CN208920893U - A kind of power cooling tower of sectional management water level - Google Patents
A kind of power cooling tower of sectional management water level Download PDFInfo
- Publication number
- CN208920893U CN208920893U CN201821358735.1U CN201821358735U CN208920893U CN 208920893 U CN208920893 U CN 208920893U CN 201821358735 U CN201821358735 U CN 201821358735U CN 208920893 U CN208920893 U CN 208920893U
- Authority
- CN
- China
- Prior art keywords
- water
- cooling tower
- water level
- cooling
- sectional management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model relates to a kind of power cooling towers of sectional management water level, including cooling tower and n sectional management partition, n >=1, the sectional management partition is set to cooling tower and is filled with water the bottom of box, it is tightly connected with the be filled with water bottom of box and two sidewalls of cooling tower, cooling water is divided into n+1 section, independent water level detection gauge and separate fan unit is provided separately in each section;The n sectional management divider height is different, by being arranged successively from low to high.Advantage: 1) water level monitor, the segmentation of section independent operating are summarized in monitoring host computer monitoring convenient for management.2) original frequent movement is reduced, parts replacement cost is reduced.3) according to the accurate regulating capacity of liquid level demand, environmental protection and energy saving.4) the frequent phenomenon of highstand shedding in water tank is reduced, time extension is recycled, reduces water resource usage amount, significant save the cost.5) the phenomenon that limited solution detection device causes malfunction delay machine to upstream device.
Description
Technical field
The utility model is a kind of power cooling tower of sectional management water level, belongs to cooling tower technical field.
Background technique
Cooling tower is a kind of device that water is cooling, and water is wherein carrying out heat exchange, mass transter with the air flowed through, causing
Make water temperature drop.Cooled down using cooling tower and is recycled.Cooling tower structure: the water that need to be cooled down column head by pipeline to
Lower sprinkling, and a very big exhaust fan is arranged at top, and air is extracted out tower top, flows to be conducive to air-flow, accelerates the cooling of water.
Above and below spraying pipe, the heat sink for having the PVC glue of tortuous hollow out to do is separated, to increase the heat dissipation time of water droplet.
Since equipment installation and the factors such as land subsidence will cause cooling tower two sides difference in level away from larger, when operation, can
East side water level monitoring can be will appear high water level has been displayed and occurs that water level overflow port overflows and west side is led also the moisturizing the phenomenon that
Monitor is caused high water level and low-water alarm occur.Phenomena such as supply upstream device brings unstable factor and delay machine.
Consequence is caused to have the following:
1. water-level instrumentation monitor feedback data disunity, there are wrong report phenomenons.
2. hutch water device frequent movement causes components aging serious, moisturizing is uneven.
3. the highstand shedding in water tank is frequent, the recycling time is short, increases water usage amount and cost.
4. increasing wastewater discharge and processing cost.
5. phenomena such as false alarm causes malfunction delay machine to upstream device.
Utility model content
The utility model proposes a kind of power cooling towers of sectional management water level, and its object is to the existing skills of face
In art two sides difference in level existing for power cooling tower away from it is larger cause instrument to be easy false alarm, cause water resource and maintenance money
The defect of source waste proposes a kind of power cooling tower of sectional management water level, solves because of water by improving structure design
Wasting phenomenon, the stabilization of operation and the upstream device that moisturizing caused by plane high and low fall is uneven, water consumption is excessively high are cooling not
Enough stabilizations and the problems such as cause delay machine phenomenon and loss.
The technical solution of the utility model:
The power cooling tower of sectional management water level, including cooling tower and n sectional management partition, n >=1, described point
Segment management partition is set to cooling tower and is filled with water the bottom of box, is filled with water the bottom of box with cooling tower and two sidewalls are tightly connected, will
Cooling water is divided into n+1 section, and independent water-level instrumentation and separate fan unit is provided separately in each section;The n segmentation
It is different to manage divider height, by being arranged successively from low to high.
The cooling tower further includes motor 1, fan 2, cooling water inlet pipe 3, heat dissipation board mount 4, PVC heat sink 5, water
Position monitor 6, recovery tank 7, disengaging maintenance overhaul mouth 8, Overflow drainage pipeline 9, wall basis 10 and moisturizing float switch 11.
The utility model has the beneficial effects that
1) water level monitor, the segmentation of section independent operating are summarized in monitoring host computer monitoring convenient for management.
2) hutch water device issues instruction according to water level monitor and opens motor-driven valve moisturizing, reduces original frequent movement, drops
Low parts replacement cost.
3) according to the accurate regulating capacity of liquid level demand, environmental protection and energy saving.
4) the frequent phenomenon of highstand shedding in water tank is reduced, time extension is recycled, reduces water resource usage amount,
Significant save the cost.
5) the phenomenon that limited solution detection device causes malfunction delay machine to upstream device.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of common motive power cooling tower.
Attached drawing 2 is the structural schematic diagram of the power cooling tower of sectional management water level.
In attached drawing 1 be motor, 2 be fan, 3 be cooling water inlet pipe, 4 be heat dissipation board mount, 5 be PVC stream guidance heat radiating plate,
6 be water-level instrumentation, 7 be recovery tank, 8 be into and out maintenance inspection socket, 9 be Overflow drainage pipeline, 10 be wall basis, 11 be mend
Water float switch, 12 be sectional management partition.
Specific embodiment
The power cooling tower of sectional management water level, including cooling tower and n sectional management partition, n >=1, described point
Segment management partition is set to cooling tower and is filled with water the bottom of box, is filled with water the bottom of box with cooling tower and two sidewalls are tightly connected, will
Cooling water is divided into n+1 section, and independent water-level instrumentation and separate fan unit is provided separately in each section;The n segmentation
It is different to manage divider height, by being arranged successively from low to high.
The cooling tower include motor 1, fan 2, cooling water inlet pipe 3, heat dissipation board mount 4, PVC stream guidance heat radiating plate 5,
Water-level instrumentation 6, recovery tank 7, disengaging maintenance overhaul mouth 8, Overflow drainage pipeline 9, wall basis 10 and moisturizing float switch 11,
Wherein, motor 1 connects cooling fan 2, and cooling water inlet pipe 3 enters cooling water by each branch line respectively by main water return tube
Tower is using PVC stream guidance heat radiating plate 5, and radiate 4 fixing PVC stream guidance heat radiating plate 5 of board mount, and water-level instrumentation 6 is set to cooling
Water tower is filled with water top of the box, and each cooling tower is filled with water cabinet section bottom equipped with a recovery tank 7, and cooling tower two sides are respectively set
There is a disengaging maintenance overhaul mouth 8, is equipped with Overflow drainage pipeline 9 at cooling tower water level, entire power cooling tower passes through wall
10 installation of body basis is fixed, and moisturizing float switch 11 is located in cooling tower water box body.
The motor 1 drives fan section 2 that Hot wet air heating inside cooling tower is taken out of and blows to atmosphere.Cooling water inlet pipe
3 be to enter cooling tower using PVC stream guidance heat radiating plate 5 into excessively each branch line respectively by main water return tube.PVC flow-guiding radiation
5 specification of plate is the buckplate of 160cmX80cm, thickness 2mm, is overlapped in cooling tower two sides.Motor 1 and cooling fan 2 are discharged wet
While hot-air, the air of entrance is entered by the gap between stream guidance heat radiating plate 5, to play cooling with the heat in water outlet
Effect.Cooling tower cooling stand 4 is to play the role of protection and increase inner space intensity.Water-level instrumentation 6 is detection water
Position height reaches standard value up and down and provides signal and do moisturizing movement and water level abnormality alarm function.The each unit of recovery tank 7 respectively has
One, it is not suck air that entirety, which plays centralized water return lower than cooling water tank,.Disengaging maintenance overhaul mouth 8 is easy for operator
It observes cooling tower water level inside and anaphase aberrations maintenance enters.Overflow drainage pipeline 9 is in cooling tower water level, and moisturizing is excessively high
Extra water level is discharged when with water level abnormality.Moisturizing float switch 11 is that unlatching moisturizing is electronic after water-level instrumentation 6 provides signal
Valve, water level, which reaches to give by the buoyancy of floating ball after standard, closes.Ground base when wall basis 10 is cooling tower installation
Booster action.
Explanation is further explained to technical solutions of the utility model with reference to the accompanying drawing.
Compare attached drawing 1, common cooling tower includes that motor 1, fan 2, cooling water inlet pipe 3, heat dissipation board mount 4, PVC are led
Wandering hot plate 5, water-level instrumentation 6, recovery tank 7, disengaging maintenance overhaul mouth 8, Overflow drainage pipeline 9, wall basis 10 and moisturizing
Float switch 11.
Compare attached drawing 2, the power cooling tower of sectional management water level, including cooling tower and n sectional management partition, n
>=1, the sectional management partition is set to cooling tower and is filled with water the bottom of box, with cooling tower be filled with water the bottom of box and two sidewalls it is close
Envelope connection, is divided into n+1 section for cooling water, independent water-level instrumentation and separate fan unit is provided separately in each section;Institute
It is different to state n sectional management divider height, by being arranged successively from low to high.
On the basis of cooling tower is filled with water cabinet horizontal plane, increases by three partitions, be divided into four sections and be provided separately respectively
The detection of section independence water-level instrumentation.Each mating three desk fans unit in section can independent operating.
Embodiment 1
Cooling tower, including motor 1, fan 2, cooling water inlet pipe 3, heat dissipation board mount 4, PVC stream guidance heat radiating plate 5, water
Position monitor 6, recovery tank 7, disengaging maintenance overhaul mouth 8, Overflow drainage pipeline 9, wall basis 10 and moisturizing float switch 11.
On the basis of cooling tower is filled with water cabinet horizontal plane, three partitions of increase are divided into four sections and each area are provided separately
Between the detection of independent water-level instrumentation.Each mating three desk fans unit in section can independent operating.
Partition periphery and cooling water bottom and both sides sealing.Increase partition 1cmX650cm(rectangle at horizontal plane) height
Successively 0.68cm, 0.65cm, 0.63cm.Original cooling tower (5060cmX650cm) square is divided into four by three pieces of partitions
The each section in section respectively has a water-level instrumentation 6 to detect.It is constant into cooling tower part.High water level can be gradually voluntarily to low
The trickling of water level section, insufficient water level is by system water supplement, and after filling water level, moisturizing float switch 11 is voluntarily closed, and moisturizing floating ball is opened
11 heights of water level are closed to adjust according to respective section height of water level.There is the outflow of overflow pipe 9 if water tank is because of moment extra water level.
By partition section water level regulation detector test water level height, each section is not by other section water level height shadows
Ring, efficiently solve cooling tower design and construct later period landform and environmental change, the deformation of cooling tower box portion etc. because
Several influences, actual use reduce the malfunction of equipment, reduce equipment delay machine.It is only to separate each water-level instrumentation in position of cutting off the water supply
It is vertical to run the interference for avoiding mutual phase factor water level height.Parts replacement cost is reduced, guarantees equipment mobility, reduce water resource
Waste.
Claims (4)
1. a kind of power cooling tower of sectional management water level, it is characterized in that including cooling tower and n sectional management partition, n
>=1, the sectional management partition is set to cooling tower and is filled with water the bottom of box, with cooling tower be filled with water the bottom of box and two sidewalls it is close
Envelope connection, is divided into n+1 section for cooling water, independent water-level instrumentation and separate fan unit is provided separately in each section;Institute
It is different to state n sectional management divider height, by being arranged successively from low to high.
2. the power cooling tower of a kind of sectional management water level according to claim 1, it is characterized in that the cooling tower
Including motor (1), fan (2), cooling water inlet pipe (3), heat dissipation board mount (4), PVC stream guidance heat radiating plate (5), water-level instrumentation
(6), recovery tank (7), disengaging maintenance overhaul mouth (8), Overflow drainage pipeline (9), wall basic (10) and moisturizing float switch
(11), wherein motor (1) connects cooling fan (2), and cooling water inlet pipe (3) is passed through each branched pipe by main water return tube respectively
Road enters cooling tower using PVC stream guidance heat radiating plate (5), and radiate board mount (4) fixing PVC stream guidance heat radiating plate (5), water level prison
It surveys instrument (6) and is set to cooling tower and be filled with water top of the box, each cooling tower is filled with water cabinet section bottom equipped with a return water
Case (7), cooling tower two sides are respectively provided with a disengaging maintenance overhaul mouth (8), are equipped with Overflow drainage pipeline at cooling tower water level
(9), entire power cooling tower is fixed by wall basic (10) installation, and moisturizing float switch (11) is filled with water positioned at cooling tower
In cabinet.
3. the power cooling tower of a kind of sectional management water level according to claim 1, it is characterized in that the cooling tower
The wide 650cm of the cabinet that is filled with water, long 5060cm, the sectional management partition have three pieces, wide 650cm, thick 1cm to be highly followed successively by
0.63cm 、0.65cm、0.68cm。
4. the power cooling tower of a kind of sectional management water level according to claim 2, it is characterized in that the PVC water conservancy diversion dissipates
Hot plate (5) is long 160cm, wide 80cm, and the buckplate of thick 2mm is overlapped in cooling tower two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821358735.1U CN208920893U (en) | 2018-08-22 | 2018-08-22 | A kind of power cooling tower of sectional management water level |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821358735.1U CN208920893U (en) | 2018-08-22 | 2018-08-22 | A kind of power cooling tower of sectional management water level |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208920893U true CN208920893U (en) | 2019-05-31 |
Family
ID=66703643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821358735.1U Active CN208920893U (en) | 2018-08-22 | 2018-08-22 | A kind of power cooling tower of sectional management water level |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208920893U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113172850A (en) * | 2021-04-27 | 2021-07-27 | 宁波宇晓包装有限公司 | Daily chemical packaging injection mold constant temperature cooling device |
-
2018
- 2018-08-22 CN CN201821358735.1U patent/CN208920893U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113172850A (en) * | 2021-04-27 | 2021-07-27 | 宁波宇晓包装有限公司 | Daily chemical packaging injection mold constant temperature cooling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203839768U (en) | Strong heat radiation distribution box | |
CN208920893U (en) | A kind of power cooling tower of sectional management water level | |
CN103411283B (en) | Water air-conditioning system coupling cooling spray device water circulation with air current cooler | |
CN103292401B (en) | Multifunctional transverse flow type heat source tower device | |
CN109838971A (en) | A kind of low-temperature storing apparatus of PVC material | |
CN105430997A (en) | Heat-pipe internal-circulation secondary refrigerant loop server cabinet heat radiation system | |
CN203657312U (en) | Cold-energy recycling device | |
CN117419499A (en) | Underground cooling water recycling device | |
CN203310303U (en) | Adjustable large-scale cooling tower air distribution system | |
CN205483620U (en) | Novel steam -jet ejector proof box | |
CN204047014U (en) | A kind of heat pipe internal-circulation type secondary refrigerant loop server cabinet cooling system | |
CN204904980U (en) | Transformer water -chilling plant | |
CN208059245U (en) | A kind of drainage apparatus of refrigerator | |
CN207751119U (en) | A kind of ultrasonic humidifier of anti-fog reflux | |
CN209731868U (en) | A kind of high-power extra-high voltage liquid cooling apparatus | |
CN209214402U (en) | A kind of air-Cooling circulating water system | |
CN208922170U (en) | A kind of computer host box convenient for heat dissipation | |
CN207880816U (en) | A kind of hybrid dead steam recovery system | |
CN201777905U (en) | Full automatic water-saving and energy-saving water distiller | |
CN202599144U (en) | Closed cooling tower | |
CN205317014U (en) | No power cycle cooling tower | |
CN212566967U (en) | Closed pure water cooling tower device | |
CN220581248U (en) | Cooling water circulation system of material pump | |
CN209689427U (en) | Convenient for the devaporizer of internal overhaul | |
CN213514601U (en) | Air-water cooling circulation system with water tank and pore plate tray |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |