CN208921198U - A kind of entrucking Qiao Zhengqiao factory calibrating installation - Google Patents
A kind of entrucking Qiao Zhengqiao factory calibrating installation Download PDFInfo
- Publication number
- CN208921198U CN208921198U CN201821541110.9U CN201821541110U CN208921198U CN 208921198 U CN208921198 U CN 208921198U CN 201821541110 U CN201821541110 U CN 201821541110U CN 208921198 U CN208921198 U CN 208921198U
- Authority
- CN
- China
- Prior art keywords
- entrucking
- fixedly connected
- liquid phase
- sled
- zhengqiao
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 47
- 239000007791 liquid phase Substances 0.000 claims abstract description 30
- 230000008676 import Effects 0.000 claims abstract description 27
- 230000001105 regulatory effect Effects 0.000 claims abstract description 24
- 238000005303 weighing Methods 0.000 claims abstract description 6
- 238000012795 verification Methods 0.000 claims description 20
- 230000008859 change Effects 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 2
- 238000000034 method Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 8
- 239000000463 material Substances 0.000 description 4
- 238000005259 measurement Methods 0.000 description 3
- 229910000975 Carbon steel Inorganic materials 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000010962 carbon steel Substances 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000012071 phase Substances 0.000 description 1
- 210000000664 rectum Anatomy 0.000 description 1
Landscapes
- Control Of Non-Electrical Variables (AREA)
Abstract
The utility model relates to entruckings to prize technical field, and disclose a kind of entrucking Qiao Zhengqiao factory calibrating installation, including water pump, top on the right side of the water pump is fixedly connected with import hand-operated valve, entrucking sled is fixedly connected at the top of the import hand-operated valve, the top of the import hand-operated valve and entrucking sled inside be fixedly installed with liquid phase pipeline, the top of the mass flowmenter is fixedly connected with the first regulating valve by liquid phase pipeline, and the top of first regulating valve is fixedly connected with water pipe by liquid phase pipeline.Upper inlet hand-operated valve is prized by opening entrucking, commutator, which is opened, leads to water tank side, start water pump, keep stability of flow, until the temperature, pressure on liquid phase pipeline are stable, according to vertification regulation, 5 flows are selected to carry out calibrating operation, each flow point is done three times, compares mass flowmenter registration and master scale weighing indicating value, it is thus provided with the device of calibrating, entrucking can be prized and carry out effective whole sled calibrating.
Description
Technical field
The utility model relates to entruckings to prize technical field, specially a kind of entrucking Qiao Zhengqiao factory calibrating installation.
Background technique
Skid, which refers to, is fixed on one group of equipment on chassis made of one angle steel or I-steel, movement, in place can be with
Using crowbar, meanwhile, skid also refers to a monoblock type set for having installed the equipment such as valve, pump, in system its
When his equipment connection, no longer need to only use pipeline connection, skid is equipment frame in equipment such as centre installation valve, instrument
A kind of form of frame and equipment entire combination.
Currently, there is no the devices that can be examined and determine well for entrucking sled, without energy during prizing whole sled for entrucking
It is enough to carry out effective whole sled calibrating, many inconvenience can be brought for the whole sled process of entrucking sled in this way, the use for entrucking sled
Also very unfavorable, therefore, we devise a kind of this entrucking Qiao Zhengqiao factory calibrating installation.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of entrucking Qiao Zhengqiao factory calibrating installation, has whole
The advantages of sled calibrating, solves the problems, such as no whole sled calibrating.
(2) technical solution
For the purpose for realizing above-mentioned whole sled calibrating, the utility model is provided the following technical solutions: a kind of whole sled work of entrucking sled
Factory's calibrating installation, including water pump, the top on the right side of the water pump are fixedly connected with import hand-operated valve, the top of the import hand-operated valve
Portion be fixedly connected with entrucking sled, the top of the import hand-operated valve and entrucking sled inside be fixedly installed with liquid phase pipeline, institute
It states and is fixedly connected with mass flowmenter at the top of liquid phase pipeline, the top of the mass flowmenter is fixedly connected by liquid phase pipeline
There is the first regulating valve, the top of first regulating valve is fixedly connected with water pipe, a left side for the liquid phase pipeline by liquid phase pipeline
Side and pressure transmitter is connected with by electric wire interaction in the inside of entrucking sled, the top of the pressure transmitter and in entrucking sled
Inside batch control device is fixedly connected with by electric wire, the right side of described batch of control device is fixedly connected with entrucking sled instrument by electric wire,
Bottom on the right side of the water pipe is fixedly connected with commutator, and the top on the left of the commutator is fixedly connected with calibrating by electric wire
System, the bottom of the commutator are fixedly connected with drainage tube, and the bottom of the drainage tube is fixedly connected with gravimetric tank, the title
The bottom of weight tank is fixedly connected with master scale, and the second regulating valve is fixedly connected on the right side of the gravimetric tank, and described second is adjusted
The bottom of valve is fixedly connected with water tank by water pipe, is fixedly connected with Zhi Liuguan on the right side of the commutator.
Preferably, it is connected between the right side of the entrucking sled instrument and the left side of mass flowmenter by electric wire.
Preferably, it is fixedly connected between the top of described batch of control device and the left side of the first regulating valve by electric wire and in entrucking
The inside of sled.
Preferably, described batch of control device has signal company between entrucking sled instrument, pressure transmitter and the first regulating valve respectively
It connects.
Preferably, the verification system respectively with mass flowmenter, batch have signal between control device, commutator and master scale
Connection.
Preferably, at least 2,050 kilograms of the weighing of the master scale.
Preferably, second regulating valve is fixedly connected between water tank, gravimetric tank by water pipe respectively.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of entrucking Qiao Zhengqiao factory calibrating installation, and having following has
Beneficial effect:
1, entrucking Qiao Zhengqiao factory calibrating installation prizes upper inlet hand-operated valve by opening entrucking, and verification system control is changed
It is opened to device and leads to water tank side, start water pump, entrucking sled import hand-operated valve is opened to maximum, stability of flow is kept, until liquid
Temperature, pressure on phase pipeline is stable, according to vertification regulation, 5 flows is selected to carry out calibrating operation, each flow point is done
Three times, compare mass flowmenter registration and master scale weighing indicating value, cut out the pump, band mass flowmenter indicating value becomes zero Hou Guan completely
Import hand-operated valve is closed, the device of calibrating is thus provided with, entrucking can be prized and carry out effective whole sled calibrating.
2, entrucking Qiao Zhengqiao factory calibrating installation prizes upper inlet hand-operated valve by opening entrucking, and verification system control is changed
It is opened to device and leads to water tank side, start water pump and circulation liquid phase pipeline, the liquid-phase tube line charge of near entrucking sled part is full, entrucking
It prizes import hand-operated valve to close, gravimetric tank is slack tank, records slack tank weight, and setting batch is worth on batch control device, it should be noted that Bu Nengman
Tank clicks batch control device and starts key, starts the verification process of a batch, and after reaching batch set amount, import hand-operated valve is automatic
Close, record batch control device, gravimetric tank, verification system reading, each batch at least does three times, thus there is the another of calibrating
Kind mode, improves the efficiency of calibrating, reduces cost.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
In figure: 1 water pump, 2 import hand-operated valves, 3 pressure transmitters, 4 entruckings sled, 5 batches of control devices, 6 mass flowmenters, 7 entruckings
Prize instrument, 8 first regulating valves, 9 liquid phase pipelines, 10 water pipes, 11 verification systems, 12 commutators, 13 flow tubes, 14 drainage tubes, 15
Gravimetric tank, 16 water tanks, 17 second regulating valves, 18 master scales.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, a kind of entrucking Qiao Zhengqiao factory calibrating installation, including water pump 1, the model 100WL80- of water pump 1
8-4, flow 22.2l/s, revolving speed 1440r/min, shaft power 2.5KW, efficiency 71%, weight 250kg, the top on 1 right side of water pump
It is fixedly connected with import hand-operated valve 2, the model of import hand-operated valve 2 is BQ41F, and material is stainless steel, inside nominal diameter 20-200mm,
Pressure environment 1.6-2.5mpa, the top of import hand-operated valve 2 are fixedly connected with entrucking sled 4, prize 4 upper inlet hands by opening entrucking
Dynamic valve 2, verification system 11, which controls commutator 12 and opens, leads to 16 side of water tank, starts water pump 1,4 import hand-operated valves 2 are prized in entrucking
It opens to maximum, keeps stability of flow, until the temperature, pressure on liquid phase pipeline 9 are stable, according to vertification regulation, select at 5 points
Flow carries out calibrating operation, and each flow point is done three times, compares 6 registration of mass flowmenter and the weighing indicating value of master scale 18, Guan Shui
Pump 1, band 6 indicating value of mass flowmenter become zero completely after close import hand-operated valve 2, the top of import hand-operated valve 2 and entrucking prize 4
Inside be fixedly installed with liquid phase pipeline 9, the top of liquid phase pipeline 9 is fixedly connected with mass flowmenter 6, mass flowmenter 6
Model MV-194-HE, measurement range 0.1-20m3/h, operating pressure 0-1MPa, 0-50 DEG C of operating temperature, instrument 7 is prized in entrucking
Right side and mass flowmenter 6 left side between connected by electric wire, the top of mass flowmenter 6 passes through the fixation of liquid phase pipeline 9
It is connected with the first regulating valve 8, batch control device 5 has signal between entrucking sled instrument 7, pressure transmitter 3 and the first regulating valve 8 respectively
Connection, 8 model of the first regulating valve is DN15-80, and material is stainless steel, and type of attachment is internal screw thread, inside nominal diameter DN15-
80mm, the top of the first regulating valve 8 are fixedly connected with water pipe 10 by liquid phase pipeline 9, the left side of liquid phase pipeline 9 and prize in entrucking
4 inside is connected with pressure transmitter 3, the model XG3051 of pressure transmitter 3, measurement range 0- by electric wire interaction
10000kPa, accuracy class 0.2,4~20mA of output signal, explosive-proof grade dIIBT4, degree of protection IP67, supply voltage 24V,
The top of pressure transmitter 3 and electric wire is crossed in the inside of entrucking sled 4 be fixedly connected with batch control device 5, the model WS- of batch control device 5
MPPT30, voltage rating 12/24/48V, rated current 30A, power consumption 0.1W, outer dimension 193*112*53mm, batch control device 5
It is fixedly connected between top and the left side of the first regulating valve 8 by electric wire and prizes 4 inside in entrucking, the right side of batch control device 5 is logical
It crosses electric wire and is fixedly connected with entrucking sled instrument 7, the model of entrucking sled instrument 7 is HD-L, 0.001-0.1m3/h of measurement range, public affairs
Claim latus rectum 4mm, operating pressure 1.6MPa, prizes 4 upper inlet hand-operated valves 2 by opening entrucking, verification system 11 controls commutator 12
It opens and leads to 16 side of water tank, start water pump 1 and circulation liquid phase pipeline 9, the liquid phase pipeline 9 that 4 parts are prized near entrucking are full of, fill
Vehicle is prized 4 import hand-operated valves 2 and is closed, and gravimetric tank 15 is slack tank, records slack tank weight, and setting batch is worth on batch control device 5, it should be noted that
Tank cannot be overflow, batch control device 5 is clicked and starts key, start the verification process of a batch, after reaching batch set amount, import is manual
Valve 2 is automatically closed, record batch control device 5, gravimetric tank 15, verification system 11 reading, each batch at least does three times, and water pipe 10 is right
The bottom of side is fixedly connected with commutator 12, the model DN500 of commutator 12, and material is carbon steel, type (channel position) guide
Formula, flow direction are unidirectional, inside nominal diameter 10mm, and the top in 12 left side of commutator is fixedly connected with verification system by electric wire
11, verification system 11 respectively with mass flowmenter 6, batch have signal connection between control device 5, commutator 12 and master scale 18, change
It is fixedly connected with drainage tube 14 to the bottom of device 12, the bottom of drainage tube 14 is fixedly connected with gravimetric tank 15, the bottom of gravimetric tank 15
Portion is fixedly connected with master scale 18, and the model of master scale 18 is SCS-P771A, maximum capacity 3000KG, mesa dimensions 120*
120cm, at least 2,050 kilograms of the weighing of master scale 18, the right side of gravimetric tank 15 is fixedly connected with the second regulating valve
17, the model of the second regulating valve 17 is ZJHP-16F46, and material is carbon steel, and type of attachment is flange, inside nominal diameter DN20-
150mm, the second regulating valve 17 are fixedly connected between water tank 16, gravimetric tank 15 by water pipe 10 respectively, the second regulating valve 17
Bottom is fixedly connected with water tank 16 by water pipe 10, and the right side of commutator 12 is fixedly connected with Zhi Liuguan 13.
When in use, 4 upper inlet hand-operated valves 2 are prized by opening entrucking, verification system 11 controls the opening of commutator 12 and leads to
16 side of water tank, starts water pump 1 and circulation liquid phase pipeline 9, the liquid phase pipeline 9 that 4 parts are prized near entrucking are full of, entrucking sled 4 into
Mouth hand-operated valve 2 is closed, and gravimetric tank 15 is slack tank, records slack tank weight, and batch is arranged on batch control device 5 and is worth, it should be noted that Bu Nengman
Tank clicks batch control device 5 and starts key, starts the verification process of a batch, and after reaching batch set amount, import hand-operated valve 2 is certainly
It is dynamic to close, record batch control device 5, gravimetric tank 15, verification system 11 reading, each batch at least does three times, and calibrating terminates, Guan Shui
Pump 1.
In conclusion entrucking Qiao Zhengqiao factory calibrating installation, prizes 4 upper inlet hand-operated valves 2, calibrating system by opening entrucking
11 control commutator 12 of system, which is opened, leads to 16 side of water tank, starts water pump 1,4 import hand-operated valves 2 are prized in entrucking and are opened to maximum, are protected
Stability of flow is held, until the temperature, pressure on liquid phase pipeline 9 are stable, according to vertification regulation, 5 flows is selected to be examined and determine
Operation, each flow point does three times, compares 6 registration of mass flowmenter and master scale 18 is weighed indicating value, cuts out the pump 1, band quality stream
6 indicating value of meter closes import hand-operated valve 2 after becoming zero completely, is thus provided with the device of calibrating, can prize 4 to entrucking and carry out
Effective whole sled calibrating prizes 4 upper inlet hand-operated valves 2 by opening entrucking, and verification system 11, which controls commutator 12 and opens, leads to water
16 side of case, starts water pump 1 and circulation liquid phase pipeline 9, the liquid phase pipeline 9 that 4 parts are prized near entrucking are full of, and 4 imports are prized in entrucking
Hand-operated valve 2 is closed, and gravimetric tank 15 is slack tank, records slack tank weight, and setting batch is worth on batch control device 5, it should be noted that tank cannot be overflow,
It clicks batch control device 5 and starts key, start the verification process of a batch, after reaching batch set amount, import hand-operated valve 2 closes automatically
Close, record batch control device 5, gravimetric tank 15, verification system 11 reading, each batch at least does three times, thus there is calibrating
Another way improves the efficiency of calibrating, reduces cost.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of entrucking Qiao Zhengqiao factory calibrating installation, including water pump (1), it is characterised in that: the top on the right side of the water pump (1)
It is fixedly connected with import hand-operated valve (2), entrucking sled (4), the import hand is fixedly connected at the top of the import hand-operated valve (2)
It moves the top of valve (2) and is fixedly installed with liquid phase pipeline (9) in the inside of entrucking sled (4), the top of the liquid phase pipeline (9) is solid
Surely it is connected with mass flowmenter (6), the top of the mass flowmenter (6) is fixedly connected with the first tune by liquid phase pipeline (9)
It saves valve (8), the top of first regulating valve (8) is fixedly connected with water pipe (10) by liquid phase pipeline (9), the liquid phase pipeline
(9) left side and being interacted in the inside of entrucking sled (4) by electric wire is connected with pressure transmitter (3), the pressure transmitter (3)
Top and be fixedly connected in the inside of entrucking sled (4) by electric wire and criticize control device (5), pass through on the right side of described batch of control device (5)
Electric wire is fixedly connected with entrucking sled instrument (7), and the bottom on the right side of the water pipe (10) is fixedly connected with commutator (12), described to change
Top on the left of to device (12) is fixedly connected with verification system (11) by electric wire, and the bottom of the commutator (12) is fixedly connected
Have drainage tube (14), the bottom of the drainage tube (14) is fixedly connected with gravimetric tank (15), and the bottom of the gravimetric tank (15) is solid
Surely it is connected with master scale (18), is fixedly connected with the second regulating valve (17) on the right side of the gravimetric tank (15), described second is adjusted
The bottom of valve (17) passes through water pipe (10) and is fixedly connected with water tank (16) below master scale (18), the commutator (12)
Right side be fixedly connected with Zhi Liuguan (13).
2. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: instrument is prized in the entrucking
(7) it is connect between right side and the left side of mass flowmenter (6) by electric wire.
3. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: described batch of control device (5)
Top and the left side of the first regulating valve (8) between be fixedly connected by electric wire and entrucking sled (4) inside.
4. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: described batch of control device (5)
There is signal connection between entrucking sled instrument (7), pressure transmitter (3) and the first regulating valve (8) respectively.
5. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: the verification system
(11) there is signal connection between mass flowmenter (6), batch control device (5), commutator (12) and master scale (18) respectively.
6. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: the master scale (18)
At least 2,050 kilograms of weighing.
7. a kind of entrucking Qiao Zhengqiao factory according to claim 1 calibrating installation, it is characterised in that: second regulating valve
(17) it is fixedly connected between water tank (16), gravimetric tank (15) by water pipe (10) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821541110.9U CN208921198U (en) | 2018-09-20 | 2018-09-20 | A kind of entrucking Qiao Zhengqiao factory calibrating installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821541110.9U CN208921198U (en) | 2018-09-20 | 2018-09-20 | A kind of entrucking Qiao Zhengqiao factory calibrating installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208921198U true CN208921198U (en) | 2019-05-31 |
Family
ID=66706399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821541110.9U Active CN208921198U (en) | 2018-09-20 | 2018-09-20 | A kind of entrucking Qiao Zhengqiao factory calibrating installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208921198U (en) |
-
2018
- 2018-09-20 CN CN201821541110.9U patent/CN208921198U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102133770B (en) | Water supply metering device and concrete stirring equipment comprising same | |
CN107702933B (en) | Device and method for measuring water quantity-electricity quantity conversion coefficient of plain river network irrigation pump station | |
CN201852622U (en) | Automatic capacity calibration device for tank truck | |
CN201974701U (en) | Electronic scale flow control system | |
CN101659087A (en) | Additive metering system and metering method of cement concrete stirring device | |
CN202350881U (en) | Full-automatic water meter calibrating device | |
CN202648917U (en) | Device for testing separation effect of three-phase separator in anaerobic reactor | |
CN201493963U (en) | Additive metering system of cement concrete mixing equipment | |
CN208921198U (en) | A kind of entrucking Qiao Zhengqiao factory calibrating installation | |
CN107587586A (en) | A kind of device and the flow control methods based on the device and anti-down irrigation method on pipeline | |
CN110954190A (en) | Online calibrator and calibration method for oil field high-pressure water injection well flowmeter | |
CN201707096U (en) | Container tank calibration device | |
JPS5824759Y2 (en) | Flow meter calibration device | |
CN201886789U (en) | Flowmeter for main pump seal leakage flow | |
CN218349563U (en) | Accumulated water flow and purified water flow measuring device of water purifier | |
CN112264402B (en) | Anti-blocking device and method for regulating valve for intermittent delivery of liquid-solid two-phase fluid | |
CN214133138U (en) | Regulating valve anti-blocking device for intermittent conveying of liquid-solid two-phase fluid | |
CN107570099B (en) | Tank pressure control device of parallel reactor | |
CN208751683U (en) | A kind of flying dust chelate solution proportion weighing system | |
CN207436196U (en) | A kind of device on pipeline | |
CN208736530U (en) | A kind of water meter calibration | |
CN201196585Y (en) | Vehicle-mounted small flow meter calibrating apparatus | |
CN219334074U (en) | Automatic feeding system | |
CN211367089U (en) | Novel buffer tank for concentrated sulfuric acid | |
CN215756601U (en) | Automatic accurate charge device of intermittent type nature water unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A calibration device for loading and prying factories Granted publication date: 20190531 Pledgee: Bank of China Limited by Share Ltd. Nanjing Jiangning branch Pledgor: NANJING TIANTI AUTOMATION EQUIPMENT Co.,Ltd. Registration number: Y2024980004721 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |