspects: on the one hand, the electric insulation and arc extinction performance of SF6 gas and its pressure are closely related, pressure
Its insulation performance declines to a great extent with arc extinction performance when decline, when gas pressure falls to approximately 0.3MPa only with insulating oil phase
When.Such as its gas leakage point cannot be handled well, just must frequently tonifying Qi be considerably increased with meeting job requirement
Safeguard the cost used;On the other hand, SF6 gas is a kind of important greenhouse gases again, and environmental hazard is very big.Therefore,
SF6 gas leakage problem, especially SF6 gas Live leaking-stopping technology how are solved, the reliability for improving power equipment, drop are become
The urgent problem to be solved of low use cost and protection environment.
Utility model content
The purpose of the utility model is to provide a kind of SF6 gas leakage defect experiment simulators, by having built one kind
SF6 gas leakage defect experiment simulator can simulate GIS device SF6 gas leakage process, while can also be right
GIS device repair process and effect are simulated, in order to obtain better recovery scenario.
In order to solve the above technical problems, the utility model provides a kind of SF6 gas leakage defect experiment simulator, including
Pressurized tank, the lid being located at the top of pressurized tank and pass through gas tube and the tank connected air compressor machine of the pressure;The lid body
It is equipped with pressure gauge and thermometer;The side wall of the pressurized tank is equipped with a leakage hole, and pressurized tank is equipped with an anxious reparation
Device, the urgency prosthetic device repair the leakage hole for simulating;
The urgency prosthetic device includes balance positioner, the belt connecting respectively with the both ends of the balance positioner, wears
Cross the balance positioner and the screw rod being threadedly coupled with it and the closure mold of one end that the screw rod is set, the envelope
Stifled mold is equipped with groove far from one end of the screw rod;When carrying out simulation repair operation, the urgency prosthetic device passes through the skin
Band is fixed on pressurized tank.
Further, exhaust pipe is additionally provided on the side wall of the pressurized tank, the exhaust pipe is equipped with relief valve.
Further, the outer sheath for blocking mold is equipped with for resisting pressurized tank to prevent from blocking determining for mold sliding
Position mould.
Further, one end that the positioning mold is contacted with pressurized tank is built-in with electric heating sheets, the electric heating sheets with
The side of pressurized tank contact is equipped with thermally conductive sheet, is equipped with the electric heating control being electrically connected with the electric heating sheets on the outside of the positioning mold
Device processed.
Further, the positioning mold can be slided up and down along the closure mold.
Further, the positioning mold is equipped with the lock-screw for preventing positioning mold and blocking mold relative movement.
Further, gasket is equipped between the closure mold and the screw rod.
Further, one end curved portion with outward extension that the positioning mold is contacted with pressurized tank.
Further, one end L shape with outward extension portion that the positioning mold is contacted with pressurized tank.
Further, the screw rod is equipped with handle far from described one end for blocking mold.
The utility model has the following beneficial effects: the utility model is by having built a kind of SF6 gas leakage defect test mould
Quasi- device, can simulate GIS device SF6 gas leakage process, while can also be to GIS device repair process and effect
It is simulated, in order to obtain better recovery scenario.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, at this
The same or similar part, the illustrative embodiments and their description of the application are indicated using identical reference label in a little attached drawings
For explaining the application, do not constitute an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Fig. 2 is the structural schematic diagram of the anxious prosthetic device of the utility model one embodiment.
Fig. 3 is the structural schematic diagram of the positioning mold of another embodiment of the utility model.
Wherein: 1, pressurized tank;11, lid;12, exhaust pipe;2, pressure gauge;21, thermometer;3, air compressor machine;31, it inflates
Pipe;4, positioning mold;41, lock-screw;42, electrical heating controller;43, electric heating sheets;44, thermally conductive sheet;5, mold is blocked;
51, airtight and watertight padding chamber;6, belt;7, screw rod;8, balance positioner;9, handle.
Specific embodiment
SF6 gas leakage defect experiment simulator as shown in Figure 1 including pressurized tank 1, is located at 1 top of pressurized tank
Lid 11 and the air compressor machine 3 being connect by gas tube 31 with the pressurized tank 1;11 body of lid is equipped with for monitoring pressure
The pressure gauge 2 of pressure in power tank and the thermometer 21 of the temperature in monitoring pressurized tank;The side wall of the pressurized tank 1 is equipped with one
A leakage hole, pressurized tank 1 are equipped with an anxious prosthetic device, and the urgency prosthetic device repairs the leakage hole for simulating.Its
In, inflating port is located at the lower part of pressurized tank, and its object is to will not influence experimental implementation;Two parameter lists (pressure gauge 2 and temperature
21) meter is located at tank body top, in order to which observation is convenient, and does not influence experimental implementation.
As shown in Fig. 2, it is described urgency prosthetic device include balance positioner 8, respectively with the both ends of the balance positioner 8 connect
The belt 6 that connects, across the balance positioner 8 and the screw rod 7 being threadedly coupled with it and one end that the screw rod 7 is arranged in
Mold 5 is blocked, the described one end of mold 5 far from the screw rod 7 that blocks is equipped with groove.In leak stopping, will be placed on to pressurized tank 1
Between belt 6 and balance positioners 8, repair materials are then coated in closure mold 5 and are met into the groove of the side of pressurized tank 1,
Last adjusting screw rod 7, squeezing closure mold 5 by screw rod 7 can be completed leak stopping operation in air-leak section for repair materials closure.It should
Prosthetic device is easy to operate, fast blockage operation may be implemented, and the device passes through 6 fixation pressure tank 1 of belt, in use process
In can adjust the length of belt 6 as needed, to increase its scope of application.
According to one embodiment of the application, exhaust pipe 12, the exhaust pipe 12 are additionally provided on the side wall of the pressurized tank 1
It is equipped with relief valve, can according to need and pressure release is carried out to pressurized tank 1.
According to one embodiment of the application, the outer sheath for blocking mold 5 is equipped with for resisting pressurized tank 1 to prevent
Block the positioning mold 4 that mold 5 slides.It can prevent from blocking the sliding of mold 5 and influencing plugging effect in use process.
According to one embodiment of the application, as shown in figure 3, built in one end that the positioning mold 4 is contacted with pressurized tank 1
There are electric heating sheets 43, the side that the electric heating sheets 43 are contacted with pressurized tank 1 is equipped with thermally conductive sheet 44,4 outside of positioning mold
Equipped with the electrical heating controller 42 being electrically connected with the electric heating sheets 43.It can be controlled by electrical heating controller 42 in use process
Electric heating sheets 43 heat, and heat transferring heat to pressurized tank 1 by thermally conductive sheet 44 for it, to improve the solidification of repair materials
Efficiency.
It is demonstrated experimentally that blocking consolidating for the repair materials in mold 5 when 1 surface temperature of pressurized tank is lower (20 DEG C or less)
Change from top to bottom, it is still gel that the part that lowest level is directly contacted with 1 surface of pressurized tank cannot be fully cured in 10 minutes
State.When 1 surface temperature of pressurized tank is higher (60 DEG C or more), block mold 5 in repair materials solidification from the bottom to top,
This situation should be able to reach preferable plugging effect during practical leak stopping.
According to one embodiment of the application, the positioning mold 4 can be slided up and down along the closure mold 5.
According to one embodiment of the application, the positioning mold 4, which is equipped with, to be prevented positioning mold 4 and blocks 5 phase of mold
To mobile lock-screw 41.
With in the process can, make first positioning mold 4 to one end sliding far from screw rod 7 make the section of positioning mold 4 with
It blocks the short of mold 5 to be staggered, then by lock-screw 41 that positioning mold 4 and closure mold 5 is fixed, then by positioning mold 4
It resists after being heated around leakage hole, unclamps again lock-screw 41, while adjusting screw rod 7 will block mold 5 and press to band gas leakage
It is blocked at hole.It is preheated using the surface first to pressurized tank 1, is being blocked, can be further improved curing efficiency.
According to one embodiment of the application, gasket is equipped between the closure mold 5 and the screw rod 7, gasket can make
Block 5 uniform force of mold.
According to one embodiment of the application, one end that the positioning mold 4 is contacted with pressurized tank 1 is with outward extension
Curved portion.
According to one embodiment of the application, one end that the positioning mold 4 is contacted with pressurized tank 1 is with outward extension
L shape portion.
According to one embodiment of the application, the screw rod 7 is equipped with handle 9 far from described one end for blocking mold 5.
According to one embodiment of the application, the one side that the closure mold 5 is contacted with pressurized tank 1 is equipped with the shape that is recessed inwardly
At with the airtight and watertight padding chamber 51. of arc groove
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng
The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this
The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model
It encloses, should all cover in the scope of the claims of the utility model.
Claims (10)
1. a kind of SF6 gas leakage defect experiment simulator, which is characterized in that including pressurized tank, be located at the top of pressurized tank
Lid and pass through gas tube and the tank connected air compressor machine of the pressure;The lid body is equipped with pressure gauge and thermometer;Institute
The side wall for stating pressurized tank is equipped with a leakage hole, and pressurized tank is equipped with an anxious prosthetic device, and the urgency prosthetic device is used for
The leakage hole is repaired in simulation;
The urgency prosthetic device includes balance positioner, the belt connecting respectively with the both ends of the balance positioner, passes through institute
State balance positioner and the screw rod being threadedly coupled with it and the closure mold of one end that the screw rod is set, the closure mould
Have one end far from the screw rod and is equipped with groove;When carrying out simulation repair operation, the urgency prosthetic device is solid by the belt
It is scheduled on pressurized tank.
2. SF6 gas leakage defect experiment simulator according to claim 1, which is characterized in that the pressurized tank
Exhaust pipe is additionally provided on side wall, the exhaust pipe is equipped with relief valve.
3. SF6 gas leakage defect experiment simulator according to claim 2, which is characterized in that the closure mold
Outer sheath be equipped with for resisting pressurized tank with prevent block mold sliding positioning mold.
4. SF6 gas leakage defect experiment simulator according to claim 3, which is characterized in that the positioning mold
The one end contacted with pressurized tank is built-in with electric heating sheets, and the side that the electric heating sheets are contacted with pressurized tank is equipped with thermally conductive sheet, institute
State the electrical heating controller for being equipped on the outside of positioning mold and being electrically connected with the electric heating sheets.
5. SF6 gas leakage defect experiment simulator according to claim 4, which is characterized in that the positioning mold
It can be slided up and down along the closure mold.
6. SF6 gas leakage defect experiment simulator according to claim 5, which is characterized in that the positioning mold
It is equipped with the lock-screw for preventing positioning mold and blocking mold relative movement.
7. SF6 gas leakage defect experiment simulator according to claim 6, which is characterized in that the closure mold
Gasket is equipped between the screw rod.
8. SF6 gas leakage defect experiment simulator according to claim 7, which is characterized in that the positioning mold
The one end contacted with pressurized tank curved portion with outward extension.
9. SF6 gas leakage defect experiment simulator according to claim 8, which is characterized in that the positioning mold
The one end contacted with pressurized tank L shape with outward extension portion.
10. SF6 gas leakage defect experiment simulator according to claim 9, which is characterized in that the screw rod is separate
Described one end for blocking mold is equipped with handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822037902.9U CN208921359U (en) | 2018-12-05 | 2018-12-05 | SF6 gas leakage defect experiment simulator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822037902.9U CN208921359U (en) | 2018-12-05 | 2018-12-05 | SF6 gas leakage defect experiment simulator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208921359U true CN208921359U (en) | 2019-05-31 |
Family
ID=66712627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822037902.9U Active CN208921359U (en) | 2018-12-05 | 2018-12-05 | SF6 gas leakage defect experiment simulator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208921359U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112223608A (en) * | 2020-10-22 | 2021-01-15 | 辽宁北方玻璃机械股份有限公司 | High-temperature high-pressure hydraulic kettle for processing aerospace glass |
-
2018
- 2018-12-05 CN CN201822037902.9U patent/CN208921359U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112223608A (en) * | 2020-10-22 | 2021-01-15 | 辽宁北方玻璃机械股份有限公司 | High-temperature high-pressure hydraulic kettle for processing aerospace glass |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105652169B (en) | A kind of controllable temperature gas-insulated performance test system and its method | |
CN202493896U (en) | Portable sulfur hexafluoride inflation device | |
CN208921359U (en) | SF6 gas leakage defect experiment simulator | |
CN205539335U (en) | Controllable temperature gas -insulated performance test system | |
CN103364529B (en) | SF6 micro-water tester joint fixing apparatus and using method thereof | |
CN208366554U (en) | A kind of oil-immersed transformer seal test device | |
CN104964163A (en) | Movable all-weather intelligent automatic gas supplementing device for SF6 equipment | |
CN110350429A (en) | A kind of novel pressurized leaking stoppage method of GIS device | |
CN204240052U (en) | SF 6gas inflated, exhaust gas recovery, density meter effect instrument | |
CN209133953U (en) | GIS device SF6Gas leaks quick lash-up recovering device | |
CN105811280B (en) | A kind of GIS device gas leaks powered pressurized leaking stoppage method | |
CN103528769A (en) | Sealing leakage test device for oil-immersed transformer | |
CN102568762A (en) | Expansion protecting device | |
CN204554033U (en) | A kind of testing apparatus with valve rod bellows component sealing | |
CN204027786U (en) | The unobstructed instruments of inspection of a kind of dehydrating breather | |
CN107830402B (en) | SF (sulfur hexafluoride) 6 Mixed gas insulation equipment inflating device and method | |
CN208780411U (en) | Expansion joint leakage testing device | |
CN206697860U (en) | Cable outer jacket repair machine | |
CN204756443U (en) | Portable all -weather intelligent AUTOMATICALLY SUPPLY AIR device of SF6 equipment | |
CN206846296U (en) | A kind of combined type SF6 quick air-inflating apparatus | |
CN209166121U (en) | A kind of electric furnace electrode sand seal device | |
CN103364280A (en) | Method for testing mechanical strength of transformer fuel tank | |
CN204372533U (en) | A kind of New type of S F6 gas inflator | |
CN203847994U (en) | SF6 (Sulfur hexafluoride) steel bottle heating device | |
CN104006179B (en) | A kind of manufacturing process of sealing configuration of four sealing aviation fuel valves |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |